GenH, Inc.; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene, 17818-17819 [2018-08475]
Download as PDF
17818
Federal Register / Vol. 83, No. 79 / Tuesday, April 24, 2018 / Notices
Dated: April 17, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–08480 Filed 4–23–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CD18–6–000]
GenH, Inc.; Notice of Preliminary
Determination of a Qualifying Conduit
Hydropower Facility and Soliciting
Comments and Motions To Intervene
On April 12, 2018, GenH, Inc. filed a
notice of intent to construct a qualifying
conduit hydropower facility, pursuant
to section 30 of the Federal Power Act
(FPA), as amended by section 4 of the
Hydropower Regulatory Efficiency Act
of 2013 (HREA). The proposed
McClellan Wash Hydro Station Project
would have an installed capacity of 75
kilowatts (kW), and would be located at
the existing McClellan Wash Drop along
the Central Main Canal near Eloy, Pinal
County, Arizona.
Applicant Contact: Robert Freda, 306
Bellevue St., Boston, MA 02132, Phone
No. (617) 435–6288.
FERC Contact: Christopher Chaney,
Phone No. (202) 502–6778, email:
Christopher.Chaney@ferc.gov.
Qualifying Conduit Hydropower
Facility Description: The proposed
project would consist of: (1) Five 15-kW
Turgo turbine units with a total
installed capacity of 75 kW located at
the McClellan Wash Drop of the Central
Main Canal; and (2) appurtenant
facilities. The proposed project would
have an estimated annual generating
capacity of about 900,000 kilowatthours.
A qualifying conduit hydropower
facility is one that is determined or
deemed to meet all of the criteria shown
in the table below.
TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
Statutory Provision
Description
Satisfies
(Y/N)
FPA 30(a)(3)(A), as amended by HREA ..
The conduit the facility uses is a tunnel, canal, pipeline, aqueduct, flume, ditch, or
similar manmade water conveyance that is operated for the distribution of water
for agricultural, municipal, or industrial consumption and not primarily for the generation of electricity.
The facility is constructed, operated, or maintained for the generation of electric
power and uses for such generation only the hydroelectric potential of a non-federally owned conduit.
The facility has an installed capacity that does not exceed 5 megawatts ..................
Y
FPA 30(a)(3)(C)(i), as amended by HREA
daltland on DSKBBV9HB2PROD with NOTICES
FPA 30(a)(3)(C)(ii), as amended
HREA.
FPA 30(a)(3)(C)(iii), as amended
HREA.
by
by
On or before August 9, 2013, the facility is not licensed, or exempted from the licensing requirements of Part I of the FPA.
Preliminary Determination: The
proposed addition of the hydroelectric
project along the existing irrigation
canal will not alter its primary purpose.
Therefore, based upon the above
information and criteria, Commission
staff preliminarily determines that the
proposal satisfies the requirements for a
qualifying conduit hydropower facility,
which is not required to be licensed or
exempted from licensing.
Comments and Motions to Intervene:
Deadline for filing comments contesting
whether the facility meets the qualifying
criteria is 45 days from the issuance
date of this notice.
Deadline for filing motions to
intervene is 30 days from the issuance
date of this notice.
Anyone may submit comments or a
motion to intervene in accordance with
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210 and
385.214. Any motions to intervene must
be received on or before the specified
deadline date for the particular
proceeding.
Filing and Service of Responsive
Documents: All filings must (1) bear in
all capital letters the COMMENTS
CONTESTING QUALIFICATION FOR A
VerDate Sep<11>2014
17:03 Apr 23, 2018
Jkt 244001
CONDUIT HYDROPOWER FACILITY or
MOTION TO INTERVENE, as
applicable; (2) state in the heading the
name of the applicant and the project
number of the application to which the
filing responds; (3) state the name,
address, and telephone number of the
person filing; and (4) otherwise comply
with the requirements of sections
385.2001 through 385.2005 of the
Commission’s regulations.1 All
comments contesting Commission staff’s
preliminary determination that the
facility meets the qualifying criteria
must set forth their evidentiary basis.
