Drawbridge Operation Regulation; Atlantic Intracoastal Waterway, Palm Beach, FL, 17492 [2018-08260]
Download as PDF
17492
Federal Register / Vol. 83, No. 77 / Friday, April 20, 2018 / Rules and Regulations
(d) Informational broadcasts. The
COTP or a designated representative
will inform the public through
Broadcast Notices to Mariners of the
enforcement period for the temporary
special local regulation as well as any
changes in the planned schedule.
Dated: April 16, 2018.
M.R. Mclellan,
Captain, U.S. Coast Guard, Captain of the
Port Sector Mobile.
[FR Doc. 2018–08314 Filed 4–19–18; 8:45 am]
BILLING CODE 9110–04–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2018–0342]
Drawbridge Operation Regulation;
Atlantic Intracoastal Waterway, Palm
Beach, FL
Coast Guard, DHS.
Notice of deviation from
drawbridge regulation.
AGENCY:
ACTION:
The Coast Guard has issued a
temporary deviation from the operating
schedule that governs the Southern
Boulevard (SR 700/80) Bridge across the
Atlantic Intracoastal Waterway, mile
1024.7, at Palm Beach, FL. The
deviation is necessary to accommodate
the installation of a temporary lift
bridge. This deviation allows the bridge
to remain closed to navigation with
openings when advanced notice is given
during the temporary lift bridge
installation.
DATES: This deviation is effective
without actual notice from April 20,
2018 through 6 p.m. on April 30, 2018.
For the purposes of enforcement, actual
notice will be used from 7 a.m. on April
10, 2018, until April 20, 2018.
ADDRESSES: The docket for this
deviation, USCG–2018–0342 is available
at https://www.regulations.gov. Type the
docket number in the ‘‘SEARCH’’ box
and click ‘‘SEARCH’’. Click on Open
Docket Folder on the line associated
with this deviation.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this temporary
deviation, call or email LT Ruth
Sadowitz, U.S. Coast Guard Sector
Miami, Waterways Management
Division; telephone 305–535–4307,
email ruth.a.sadowitz@uscg.mil.
SUPPLEMENTARY INFORMATION: Johnson
Bros. Corporation, on behalf of the
bridge owner, Florida Department of
Transportation, has requested a
sradovich on DSK3GMQ082PROD with RULES
SUMMARY:
VerDate Sep<11>2014
15:57 Apr 19, 2018
Jkt 244001
temporary deviation from the current
operating regulation that governs the
Southern Boulevard (SR 700/80) Bridge
across the Atlantic Intracoastal
Waterway, mile 1024.7, at Palm Beach,
FL. The deviation is necessary to
facilitate the installation of a temporary
lift bridge adjacent to the existing
bascule bridge, which will be used
during the bridge replacement of the
Southern Boulevard Bridge. The
existing bridge is a double-leaf bascule
bridge with a vertical clearance of 14
feet at mean high water in the closed to
navigation position. The temporary lift
bridge will have a vertical clearance of
14 feet in the closed position and 65 feet
in the lifted position at mean high
water.
The existing bridge operating
regulation is set out in 33 CFR
117.261(w). Under this temporary
deviation, the bridge will remain in the
closed to navigation position from 7
a.m. on April 10, 2018 through 6 p.m.
on April 16, 2018. From 6:01 p.m. on
April 16, 2018 through 6 p.m. on April
30, 2018, both the existing bascule
bridge and the temporary lift bridge will
open with a four (4) hour advanced
notice to the bridge tender. The vertical
clearance will be reduced to 65 feet
until the completion of the bridge
replacement project.
The Atlantic Intracoastal Waterway is
used by a variety of vessels including
U.S. government vessels, small
commercial vessels, recreational vessels
and tugs and barge traffic. The Coast
Guard has carefully considered the
restrictions with waterway users in
publishing this temporary deviation.
For the duration of the temporary lift
bridge installation, 7 a.m. on April 10,
2018 through 6 p.m. on April 16, 2018,
vessels will not be allowed to pass
through the bridge for safety reasons.
From 6:01 p.m. on April 16, 2018
through 6 p.m. on April 30, 2018,
vessels able to pass through the bridge
in the closed position may do so at any
time. The bridge will not be able to open
for emergencies and there is no
immediate alternate route for vessels to
pass.
The Coast Guard will also inform the
users of the waterways through our
Local and Broadcast Notices to Mariners
of the change in operating schedule for
the bridge so that vessel operators can
arrange their transits to minimize any
impact caused by the temporary
deviation.
In accordance with 33 CFR 117.35(e),
the drawbridge must return to its regular
operating schedule immediately at the
end of the effective period of this
temporary deviation. This deviation
PO 00000
Frm 00016
Fmt 4700
Sfmt 4700
from the operating regulations is
authorized under 33 CFR 117.35.
Barry L. Dragon,
Director, Bridge Branch, Seventh Coast Guard
District.
[FR Doc. 2018–08260 Filed 4–19–18; 8:45 am]
BILLING CODE 9110–04–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2018–0199]
Drawbridge Operation Regulation;
Willamette River, Portland, OR
Coast Guard, DHS.
Notice of deviation from
drawbridge regulation.
AGENCY:
ACTION:
The Coast Guard has issued a
temporary deviation from the operating
schedule that governs the Broadway
Bridge across the Willamette River, mile
11.7, at Portland, OR. The deviation is
necessary to accommodate the Portland
Race for the Roses event. This deviation
allows the bridge to remain in the
closed-to-navigation position to
facilitate the safe movement of event
participants across the bridge.
