Combined Notice of Filings #1, 18548-18549 [2018-08832]
Download as PDF
daltland on DSKBBV9HB2PROD with NOTICES
18548
Federal Register / Vol. 83, No. 82 / Friday, April 27, 2018 / Notices
Corporation (Complainant) filed a
formal complaint (complaint) against
Colonial Pipeline Company
(Respondent) alleging that the rates
charged in Colonial’s FERC Tariff No.
99.36.0 and predecessor tariffs are
unjust and unreasonable under sections
1(5), 6, 8, 9, 13, 15 and 16 of the
Interstate Commerce Act,3 all as more
fully explained in the complaint.
Complainant states that a copy of the
complaint was served on the contacts
for Respondent listed on the
Commission’s list of Corporate Officials.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. The Respondent’s answer
and all interventions, or protests must
be filed on or before the comment date.
The Respondent’s answer, motions to
intervene, and protests must be served
on the Complainants.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
eFiling link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the eLibrary
link and is available for electronic
review in the Commission’s Public
Reference Room in Washington, DC.
There is an eSubscription link on the
website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on May 21, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–08862 Filed 4–26–18; 8:45 am]
BILLING CODE 6717–01–P
3 49
U.S.C. App. 1(5), 6, 8, 9, 13, 15 and 16.
VerDate Sep<11>2014
18:18 Apr 26, 2018
Jkt 244001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC18–51–000.
Applicants: MDU Resources Group,
Inc.
Description: Second Supplement to
January 31, 2018 Application [Revised
Exhibit N] for Authorization Under
Section 203 of the Federal Power Act of
MDU Resources Group, Inc.
Filed Date: 4/20/18.
Accession Number: 20180420–5055.
Comments Due: 5 p.m. ET 5/11/18.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–2607–005;
ER10–2626–004.
Applicants: Old Dominion Electric
Cooperative, TEC Trading, Inc.
Description: Notice of Change in
Status of the ODEC Entities.
Filed Date: 4/19/18.
Accession Number: 20180419–5294.
Comments Due: 5 p.m. ET 5/10/18.
Docket Numbers: ER10–3028–003.
Applicants: Elk Hills Power, LLC.
Description: Supplement to March 8,
2018 Notice of Non-Material Change in
Status of Elk Hills Power, LLC.
Filed Date: 4/20/18.
Accession Number: 20180420–5155.
Comments Due: 5 p.m. ET 5/11/18.
Docket Numbers: ER17–428–004.
Applicants: Southwest Power Pool,
Inc.
Description: Compliance filing:
Missouri River Energy Services Member
Formula Rate (Vermillion) Compliance
to be effective 2/1/2017.
Filed Date: 4/19/18.
Accession Number: 20180419–5208.
Comments Due: 5 p.m. ET 5/10/18.
Docket Numbers: ER18–1403–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing: 3399
Basin Electric and MidAmerican Energy
Attachment AO to be effective 4/1/2018.
Filed Date: 4/20/18.
Accession Number: 20180420–5009.
Comments Due: 5 p.m. ET 5/11/18.
Docket Numbers: ER18–1404–000.
Applicants: NS Power Energy
Marketing Inc.
Description: Baseline eTariff Filing:
Application for Market-Based Rate
Authority to be effective 6/20/2018.
Filed Date: 4/20/18.
Accession Number: 20180420–5011.
PO 00000
Frm 00048
Fmt 4703
Sfmt 4703
Comments Due: 5 p.m. ET 5/11/18.
Docket Numbers: ER18–1405–000.
Applicants: Public Service Company
of Oklahoma.
Description: § 205(d) Rate Filing:
PSO–AEPOTC–WFEC Roosevelt-Steed
DPA Amend & Restated to be effective
3/20/2018.
Filed Date: 4/20/18.
Accession Number: 20180420–5032.
Comments Due: 5 p.m. ET 5/11/18.
Docket Numbers: ER18–1406–000.
Applicants: Florida Power & Light
Company.
Description: § 205(d) Rate Filing: FPL
Amendments to LCEC Rate Schedule
No. 317 to be effective 1/1/2017.
Filed Date: 4/20/18.
Accession Number: 20180420–5093.
Comments Due: 5 p.m. ET 5/11/18.
Docket Numbers: ER18–1407–000.
Applicants: Florida Power & Light
Company.
Description: § 205(d) Rate Filing: FPL
Amendments to FKEC Rate Schedule
No. 322 to be effective 1/1/2017.
Filed Date: 4/20/18.
Accession Number: 20180420–5095.
Comments Due: 5 p.m. ET 5/11/18.
Docket Numbers: ER18–1408–000.
Applicants: New York Independent
System Operator, Inc.
Description: § 205(d) Rate Filing:
Amendments related to solar energy
forecasting for the NYCA to be effective
6/20/2018.
Filed Date: 4/20/18.
Accession Number: 20180420–5148.
Comments Due: 5 p.m. ET 5/11/18.
