Columbia Gas Transmission, LLC; Notice of Request Under Blanket Authorization, 17820-17821 [2018-08476]
Download as PDF
daltland on DSKBBV9HB2PROD with NOTICES
17820
Federal Register / Vol. 83, No. 79 / Tuesday, April 24, 2018 / Notices
Description: Joint Petition for Limited
Waiver of Capacity Release Regulations
and Tariff Provisions of NRG Canal LLC,
et al.
Filed Date: 4/12/18.
Accession Number: 20180412–5075.
Comments Due: 5 p.m. ET 4/24/18.
Docket Numbers: RP18–701–000.
Applicants: Texas Eastern
Transmission, LP.
Description: § 4(d) Rate Filing: GT&C
Section 14.3 Modification to be effective
5/12/2018.
Filed Date: 4/12/18.
Accession Number: 20180412–5112.
Comments Due: 5 p.m. ET 4/24/18.
Docket Numbers: RP18–702–000.
Applicants: National Fuel Gas Supply
Corporation.
Description: § 4(d) Rate Filing: NonConforming Line K Uprate to be
effective 6/1/2018.
Filed Date: 4/12/18.
Accession Number: 20180412–5137.
Comments Due: 5 p.m. ET 4/24/18.
Docket Numbers: RP17–598–004.
Applicants: Great Lakes Gas
Transmission Limited Partnership.
Description: Compliance filing
Settlement Compliance to RP17–598–
001 to be effective 10/1/2017.
Filed Date: 4/13/18.
Accession Number: 20180413–5108.
Comments Due: 5 p.m. ET 4/25/18.
Docket Numbers: RP18–703–000.
Applicants: Algonquin Gas
Transmission, LLC.
Description: § 4(d) Rate Filing:
Negotiated Rate—Bay State to
Macquarie 796310 to be effective
5/1/2018.
Filed Date: 4/13/18.
Accession Number: 20180413–5002.
Comments Due: 5 p.m. ET 4/25/18.
Docket Numbers: RP18–704–000.
Applicants: El Paso Natural Gas
Company, L.L.C.
Description: § 4(d) Rate Filing:
Negotiated Agreement Update Filing
(Conoco Redesignation Apr 18) to be
effective 4/16/2018.
Filed Date: 4/13/18.
Accession Number: 20180413–5169.
Comments Due: 5 p.m. ET 4/25/18.
Docket Numbers: RP18–705–000.
Applicants: Natural Gas Pipeline
Company of America.
Description: § 4(d) Rate Filing:
Amendment to NRA—Macquarie Energy
LLC to be effective 4/13/2018.
Filed Date: 4/13/18.
Accession Number: 20180413–5182.
Comments Due: 5 p.m. ET 4/25/18.
Docket Numbers: RP18–706–000.
Applicants: Gulf Crossing Pipeline
Company LLC.
Description: § 4(d) Rate Filing: Cap
Rel Neg Rate Agmt (Newfield 18 to
Sequent 1971) to be effective 4/12/2018.
VerDate Sep<11>2014
17:03 Apr 23, 2018
Jkt 244001
Filed Date: 4/16/18.
Accession Number: 20180416–5071.
Comments Due: 5 p.m. ET 4/30/18.
Docket Numbers: RP18–707–000.
Applicants: Guardian Pipeline, L.L.C.
Description: § 4(d) Rate Filing:
Negotiated Rate PAL Agreement—
MIECO, INC to be effective 4/16/2018.
Filed Date: 4/16/18.
Accession Number: 20180416–5150.
Comments Due: 5 p.m. ET 4/30/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: April 18, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–08489 Filed 4–23–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP18–173–000]
Columbia Gas Transmission, LLC;
Notice of Request Under Blanket
Authorization
Take notice that on April 10, 2018,
Columbia Gas Transmission, LLC
(Columbia), 700 Louisiana Street, Suite
700, Houston, Texas 77002–2700, filed
in Docket No. CP18–173–000 a prior
notice request pursuant to sections
157.205 and 157.213(b) of the
Commission’s regulations under the
Natural Gas Act (NGA), requesting
authorization to construct and operate
one new horizontal storage well,
designated Well 12622, and related
pipeline and appurtenances at
Columbia’s Weaver Storage Field,
located in Ashland, Holmes, Knox, and
Richland Counties, Ohio. Columbia
estimates the cost of the proposed
project to be approximately $2,800,000,
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
all as more fully set forth in the
application which is on file with the
Commission and open to public
inspection. The filing may also be
viewed on the web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov or toll free at (866) 208–3676, or
TTY, contact (202) 502–8659.
