Exelon Generation Company, LLC, 19302-19304 [2018-09210]
Download as PDF
19302
Federal Register / Vol. 83, No. 85 / Wednesday, May 2, 2018 / Notices
Science Board website for additional
information. Meeting information and
schedule updates (time, place, subject
matter, and status of meeting) may be
found at https://www.nsf.gov/nsb/
meetings/notices.jsp#sunshine.
Chris Blair,
Executive Assistant, National Science Board
Office.
[FR Doc. 2018–09346 Filed 4–30–18; 11:15 am]
BILLING CODE 7555–01–P
NUCLEAR REGULATORY
COMMISSION
[Docket Nos. STN 50–454, STN 50–455, STN
50–456, and STN 50–457; NRC–2018–0081]
Exelon Generation Company, LLC
Nuclear Regulatory
Commission.
ACTION: Director’s decision under 10
CFR 2.206; issuance.
AGENCY:
The U.S. Nuclear Regulatory
Commission (NRC) has issued a
director’s decision in response to a
petition dated February 8, 2017, filed by
Mr. Barry Quigley (the petitioner),
requesting that the NRC take action with
regard to Exelon Generation Company,
LLC (Exelon or the licensee). The
petitioner’s requests and the director’s
decision are included in the
SUPPLEMENTARY INFORMATION section of
this document.
DATES: The director’s decision was
issued on April 24, 2018.
ADDRESSES: Please refer to Docket ID
NRC–2018–0081 when contacting the
NRC about the availability of
information regarding this document.
You may obtain publicly-available
information related to this document
using any of the following methods:
• Federal Rulemaking Web Site: Go to
https://www.regulations.gov and search
for Docket ID NRC–2018–0081. Address
questions about NRC dockets to Jennifer
Borges; telephone: 301–287–9127;
email: Jennifer.Borges@nrc.gov. For
technical questions, contact the
individual listed in the FOR FURTHER
INFORMATION CONTACT section of this
document.
• NRC’s Agencywide Documents
Access and Management System
(ADAMS): You may obtain publiclyavailable documents online in the
ADAMS Public Documents collection at
https://www.nrc.gov/reading-rm/
adams.html. To begin the search, select
‘‘ADAMS Public Documents’’ and then
select ‘‘Begin Web-based ADAMS
Search.’’ For problems with ADAMS,
please contact the NRC’s Public
Document Room (PDR) reference staff at
daltland on DSKBBV9HB2PROD with NOTICES
SUMMARY:
VerDate Sep<11>2014
22:14 May 01, 2018
Jkt 244001
1–800–397–4209, 301–415–4737, or by
email to pdr.resource@nrc.gov. The
ADAMS accession number for each
document referenced (if it is available in
ADAMS) is provided the first time that
it is mentioned in this document. In
addition, for the convenience of the
reader, the ADAMS accession numbers
are provided in a table in the
‘‘Availability of Documents’’ section of
this document.
• NRC’s PDR: You may examine and
purchase copies of public documents at
the NRC’s PDR, Room O1–F21, One
White Flint North, 11555 Rockville
Pike, Rockville, Maryland 20852.
FOR FURTHER INFORMATION CONTACT: Joel
Wiebe, Office of Nuclear Reactor
Regulation, U.S. Nuclear Regulatory
Commission, Washington DC 20555–
0001, telephone: 301–415–6606; e-mail:
Joel.Wiebe@nrc.gov.
SUPPLEMENTARY INFORMATION: The text of
the director’s decision is attached.
Dated at Rockville, Maryland, this 26th day
of April, 2018.
For the Nuclear Regulatory Commission.
Joel S. Wiebe,
Senior Project Manager, Plant Licensing
Branch III, Division of Operating Reactor
Licensing, Office of Nuclear Reactor
Regulation.
Attachment—Director’s Decision DD-18-01
UNITED STATES OF AMERICA
NUCLEAR REGULATORY COMMISSION
OFFICE OF NUCLEAR REACTOR
REGULATION
In the Matter of Exelon Generation Company,
LLC
Braidwood Station, Unit Nos. 1 and 2
Docket Nos. STN 50-456, 50-457
License Nos. NPF-72, NPF-77
Byron Station, Unit Nos. 1 and 2
Docket Nos. STN 50-454, 50-455
License Nos. NPF-37, NPF-66
DIRECTOR’S DECISION UNDER 10 CFR
2.206
I. Introduction
By e-mail to Mr. Victor M. McCree,
Executive Director for Operations, dated
February 8, 2017 (Agencywide Documents
Access and Management System (ADAMS)
Accession No. ML17061A127), Mr. Barry
Quigley filed a petition under Title 10,
‘‘Energy,’’ of the Code of Federal Regulations
(10 CFR) 2.206, ‘‘Requests for Action under
this Subpart.’’ Attachments to the petition are
located at ADAMS Accession Nos.
