Combined Notice of Filings #1, 17408-17409 [2018-08168]
Download as PDF
17408
Federal Register / Vol. 83, No. 76 / Thursday, April 19, 2018 / Notices
The Application is available for
inspection and copying in the Office of
Regulation and International
Engagement docket room, Room 3E–
042, 1000 Independence Avenue SW,
Washington, DC 20585. The docket
room is open between the hours of 8:00
a.m. and 4:30 p.m., Monday through
Friday, except Federal holidays. The
Application and any filed protests,
motions to intervene or notice of
interventions, and comments will also
be available electronically by going to
the following DOE/FE Web address:
https://www.fe.doe.gov/programs/
gasregulation/.
Issued in Washington, DC, on April 13,
2018.
Robert Smith,
Deputy Assistant Secretary for Oil and
Natural Gas (Acting).
[FR Doc. 2018–08149 Filed 4–18–18; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
daltland on DSKBBV9HB2PROD with NOTICES
Combined Notice of Filings #2
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER18–1363–000.
Applicants: Blue Canyon Windpower
LLC.
Description: § 205(d) Rate Filing:
Revised MBR Tariff to be effective 4/14/
2018.
Filed Date: 4/13/18.
Accession Number: 20180413–5086.
Comments Due: 5 p.m. ET 5/4/18.
Docket Numbers: ER18–1364–000.
Applicants: Duke Energy Florida,
LLC.
Description: § 205(d) Rate Filing: Joint
OATT Real Power Loss (DEF) 2018 to be
effective 5/1/2018.
Filed Date: 4/13/18.
Accession Number: 20180413–5104.
Comments Due: 5 p.m. ET 5/4/18.
Docket Numbers: ER18–1365–000.
Applicants: Blue Canyon Windpower
II LLC.
Description: § 205(d) Rate Filing:
Revised MBR Tariff to be effective 4/14/
2018.
Filed Date: 4/13/18.
Accession Number: 20180413–5113.
Comments Due: 5 p.m. ET 5/4/18.
Docket Numbers: ER18–1366–000.
Applicants: Blue Canyon Windpower
V LLC.
Description: § 205(d) Rate Filing:
Revised MBR Tariff to be effective 4/14/
2018.
VerDate Sep<11>2014
17:49 Apr 18, 2018
Jkt 244001
Filed Date: 4/13/18.
Accession Number: 20180413–5117.
Comments Due: 5 p.m. ET 5/4/18.
Docket Numbers: ER18–1367–000.
Applicants: Blue Canyon Windpower
VI LLC.
Description: § 205(d) Rate Filing:
Revised MBR Tariff to be effective 4/14/
2018.
Filed Date: 4/13/18.
Accession Number: 20180413–5127.
Comments Due: 5 p.m. ET 5/4/18.
Docket Numbers: ER18–1368–000.
Applicants: Southern California
Edison Company.
Description: § 205(d) Rate Filing:
Amended IFA Dillon I Project SA No.
521 to be effective 4/14/2018.
Filed Date: 4/13/18.
Accession Number: 20180413–5136.
Comments Due: 5 p.m. ET 5/4/18.
Docket Numbers: ER18–1369–000.
Applicants: Cloud County Wind
Farm, LLC.
Description: § 205(d) Rate Filing:
Revised MBR Tariff to be effective 4/14/
2018.
Filed Date: 4/13/18.
Accession Number: 20180413–5137.
Comments Due: 5 p.m. ET 5/4/18.
Docket Numbers: ER18–1370–000.
Applicants: Sagebrush Power
Partners, LLC.
Description: § 205(d) Rate Filing:
Revised MBR Tariff to be effective 4/14/
2018.
Filed Date: 4/13/18.
Accession Number: 20180413–5153.
Comments Due: 5 p.m. ET 5/4/18.
Docket Numbers: ER18–1371–000.
Applicants: Telocaset Wind Power
Partners, LLC.
Description: § 205(d) Rate Filing:
Revised MBR Tariff to be effective 4/14/
2018.
Filed Date: 4/13/18.