Any questions concerning this
application may be directed to Linda
Farquhar, Manager, Project
Determinations & Regulatory
Administration, Columbia Gas
Transmission, LLC, 700 Louisiana
Street, Suite 700, Houston, Texas
77002–2700, by telephone at (832) 320–
5685, by fax at (832) 320–6685, or by
email at linda_farquhar@
transcanada.com.
Any person or the Commission’s staff
may, within 60 days after issuance of
the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and pursuant to section
157.205 of the regulations under the
NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the
time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for filing a protest. If a
protest is filed and not withdrawn
within 30 days after the allowed time
for filing a protest, the instant request
shall be treated as an application for
authorization pursuant to section 7 of
the NGA.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the EA
for this proposal. The filing of the EA
in the Commission’s public record for
this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s EA.
E:\FR\FM\24APN1.SGM
24APN1
Federal Register / Vol. 83, No. 79 / Tuesday, April 24, 2018 / Notices
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenter’s will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commenter’s will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentary,
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the eFiling link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy regulatory Commission,
888 First Street NE, Washington, DC
20426.
Dated: April 18, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–08476 Filed 4–23–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 5670–001]
daltland on DSKBBV9HB2PROD with NOTICES
San Diego County Water Authority;
Notice of Application Accepted for
Filing and Soliciting Comments,
Motions To Intervene, Protests,
Recommendations, and Terms and
Conditions
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Amendment
of Conduit Exemption.
b. Project No.: 5670–001.
c. Date filed: April 3, 2018.
d. Applicant: San Diego County Water
Authority.
e. Name of Project: Alvarado
Hydroelectric Project.
f. Location: The project is located
within Alvarado Water Treatment Plant
in the city of San Diego, San Diego
VerDate Sep<11>2014
17:03 Apr 23, 2018
Jkt 244001
County, California. The land on which
all the project facilities are located is
owned by the applicant.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791a–825r.
h. Applicant Contact: Mr. Brent
Fountain, Engineer, 4677 Overland
Avenue, San Diego, California 92123,
phone (858) 522–6808.
i. FERC Contact: Christopher Chaney,
(202) 502–6778 or christopher.chaney@
ferc.gov.
j. Deadline for filing responsive
documents: Due to the small size of the
proposed project, as well as the resource
agency consultation letters filed with
the application, the 60-day timeframe
specified in 18 CFR 4.34(b) for filing all
comments, motions to intervene,
protests, recommendations, terms and
conditions, and prescriptions is
shortened to 30 days from the issuance
date of this notice. All reply comments
must be filed with the Commission
within 45 days from the issuance date
of this notice.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, and protests using
the Commission’s eFiling system at
https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://www.ferc.
gov/docs-filing/ecomment.asp. You
must include your name and contact
information at the end of your
comments. For assistance, please
contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket number P–5670–001.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person on the official service list
for the project. Further, if an intervenor
files comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, it must
also serve a copy of the document on
that resource agency.
k. Description of Project: The
proposed amendment consists of the
rehabilitation of the existing
hydroelectric facility by: (1) Replacing
the two existing, 1-megawatt (MW)
turbine/generating units with a single,
1.7 MW-rated turbine/generating unit,
switchgear, and generator protection
panels; and (2) installing a flow control
PO 00000
Frm 00034
Fmt 4703
Sfmt 4703
17821
bypass line to provide flow to the water
treatment plant when the project is
offline.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street NE, Room 2A,
Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s website at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number,
P–5670, in the docket number field to
access the document. You may also
register online at https://www.ferc.gov/
docs-filing/esubscription.asp to be
notified via email of new filings and
issuances related to this or other
pending projects. For assistance, call 1–
866–208–3676 or email
FERCOnlineSupport@ferc.gov, for TTY,
call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above.
m. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, and
.214. In determining the appropriate
action to take, the Commission will
consider all protests or other comments
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
deadline date for the particular
application.
n. Filing and Service of Responsive
Documents: Any filing must (1) bear in
all capital letters the title COMMENTS,
PROTEST, MOTION TO INTERVENE,
REPLY COMMENTS,
RECOMMENDATIONS, TERMS AND
CONDITIONS, or PRESCRIPTIONS; (2)
set forth in the heading, the name of the
applicant and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
protesting or intervening; and (4)
otherwise comply with the requirements
of 18 CFR 385.2001 through 385.2005.