ML17061A126, ML17061A125, and
ML17061A124. The petitioner requested that
the U.S. Nuclear Regulatory Commission
(NRC or the Commission) take the following
actions against Exelon Generation Company,
LLC (Exelon), the licensee for Byron Station,
PO 00000
Frm 00092
Fmt 4703
Sfmt 4703
Unit Nos. 1 and 2, and Braidwood Station,
Units 1 and 2:
1. Issue a violation under 10 CFR Part 50,
‘‘Domestic Licensing of Production and
Utilization Facilities,’’ Appendix B, ‘‘Quality
Assurance Criteria for Nuclear Power Plants
and Fuel Reprocessing Plants,’’ Criterion III,
‘‘Design Control,’’ for deficiencies in the
analysis of record (AOR) for the main steam
isolation valve (MSIV) room pressurization
following a high-energy line break (HELB).
2. Issue a violation under 10 CFR Part 50,
Appendix B, Criterion XVI, ‘‘Corrective
Action,’’ for failure to update the AOR in a
timely manner.
3. Require Exelon to show that the
consequences of the secondary missiles
resulting from MSIV room pressurization do
not have adverse consequences.
4. Issue a Demand for Information under 10
CFR 2.204, ‘‘Demand for Information,’’ to
compare and contrast the behavior of Exelon
management as described in the petition with
the NRC’s policy statement on the attributes
of a safety-conscious work environment
(SCWE).
5. Use Exelon’s response to Item 4 above
as a basis on which to determine whether to
issue a ‘‘chilling effects’’ letter.
As the basis for the request, the petitioner
stated the following:
1. (a)—Break enthalpies used in the MSIV
room pressurization AOR are actually the
thermodynamic internal energy of the steam,
not the enthalpy. Because, in the range of
interest, the internal energy is about 13
percent less than the enthalpy, the energy
flow to the areas of concern is
nonconservative.
(b)—Steam flow from secondary piping is
neglected.
2. Corrective actions to resolve an issue in
the AOR are long overdue (8 years) and
improperly tracked.
3. A proposed revision to the AOR shows
that the MSIV room roof slabs will be ejected
by the high pressures in the MSIV rooms
becoming potential missiles.
4. Management dismissed information in
the updated final safety evaluation report
(UFSAR) that supported the concerns about
the AOR as ‘‘excessive detail’’ and directed
personnel to remove the information.
Management dismissed UFSAR internal
inconsistency related to the ‘‘Break Exclusion
Zone’’ without discussion or review and
stated that the information supporting the
concern could be deleted as an UFSAR
cleanup item. Recently, there was an
operability concern for which engineering
management maintained a position of
operability in the face of conflicting
information. The information that
engineering management relied on to support
operability was demonstrably irrelevant.
The petitioner met with the Office of
Nuclear Reactor Regulation (NRR) Petition
Review Board (PRB) on April 13, 2017, to
clarify the basis for the petition. The NRC is
treating the transcript of this meeting
(ADAMS Accession No. ML17111A774) as a
supplement to the petition. In its
acknowledgement letter dated July 17, 2017
(ADAMS Accession No. ML17125A245), the
NRC informed the petitioner that Items 1, 2,
4, and 5 were accepted for review under 10
E:\FR\FM\02MYN1.SGM
02MYN1
Federal Register / Vol. 83, No. 85 / Wednesday, May 2, 2018 / Notices
daltland on DSKBBV9HB2PROD with NOTICES
CFR 2.206 and that the agency had referred
the issues in the petition to NRR for
appropriate action. This letter states that Item
3 does not request enforcement action and,
therefore, does not meet the criteria for
acceptance for review under 10 CFR 2.206.
However, the NRC informed the petitioner
that the item is likely to be resolved when
reviewing activities to address the AOR
under Item 1.
By letter dated July 26, 2017 (ADAMS
Accession No. ML17166A362), the NRC
requested that Exelon provide a voluntary
response to the petition. By letter dated
September 1, 2017 (ADAMS Accession No.
ML17255A824), Exelon provided its
voluntary response.
II. Discussion
1. Issue a violation under 10 CFR Part 50,
Appendix B, Criterion III, for deficiencies in
the AOR for the MSIV room pressurization
following an HELB.
The petitioner’s basis and the licensee’s
September 1, 2017, voluntary response letter
both identify errors in calculation 3C8-0282001, Revision 3. The licensee stated in its
voluntary response letter that calculation
3C8-0282-001 is the design-basis analysis for
the structural design of the MSIV house and
the main steam tunnel. The regulation under
10 CFR Part 50, Appendix B, Criterion III,
‘‘Design Control,’’ requires, in part, that the
licensee provide for verifying or checking the
adequacy of design, such as by the
performance of design reviews, by the use of
alternate or simplified calculational methods,
or by the performance of a suitable testing
program. The NRC Region III staff conducted
inspections at the Byron and Braidwood
Stations between October 30 and November
16, 2017. The inspectors identified that as of
October 22, 1996, and continuing through the
date of the NRC inspections, the licensee
failed to verify that Design Analysis 3C80282-001, Revision 3, which was the AOR
addressing a postulated HELB in the safetyrelated main steam safety valve (MSSV)
rooms [the petitioner and the licensee used
the label MSIV house or room], would not
cause a structural failure since it failed to
apply worst-case environmental loading. The
NRC Inspection Reports 05000454/455-2017010 for Byron Station and 05000456/4572017-008 for Braidwood Station, dated
December 15, 2017 (ADAMS Accession Nos.