The Commission strongly encourages
electronic filing. Please file motions to
intervene and comments using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
1 18
PO 00000
Fmt 4703
Sfmt 4703
Y
Y
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
A copy of all other filings in reference
to this application must be accompanied
by proof of service on all persons listed
in the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Locations of Notice of Intent: Copies
of the notice of intent can be obtained
directly from the applicant or such
copies can be viewed and reproduced at
the Commission in its Public Reference
Room, Room 2A, 888 First Street NE,
Washington, DC 20426. The filing may
also be viewed on the web at https://
www.ferc.gov/docs-filing/elibrary.asp
using the eLibrary link. Enter the docket
number (i.e., CD18–6) in the docket
number field to access the document.
For assistance, call toll-free 1–866–208–
3676 or email FERCOnlineSupport@
ferc.gov. For TTY, call (202) 502–8659.
CFR 385.2001–2005 (2017).
Frm 00031
Y
E:\FR\FM\24APN1.SGM
24APN1
Federal Register / Vol. 83, No. 79 / Tuesday, April 24, 2018 / Notices
Dated: April 17, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–08475 Filed 4–23–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
daltland on DSKBBV9HB2PROD with NOTICES
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC18–85–000.
Applicants: New England Power
Company.
Description: Application for
Authorization Under Section 203 of the
Federal Power Act and Requests for CEII
Treatment and Certain Waivers of New
England Power Company.
Filed Date: 4/16/18.
Accession Number: 20180416–5244.
Comments Due: 5 p.m. ET 5/7/18.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER14–1193–005.
Applicants: West Deptford Energy,
LLC.
Description: Compliance filing:
Refund Report—Informational Filing
(Doc. No. EL16–100–000) to be effective
N/A.
Filed Date: 4/17/18.
Accession Number: 20180417–5001.
Comments Due: 5 p.m. ET 5/8/18.
Docket Numbers: ER18–1314–001.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Amendment:
Amendment to April 9 Filing to be
effective 1/4/2019.
Filed Date: 4/16/18.
Accession Number: 20180416–5098.
Comments Due: 5 p.m. ET 5/7/18.
Docket Numbers: ER18–1378–000.
Applicants: ITC Great Plains, LLC.
Description: Expedited Petition of ITC
Great Plains, LLC for Waiver of Tariff
Provisions and Shortened Answer
Period.
Filed Date: 4/16/18.
Accession Number: 20180416–5237.
Comments Due: 5 p.m. ET 4/26/18.
Docket Numbers: ER18–1379–000.
Applicants: PJM Interconnection,
L.L.C., Delaware Municipal Electric
Corporation, Inc.
Description: § 205(d) Rate Filing:
Revised SA No. 2978—NITSA among
PJM and Delaware Municipal Electric
Corp. to be effective 4/1/2018.
Filed Date: 4/17/18.
VerDate Sep<11>2014
17:03 Apr 23, 2018
Jkt 244001
Accession Number: 20180417–5018.
Comments Due: 5 p.m. ET 5/8/18.
Docket Numbers: ER18–1380–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
Hoosier Energy Rural Electric
Cooperative.
Description: § 205(d) Rate Filing:
2018–04–17_Revisions to add Hoosier
Energy to Ameren-PPI JPZA & Schs
7,8,9 to be effective 7/1/2018.
Filed Date: 4/17/18.
Accession Number: 20180417–5117.
Comments Due: 5 p.m. ET 5/8/18.
Docket Numbers: ER18–1381–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2018–04–17_Revisions to add Hoosier
Energy to Ameren-PPI JPZA & Schs
7,8,9 to be effective 7/1/2018.
Filed Date: 4/17/18.
Accession Number: 20180417–5126.
Comments Due: 5 p.m. ET 5/8/18.
Docket Numbers: ER18–1382–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
1630R8 The Empire District Electric
Company NITSA and NOA to be
effective 4/1/2018.
