Carolina Solar Power, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization, 17546-17547 [2018-08307]
Download as PDF
17546
Federal Register / Vol. 83, No. 77 / Friday, April 20, 2018 / Notices
low enriched uranium, 61,535 g of
which is in the isotope of U–235 (12.12
percent enrichment), and 4,427 g of
plutonium, in the form of 236 irradiated
fuel assemblies from the Open Pool
Australian Lightwater (OPAL) research
reactor at the Australian Nuclear
Science and Technology Organisation in
Australia, to Orano (formerly AREVA
NC) at the La Hague reprocessing plant
in France. The material in the irradiated
fuel assemblies, which is currently
located at the OPAL reactor, is to be
retransferred to the La Hague plant for
reprocessing. Orano will take title to the
plutonium recovered during
reprocessing, which will be
incorporated into fresh civilian mixed
oxide fuel assemblies. Residual
plutonium that is not removed during
reprocessing will be vitrified in
canisters, which will be returned to
Australia at a later time.
In accordance with section 131 of the
Atomic Energy Act of 1954, as amended,
I have determined that this subsequent
arrangement concerning the retransfer of
U.S.-obligated special nuclear material
for reprocessing will not be inimical to
the common defense and security of the
United States of America and made the
judgment that it will not result in a
significant increase in the risk of
proliferation beyond that which exists
now, or which existed at the time
approval was requested.
Dated: April 10, 2018.
For the Department of Energy.
Lisa E. Gordon-Hagerty,
Under Secretary for Nuclear Security
Administrator, National Nuclear Security
Administration.
[FR Doc. 2018–08284 Filed 4–19–18; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
DOE/NSF High Energy Physics
Advisory Panel
Office of Science, Department
of Energy.
ACTION: Notice of open meeting.
AGENCY:
This notice announces a
meeting of the DOE/NSF High Energy
Physics Advisory Panel (HEPAP). The
Federal Advisory Committee Act
requires that public notice of these
meetings be announced in the Federal
Register.
DATES: Monday, May 14, 2018, 8:30 a.m.
to 6:00 p.m.; Tuesday, May 15, 2018,
8:30 a.m. to 4:00 p.m.
ADDRESSES: Hilton Washington DC
North/Gaithersburg, 620 Perry Parkway,
Gaithersburg, MD 20877.
sradovich on DSK3GMQ082PROD with NOTICES
SUMMARY:
VerDate Sep<11>2014
17:44 Apr 19, 2018
Jkt 244001
John
Kogut, Executive Secretary; High Energy
Physics Advisory Panel (HEPAP); U.S.
Department of Energy; Office of Science;
SC–25/Germantown Building, 1000
Independence Avenue SW, Washington,
DC 20585; Telephone: (301) 903–1298.
FOR FURTHER INFORMATION CONTACT:
SUPPLEMENTARY INFORMATION:
Purpose of Meeting: To provide
advice and guidance on a continuing
basis to the Department of Energy and
the National Science Foundation on
scientific priorities within the field of
high energy physics research.
Tentative Agenda: Agenda will
include discussions of the following:
May 14–15, 2018.
• Discussion of Department of Energy
High Energy Physics Program
• Discussion of National Science
Foundation Elementary Particle
Physics Program
• Reports on and Discussions of Topics
of General Interest in High Energy
Physics
• Public Comment (10-minute rule)
Public Participation: The meeting is
open to the public. A webcast of this
meeting will be available. Please check
the website below for updates and
information on how to view the
meeting. If you would like to file a
written statement with the Committee,
you may do so either before or after the
meeting. If you would like to make oral
statements regarding any of these items
on the agenda, you should contact John
Kogut, (301) 903–1298 or by email at:
John.Kogut@science.doe.gov. You must
make your request for an oral statement
at least five business days before the
meeting. Reasonable provision will be
made to include the scheduled oral
statements on the agenda. The
Chairperson of the Panel will conduct
the meeting to facilitate the orderly
conduct of business. Public comment
will follow the 10-minute rule.
Minutes: The minutes of the meeting
will be available on the U.S. Department
of Energy’s Office of High Energy
Physics Advisory Panel website: https://
science.energy.gov/hep/hepap/
meetings/.
Issued at Washington, DC, on April 16,
2018.
Latanya Butler,
Deputy Committee Management Officer.
[FR Doc. 2018–08242 Filed 4–19–18; 8:45 am]
BILLING CODE 6450–01–P
PO 00000
Frm 00027
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER18–1343–000]
Carolina Solar Power, LLC;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
This is a supplemental notice in the
above-referenced proceeding Carolina
Solar Power, LLC‘s application for
market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is May 7, 2018.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
E:\FR\FM\20APN1.SGM
20APN1
Federal Register / Vol. 83, No. 77 / Friday, April 20, 2018 / Notices
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: April 16, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–08307 Filed 4–19–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2788–017]
sradovich on DSK3GMQ082PROD with NOTICES
Notice of Application Ready for
Environmental Analysis and Soliciting
Comments, Recommendations, Terms
and Conditions, and Prescriptions;
Goodyear Lake Hydro, LLC
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Subsequent
Minor License.
b. Project No.: 2788–017.
c. Date filed: February 27, 2017.
d. Applicant: Goodyear Lake Hydro,
LLC (Goodyear Lake Hydro).
e. Name of Project: Colliersville
Hydroelectric Project.
f. Location: On the Susquehanna
River, in the Town of Milford, Otsego
County, New York. The project does not
occupy lands of the United States.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791 (a)–825(r).
h. Applicant Contact: Mr. Kevin
Webb, Hydro Licensing Manager; Enel
Green Power North America, Inc., 100
Brickstone Square, Suite 300, Andover,
MA 01810; (978) 935–6039;
kevin.webb@enel.com.
i. FERC Contact: Emily Carter, (202)
502–6512 or emily.carter@ferc.gov.
j. Deadline for filing comments,
recommendations, terms and
conditions, and prescriptions: 60 days
from the issuance date of this notice;
reply comments are due 105 days from
the issuance date of this notice.