DATES: This deviation is effective from
5 a.m. to Noon on April 29, 2018.
ADDRESSES: The docket for this
deviation, USCG–2018–0199, is
available at https://www.regulations.gov.
Type the docket number in the
‘‘SEARCH’’ box and click ‘‘SEARCH.’’
Click on Open Docket Folder on the line
associated with this deviation.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this temporary
deviation, call or email Mr. Steven
Fischer, Bridge Administrator,
Thirteenth Coast Guard District;
telephone 206–220–7282, email
Steven.M.Fischer@uscg.mil.
SUPPLEMENTARY INFORMATION:
Multnomah County, the bridge owner,
requested the Broadway Bridge be
allowed to remain in closed-tonavigation position to vessel traffic to
facilitate the safe, uninterrupted
roadway passage of participants in the
Portland Race for the Roses event. The
Broadway Bridge crosses the Willamette
River at mile 11.7, and provides 90 feet
of vertical clearance above Columbia
River Datum 0.0 while in the closed-tonavigation position. This bridge
operates in accordance with 33 CFR
117.897. This deviation allows the
Broadway Bridge to not open to marine
vessels from 5 a.m. to Noon (12 p.m.) on
SUMMARY:
E:\FR\FM\20APR1.SGM
20APR1
Agencies
[Federal Register Volume 83, Number 77 (Friday, April 20, 2018)]
[Rules and Regulations]
[Page 17492]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-08260]
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG-2018-0342]
Drawbridge Operation Regulation; Atlantic Intracoastal Waterway,
Palm Beach, FL
AGENCY: Coast Guard, DHS.
ACTION: Notice of deviation from drawbridge regulation.
-----------------------------------------------------------------------
SUMMARY: The Coast Guard has issued a temporary deviation from the
operating schedule that governs the Southern Boulevard (SR 700/80)
Bridge across the Atlantic Intracoastal Waterway, mile 1024.7, at Palm
Beach, FL. The deviation is necessary to accommodate the installation
of a temporary lift bridge. This deviation allows the bridge to remain
closed to navigation with openings when advanced notice is given during
the temporary lift bridge installation.
DATES: This deviation is effective without actual notice from April 20,
2018 through 6 p.m. on April 30, 2018. For the purposes of enforcement,
actual notice will be used from 7 a.m. on April 10, 2018, until April
20, 2018.
ADDRESSES: The docket for this deviation, USCG-2018-0342 is available
at https://www.regulations.gov. Type the docket number in the ``SEARCH''
box and click ``SEARCH''. Click on Open Docket Folder on the line
associated with this deviation.
FOR FURTHER INFORMATION CONTACT: If you have questions on this
temporary deviation, call or email LT Ruth Sadowitz, U.S. Coast Guard
Sector Miami, Waterways Management Division; telephone 305-535-4307,
email [email protected].
SUPPLEMENTARY INFORMATION: Johnson Bros. Corporation, on behalf of the
bridge owner, Florida Department of Transportation, has requested a
temporary deviation from the current operating regulation that governs
the Southern Boulevard (SR 700/80) Bridge across the Atlantic
Intracoastal Waterway, mile 1024.7, at Palm Beach, FL. The deviation is
necessary to facilitate the installation of a temporary lift bridge
adjacent to the existing bascule bridge, which will be used during the
bridge replacement of the Southern Boulevard Bridge. The existing
bridge is a double-leaf bascule bridge with a vertical clearance of 14
feet at mean high water in the closed to navigation position. The
temporary lift bridge will have a vertical clearance of 14 feet in the
closed position and 65 feet in the lifted position at mean high water.
The existing bridge operating regulation is set out in 33 CFR
117.261(w). Under this temporary deviation, the bridge will remain in
the closed to navigation position from 7 a.m. on April 10, 2018 through
6 p.m. on April 16, 2018. From 6:01 p.m. on April 16, 2018 through 6
p.m. on April 30, 2018, both the existing bascule bridge and the
temporary lift bridge will open with a four (4) hour advanced notice to
the bridge tender. The vertical clearance will be reduced to 65 feet
until the completion of the bridge replacement project.
The Atlantic Intracoastal Waterway is used by a variety of vessels
including U.S. government vessels, small commercial vessels,
recreational vessels and tugs and barge traffic. The Coast Guard has
carefully considered the restrictions with waterway users in publishing
this temporary deviation.
For the duration of the temporary lift bridge installation, 7 a.m.
on April 10, 2018 through 6 p.m. on April 16, 2018, vessels will not be
allowed to pass through the bridge for safety reasons. From 6:01 p.m.
on April 16, 2018 through 6 p.m. on April 30, 2018, vessels able to
pass through the bridge in the closed position may do so at any time.
The bridge will not be able to open for emergencies and there is no
immediate alternate route for vessels to pass.
The Coast Guard will also inform the users of the waterways through
our Local and Broadcast Notices to Mariners of the change in operating
schedule for the bridge so that vessel operators can arrange their
transits to minimize any impact caused by the temporary deviation.
In accordance with 33 CFR 117.35(e), the drawbridge must return to
its regular operating schedule immediately at the end of the effective
period of this temporary deviation. This deviation from the operating
regulations is authorized under 33 CFR 117.35.
Barry L. Dragon,
Director, Bridge Branch, Seventh Coast Guard District.
[FR Doc. 2018-08260 Filed 4-19-18; 8:45 am]
BILLING CODE 9110-04-P