Filed Date: 4/17/18.
Accession Number: 20180417–5135.
Comments Due: 5 p.m. ET 5/8/18.
Docket Numbers: ER18–1383–000.
Applicants: PacifiCorp.
Description: § 205(d) Rate Filing: BPA
Construction Agmt ? Conversion RossLex-Swift Rev 1 to be effective
6/18/2018.
Filed Date: 4/17/18.
Accession Number: 20180417–5140.
Comments Due: 5 p.m. ET 5/8/18.
Docket Numbers: ER18–1384–000.
Applicants: Buchanan Generation,
LLC.
Description: § 205(d) Rate Filing:
Notice of Succession for Reactive
Service Rate Schedule to be effective
3/1/2018.
Filed Date: 4/17/18.
Accession Number: 20180417–5153.
Comments Due: 5 p.m. ET 5/8/18.
Accession Number: 20180416–5091.
Comments Due: 5 p.m. ET 5/7/18.
Take notice that the Commission
received the following qualifying
facility filings:
Docket Numbers: QF17–1029–002;
QF17–1030–001; QF17–1256–002;
QF17–1257–002; QF17–1258–002;
QF17–1337–001; QF17–1338–001;
QF17–1357–001; QF17–1455–001;
QF17–1532–001; QF17–1537–001; Q17–
1538–001.
Applicants: IGS ORIX Solar I, LLC,
IGS Solar I, LLC.
PO 00000
Frm 00032
Fmt 4703
Sfmt 4703
17819
Description: Refund Report of IGS
ORIX Solar I, LLC and IGS Solar I, LLC.
Filed Date: 4/17/18.
Accession Number: 20180417–5132.
Comments Due: 5 p.m. ET 5/7/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: April 17, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–08487 Filed 4–23–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Number: PR18–41–000.
Applicants: Kinder Morgan Texas
Pipeline LLC.
Description: Tariff filing per
284.123(b)(1)/: 2017 Annual
Certification.
Filed Date: 4/5/18.
Accession Number: 201804055113.
Comments/Protests Due: 5 p.m. ET
4/26/18.
Docket Numbers: RP18–699–000.
Applicants: Transcontinental Gas
Pipe Line Company.
Description: § 4(d) Rate Filing: GT&C
Section 61—Off-System Capacity to be
effective 5/13/2018.
Filed Date: 4/12/18.
Accession Number: 20180412–5053.
Comments Due: 5 p.m. ET 4/24/18.
Docket Numbers: RP18–700–000.
Applicants: NRG Canal LLC,GenOn
Holdco 10, LLC.
E:\FR\FM\24APN1.SGM
24APN1
Agencies
[Federal Register Volume 83, Number 79 (Tuesday, April 24, 2018)]
[Notices]
[Pages 17818-17819]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-08475]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CD18-6-000]
GenH, Inc.; Notice of Preliminary Determination of a Qualifying
Conduit Hydropower Facility and Soliciting Comments and Motions To
Intervene
On April 12, 2018, GenH, Inc. filed a notice of intent to construct
a qualifying conduit hydropower facility, pursuant to section 30 of the
Federal Power Act (FPA), as amended by section 4 of the Hydropower
Regulatory Efficiency Act of 2013 (HREA). The proposed McClellan Wash
Hydro Station Project would have an installed capacity of 75 kilowatts
(kW), and would be located at the existing McClellan Wash Drop along
the Central Main Canal near Eloy, Pinal County, Arizona.
Applicant Contact: Robert Freda, 306 Bellevue St., Boston, MA
02132, Phone No. (617) 435-6288.
FERC Contact: Christopher Chaney, Phone No. (202) 502-6778, email:
[email protected].
Qualifying Conduit Hydropower Facility Description: The proposed
project would consist of: (1) Five 15-kW Turgo turbine units with a
total installed capacity of 75 kW located at the McClellan Wash Drop of
the Central Main Canal; and (2) appurtenant facilities. The proposed
project would have an estimated annual generating capacity of about
900,000 kilowatt-hours.