ML17349A917 and ML17349A894,
respectively), each identify a non-cited
violation (NCV) of 10 CFR Part 50, Appendix
B, Criterion III, ‘‘Design Control.’’
2. Issue a violation under 10 CFR Part 50,
Appendix B, Criterion XVI, for failure to
update the AOR in a timely manner.
The petitioner’s basis states that although
the errors regarding the wrong break
enthalpies in calculation 3C8-0282-001,
Revision 3, were documented on June 30,
2008, in Issue Report 792213, ‘‘MSLB
Calc[ulation] Energy Release Error,’’ the
analysis still contains the nonconservative
break enthalpies 8 years later. Exelon’s
voluntary response letter agrees that Issue
Report 792213 for Byron Station and the
related Issue Report 792215 for Braidwood
Station were documented on June 30, 2008.
Exelon’s voluntary response letter shows that
VerDate Sep<11>2014
22:14 May 01, 2018
Jkt 244001
it issued a contract with a vendor to revise
calculation 3C8-0282-001, Revision 3, in
February 2013; 5 years after identification of
the error. In November 2013, the vendor
provided a draft copy of a revision to
calculation 3C8-0282-001 to Exelon for
review. Currently, Exelon still has the
analysis and proposed plant modifications
under review to correct the analysis.
The regulation under 10 CFR 50, Appendix
B, Criterion XVI, ‘‘Corrective Action,’’
requires, in part, that measures shall be
established to assure that conditions adverse
to quality, such as non-conformances, are
promptly identified and corrected. The NRC
Region III staff conducted inspections at the
Byron and Braidwood Stations between
October 30 and November 16, 2017. The
inspectors identified that as of the dates of
NRC inspections at Byron and Braidwood
Stations, the licensee failed to promptly
correct errors in Design Analysis
3C8-0282-001, Revision 3, for a main steam
line break in the safety-related MSSV rooms
[the petitioner and the licensee used the label
MSIV house or room] and steam tunnels that
were identified on June 30, 2008. The NRC
Inspection Reports 05000454/455-2017-010
for Byron Station and 05000456/457-2017008 for Braidwood Station, dated December
15, 2017, each identify a NCV of 10 CFR Part
50, Appendix B, Criterion XVI, ‘‘Corrective
Action.’’
3. Require Exelon to show that the
consequences of the secondary missiles
resulting from MSIV room pressurization do
not have adverse consequences.
The July 17, 2017, acknowledgement letter
informed the petitioner that this item did not
meet the criteria for review under 10 CFR
2.206 because it does not request
enforcement action, as specified in
Management Directive 8.11, ‘‘Review Process
for 10 CFR 2.206 Petitions’’ (MD 8.11).
However, the licensee and NRC have taken
action that addresses the issue raised by the
petitioner. In September 2017, the licensee
initiated operability evaluations (Operability
Evaluation 17-002, Revision 0, for Braidwood
Station and Operability Evaluation 17-001,
Revision 0, for Byron Station) to address the
consequences of secondary missiles from the
MSIV room pressurization and has
determined that no equipment safety
functions are affected by potential missiles.
During inspections conducted at Byron
Station (Inspection Reports 05000454/4552017-003 (ADAMS Accession No.
ML17306A639) and 05000454/455-2017-010)
and Braidwood Station (Inspection Reports
05000456/457-2017-003 (ADAMS Accession
No. ML17306A664) and 05000456/457-2017008), the NRC reviewed the licensee’s
revisions to the applicable operability
evaluations and did not identify any
concerns, but did identify NCVs of 10 CFR
part 50, Appendix B, Criterion III, ‘‘Design
Control,’’ for the failure to identify design
deficiencies involving secondary missiles
from the MSSV room pressurization and
NCVs of 10 CFR part 50, Appendix B,
Criterion XVI, ‘‘Corrective Action,’’ for the
failure to correct the design deficiencies.
4. Issue a ‘‘Demand for Information’’ under
10 CFR 2.204, to compare and contrast the
behavior of Exelon management as described
PO 00000
Frm 00093
Fmt 4703
Sfmt 4703
19303
in the petition with the NRC’s policy
statement on the attributes of an SCWE.
As described in the NRC Enforcement
Manual (ADAMS Accession No.
ML102630150), a demand for information
(DFI) is a formal request made to a licensee
or applicant to obtain information for the
NRC staff to determine whether an Order
should be issued to modify, suspend, or
revoke the license, or whether to take other
enforcement action. The PRB determined that
issuance of a DFI in this circumstance was
not necessary to evaluate the SCWE concerns
expressed in the petition. Consistent with
MD 8.11, the NRC’s letter dated July 26,
2017, requested that Exelon provide a
voluntary response to the concerns raised in
the petition. Exelon’s September 1, 2017,
response, in part, provided the results of its
evaluation of the SCWE at Byron Station.
Exelon’s evaluation included interviews with
Braidwood Station personnel that were
involved with the activities that the
petitioner described in the petition. The
evaluation concluded that the actions taken
and behaviors demonstrated by Exelon
management in response to the issues and
activities cited in the petition dated February
8, 2017, demonstrate a healthy SCWE.