Accession Number: 20180413–5164.
Comments Due: 5 p.m. ET 5/4/18.
Docket Numbers: ER18–1372–000.
Applicants: Waverly Wind Farm LLC.
Description: § 205(d) Rate Filing:
Revised MBR Tariff to be effective 4/14/
2018.
Filed Date: 4/13/18.
Accession Number: 20180413–5175.
Comments Due: 5 p.m. ET 5/4/18.
Docket Numbers: ER18–1373–000.
Applicants: Wheat Field Wind Power
Project LLC.
Description: § 205(d) Rate Filing:
Revised MBR Tariff to be effective 4/14/
2018.
Filed Date: 4/13/18.
Accession Number: 20180413–5196.
Comments Due: 5 p.m. ET 5/4/18.
Docket Numbers: ER18–1374–000.
Applicants: Lost Lakes Wind Farm
LLC.
PO 00000
Frm 00050
Fmt 4703
Sfmt 4703
Description: § 205(d) Rate Filing:
Revised MBR Tariff to be effective 4/14/
2018.
Filed Date: 4/13/18.
Accession Number: 20180413–5230.
Comments Due: 5 p.m. ET 5/4/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: April 13, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–08167 Filed 4–18–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC18–83–000.
Applicants: GenOn Holdco 10, LLC,
NRG Canal LLC, Stonepeak Kestrel
Holdings LLC.
Description: Joint Application under
FPA Section 203 of GenOn Holdco 10,
LLC, et. al.
Filed Date: 4/12/18.
Accession Number: 20180412–5227.
Comments Due: 5 p.m. ET 5/3/18.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER18–865–001.
Applicants: Power 52 Inc.
Description: Tariff Amendment:
Power52 Market Based Rate Tariff to be
effective 4/17/2018.
Filed Date: 4/12/18.
Accession Number: 20180412–5224.
Comments Due: 5 p.m. ET 5/3/18.
Docket Numbers: ER18–1357–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
E:\FR\FM\19APN1.SGM
19APN1
daltland on DSKBBV9HB2PROD with NOTICES
Federal Register / Vol. 83, No. 76 / Thursday, April 19, 2018 / Notices
Michigan Electric Transmission
Company.
Description: § 205(d) Rate Filing:
2018–04–12 SA 3026 METC—City of
Holland 1st Rev SIFA to be effective
5/12/2018.
Filed Date: 4/12/18.
Accession Number: 20180412–5215.
Comments Due: 5 p.m. ET 5/3/18.
Docket Numbers: ER18–1358–000.
Applicants: Avangrid Renewables,
LLC.
Description: Tariff Cancellation:
Notice of Termination of Wind
Balancing Services Tariff to be effective
6/1/2018.
Filed Date: 4/12/18.
Accession Number: 20180412–5225.
Comments Due: 5 p.m. ET 5/3/18.
Docket Numbers: ER18–1359–000.
Applicants: Pacific Gas and Electric
Company.
Description: § 205(d) Rate Filing:
Amendment to Power and Water
Resources Pooling Authority IA and
WDT SA (SA 30) to be effective 5/1/
2018.
Filed Date: 4/13/18.
Accession Number: 20180413–5000.
Comments Due: 5 p.m. ET 5/4/18.
Docket Numbers: ER18–1360–000.
Applicants: San Diego Gas & Electric
Company.
Description: Request for One Time
Waiver of San Diego Gas & Electric
Company.
Filed Date: 4/12/18.
Accession Number: 20180412–5226.
Comments Due: 5 p.m. ET 5/3/18.
Docket Numbers: ER18–1361–000.
Applicants: Arbuckle Mountain Wind
Farm LLC.
Description: § 205(d) Rate Filing:
Revised MBR Tariff to be effective 4/14/
2018.
Filed Date: 4/13/18.
Accession Number: 20180413–5084.
Comments Due: 5 p.m. ET 5/4/18.
Docket Numbers: ER18–1362–000.
Applicants: Arlington Wind Power
Project LLC.
