Notice of Application Ready for Environmental Analysis and Soliciting Comments, Recommendations, Terms and Conditions, and Prescriptions; Goodyear Lake Hydro, LLC, 17547-17548 [2018-08267]
Download as PDF
Federal Register / Vol. 83, No. 77 / Friday, April 20, 2018 / Notices
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: April 16, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–08307 Filed 4–19–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2788–017]
sradovich on DSK3GMQ082PROD with NOTICES
Notice of Application Ready for
Environmental Analysis and Soliciting
Comments, Recommendations, Terms
and Conditions, and Prescriptions;
Goodyear Lake Hydro, LLC
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Subsequent
Minor License.
b. Project No.: 2788–017.
c. Date filed: February 27, 2017.
d. Applicant: Goodyear Lake Hydro,
LLC (Goodyear Lake Hydro).
e. Name of Project: Colliersville
Hydroelectric Project.
f. Location: On the Susquehanna
River, in the Town of Milford, Otsego
County, New York. The project does not
occupy lands of the United States.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791 (a)–825(r).
h. Applicant Contact: Mr. Kevin
Webb, Hydro Licensing Manager; Enel
Green Power North America, Inc., 100
Brickstone Square, Suite 300, Andover,
MA 01810; (978) 935–6039;
kevin.webb@enel.com.
i. FERC Contact: Emily Carter, (202)
502–6512 or emily.carter@ferc.gov.
j. Deadline for filing comments,
recommendations, terms and
conditions, and prescriptions: 60 days
from the issuance date of this notice;
reply comments are due 105 days from
the issuance date of this notice.
The Commission strongly encourages
electronic filing. Please file comments,
recommendations, terms and
conditions, and prescriptions using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket number P–2788–017.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. This application has been accepted,
and is ready for environmental analysis
at this time.
l. The Colliersville Hydroelectric
Project consists of: (1) A 200-foot-long,
35-foot-high reinforced-concrete
Ambursen-type dam; (2) a 364-acre
reservoir (Goodyear Lake) with a gross
storage capacity of 7,800 acre-feet at a
normal pool elevation of 1,150.22 feet
National Geodetic Vertical Datum of
1929; (3) a 550-foot-long reinforced
concrete power canal, approximately 50
feet wide and 6 feet deep at the head
gates, extending from a head gate
structure adjacent to the dam (i.e., the
intake) to the powerhouse; (4) a 103foot-long by 33-foot-wide reinforced
concrete powerhouse with trash racks
with a clear spacing of 1.5 inches, and
containing two turbines rated at 850
horsepower (HP) and 1,150 HP, and two
generators having a rated capacity of
650 kilowatts (kW) and 850 kW,
respectively; (5) a 300-foot-long and
approximately 50- to 60-foot-wide
tailrace; (6) approximately 80-foot-long,
4.16-kilovolt underground generator
leads or transmission lines from the
powerhouse to an adjacent substation
owned by the New York State Electric
and Gas Corporation; and (7)
appurtenant facilities.
Goodyear Lake Hydro operates the
project in a run-of-river mode. The
project experiences substantial seasonal
and annual variations in generation, and
generates an annual average of 5,985
megawatt-hours. Goodyear Lake Hydro
proposes to continue to operate the
project in run-of-river mode.
m. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s website at
https://www.ferc.gov using the eLibrary
link. Enter the docket number excluding
the last three digits in the docket
number field to access the document.
For assistance, contact FERC Online
Support. A copy is also available for
inspection and reproduction at the
address in item h above.
All filings must (1) bear in all capital
letters the title COMMENTS, REPLY
COMMENTS, RECOMMENDATIONS,
TERMS AND CONDITIONS, or
PRESCRIPTIONS; (2) set forth in the
heading the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person submitting the
filing; and (4) otherwise comply with
the requirements of 18 CFR 385.2001
through 385.2005. All comments,
recommendations, terms and conditions
or prescriptions must set forth their
evidentiary basis and otherwise comply
with the requirements of 18 CFR 4.34(b).
Agencies may obtain copies of the
application directly from the applicant.
Each filing must be accompanied by
proof of service on all persons listed on
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. A license applicant must file no
later than 60 days following the date of
issuance of this notice: (1) A copy of the
water quality certification; (2) a copy of
the request for certification, including
proof of the date on which the certifying
agency received the request; or (3)
evidence of waiver of water quality
certification.
o. Procedural schedule: The
application will be processed according
to the following schedule. Revisions to
the schedule will be made as
appropriate.
Milestone
Target date
Deadline for Filing Comments, Recommendations, and Agency Terms and Conditions/Prescriptions .................................
Deadline for filing Reply Comments ........................................................................................................................................
Commission issues EA ............................................................................................................................................................
VerDate Sep<11>2014
17:44 Apr 19, 2018
Jkt 244001
PO 00000
Frm 00028
Fmt 4703
17547
Sfmt 4703
E:\FR\FM\20APN1.SGM
20APN1
June 2018.
July 2018.
November 2018.