The NRC conducted an inspection at Byron
Station that ended on August 25, 2017
(Inspection Report 05000454/455-2017-007
(ADAMS Accession No. ML17276B174) that,
in part, assessed the licensee’s SCWE at
Byron Station. Information obtained from
interviews and focus groups (including with
engineering personnel) indicated that an
environment was established where licensee
personnel felt free to raise nuclear safety
issues without fear of retaliation. Licensee
personnel were generally aware of and
familiar with the corrective action program
(CAP) and other processes, including the
Employee Concerns Program (ECP) and the
NRC’s allegation process, through which
concerns could be raised. In addition, a
review of the types of issues in the ECP
indicated that the licensee’s staff members
were appropriately using the CAP and ECP
to identify issues. The inspection did not
identify any examples where there was
retaliation for raising nuclear safety issues.
Documents regarding surveys and monitoring
of the safety culture and SCWE generally
supported the conclusions from the
interviews. The inspection did not identify
any chilling effect or impediment to the
establishment of an SCWE at Byron Station.
5. Use Exelon’s response to Item 4 above
as a basis on which to determine whether to
issue a ‘‘chilling effects’’ letter.
A chilling effect letter is a regulatory tool
identified in the NRC Allegations Manual
(ADAMS Accession No. ML17003A227) that
the NRC uses to ensure that licensees are
taking appropriate actions to foster a
workplace environment that encourages
employees to raise safety concerns and to feel
free to do so without fear of retaliation,
referred to as an SCWE. A chilling effect
letter may be appropriate when there are
indications of a chilled work environment,
but no discrimination concern has been
substantiated. Neither Exelon’s voluntary
response nor NRC’s inspection at Byron
Station, as discussed in Item 4, identified
E:\FR\FM\02MYN1.SGM
02MYN1
19304
Federal Register / Vol. 83, No. 85 / Wednesday, May 2, 2018 / Notices
evidence of a chilled environment at the
Byron Station.
III. Conclusion
The NRC staff conducted inspections at the
Byron Station and Braidwood Station that
assessed the licensee’s compliance with the
regulations under 10 CFR part 50, Appendix
B, Criterion III, ‘‘Design Control,’’ and
Criterion XVI, ‘‘Corrective Action,’’ related to
the adequacy of the AOR for the structural
design of the MSIV house and the main
steam tunnel, and took enforcement action as
outlined in the inspection reports identified
above. The NRC staff requested that the
licensee evaluate the SCWE concerns
expressed in the petition, and conducted an
inspection that assessed the licensee’s SCWE
at Byron Station. Based on the licensee’s
voluntary response and the results of the
inspection, the NRC staff did not identify
challenges to the licensee’s SCWE or
evidence of a chilled environment at the
Byron Station and, therefore, determined that
issuance of a chilling effect letter was not
warranted. Because these actions address the
underlying concerns raised in requests 1, 2,
4, and 5 of the petition, the petition is
granted in part.
As provided in 10 CFR 2.206(c), a copy of
this director’s decision will be filed with the
Secretary of the Commission for review. As
provided by this regulation, the decision will
constitute the final action of the Commission
25 days after the date of the decision unless
the Commission, on its own motion,
institutes a review of the decision within that
time.
Dated at Rockville, Maryland, this 24th day
of April, 2018.
For the Nuclear Regulatory Commission.
Brian E. Holian,
Acting Director, Office of Nuclear Reactor
Regulation.
[FR Doc. 2018–09210 Filed 5–1–18; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[Docket Nos. 50–250 and 50–251; NRC–
2018–0074]
Florida Power & Light Company;
Turkey Point Nuclear Generating, Unit
Nos. 3 and 4
Nuclear Regulatory
Commission.
ACTION: License renewal application;
opportunity to request a hearing and to
petition for leave to intervene.
AGENCY:
The U.S. Nuclear Regulatory
Commission (NRC) is considering an
application for the subsequent license
renewal of Renewed Facility Operating
License Nos. DPR–31 and DPR–41,
which authorize Florida Power & Light
Company (FPL or the applicant) to
operate Turkey Point Nuclear
Generating Unit Nos. 3 and 4 (Turkey
daltland on DSKBBV9HB2PROD with NOTICES
SUMMARY:
VerDate Sep<11>2014
22:14 May 01, 2018
Jkt 244001
Point). The renewed licenses would
authorize the applicant to operate
Turkey Point for an additional 20 years
beyond the period specified in each of
the current renewed licenses. The
current renewed operating licenses for
Turkey Point expire as follows: Unit No.
3 on July 19, 2032, and Unit No. 4 on
April 10, 2033.
DATES: A request for a hearing or
petition for leave to intervene must be
filed July 2, 2018.
ADDRESSES: Please refer to Docket ID
NRC–2018–0074 when contacting the
NRC about the availability of
information regarding this document.
You may obtain publicly-available
information related to this document
using any of the following methods:
• Federal Rulemaking website: Go to
https://www.regulations.gov and search
for Docket ID NRC–2018–0074. Address
questions about NRC dockets to Jennifer
Borges; telephone: 301–287–9127;
email: Jennifer.Borges@nrc.gov. For
technical questions, contact the
individual listed in the FOR FURTHER
INFORMATION CONTACT section of this
document.