The Commission strongly encourages
electronic filing. Please file comments,
recommendations, terms and
conditions, and prescriptions using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket number P–2788–017.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. This application has been accepted,
and is ready for environmental analysis
at this time.
l. The Colliersville Hydroelectric
Project consists of: (1) A 200-foot-long,
35-foot-high reinforced-concrete
Ambursen-type dam; (2) a 364-acre
reservoir (Goodyear Lake) with a gross
storage capacity of 7,800 acre-feet at a
normal pool elevation of 1,150.22 feet
National Geodetic Vertical Datum of
1929; (3) a 550-foot-long reinforced
concrete power canal, approximately 50
feet wide and 6 feet deep at the head
gates, extending from a head gate
structure adjacent to the dam (i.e., the
intake) to the powerhouse; (4) a 103foot-long by 33-foot-wide reinforced
concrete powerhouse with trash racks
with a clear spacing of 1.5 inches, and
containing two turbines rated at 850
horsepower (HP) and 1,150 HP, and two
generators having a rated capacity of
650 kilowatts (kW) and 850 kW,
respectively; (5) a 300-foot-long and
approximately 50- to 60-foot-wide
tailrace; (6) approximately 80-foot-long,
4.16-kilovolt underground generator
leads or transmission lines from the
powerhouse to an adjacent substation
owned by the New York State Electric
and Gas Corporation; and (7)
appurtenant facilities.
Goodyear Lake Hydro operates the
project in a run-of-river mode. The
project experiences substantial seasonal
and annual variations in generation, and
generates an annual average of 5,985
megawatt-hours. Goodyear Lake Hydro
proposes to continue to operate the
project in run-of-river mode.
m. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s website at
https://www.ferc.gov using the eLibrary
link. Enter the docket number excluding
the last three digits in the docket
number field to access the document.
For assistance, contact FERC Online
Support. A copy is also available for
inspection and reproduction at the
address in item h above.
All filings must (1) bear in all capital
letters the title COMMENTS, REPLY
COMMENTS, RECOMMENDATIONS,
TERMS AND CONDITIONS, or
PRESCRIPTIONS; (2) set forth in the
heading the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person submitting the
filing; and (4) otherwise comply with
the requirements of 18 CFR 385.2001
through 385.2005. All comments,
recommendations, terms and conditions
or prescriptions must set forth their
evidentiary basis and otherwise comply
with the requirements of 18 CFR 4.34(b).
Agencies may obtain copies of the
application directly from the applicant.
Each filing must be accompanied by
proof of service on all persons listed on
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. A license applicant must file no
later than 60 days following the date of
issuance of this notice: (1) A copy of the
water quality certification; (2) a copy of
the request for certification, including
proof of the date on which the certifying
agency received the request; or (3)
evidence of waiver of water quality
certification.
o. Procedural schedule: The
application will be processed according
to the following schedule. Revisions to
the schedule will be made as
appropriate.
Milestone
Target date
Deadline for Filing Comments, Recommendations, and Agency Terms and Conditions/Prescriptions .................................
Deadline for filing Reply Comments ........................................................................................................................................
Commission issues EA ............................................................................................................................................................
VerDate Sep<11>2014
17:44 Apr 19, 2018
Jkt 244001
PO 00000
Frm 00028
Fmt 4703
17547
Sfmt 4703
E:\FR\FM\20APN1.SGM
20APN1
June 2018.
July 2018.
November 2018.
Agencies
[Federal Register Volume 83, Number 77 (Friday, April 20, 2018)]
[Notices]
[Pages 17546-17547]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-08307]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. ER18-1343-000]
Carolina Solar Power, LLC; Supplemental Notice That Initial
Market-Based Rate Filing Includes Request for Blanket Section 204
Authorization
This is a supplemental notice in the above-referenced proceeding
Carolina Solar Power, LLC`s application for market-based rate
authority, with an accompanying rate tariff, noting that such
application includes a request for blanket authorization, under 18 CFR
part 34, of future issuances of securities and assumptions of
liability.
Any person desiring to intervene or to protest should file with the
Federal Energy Regulatory Commission, 888 First Street NE, Washington,
DC 20426, in accordance with Rules 211 and 214 of the Commission's
Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone
filing a motion to intervene or protest must serve a copy of that
document on the Applicant.
Notice is hereby given that the deadline for filing protests with
regard to the applicant's request for blanket authorization, under 18
CFR part 34, of future issuances of securities and assumptions of
liability, is May 7, 2018.
The Commission encourages electronic submission of protests and
interventions in lieu of paper, using the FERC Online links at https://www.ferc.gov. To facilitate electronic service, persons with internet
access who will eFile a document and/or be listed as a contact for an
intervenor must create and validate an eRegistration account using the
eRegistration link. Select the eFiling link to log on and submit the
intervention or protests.
Persons unable to file electronically should submit an original and
5 copies of the intervention or protest to the Federal Energy
Regulatory Commission, 888 First Street NE, Washington, DC 20426.
The filings in the above-referenced proceeding are accessible in
the Commission's eLibrary system by clicking on the appropriate link in
the above list. They are also available for electronic review in the
Commission's Public Reference Room in Washington, DC. There is an
eSubscription link on the website that enables subscribers to receive
email notification when a document is added to a subscribed docket(s).
For assistance with any FERC Online service, please email
[[Page 17547]]
[email protected]. or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Dated: April 16, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-08307 Filed 4-19-18; 8:45 am]