San Diego County Water Authority; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, Protests, Recommendations, and Terms and Conditions, 17821-17822 [2018-08479]
Download as PDF
Federal Register / Vol. 83, No. 79 / Tuesday, April 24, 2018 / Notices
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenter’s will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commenter’s will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentary,
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the eFiling link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy regulatory Commission,
888 First Street NE, Washington, DC
20426.
Dated: April 18, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–08476 Filed 4–23–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 5670–001]
daltland on DSKBBV9HB2PROD with NOTICES
San Diego County Water Authority;
Notice of Application Accepted for
Filing and Soliciting Comments,
Motions To Intervene, Protests,
Recommendations, and Terms and
Conditions
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Amendment
of Conduit Exemption.
b. Project No.: 5670–001.
c. Date filed: April 3, 2018.
d. Applicant: San Diego County Water
Authority.
e. Name of Project: Alvarado
Hydroelectric Project.
f. Location: The project is located
within Alvarado Water Treatment Plant
in the city of San Diego, San Diego
VerDate Sep<11>2014
17:03 Apr 23, 2018
Jkt 244001
County, California. The land on which
all the project facilities are located is
owned by the applicant.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791a–825r.
h. Applicant Contact: Mr. Brent
Fountain, Engineer, 4677 Overland
Avenue, San Diego, California 92123,
phone (858) 522–6808.
i. FERC Contact: Christopher Chaney,
(202) 502–6778 or christopher.chaney@
ferc.gov.
j. Deadline for filing responsive
documents: Due to the small size of the
proposed project, as well as the resource
agency consultation letters filed with
the application, the 60-day timeframe
specified in 18 CFR 4.34(b) for filing all
comments, motions to intervene,
protests, recommendations, terms and
conditions, and prescriptions is
shortened to 30 days from the issuance
date of this notice. All reply comments
must be filed with the Commission
within 45 days from the issuance date
of this notice.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, and protests using
the Commission’s eFiling system at
https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://www.ferc.
gov/docs-filing/ecomment.asp. You
must include your name and contact
information at the end of your
comments. For assistance, please
contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket number P–5670–001.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person on the official service list
for the project. Further, if an intervenor
files comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, it must
also serve a copy of the document on
that resource agency.
k. Description of Project: The
proposed amendment consists of the
rehabilitation of the existing
hydroelectric facility by: (1) Replacing
the two existing, 1-megawatt (MW)
turbine/generating units with a single,
1.7 MW-rated turbine/generating unit,
switchgear, and generator protection
panels; and (2) installing a flow control
PO 00000
Frm 00034
Fmt 4703
Sfmt 4703
17821
bypass line to provide flow to the water
treatment plant when the project is
offline.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street NE, Room 2A,
Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s website at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number,
P–5670, in the docket number field to
access the document. You may also
register online at https://www.ferc.gov/
docs-filing/esubscription.asp to be
notified via email of new filings and
issuances related to this or other
pending projects. For assistance, call 1–
866–208–3676 or email
FERCOnlineSupport@ferc.gov, for TTY,
call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above.
m. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, and
.214. In determining the appropriate
action to take, the Commission will
consider all protests or other comments
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
deadline date for the particular
application.
n. Filing and Service of Responsive
Documents: Any filing must (1) bear in
all capital letters the title COMMENTS,
PROTEST, MOTION TO INTERVENE,
REPLY COMMENTS,
RECOMMENDATIONS, TERMS AND
CONDITIONS, or PRESCRIPTIONS; (2)
set forth in the heading, the name of the
applicant and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
protesting or intervening; and (4)
otherwise comply with the requirements
of 18 CFR 385.2001 through 385.2005.
All comments, motions to intervene, or
protests must set forth their evidentiary
basis and otherwise comply with the
requirements of 18 CFR 4.34(b).
Agencies may obtain copies of the
application directly from the applicant.
A copy of any protest or motion to
intervene must be served upon each
representative of the applicant specified
in the particular application. If an
intervener files comments or documents
E:\FR\FM\24APN1.SGM
24APN1
17822
Federal Register / Vol. 83, No. 79 / Tuesday, April 24, 2018 / Notices
with the Commission relating to the
merits of an issue that may affect the
responsibilities of a particular resource
agency, they must also serve a copy of
the document on that resource agency.