Docket Numbers: ER18–1409–000.
Applicants: MidAmerican Energy
Company.
Description: § 205(d) Rate Filing:
Interconnection Agreement—
MidAmerican and Montezuma to be
effective 5/1/2018.
Filed Date: 4/20/18.
Accession Number: 20180420–5150.
Comments Due: 5 p.m. ET 5/11/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
E:\FR\FM\27APN1.SGM
27APN1
Federal Register / Vol. 83, No. 82 / Friday, April 27, 2018 / Notices
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: April 20, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–08832 Filed 4–26–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
daltland on DSKBBV9HB2PROD with NOTICES
Filings Instituting Proceedings
Docket Numbers: RP18–725–000.
Applicants: Gulf Crossing Pipeline
Company LLC.
Description: § 4(d) Rate Filing: Revise
Section 6.9 for Posting of Short-Term
Capacity Release Agmts to be effective
5/21/2018.
Filed Date: 4/20/18.
Accession Number: 20180420–5039.
Comments Due: 5 p.m. ET 5/2/18.
Docket Numbers: RP18–726–000.
Applicants: Gulf Crossing Pipeline
Company LLC.
Description: § 4(d) Rate Filing: Cap
Rel Neg Rate Agmt (Newfield 18 to
Sequent 1976) to be effective 4/21/2018.
Filed Date: 4/20/18.
Accession Number: 20180420–5092.
Comments Due: 5 p.m. ET 5/2/18.
Docket Numbers: RP18–727–000.
Applicants: First ECA Midstream
LLC.
Description: Tariff Cancellation:
Cancellation notice to be effective
5/1/2018.
Filed Date: 4/20/18.
Accession Number: 20180420–5111.
Comments Due: 5 p.m. ET 5/2/18.
Docket Numbers: RP18–728–000.
Applicants: Iroquois Gas
Transmission System, L.P.
Description: § 4(d) Rate Filing: 042018
Negotiated Rates—Consolidated Edison
Energy, Inc. H–2275–89 to be effective
4/20/2018.
Filed Date: 4/20/18.
Accession Number: 20180420–5149.
Comments Due: 5 p.m. ET 5/2/18.
Docket Numbers: RP18–729–000.
Applicants: Kern River Gas
Transmission Company.
Description: § 4(d) Rate Filing: 2018
May Negotiated Rate Term Extensions to
be effective 4/30/2018.
Filed Date: 4/20/18.
VerDate Sep<11>2014
18:18 Apr 26, 2018
Jkt 244001
Accession Number: 20180420–5180.
Comments Due: 5 p.m. ET 5/2/18.
Docket Numbers: RP18–730–000.
Applicants: First ECA Midstream
LLC.
Description: § 4(d) Rate Filing:
Baseline new 2018 to be effective
5/1/2018.
Filed Date: 4/20/18.
Accession Number: 20180420–5211.
Comments Due: 5 p.m. ET 5/2/18.
Docket Numbers: RP18–731–000.
Applicants: First ECA Midstream
LLC.
Description: § 4(d) Rate Filing:
Baseline new 2018 Volume 1 to be
effective 5/1/2018.
Filed Date: 4/20/18.
Accession Number: 20180420–5217.
Comments Due: 5 p.m. ET 5/2/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: April 23, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–08860 Filed 4–26–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. PF18–3–000]
Notice of Intent To Prepare an
Environmental Assessment for the
Planned SPLNG Third Berth Expansion
Project, Request for Comments on
Environmental Issues: Sabine Pass
LNG, L.P.
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental assessment (EA) that will
discuss the environmental impacts of
the Sabine Pass Liquefied Natural Gas
PO 00000
Frm 00049
Fmt 4703
Sfmt 4703
18549
(SPLNG) Third Berth Expansion Project
involving construction and operation of
facilities by, SPLNG L.P. in Cameron
Parish, Louisiana. The Commission will
use this EA in its decision-making
process to determine whether the
project is in the public interest.
This notice announces the opening of
the scoping process the Commission
will use to gather input from the public
and interested agencies on the project.
You can make a difference by providing
us with your specific comments or
concerns about the project. Your
comments should focus on the potential
environmental effects, reasonable
alternatives, and measures to avoid or
lessen environmental impacts. Your
input will help the Commission staff
determine what issues they need to
evaluate in the EA. To ensure that your
comments are timely and properly
recorded, please send your comments so
that the Commission receives them in
Washington, DC on or before 5:00 p.m.
Eastern Time on May 21, 2018.
If you sent comments on this project
to the Commission before the opening of
this docket on February 23, 2018, you
will need to file those comments in
Docket No. PF18–3–000 to ensure they
are considered as part of this
proceeding.
This notice is being sent to the
Commission’s current environmental
mailing list for this project. State and
local government representatives should
notify their constituents of this planned
project and encourage them to comment
on their areas of concern.