• NRC’s Agencywide Documents
Access and Management System
(ADAMS): You may obtain publiclyavailable documents online in the
ADAMS Public Documents collection at
https://www.nrc.gov/reading-rm/
adams.html. To begin the search, select
‘‘ADAMS Public Documents’’ and then
select ‘‘Begin Web-based ADAMS
Search.’’ For problems with ADAMS,
please contact the NRC’s Public
Document Room (PDR) reference staff at
1–800–397–4209, 301–415–4737, or by
email to pdr.resource@nrc.gov. The
ADAMS accession number for each
document referenced (if it is available in
ADAMS) is provided the first time that
it is mentioned in this document.
• NRC’s PDR: You may examine and
purchase copies of public documents at
the NRC’s PDR, Room O1–F21, One
White Flint North, 11555 Rockville
Pike, Rockville, Maryland 20852.
FOR FURTHER INFORMATION CONTACT: Lois
M. James, Office of Nuclear Reactor
Regulation, U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
0001; telephone: 301–415–3306, email:
Lois.James@nrc.gov.
SUPPLEMENTARY INFORMATION:
I. Introduction
By letters dated January 30, 2018
(ADAMS Package Accession No.
ML18037A812); February 9, 2018
(ADAMS Accession No. ML18044A653);
February 16, 2018 (ADAMS Package
Accession No. ML18053A123); March 1,
2018 (ADAMS Package Accession No.
PO 00000
Frm 00094
Fmt 4703
Sfmt 4703
ML18072A224), and April 10, 2018
(ADAMS Package Accession No.
ML18102A521 and Accession No.
ML18113A132), the NRC received an
application from FPL, filed pursuant to
Section 103 of the Atomic Energy Act of
1954, as amended (the Act), and part 54
of title 10 of the Code of Federal
Regulations (10 CFR), to renew the
operating licenses for Turkey Point at
2,644 megawatt thermal each. The
Turkey Point units are pressurizedwater reactors designed by
Westinghouse Electric Company and are
located in Homestead, Miami-Dade
County, Florida. A notice of receipt of
the subsequent license renewal
application (SLRA) was published in
the Federal Register (FR) on April 18,
2018 (83 FR 17196).
The NRC staff has determined that
FPL has submitted sufficient
information in accordance with 10 CFR
54.19, 54.21, 54.22, 54.23, 51.45, and
51.53(c), to enable the staff to undertake
a review of the application, and that the
application is, therefore, acceptable for
docketing. The current Docket Nos. 50–
250 and 50–251 for Renewed Facility
Operating License Nos. DPR–31 and
DPR–41, respectively, will be retained.
The determination to accept the SLRA
for docketing does not constitute a
determination that a subsequent
renewed license should be issued, and
does not preclude the NRC staff from
requesting additional information as the
review proceeds.
Before issuance of the requested
subsequent renewed licenses, the NRC
will have made the findings required by
the Act, and the Commission’s rules and
regulations. In accordance with 10 CFR
54.29, the NRC may issue a subsequent
renewed license on the basis of its
review if it finds that actions have been
identified and have been or will be
taken with respect to: (1) Managing the
effects of aging during the period of
extended operation on the functionality
of structures and components that have
been identified as requiring aging
management review; and (2) timelimited aging analyses that have been
identified as requiring review, such that
there is reasonable assurance that the
activities authorized by the renewed
licenses will continue to be conducted
in accordance with the current licensing
basis and that any changes made to the
plant’s current licensing basis will
comply with the Act and the
Commission’s regulations.
Additionally, in accordance with 10
CFR 51.95(c), the NRC will prepare an
environmental impact statement as a
supplement to the Commission’s
NUREG–1437, ‘‘Generic Environmental
Impact Statement for License Renewal
E:\FR\FM\02MYN1.SGM
02MYN1
Agencies
[Federal Register Volume 83, Number 85 (Wednesday, May 2, 2018)]
[Notices]
[Pages 19302-19304]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-09210]
=======================================================================
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket Nos. STN 50-454, STN 50-455, STN 50-456, and STN 50-457; NRC-
2018-0081]
Exelon Generation Company, LLC
AGENCY: Nuclear Regulatory Commission.
ACTION: Director's decision under 10 CFR 2.206; issuance.
-----------------------------------------------------------------------
SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) has issued a
director's decision in response to a petition dated February 8, 2017,
filed by Mr. Barry Quigley (the petitioner), requesting that the NRC
take action with regard to Exelon Generation Company, LLC (Exelon or
the licensee). The petitioner's requests and the director's decision
are included in the SUPPLEMENTARY INFORMATION section of this document.
DATES: The director's decision was issued on April 24, 2018.
ADDRESSES: Please refer to Docket ID NRC-2018-0081 when contacting the
NRC about the availability of information regarding this document. You
may obtain publicly[dash]available information related to this document
using any of the following methods:
Federal Rulemaking Web Site: Go to https://www.regulations.gov and search for Docket ID NRC-2018-0081. Address
questions about NRC dockets to Jennifer Borges; telephone: 301-287-
9127; email: [email protected]. For technical questions, contact
the individual listed in the FOR FURTHER INFORMATION CONTACT section of
this document.