17548
Federal Register / Vol. 83, No. 77 / Friday, April 20, 2018 / Notices
Milestone
Target date
Comments due on EA .............................................................................................................................................................
Dated: April 16, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–08267 Filed 4–19–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Effectiveness of Exempt
Wholesale Generator Status
Docket Nos.
GSP Lost Nation LLC ....................
GSP Merrimack LLC .....................
GSP Newington LLC .....................
GSP Schiller LLC ..........................
GSP White Lake LLC ....................
Gray Hawk Solar, LLC ..................
Gregory Power Partners LLC ........
Montpelier Generating Station,
LLC.
Monument Generating Station,
LLC.
O.H. Hutchings CT, LLC ...............
Sidney, LLC ...................................
Tait Electric Generating Station,
LLC.
Yankee Street, LLC .......................
EG18–27–000
EG18–28–000
EG18–29–000
EG18–30–000
EG18–31–000
EG18–32–000
EG18–33–000
EG18–34–000
EG18–35–000
EG18–36–000
EG18–37–000
EG18–38–000
EG18–39–000
Take notice that during the month of
March 2018, the status of the abovecaptioned entities as Exempt Wholesale
Generators became effective by
operation of the Commission’s
regulations. 18 CFR 366.7(a)(2017).
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–08306 Filed 4–19–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
sradovich on DSK3GMQ082PROD with NOTICES
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC18–84–000.
Applicants: Star Energy Partners, LLC.
Description: Application for
Authorization Under Section 203 of the
Federal Power Act, et al. of Star Energy
Partners, LLC.
Filed Date: 4/16/18.
Accession Number: 20180416–5095.
Comments Due: 5 p.m. ET 5/7/18.
Take notice that the Commission
received the following electric rate
filings:
VerDate Sep<11>2014
17:44 Apr 19, 2018
Jkt 244001
Docket Numbers: ER10–3297–013.
Applicants: Powerex Corp.
Description: Compliance filing:
Compliance Filing to March 29 Letter
Order to be effective 3/29/2018.
Filed Date: 4/16/18.
Accession Number: 20180416–5129.
Comments Due: 5 p.m. ET 5/7/18.
Docket Numbers: ER11–3917–001;
ER10–2774–004.
Applicants: Mojave Solar LLC,
Arizona Solar One LLC.
Description: Notice of Change in
Status of Mojave Solar LLC, et al.
Filed Date: 4/13/18.
Accession Number: 20180413–5302.
Comments Due: 5 p.m. ET 5/4/18.
Docket Numbers: ER18–1375–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original WMPA SA No. 5052; Queue
No. AD1–028 to be effective 4/5/2018.
Filed Date: 4/16/18.
Accession Number: 20180416–5075.
Comments Due: 5 p.m. ET 5/7/18.
Docket Numbers: ER18–1376–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2018–04–16_SA 1558 Forward EnergyATC 8th Rev LGIA (G368) to be effective
4/2/2018.
Filed Date: 4/16/18.
Accession Number: 20180416–5159.
Comments Due: 5 p.m. ET 5/7/18.
Docket Numbers: ER18–1377–000.
Applicants: Bayonne Plant Holding,
L.L.C.
Description: Tariff Cancellation:
Notice of Cancellation to be effective 6/
1/2018.
Filed Date: 4/16/18.
Accession Number: 20180416–5165.
Comments Due: 5 p.m. ET 5/7/18.
Take notice that the Commission
received the following electric securities
filings:
Docket Numbers: ES18–29–000.
Applicants: Orange and Rockland
Utilities, Inc.
Description: Application of Orange
and Rockland Utilities, Inc. for an Order
Authorizing the Issue and Sale of Shortterm Debt.
Filed Date: 4/16/18.
Accession Number: 20180416–5092.
Comments Due: 5 p.m. ET 5/7/18.
Take notice that the Commission
received the following qualifying
facility filings:
Docket Numbers: QF18–610–000.
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
December 2018.
Applicants: Trustees of Princeton
University.
Description: Form 556 of Trustees of
Princeton University [Plainsboro].
Filed Date: 2/8/18.
Accession Number: 20180208–5154.
Comments Due: Non Applicable.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: April 16, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–08305 Filed 4–19–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2337–077]
Notice of Availability of Final
Environmental Assessment;
PacifiCorp
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission’s (Commission)
regulations, 18 CFR part 380, the Office
of Energy Projects has reviewed the
application for new license for the
Prospect No. 3 Hydroelectric Project,
located on the South Fork Rogue River
in Jackson County, Oregon, and has
prepared a Final Environmental
Assessment (FEA) for the project. The
project currently occupies 32.4 acres of
federal land managed by the U.S. Forest
Service as part of the Rogue RiverSiskiyou National Forest.