A copy of all other filings in reference
to this application must be accompanied
by proof of service on all persons listed
in the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Dated: April 18, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–08479 Filed 4–23–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CD18–5–000]
GenH, Inc.; Notice of Preliminary
Determination of a Qualifying Conduit
Hydropower Facility and Soliciting
Comments and Motions To Intervene
On April 12, 2018, GenH, Inc. filed a
notice of intent to construct a qualifying
conduit hydropower facility, pursuant
to section 30 of the Federal Power Act
(FPA), as amended by section 4 of the
Hydropower Regulatory Efficiency Act
of 2013 (HREA). The proposed Mohawk
Hydro Station Project would have an
installed capacity of up to 150 kilowatts
(kW), and would be located at an
existing unnamed drop along the
Wellton-Mohawk Canal in Roll, Yuma
County, Arizona.
Applicant Contact: Robert Freda, 306
Bellevue St., Boston, MA 02132, Phone
No. (617) 435–6288.
FERC Contact: Christopher Chaney,
Phone No. (202) 502–6778, email:
Christopher.Chaney@ferc.gov.
Qualifying Conduit Hydropower
Facility Description: The proposed
project would consist of: (1) Up to 10
15-kW Turgo turbine units with a total
installed capacity of up to 150 kW
located at an unnamed drop along the
Wellton-Mohawk Canal; and (2)
appurtenant facilities. The proposed
project would have an estimated annual
generating capacity of up to
approximately 1,336,000 kilowatt-hours.
A qualifying conduit hydropower
facility is one that is determined or
deemed to meet all of the criteria shown
in the table below.
TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
Statutory provision
Description
Satisfies
(Y/N)
FPA 30(a)(3)(A), as amended by HREA ..
The conduit the facility uses is a tunnel, canal, pipeline, aqueduct, flume, ditch, or
similar manmade water conveyance that is operated for the distribution of water
for agricultural, municipal, or industrial consumption and not primarily for the generation of electricity..
The facility is constructed, operated, or maintained for the generation of electric
power and uses for such generation only the hydroelectric potential of a non-federally owned conduit..
The facility has an installed capacity that does not exceed 5 megawatts. .................
Y
FPA 30(a)(3)(C)(i), as amended by HREA
daltland on DSKBBV9HB2PROD with NOTICES
FPA 30(a)(3)(C)(ii), as amended
HREA.
FPA 30(a)(3)(C)(iii), as amended
HREA.
by
by
On or before August 9, 2013, the facility is not licensed, or exempted from the licensing requirements of Part I of the FPA..
Preliminary Determination: The
proposed addition of the hydroelectric
project along the existing irrigation
canal will not alter its primary purpose.
Therefore, based upon the above
information and criteria, Commission
staff preliminarily determines that the
proposal satisfies the requirements for a
qualifying conduit hydropower facility,
which is not required to be licensed or
exempted from licensing.
Comments and Motions to Intervene:
Deadline for filing comments contesting
whether the facility meets the qualifying
criteria is 45 days from the issuance
date of this notice.
Deadline for filing motions to
intervene is 30 days from the issuance
date of this notice.
Anyone may submit comments or a
motion to intervene in accordance with
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210 and
385.214. Any motions to intervene must
be received on or before the specified
deadline date for the particular
proceeding.
VerDate Sep<11>2014
17:03 Apr 23, 2018
Jkt 244001
Filing and Service of Responsive
Documents: All filings must (1) bear in
all capital letters the COMMENTS
CONTESTING QUALIFICATION FOR A
CONDUIT HYDROPOWER FACILITY or
MOTION TO INTERVENE, as
applicable; (2) state in the heading the
name of the applicant and the project
number of the application to which the
filing responds; (3) state the name,
address, and telephone number of the
person filing; and (4) otherwise comply
with the requirements of sections
385.2001 through 385.2005 of the
Commission’s regulations.1 All
comments contesting Commission staff’s
preliminary determination that the
facility meets the qualifying criteria
must set forth their evidentiary basis.
The Commission strongly encourages
electronic filing. Please file motions to
intervene and comments using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
1 18
PO 00000
CFR 385.2001–2005 (2017).
