Drawbridge Operation Regulation; Atlantic Intracoastal Waterway, Boca Raton, FL, 18415 [2018-08867]
Download as PDF
Federal Register / Vol. 83, No. 82 / Friday, April 27, 2018 / Rules and Regulations
impact caused by the temporary
deviation.
In accordance with 33 CFR 117.35(e),
the drawbridge must return to its regular
operating schedule immediately at the
end of the effective period of this
temporary deviation. This deviation
from the operating regulations is
authorized under 33 CFR 117.35.
II. Public Participation and Request for
Comments
We view public participation as
essential to effective rulemaking, and
will consider all comments and material
received during the comment period.
Your comment can help shape the
outcome of this rulemaking. If you
submit a comment, please include the
docket number for this rulemaking,
indicate the specific section of this
document to which each comment
applies, and provide a reason for each
suggestion or recommendation.
We encourage you to submit
comments through the Federal
eRulemaking Portal at https://
www.regulations.gov. If your material
cannot be submitted using https://
www.regulations.gov, contact the person
in the FOR FURTHER INFORMATION
CONTACT section of this document for
alternate instructions.
We accept anonymous comments. All
comments received will be posted
without change to https://
www.regulations.gov and will include
any personal information you have
provided. For more about privacy and
the docket, visit https://
www.regulations.gov/privacynotice.
Documents mentioned in this notice
as being available in this docket and all
public comments, will be in our online
docket at https://www.regulations.gov
and can be viewed by following that
website’s instructions. Additionally, if
you go to the online docket and sign up
for email alerts, you will be notified
when comments are posted or a final
rule is published.
Dated: April 23, 2018.
Barry L. Dragon,
Director, Bridge Branch, Seventh Coast Guard
District.
jstallworth on DSKBBY8HB2PROD with RULES
[FR Doc. 2018–08866 Filed 4–26–18; 8:45 am]
BILLING CODE 9110–04–P
VerDate Sep<11>2014
13:07 Apr 26, 2018
Jkt 244001
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2018–0356]
Drawbridge Operation Regulation;
Atlantic Intracoastal Waterway, Boca
Raton, FL
Coast Guard, DHS.
Notice of deviation from
drawbridge regulation.
AGENCY:
ACTION:
The Coast Guard has issued a
temporary deviation from the operating
schedule that governs the Camino Real
(Boca Club) Bridge across the Atlantic
Intracoastal Waterway, mile 1048.2, at
Boca Raton, FL. The deviation is
necessary to facilitate the bridge
rehabilitation project. This deviation
allows the bridge single-leaf operations
with advanced notice for a full bridge
opening.
DATES: This deviation is effective
without actual notice from April 27,
2018 through 7 p.m. on October 9, 2018.
For the purposes of enforcement, actual
notice will be used from 7 a.m. on April
23, 2018, until April 27, 2018.
ADDRESSES: The docket for this
deviation, USCG–2018–0356 is available
at https://www.regulations.gov. Type the
docket number in the ‘‘SEARCH’’ box
and click ‘‘SEARCH’’. Click on Open
Docket Folder on the line associated
with this deviation.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this temporary
deviation, call or email LT Ruth
Sadowitz, U.S. Coast Guard Sector
Miami, Waterways Management
Division; telephone 305–535–4307,
email ruth.a.sadowitz@uscg.mil.
SUPPLEMENTARY INFORMATION: Kiewit
Infrastructure South Co., on behalf of
the bridge owner, Palm Beach County,
has requested a temporary deviation
from the current operating regulation
that governs the Camino Real (Boca
Club) Bridge across the Atlantic
Intracoastal Waterway, mile 1048.2, at
Boca Raton, FL. The deviation is
necessary to facilitate the bridge
rehabilitation project. The existing
bridge is a double-leaf bascule bridge
with a vertical clearance of 10 feet at
mean high water in the closed to
navigation position and a horizontal
clearance of 83 feet between the fender
system.
The existing bridge operating
regulation is set out in 33 CFR
117.261(aa–1). Under this temporary
deviation, on April 23, 2018 through
SUMMARY:
PO 00000
Frm 00017
Fmt 4700
Sfmt 4700
18415
October 9, 2018, from 7 a.m. to 7 p.m.
Monday through Saturday, the bridge
will operate on single-leaf openings
with a 6-hour advanced notice for a full
opening. During non-working hours, the
bridge will operate per the normal
bridge operating schedule.
The Atlantic Intracoastal Waterway is
used by a variety of vessels including
U.S. government vessels, small
commercial vessels, recreational vessels
and tugs and barge traffic. The Coast
Guard has carefully considered the
restrictions with waterway users in
publishing this temporary deviation.