All comments, motions to intervene, or
protests must set forth their evidentiary
basis and otherwise comply with the
requirements of 18 CFR 4.34(b).
Agencies may obtain copies of the
application directly from the applicant.
A copy of any protest or motion to
intervene must be served upon each
representative of the applicant specified
in the particular application. If an
intervener files comments or documents
E:\FR\FM\24APN1.SGM
24APN1
Agencies
[Federal Register Volume 83, Number 79 (Tuesday, April 24, 2018)]
[Notices]
[Pages 17820-17821]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-08476]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP18-173-000]
Columbia Gas Transmission, LLC; Notice of Request Under Blanket
Authorization
Take notice that on April 10, 2018, Columbia Gas Transmission, LLC
(Columbia), 700 Louisiana Street, Suite 700, Houston, Texas 77002-2700,
filed in Docket No. CP18-173-000 a prior notice request pursuant to
sections 157.205 and 157.213(b) of the Commission's regulations under
the Natural Gas Act (NGA), requesting authorization to construct and
operate one new horizontal storage well, designated Well 12622, and
related pipeline and appurtenances at Columbia's Weaver Storage Field,
located in Ashland, Holmes, Knox, and Richland Counties, Ohio. Columbia
estimates the cost of the proposed project to be approximately
$2,800,000, all as more fully set forth in the application which is on
file with the Commission and open to public inspection. The filing may
also be viewed on the web at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, please
contact FERC Online Support at [email protected] or toll free
at (866) 208-3676, or TTY, contact (202) 502-8659.
Any questions concerning this application may be directed to Linda
Farquhar, Manager, Project Determinations & Regulatory Administration,
Columbia Gas Transmission, LLC, 700 Louisiana Street, Suite 700,
Houston, Texas 77002-2700, by telephone at (832) 320-5685, by fax at
(832) 320-6685, or by email at [email protected].
Any person or the Commission's staff may, within 60 days after
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to
intervene or notice of intervention and pursuant to section 157.205 of
the regulations under the NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the time allowed therefore, the
proposed activity shall be deemed to be authorized effective the day
after the time allowed for filing a protest. If a protest is filed and
not withdrawn within 30 days after the allowed time for filing a
protest, the instant request shall be treated as an application for
authorization pursuant to section 7 of the NGA.
Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9,
within 90 days of this Notice the Commission staff will either:
Complete its environmental assessment (EA) and place it into the
Commission's public record (eLibrary) for this proceeding; or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the EA for this proposal. The filing of the EA in the Commission's
public record for this proceeding or the issuance of a Notice of
Schedule for Environmental Review will serve to notify federal and
state agencies of the timing for the completion of all necessary
reviews, and the subsequent need to complete all federal authorizations
within 90 days of the date of issuance of the Commission staff's EA.
[[Page 17821]]
Persons who wish to comment only on the environmental review of
this project should submit an original and two copies of their comments
to the Secretary of the Commission. Environmental commenter's will be
placed on the Commission's environmental mailing list, will receive
copies of the environmental documents, and will be notified of meetings
associated with the Commission's environmental review process.
Environmental commenter's will not be required to serve copies of filed
documents on all other parties. However, the non-party commentary, will
not receive copies of all documents filed by other parties or issued by
the Commission (except for the mailing of environmental documents
issued by the Commission) and will not have the right to seek court
review of the Commission's final order.
The Commission strongly encourages electronic filings of comments,
protests and interventions in lieu of paper using the eFiling link at
https://www.ferc.gov. Persons unable to file electronically should
submit an original and 5 copies of the protest or intervention to the
Federal Energy regulatory Commission, 888 First Street NE, Washington,
DC 20426.
Dated: April 18, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-08476 Filed 4-23-18; 8:45 am]