Frm 00035
Fmt 4703
Sfmt 4703
Y
Y
Y
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
A copy of all other filings in reference
to this application must be accompanied
by proof of service on all persons listed
in the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Locations of Notice of Intent: Copies
of the notice of intent can be obtained
directly from the applicant or such
copies can be viewed and reproduced at
the Commission in its Public Reference
Room, Room 2A, 888 First Street NE,
Washington, DC 20426. The filing may
also be viewed on the web at https://
www.ferc.gov/docs-filing/elibrary.asp
E:\FR\FM\24APN1.SGM
24APN1
Agencies
[Federal Register Volume 83, Number 79 (Tuesday, April 24, 2018)]
[Notices]
[Pages 17821-17822]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-08479]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 5670-001]
San Diego County Water Authority; Notice of Application Accepted
for Filing and Soliciting Comments, Motions To Intervene, Protests,
Recommendations, and Terms and Conditions
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of Application: Amendment of Conduit Exemption.
b. Project No.: 5670-001.
c. Date filed: April 3, 2018.
d. Applicant: San Diego County Water Authority.
e. Name of Project: Alvarado Hydroelectric Project.
f. Location: The project is located within Alvarado Water Treatment
Plant in the city of San Diego, San Diego County, California. The land
on which all the project facilities are located is owned by the
applicant.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791a-825r.
h. Applicant Contact: Mr. Brent Fountain, Engineer, 4677 Overland
Avenue, San Diego, California 92123, phone (858) 522-6808.
i. FERC Contact: Christopher Chaney, (202) 502-6778 or
[email protected].
j. Deadline for filing responsive documents: Due to the small size
of the proposed project, as well as the resource agency consultation
letters filed with the application, the 60-day timeframe specified in
18 CFR 4.34(b) for filing all comments, motions to intervene, protests,
recommendations, terms and conditions, and prescriptions is shortened
to 30 days from the issuance date of this notice. All reply comments
must be filed with the Commission within 45 days from the issuance date
of this notice.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, and protests using the Commission's
eFiling system at https://www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments up to 6,000 characters, without
prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact
information at the end of your comments. For assistance, please contact
FERC Online Support at [email protected], (866) 208-3676 (toll
free), or (202) 502-8659 (TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC 20426. The first page of any filing
should include docket number P-5670-001.
The Commission's Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person on the official service list for the
project. Further, if an intervenor files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, it must also serve a
copy of the document on that resource agency.
k. Description of Project: The proposed amendment consists of the
rehabilitation of the existing hydroelectric facility by: (1) Replacing
the two existing, 1-megawatt (MW) turbine/generating units with a
single, 1.7 MW-rated turbine/generating unit, switchgear, and generator
protection panels; and (2) installing a flow control bypass line to
provide flow to the water treatment plant when the project is offline.
l. Locations of the Application: A copy of the application is
available for inspection and reproduction at the Commission's Public
Reference Room, located at 888 First Street NE, Room 2A, Washington, DC
20426, or by calling (202) 502-8371. This filing may also be viewed on
the Commission's website at https://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number, P-5670, in the docket number
field to access the document. You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of
new filings and issuances related to this or other pending projects.
For assistance, call 1-866-208-3676 or email
[email protected], for TTY, call (202) 502-8659. A copy is
also available for inspection and reproduction at the address in item
(h) above.
m. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
and .214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
deadline date for the particular application.
n. Filing and Service of Responsive Documents: Any filing must (1)
bear in all capital letters the title COMMENTS, PROTEST, MOTION TO
INTERVENE, REPLY COMMENTS, RECOMMENDATIONS, TERMS AND CONDITIONS, or
PRESCRIPTIONS; (2) set forth in the heading, the name of the applicant
and the project number of the application to which the filing responds;
(3) furnish the name, address, and telephone number of the person
protesting or intervening; and (4) otherwise comply with the
requirements of 18 CFR 385.2001 through 385.2005. All comments, motions
to intervene, or protests must set forth their evidentiary basis and
otherwise comply with the requirements of 18 CFR 4.34(b). Agencies may
obtain copies of the application directly from the applicant. A copy of
any protest or motion to intervene must be served upon each
representative of the applicant specified in the particular
application. If an intervener files comments or documents
[[Page 17822]]
with the Commission relating to the merits of an issue that may affect
the responsibilities of a particular resource agency, they must also
serve a copy of the document on that resource agency. A copy of all
other filings in reference to this application must be accompanied by
proof of service on all persons listed in the service list prepared by
the Commission in this proceeding, in accordance with 18 CFR 4.34(b)
and 385.2010.
Dated: April 18, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-08479 Filed 4-23-18; 8:45 am]
BILLING CODE 6717-01-P