Public Participation
For your convenience, there are four
methods you can use to submit your
comments to the Commission. The
Commission will provide equal
consideration to all comments received,
whether filed in written form or
provided verbally. The Commission
encourages electronic filing of
comments and has expert staff available
to assist you at (202) 502–8258 or
FercOnlineSupport@ferc.gov. Please
carefully follow these instructions so
that your comments are properly
recorded.
(1) You can file your comments
electronically using the eComment
feature on the Commission’s website
(www.ferc.gov) under the link to
Documents and Filings. This is an easy
method for submitting brief, text-only
comments on a project;
(2) You can file your comments
electronically by using the eFiling
feature on the Commission’s website
(www.ferc.gov) under the link to
Documents and Filings. With eFiling,
you can provide comments in a variety
E:\FR\FM\27APN1.SGM
27APN1
Agencies
[Federal Register Volume 83, Number 82 (Friday, April 27, 2018)]
[Notices]
[Pages 18548-18549]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-08832]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
corporate filings:
Docket Numbers: EC18-51-000.
Applicants: MDU Resources Group, Inc.
Description: Second Supplement to January 31, 2018 Application
[Revised Exhibit N] for Authorization Under Section 203 of the Federal
Power Act of MDU Resources Group, Inc.
Filed Date: 4/20/18.
Accession Number: 20180420-5055.
Comments Due: 5 p.m. ET 5/11/18.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER10-2607-005; ER10-2626-004.
Applicants: Old Dominion Electric Cooperative, TEC Trading, Inc.
Description: Notice of Change in Status of the ODEC Entities.
Filed Date: 4/19/18.
Accession Number: 20180419-5294.
Comments Due: 5 p.m. ET 5/10/18.
Docket Numbers: ER10-3028-003.
Applicants: Elk Hills Power, LLC.
Description: Supplement to March 8, 2018 Notice of Non-Material
Change in Status of Elk Hills Power, LLC.
Filed Date: 4/20/18.
Accession Number: 20180420-5155.
Comments Due: 5 p.m. ET 5/11/18.
Docket Numbers: ER17-428-004.
Applicants: Southwest Power Pool, Inc.
Description: Compliance filing: Missouri River Energy Services
Member Formula Rate (Vermillion) Compliance to be effective 2/1/2017.
Filed Date: 4/19/18.
Accession Number: 20180419-5208.
Comments Due: 5 p.m. ET 5/10/18.
Docket Numbers: ER18-1403-000.
Applicants: Southwest Power Pool, Inc.
Description: Sec. 205(d) Rate Filing: 3399 Basin Electric and
MidAmerican Energy Attachment AO to be effective 4/1/2018.
Filed Date: 4/20/18.
Accession Number: 20180420-5009.
Comments Due: 5 p.m. ET 5/11/18.
Docket Numbers: ER18-1404-000.
Applicants: NS Power Energy Marketing Inc.
Description: Baseline eTariff Filing: Application for Market-Based
Rate Authority to be effective 6/20/2018.
Filed Date: 4/20/18.
Accession Number: 20180420-5011.
Comments Due: 5 p.m. ET 5/11/18.
Docket Numbers: ER18-1405-000.
Applicants: Public Service Company of Oklahoma.
Description: Sec. 205(d) Rate Filing: PSO-AEPOTC-WFEC Roosevelt-
Steed DPA Amend & Restated to be effective 3/20/2018.
Filed Date: 4/20/18.
Accession Number: 20180420-5032.
Comments Due: 5 p.m. ET 5/11/18.
Docket Numbers: ER18-1406-000.
Applicants: Florida Power & Light Company.
Description: Sec. 205(d) Rate Filing: FPL Amendments to LCEC Rate
Schedule No. 317 to be effective 1/1/2017.
Filed Date: 4/20/18.
Accession Number: 20180420-5093.
Comments Due: 5 p.m. ET 5/11/18.
Docket Numbers: ER18-1407-000.
Applicants: Florida Power & Light Company.
Description: Sec. 205(d) Rate Filing: FPL Amendments to FKEC Rate
Schedule No. 322 to be effective 1/1/2017.
Filed Date: 4/20/18.
Accession Number: 20180420-5095.
Comments Due: 5 p.m. ET 5/11/18.
Docket Numbers: ER18-1408-000.
Applicants: New York Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: Amendments related to solar
energy forecasting for the NYCA to be effective 6/20/2018.
Filed Date: 4/20/18.
Accession Number: 20180420-5148.
Comments Due: 5 p.m. ET 5/11/18.
Docket Numbers: ER18-1409-000.
Applicants: MidAmerican Energy Company.
Description: Sec. 205(d) Rate Filing: Interconnection Agreement--
MidAmerican and Montezuma to be effective 5/1/2018.
Filed Date: 4/20/18.
Accession Number: 20180420-5150.
Comments Due: 5 p.m. ET 5/11/18.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings
[[Page 18549]]
can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Dated: April 20, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-08832 Filed 4-26-18; 8:45 am]