Vessels able to pass through the
bridge in the closed position may do so
at any time. The bridge will not be able
to provide a full opening for
emergencies and there is no immediate
alternate route for vessels to pass. The
Coast Guard will also inform the users
of the waterways through our Local and
Broadcast Notices to Mariners of the
change in operating schedule for the
bridge so that vessel operators can
arrange their transits to minimize any
impact caused by the temporary
deviation.
In accordance with 33 CFR 117.35(e),
the drawbridge must return to its regular
operating schedule immediately at the
end of the effective period of this
temporary deviation. This deviation
from the operating regulations is
authorized under 33 CFR 117.35.
Dated: April 23, 2018.
Barry L. Dragon,
Director, Bridge Branch, Seventh Coast Guard
District.
[FR Doc. 2018–08867 Filed 4–26–18; 8:45 am]
BILLING CODE 9110–04–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 165
[Docket Number USCG–2018–0198]
RIN 1625–AA00
Safety Zones; Recurring Safety Zones
in Captain of the Port Sault Sainte
Marie Zone
Coast Guard, DHS.
Final rule.
AGENCY:
ACTION:
The Coast Guard is updating
its recurring safety zones regulations in
the Captain of the Port Sault Sainte
Marie Zone. This rule updates eighteen
safety zone locations, dates, and sizes,
adds three safety zones, removes two
established safety zones, and reformats
the regulations into an easier to read
SUMMARY:
E:\FR\FM\27APR1.SGM
27APR1
Agencies
[Federal Register Volume 83, Number 82 (Friday, April 27, 2018)]
[Rules and Regulations]
[Page 18415]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-08867]
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG-2018-0356]
Drawbridge Operation Regulation; Atlantic Intracoastal Waterway,
Boca Raton, FL
AGENCY: Coast Guard, DHS.
ACTION: Notice of deviation from drawbridge regulation.
-----------------------------------------------------------------------
SUMMARY: The Coast Guard has issued a temporary deviation from the
operating schedule that governs the Camino Real (Boca Club) Bridge
across the Atlantic Intracoastal Waterway, mile 1048.2, at Boca Raton,
FL. The deviation is necessary to facilitate the bridge rehabilitation
project. This deviation allows the bridge single-leaf operations with
advanced notice for a full bridge opening.
DATES: This deviation is effective without actual notice from April 27,
2018 through 7 p.m. on October 9, 2018. For the purposes of
enforcement, actual notice will be used from 7 a.m. on April 23, 2018,
until April 27, 2018.
ADDRESSES: The docket for this deviation, USCG-2018-0356 is available
at https://www.regulations.gov. Type the docket number in the ``SEARCH''
box and click ``SEARCH''. Click on Open Docket Folder on the line
associated with this deviation.
FOR FURTHER INFORMATION CONTACT: If you have questions on this
temporary deviation, call or email LT Ruth Sadowitz, U.S. Coast Guard
Sector Miami, Waterways Management Division; telephone 305-535-4307,
email [email protected].
SUPPLEMENTARY INFORMATION: Kiewit Infrastructure South Co., on behalf
of the bridge owner, Palm Beach County, has requested a temporary
deviation from the current operating regulation that governs the Camino
Real (Boca Club) Bridge across the Atlantic Intracoastal Waterway, mile
1048.2, at Boca Raton, FL. The deviation is necessary to facilitate the
bridge rehabilitation project. The existing bridge is a double-leaf
bascule bridge with a vertical clearance of 10 feet at mean high water
in the closed to navigation position and a horizontal clearance of 83
feet between the fender system.
The existing bridge operating regulation is set out in 33 CFR
117.261(aa-1). Under this temporary deviation, on April 23, 2018
through October 9, 2018, from 7 a.m. to 7 p.m. Monday through Saturday,
the bridge will operate on single-leaf openings with a 6-hour advanced
notice for a full opening. During non-working hours, the bridge will
operate per the normal bridge operating schedule.
The Atlantic Intracoastal Waterway is used by a variety of vessels
including U.S. government vessels, small commercial vessels,
recreational vessels and tugs and barge traffic. The Coast Guard has
carefully considered the restrictions with waterway users in publishing
this temporary deviation.
Vessels able to pass through the bridge in the closed position may
do so at any time. The bridge will not be able to provide a full
opening for emergencies and there is no immediate alternate route for
vessels to pass. The Coast Guard will also inform the users of the
waterways through our Local and Broadcast Notices to Mariners of the
change in operating schedule for the bridge so that vessel operators
can arrange their transits to minimize any impact caused by the
temporary deviation.
In accordance with 33 CFR 117.35(e), the drawbridge must return to
its regular operating schedule immediately at the end of the effective
period of this temporary deviation. This deviation from the operating
regulations is authorized under 33 CFR 117.35.
Dated: April 23, 2018.
Barry L. Dragon,
Director, Bridge Branch, Seventh Coast Guard District.
[FR Doc. 2018-08867 Filed 4-26-18; 8:45 am]
BILLING CODE 9110-04-P