Description: § 205(d) Rate Filing:
Revised MBR Tariff to be effective 4/14/
2018.
Filed Date: 4/13/18.
Accession Number: 20180413–5085.
Comments Due: 5 p.m. ET 5/4/18.
Take notice that the Commission
received the following electric securities
filings:
Docket Numbers: ES18–28–000.
Applicants: DTE Electric Company.
Description: Application of DTE
Electric Company for Authorization to
Issue Securities and Request for
Exemption from Competitive Bidding
Requirements.
VerDate Sep<11>2014
17:49 Apr 18, 2018
Jkt 244001
Filed Date: 4/13/18.
Accession Number: 20180413–5109.
Comments Due: 5 p.m. ET 5/4/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: April 13, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–08168 Filed 4–18–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Staff Attendance at The
Southwest Power Pool, Inc. Regional
Entity Trustee, Regional State
Committee, Members Committee, and
Board of Directors Meetings
The Federal Energy Regulatory
Commission (Commission) hereby gives
notice that members of its staff may
attend the meetings of the Southwest
Power Pool, Inc. Regional State
Committee (RSC), Regional Entity
Trustee (RET), Members Committee, and
Board of Directors, as noted below.
Their attendance is part of the
Commission’s ongoing outreach efforts.
The meetings will be held at the
InterContinental at the Plaza, 401 Ward
Parkway, Kansas City, MO 64112. The
phone number is (816) 756–1500. All
meetings are Central Time.
SPP RET—April 23, 2018 (8:00 a.m.—
5:00 p.m.).
SPP RSC—April 23, 2018 (1:00 p.m.—
5:00 p.m.).
SPP Members/Board of Directors—
April 24, 2018 (8:00 a.m.—3:00 p.m.).
The discussions may address matters
at issue in the following proceedings:
Docket No. ER12–1179, Southwest
Power Pool, Inc.
PO 00000
Frm 00051
Fmt 4703
Sfmt 4703
17409
Docket No. ER14–2850, Southwest
Power Pool, Inc.
Docket No. ER14–2851, Southwest
Power Pool, Inc.
Docket No. ER15–2028, Southwest
Power Pool, Inc.
Docket No. ER15–2115, Southwest
Power Pool, Inc.
Docket No. ER15–2237, Kanstar
Transmission, LLC
Docket No. ER15–2594, South Central
MCN LLC
Docket No. EL16–91, Southwest Power
Pool, Inc.
Docket No. EL16–108, Tilton Energy v.
Midcontinent Independent System
Operator, Inc.
Docket No. EL16–110, Southwest Power
Pool, Inc.
Docket No. ER16–204, Southwest Power
Pool, Inc.
Docket No. ER16–2522, Southwest
Power Pool, Inc.
Docket No. ER16–2523, Southwest
Power Pool, Inc.
Docket No. EL17–11, Alabama Power
Co. v. Southwest Power Pool, Inc.
Docket No. EL17–21, Kansas Electric Co.
v. Southwest Power Pool, Inc.
Docket No. EL17–69, Buffalo Dunes et
al. v. Southwest Power Pool, Inc.
Docket No. EL17–89, American Electric
Power Service Corporation v.
Midcontinent Independent System
Operator, Inc., et al.
Docket No. ER17–426, Southwest Power
Pool, Inc.
Docket No. ER17–428, Southwest Power
Pool, Inc.
Docket No. ER17–469, Southwest Power
Pool, Inc.
Docket No. ER17–772, Southwest Power
Pool, Inc.
Docket No. ER17–953, South Central
MCN LLC
Docket No. ER17–1092, Southwest
Power Pool, Inc.
Docket No. ER17–1575, Southwest
Power Pool, Inc.
Docket No. ER17–1610, Southwest
Power Pool, Inc.
Docket No. ER17–2229, Southwest
Power Pool, Inc.
Docket No. EL18–9, Xcel Energy
Services, Inc. v. Southwest Power
Pool, Inc.