NRC's Agencywide Documents Access and Management System
(ADAMS): You may obtain publicly-available documents online in the
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS,
please contact the NRC's Public Document Room (PDR) reference staff at
1-800-397-4209, 301-415-4737, or by email to [email protected]. The
ADAMS accession number for each document referenced (if it is available
in ADAMS) is provided the first time that it is mentioned in this
document. In addition, for the convenience of the reader, the ADAMS
accession numbers are provided in a table in the ``Availability of
Documents'' section of this document.
NRC's PDR: You may examine and purchase copies of public
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555
Rockville Pike, Rockville, Maryland 20852.
FOR FURTHER INFORMATION CONTACT: Joel Wiebe, Office of Nuclear Reactor
Regulation, U.S. Nuclear Regulatory Commission, Washington DC 20555-
0001, telephone: 301-415-6606; e-mail: [email protected].
SUPPLEMENTARY INFORMATION: The text of the director's decision is
attached.
Dated at Rockville, Maryland, this 26th day of April, 2018.
For the Nuclear Regulatory Commission.
Joel S. Wiebe,
Senior Project Manager, Plant Licensing Branch III, Division of
Operating Reactor Licensing, Office of Nuclear Reactor Regulation.
Attachment--Director's Decision DD-18-01
UNITED STATES OF AMERICA
NUCLEAR REGULATORY COMMISSION
OFFICE OF NUCLEAR REACTOR REGULATION
In the Matter of Exelon Generation Company, LLC
Braidwood Station, Unit Nos. 1 and 2
Docket Nos. STN 50[dash]456, 50[dash]457
License Nos. NPF[dash]72, NPF[dash]77
Byron Station, Unit Nos. 1 and 2
Docket Nos. STN 50[dash]454, 50[dash]455
License Nos. NPF[dash]37, NPF[dash]66
DIRECTOR'S DECISION UNDER 10 CFR 2.206
I. Introduction
By e[dash]mail to Mr. Victor M. McCree, Executive Director for
Operations, dated February 8, 2017 (Agencywide Documents Access and
Management System (ADAMS) Accession No. ML17061A127), Mr. Barry
Quigley filed a petition under Title 10, ``Energy,'' of the Code of
Federal Regulations (10 CFR) 2.206, ``Requests for Action under this
Subpart.'' Attachments to the petition are located at ADAMS
Accession Nos. ML17061A126, ML17061A125, and ML17061A124. The
petitioner requested that the U.S. Nuclear Regulatory Commission
(NRC or the Commission) take the following actions against Exelon
Generation Company, LLC (Exelon), the licensee for Byron Station,
Unit Nos. 1 and 2, and Braidwood Station, Units 1 and 2:
1. Issue a violation under 10 CFR Part 50, ``Domestic Licensing
of Production and Utilization Facilities,'' Appendix B, ``Quality
Assurance Criteria for Nuclear Power Plants and Fuel Reprocessing
Plants,'' Criterion III, ``Design Control,'' for deficiencies in the
analysis of record (AOR) for the main steam isolation valve (MSIV)
room pressurization following a high-energy line break (HELB).
2. Issue a violation under 10 CFR Part 50, Appendix B, Criterion
XVI, ``Corrective Action,'' for failure to update the AOR in a
timely manner.
3. Require Exelon to show that the consequences of the secondary
missiles resulting from MSIV room pressurization do not have adverse
consequences.
4. Issue a Demand for Information under 10 CFR 2.204, ``Demand
for Information,'' to compare and contrast the behavior of Exelon
management as described in the petition with the NRC's policy
statement on the attributes of a safety-conscious work environment
(SCWE).
5. Use Exelon's response to Item 4 above as a basis on which to
determine whether to issue a ``chilling effects'' letter.
As the basis for the request, the petitioner stated the
following:
1. (a)--Break enthalpies used in the MSIV room pressurization
AOR are actually the thermodynamic internal energy of the steam, not
the enthalpy. Because, in the range of interest, the internal energy
is about 13 percent less than the enthalpy, the energy flow to the
areas of concern is nonconservative.
(b)--Steam flow from secondary piping is neglected.
2. Corrective actions to resolve an issue in the AOR are long
overdue (8 years) and improperly tracked.
3. A proposed revision to the AOR shows that the MSIV room roof
slabs will be ejected by the high pressures in the MSIV rooms
becoming potential missiles.
4. Management dismissed information in the updated final safety
evaluation report (UFSAR) that supported the concerns about the AOR
as ``excessive detail'' and directed personnel to remove the
information. Management dismissed UFSAR internal inconsistency
related to the ``Break Exclusion Zone'' without discussion or review
and stated that the information supporting the concern could be
deleted as an UFSAR cleanup item. Recently, there was an operability
concern for which engineering management maintained a position of
operability in the face of conflicting information. The information
that engineering management relied on to support operability was
demonstrably irrelevant.