A qualifying conduit hydropower facility is one that is determined
or deemed to meet all of the criteria shown in the table below.
Table 1--Criteria for Qualifying Conduit Hydropower Facility
------------------------------------------------------------------------
Statutory Provision Description Satisfies (Y/N)
------------------------------------------------------------------------
FPA 30(a)(3)(A), as amended by The conduit the Y
HREA. facility uses is a
tunnel, canal,
pipeline, aqueduct,
flume, ditch, or
similar manmade water
conveyance that is
operated for the
distribution of water
for agricultural,
municipal, or
industrial
consumption and not
primarily for the
generation of
electricity.
FPA 30(a)(3)(C)(i), as amended The facility is Y
by HREA. constructed,
operated, or
maintained for the
generation of
electric power and
uses for such
generation only the
hydroelectric
potential of a non-
federally owned
conduit.
FPA 30(a)(3)(C)(ii), as amended The facility has an Y
by HREA. installed capacity
that does not exceed
5 megawatts.
FPA 30(a)(3)(C)(iii), as On or before August 9, Y
amended by HREA. 2013, the facility is
not licensed, or
exempted from the
licensing
requirements of Part
I of the FPA.
------------------------------------------------------------------------
Preliminary Determination: The proposed addition of the
hydroelectric project along the existing irrigation canal will not
alter its primary purpose. Therefore, based upon the above information
and criteria, Commission staff preliminarily determines that the
proposal satisfies the requirements for a qualifying conduit hydropower
facility, which is not required to be licensed or exempted from
licensing.
Comments and Motions to Intervene: Deadline for filing comments
contesting whether the facility meets the qualifying criteria is 45
days from the issuance date of this notice.
Deadline for filing motions to intervene is 30 days from the
issuance date of this notice.
Anyone may submit comments or a motion to intervene in accordance
with the requirements of Rules of Practice and Procedure, 18 CFR
385.210 and 385.214. Any motions to intervene must be received on or
before the specified deadline date for the particular proceeding.
Filing and Service of Responsive Documents: All filings must (1)
bear in all capital letters the COMMENTS CONTESTING QUALIFICATION FOR A
CONDUIT HYDROPOWER FACILITY or MOTION TO INTERVENE, as applicable; (2)
state in the heading the name of the applicant and the project number
of the application to which the filing responds; (3) state the name,
address, and telephone number of the person filing; and (4) otherwise
comply with the requirements of sections 385.2001 through 385.2005 of
the Commission's regulations.\1\ All comments contesting Commission
staff's preliminary determination that the facility meets the
qualifying criteria must set forth their evidentiary basis.
---------------------------------------------------------------------------
\1\ 18 CFR 385.2001-2005 (2017).
---------------------------------------------------------------------------
The Commission strongly encourages electronic filing. Please file
motions to intervene and comments using the Commission's eFiling system
at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit
brief comments up to 6,000 characters, without prior registration,
using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the
end of your comments. For assistance, please contact FERC Online
Support at [email protected], (866) 208-3676 (toll free), or
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper
copy to: Secretary, Federal Energy Regulatory Commission, 888 First
Street NE, Washington, DC 20426. A copy of all other filings in
reference to this application must be accompanied by proof of service
on all persons listed in the service list prepared by the Commission in
this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
Locations of Notice of Intent: Copies of the notice of intent can
be obtained directly from the applicant or such copies can be viewed
and reproduced at the Commission in its Public Reference Room, Room 2A,
888 First Street NE, Washington, DC 20426. The filing may also be
viewed on the web at https://www.ferc.gov/docs-filing/elibrary.asp using
the eLibrary link. Enter the docket number (i.e., CD18-6) in the docket
number field to access the document. For assistance, call toll-free 1-
866-208-3676 or email [email protected]. For TTY, call (202)
502-8659.
[[Page 17819]]
Dated: April 17, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-08475 Filed 4-23-18; 8:45 am]