Docket No. EL18–12, ATX Southwest,
LLC
Docket No. EL18–13, Transource
Kansas, LLC
Docket No. EL18–14, Midwest Power
Transmission Arkansas, LLC
Docket No. EL18–15, Kanstar
Transmission, LLC
Docket No. EL18–16, South Central
MCN, LLC
Docket No. EL18–19, Southwest Power
Pool, Inc.
Docket No. EL18–20, Indicated SPP
Transmission Owners v. Southwest
Power Pool, Inc.
E:\FR\FM\19APN1.SGM
19APN1
Agencies
[Federal Register Volume 83, Number 76 (Thursday, April 19, 2018)]
[Notices]
[Pages 17408-17409]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-08168]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
corporate filings:
Docket Numbers: EC18-83-000.
Applicants: GenOn Holdco 10, LLC, NRG Canal LLC, Stonepeak Kestrel
Holdings LLC.
Description: Joint Application under FPA Section 203 of GenOn
Holdco 10, LLC, et. al.
Filed Date: 4/12/18.
Accession Number: 20180412-5227.
Comments Due: 5 p.m. ET 5/3/18.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER18-865-001.
Applicants: Power 52 Inc.
Description: Tariff Amendment: Power52 Market Based Rate Tariff to
be effective 4/17/2018.
Filed Date: 4/12/18.
Accession Number: 20180412-5224.
Comments Due: 5 p.m. ET 5/3/18.
Docket Numbers: ER18-1357-000.
Applicants: Midcontinent Independent System Operator, Inc.,
[[Page 17409]]
Michigan Electric Transmission Company.
Description: Sec. 205(d) Rate Filing: 2018-04-12 SA 3026 METC--
City of Holland 1st Rev SIFA to be effective 5/12/2018.
Filed Date: 4/12/18.
Accession Number: 20180412-5215.
Comments Due: 5 p.m. ET 5/3/18.
Docket Numbers: ER18-1358-000.
Applicants: Avangrid Renewables, LLC.
Description: Tariff Cancellation: Notice of Termination of Wind
Balancing Services Tariff to be effective 6/1/2018.
Filed Date: 4/12/18.
Accession Number: 20180412-5225.
Comments Due: 5 p.m. ET 5/3/18.
Docket Numbers: ER18-1359-000.
Applicants: Pacific Gas and Electric Company.
Description: Sec. 205(d) Rate Filing: Amendment to Power and Water
Resources Pooling Authority IA and WDT SA (SA 30) to be effective 5/1/
2018.
Filed Date: 4/13/18.
Accession Number: 20180413-5000.
Comments Due: 5 p.m. ET 5/4/18.
Docket Numbers: ER18-1360-000.
Applicants: San Diego Gas & Electric Company.
Description: Request for One Time Waiver of San Diego Gas &
Electric Company.
Filed Date: 4/12/18.
Accession Number: 20180412-5226.
Comments Due: 5 p.m. ET 5/3/18.
Docket Numbers: ER18-1361-000.
Applicants: Arbuckle Mountain Wind Farm LLC.
Description: Sec. 205(d) Rate Filing: Revised MBR Tariff to be
effective 4/14/2018.
Filed Date: 4/13/18.
Accession Number: 20180413-5084.
Comments Due: 5 p.m. ET 5/4/18.
Docket Numbers: ER18-1362-000.
Applicants: Arlington Wind Power Project LLC.
Description: Sec. 205(d) Rate Filing: Revised MBR Tariff to be
effective 4/14/2018.
Filed Date: 4/13/18.
Accession Number: 20180413-5085.
Comments Due: 5 p.m. ET 5/4/18.
Take notice that the Commission received the following electric
securities filings:
Docket Numbers: ES18-28-000.
Applicants: DTE Electric Company.
Description: Application of DTE Electric Company for Authorization
to Issue Securities and Request for Exemption from Competitive Bidding
Requirements.
Filed Date: 4/13/18.
Accession Number: 20180413-5109.
Comments Due: 5 p.m. ET 5/4/18.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: April 13, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-08168 Filed 4-18-18; 8:45 am]
BILLING CODE 6717-01-P