The petitioner met with the Office of Nuclear Reactor Regulation
(NRR) Petition Review Board (PRB) on April 13, 2017, to clarify the
basis for the petition. The NRC is treating the transcript of this
meeting (ADAMS Accession No. ML17111A774) as a supplement to the
petition. In its acknowledgement letter dated July 17, 2017 (ADAMS
Accession No. ML17125A245), the NRC informed the petitioner that
Items 1, 2, 4, and 5 were accepted for review under 10
[[Page 19303]]
CFR 2.206 and that the agency had referred the issues in the
petition to NRR for appropriate action. This letter states that Item
3 does not request enforcement action and, therefore, does not meet
the criteria for acceptance for review under 10 CFR 2.206. However,
the NRC informed the petitioner that the item is likely to be
resolved when reviewing activities to address the AOR under Item 1.
By letter dated July 26, 2017 (ADAMS Accession No. ML17166A362),
the NRC requested that Exelon provide a voluntary response to the
petition. By letter dated September 1, 2017 (ADAMS Accession No.
ML17255A824), Exelon provided its voluntary response.
II. Discussion
1. Issue a violation under 10 CFR Part 50, Appendix B, Criterion
III, for deficiencies in the AOR for the MSIV room pressurization
following an HELB.
The petitioner's basis and the licensee's September 1, 2017,
voluntary response letter both identify errors in calculation 3C8-
0282-001, Revision 3. The licensee stated in its voluntary response
letter that calculation 3C8-0282-001 is the design-basis analysis
for the structural design of the MSIV house and the main steam
tunnel. The regulation under 10 CFR Part 50, Appendix B, Criterion
III, ``Design Control,'' requires, in part, that the licensee
provide for verifying or checking the adequacy of design, such as by
the performance of design reviews, by the use of alternate or
simplified calculational methods, or by the performance of a
suitable testing program. The NRC Region III staff conducted
inspections at the Byron and Braidwood Stations between October 30
and November 16, 2017. The inspectors identified that as of October
22, 1996, and continuing through the date of the NRC inspections,
the licensee failed to verify that Design Analysis 3C8-0282-001,
Revision 3, which was the AOR addressing a postulated HELB in the
safety-related main steam safety valve (MSSV) rooms [the petitioner
and the licensee used the label MSIV house or room], would not cause
a structural failure since it failed to apply worst-case
environmental loading. The NRC Inspection Reports 05000454/455-2017-
010 for Byron Station and 05000456/457-2017-008 for Braidwood
Station, dated December 15, 2017 (ADAMS Accession Nos. ML17349A917
and ML17349A894, respectively), each identify a non-cited violation
(NCV) of 10 CFR Part 50, Appendix B, Criterion III, ``Design
Control.''
2. Issue a violation under 10 CFR Part 50, Appendix B, Criterion
XVI, for failure to update the AOR in a timely manner.
The petitioner's basis states that although the errors regarding
the wrong break enthalpies in calculation 3C8-0282-001, Revision 3,
were documented on June 30, 2008, in Issue Report 792213, ``MSLB
Calc[ulation] Energy Release Error,'' the analysis still contains
the nonconservative break enthalpies 8 years later. Exelon's
voluntary response letter agrees that Issue Report 792213 for Byron
Station and the related Issue Report 792215 for Braidwood Station
were documented on June 30, 2008. Exelon's voluntary response letter
shows that it issued a contract with a vendor to revise calculation
3C8-0282-001, Revision 3, in February 2013; 5 years after
identification of the error. In November 2013, the vendor provided a
draft copy of a revision to calculation 3C8-0282-001 to Exelon for
review. Currently, Exelon still has the analysis and proposed plant
modifications under review to correct the analysis.
The regulation under 10 CFR 50, Appendix B, Criterion XVI,
``Corrective Action,'' requires, in part, that measures shall be
established to assure that conditions adverse to quality, such as
non-conformances, are promptly identified and corrected. The NRC
Region III staff conducted inspections at the Byron and Braidwood
Stations between October 30 and November 16, 2017. The inspectors
identified that as of the dates of NRC inspections at Byron and
Braidwood Stations, the licensee failed to promptly correct errors
in Design Analysis 3C8[dash]0282[dash]001, Revision 3, for a main
steam line break in the safety-related MSSV rooms [the petitioner
and the licensee used the label MSIV house or room] and steam
tunnels that were identified on June 30, 2008. The NRC Inspection
Reports 05000454/455-2017-010 for Byron Station and 05000456/457-
2017-008 for Braidwood Station, dated December 15, 2017, each
identify a NCV of 10 CFR Part 50, Appendix B, Criterion XVI,
``Corrective Action.''
3. Require Exelon to show that the consequences of the secondary
missiles resulting from MSIV room pressurization do not have adverse
consequences.