E:\FR\FM\20APN1.SGM
20APN1
Agencies
[Federal Register Volume 83, Number 77 (Friday, April 20, 2018)]
[Notices]
[Pages 17547-17548]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-08267]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2788-017]
Notice of Application Ready for Environmental Analysis and
Soliciting Comments, Recommendations, Terms and Conditions, and
Prescriptions; Goodyear Lake Hydro, LLC
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Subsequent Minor License.
b. Project No.: 2788-017.
c. Date filed: February 27, 2017.
d. Applicant: Goodyear Lake Hydro, LLC (Goodyear Lake Hydro).
e. Name of Project: Colliersville Hydroelectric Project.
f. Location: On the Susquehanna River, in the Town of Milford,
Otsego County, New York. The project does not occupy lands of the
United States.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791 (a)-825(r).
h. Applicant Contact: Mr. Kevin Webb, Hydro Licensing Manager; Enel
Green Power North America, Inc., 100 Brickstone Square, Suite 300,
Andover, MA 01810; (978) 935-6039; [email protected].
i. FERC Contact: Emily Carter, (202) 502-6512 or
[email protected].
j. Deadline for filing comments, recommendations, terms and
conditions, and prescriptions: 60 days from the issuance date of this
notice; reply comments are due 105 days from the issuance date of this
notice.
The Commission strongly encourages electronic filing. Please file
comments, recommendations, terms and conditions, and prescriptions
using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000
characters, without prior registration, using the eComment system at
https://www.ferc.gov/docs-filing/ecomment.asp. You must include your
name and contact information at the end of your comments. For
assistance, please contact FERC Online Support at
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE,
Washington, DC 20426. The first page of any filing should include
docket number P-2788-017.
The Commission's Rules of Practice require all intervenors filing
documents with the Commission to serve a copy of that document on each
person on the official service list for the project. Further, if an
intervenor files comments or documents with the Commission relating to
the merits of an issue that may affect the responsibilities of a
particular resource agency, they must also serve a copy of the document
on that resource agency.
k. This application has been accepted, and is ready for
environmental analysis at this time.
l. The Colliersville Hydroelectric Project consists of: (1) A 200-
foot-long, 35-foot-high reinforced-concrete Ambursen-type dam; (2) a
364-acre reservoir (Goodyear Lake) with a gross storage capacity of
7,800 acre-feet at a normal pool elevation of 1,150.22 feet National
Geodetic Vertical Datum of 1929; (3) a 550-foot-long reinforced
concrete power canal, approximately 50 feet wide and 6 feet deep at the
head gates, extending from a head gate structure adjacent to the dam
(i.e., the intake) to the powerhouse; (4) a 103-foot-long by 33-foot-
wide reinforced concrete powerhouse with trash racks with a clear
spacing of 1.5 inches, and containing two turbines rated at 850
horsepower (HP) and 1,150 HP, and two generators having a rated
capacity of 650 kilowatts (kW) and 850 kW, respectively; (5) a 300-
foot-long and approximately 50- to 60-foot-wide tailrace; (6)
approximately 80-foot-long, 4.16-kilovolt underground generator leads
or transmission lines from the powerhouse to an adjacent substation
owned by the New York State Electric and Gas Corporation; and (7)
appurtenant facilities.
Goodyear Lake Hydro operates the project in a run-of-river mode.
The project experiences substantial seasonal and annual variations in
generation, and generates an annual average of 5,985 megawatt-hours.
Goodyear Lake Hydro proposes to continue to operate the project in run-
of-river mode.
m. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's website at https://www.ferc.gov using the eLibrary link.
Enter the docket number excluding the last three digits in the docket
number field to access the document. For assistance, contact FERC
Online Support. A copy is also available for inspection and
reproduction at the address in item h above.
All filings must (1) bear in all capital letters the title
COMMENTS, REPLY COMMENTS, RECOMMENDATIONS, TERMS AND CONDITIONS, or
PRESCRIPTIONS; (2) set forth in the heading the name of the applicant
and the project number of the application to which the filing responds;
(3) furnish the name, address, and telephone number of the person
submitting the filing; and (4) otherwise comply with the requirements
of 18 CFR 385.2001 through 385.2005. All comments, recommendations,
terms and conditions or prescriptions must set forth their evidentiary
basis and otherwise comply with the requirements of 18 CFR 4.34(b).
Agencies may obtain copies of the application directly from the
applicant. Each filing must be accompanied by proof of service on all
persons listed on the service list prepared by the Commission in this
proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
n. A license applicant must file no later than 60 days following
the date of issuance of this notice: (1) A copy of the water quality
certification; (2) a copy of the request for certification, including
proof of the date on which the certifying agency received the request;
or (3) evidence of waiver of water quality certification.
o. Procedural schedule: The application will be processed according
to the following schedule. Revisions to the schedule will be made as
appropriate.
------------------------------------------------------------------------
Milestone Target date
------------------------------------------------------------------------
Deadline for Filing Comments, June 2018.
Recommendations, and Agency Terms and
Conditions/Prescriptions.
Deadline for filing Reply Comments........ July 2018.
Commission issues EA...................... November 2018.
[[Page 17548]]
Comments due on EA........................ December 2018.
------------------------------------------------------------------------
Dated: April 16, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-08267 Filed 4-19-18; 8:45 am]
BILLING CODE 6717-01-P