The July 17, 2017, acknowledgement letter informed the
petitioner that this item did not meet the criteria for review under
10 CFR 2.206 because it does not request enforcement action, as
specified in Management Directive 8.11, ``Review Process for 10 CFR
2.206 Petitions'' (MD 8.11). However, the licensee and NRC have
taken action that addresses the issue raised by the petitioner. In
September 2017, the licensee initiated operability evaluations
(Operability Evaluation 17-002, Revision 0, for Braidwood Station
and Operability Evaluation 17-001, Revision 0, for Byron Station) to
address the consequences of secondary missiles from the MSIV room
pressurization and has determined that no equipment safety functions
are affected by potential missiles. During inspections conducted at
Byron Station (Inspection Reports 05000454/455-2017-003 (ADAMS
Accession No. ML17306A639) and 05000454/455-2017-010) and Braidwood
Station (Inspection Reports 05000456/457-2017-003 (ADAMS Accession
No. ML17306A664) and 05000456/457-2017-008), the NRC reviewed the
licensee's revisions to the applicable operability evaluations and
did not identify any concerns, but did identify NCVs of 10 CFR part
50, Appendix B, Criterion III, ``Design Control,'' for the failure
to identify design deficiencies involving secondary missiles from
the MSSV room pressurization and NCVs of 10 CFR part 50, Appendix B,
Criterion XVI, ``Corrective Action,'' for the failure to correct the
design deficiencies.
4. Issue a ``Demand for Information'' under 10 CFR 2.204, to
compare and contrast the behavior of Exelon management as described
in the petition with the NRC's policy statement on the attributes of
an SCWE.
As described in the NRC Enforcement Manual (ADAMS Accession No.
ML102630150), a demand for information (DFI) is a formal request
made to a licensee or applicant to obtain information for the NRC
staff to determine whether an Order should be issued to modify,
suspend, or revoke the license, or whether to take other enforcement
action. The PRB determined that issuance of a DFI in this
circumstance was not necessary to evaluate the SCWE concerns
expressed in the petition. Consistent with MD 8.11, the NRC's letter
dated July 26, 2017, requested that Exelon provide a voluntary
response to the concerns raised in the petition. Exelon's September
1, 2017, response, in part, provided the results of its evaluation
of the SCWE at Byron Station. Exelon's evaluation included
interviews with Braidwood Station personnel that were involved with
the activities that the petitioner described in the petition. The
evaluation concluded that the actions taken and behaviors
demonstrated by Exelon management in response to the issues and
activities cited in the petition dated February 8, 2017, demonstrate
a healthy SCWE.
The NRC conducted an inspection at Byron Station that ended on
August 25, 2017 (Inspection Report 05000454/455-2017-007 (ADAMS
Accession No. ML17276B174) that, in part, assessed the licensee's
SCWE at Byron Station. Information obtained from interviews and
focus groups (including with engineering personnel) indicated that
an environment was established where licensee personnel felt free to
raise nuclear safety issues without fear of retaliation. Licensee
personnel were generally aware of and familiar with the corrective
action program (CAP) and other processes, including the Employee
Concerns Program (ECP) and the NRC's allegation process, through
which concerns could be raised. In addition, a review of the types
of issues in the ECP indicated that the licensee's staff members
were appropriately using the CAP and ECP to identify issues. The
inspection did not identify any examples where there was retaliation
for raising nuclear safety issues. Documents regarding surveys and
monitoring of the safety culture and SCWE generally supported the
conclusions from the interviews. The inspection did not identify any
chilling effect or impediment to the establishment of an SCWE at
Byron Station.
5. Use Exelon's response to Item 4 above as a basis on which to
determine whether to issue a ``chilling effects'' letter.
A chilling effect letter is a regulatory tool identified in the
NRC Allegations Manual (ADAMS Accession No. ML17003A227) that the
NRC uses to ensure that licensees are taking appropriate actions to
foster a workplace environment that encourages employees to raise
safety concerns and to feel free to do so without fear of
retaliation, referred to as an SCWE. A chilling effect letter may be
appropriate when there are indications of a chilled work
environment, but no discrimination concern has been substantiated.
Neither Exelon's voluntary response nor NRC's inspection at Byron
Station, as discussed in Item 4, identified
[[Page 19304]]
evidence of a chilled environment at the Byron Station.
III. Conclusion
The NRC staff conducted inspections at the Byron Station and
Braidwood Station that assessed the licensee's compliance with the
regulations under 10 CFR part 50, Appendix B, Criterion III,
``Design Control,'' and Criterion XVI, ``Corrective Action,''
related to the adequacy of the AOR for the structural design of the
MSIV house and the main steam tunnel, and took enforcement action as
outlined in the inspection reports identified above. The NRC staff
requested that the licensee evaluate the SCWE concerns expressed in
the petition, and conducted an inspection that assessed the
licensee's SCWE at Byron Station. Based on the licensee's voluntary
response and the results of the inspection, the NRC staff did not
identify challenges to the licensee's SCWE or evidence of a chilled
environment at the Byron Station and, therefore, determined that
issuance of a chilling effect letter was not warranted. Because
these actions address the underlying concerns raised in requests 1,
2, 4, and 5 of the petition, the petition is granted in part.
As provided in 10 CFR 2.206(c), a copy of this director's
decision will be filed with the Secretary of the Commission for
review. As provided by this regulation, the decision will constitute
the final action of the Commission 25 days after the date of the
decision unless the Commission, on its own motion, institutes a
review of the decision within that time.
Dated at Rockville, Maryland, this 24th day of April, 2018.
For the Nuclear Regulatory Commission.
Brian E. Holian,
Acting Director, Office of Nuclear Reactor Regulation.
[FR Doc. 2018-09210 Filed 5-1-18; 8:45 am]