Sunshine Act Meeting Notice, 16849-16850 [2018-08082]
Download as PDF
Federal Register / Vol. 83, No. 74 / Tuesday, April 17, 2018 / Notices
With this notice, we are asking
agencies with jurisdiction by law and/
or special expertise with respect to the
environmental issues of this project to
formally cooperate with us in the
preparation of the EA.3 Agencies that
would like to request cooperating
agency status should follow the
instructions for filing comments
provided under the Public Participation
section of this notice.
Consultations Under Section 106 of the
National Historic Preservation Act
In accordance with the Advisory
Council on Historic Preservation’s
implementing regulations for section
106 of the National Historic
Preservation Act, we are using this
notice to initiate consultation with the
applicable State Historic Preservation
Offices (SHPO), and to solicit their
views and those of other government
agencies, interested Indian tribes, and
the public on the project’s potential
effects on historic properties.4 We will
define the project-specific Area of
Potential Effects (APE) in consultation
with the SHPOs as the project develops.
On natural gas facility projects, the APE
at a minimum encompasses all areas
subject to ground disturbance (examples
include construction right-of-way,
contractor/pipe storage yards,
compressor stations, and access roads).
Our EA for this project will document
our findings on the impacts on historic
properties and summarize the status of
consultations under section 106.
Environmental Mailing List
daltland on DSKBBV9HB2PROD with NOTICES
The environmental mailing list
includes federal, state, and local
government representatives and
agencies; elected officials; Native
American Tribes; other interested
parties; and local libraries and
newspapers. This list also includes all
affected landowners (as defined in the
Commission’s regulations) who are
potential right-of-way grantors, whose
property may be used temporarily for
3 The Council on Environmental Quality
regulations addressing cooperating agency
responsibilities are at Title 40, Code of Federal
Regulations, Part 1501.6.
4 The Advisory Council on Historic Preservation’s
regulations are at Title 36, Code of Federal
Regulations, Part 800. Those regulations define
historic properties as any prehistoric or historic
district, site, building, structure, or object included
in or eligible for inclusion in the National Register
of Historic Places.
VerDate Sep<11>2014
21:16 Apr 16, 2018
Jkt 244001
project purposes, or who own homes
within certain distances of aboveground
facilities, and anyone who submits
comments on the project. We will
update the environmental mailing list as
the analysis proceeds to ensure that we
send the information related to this
environmental review to all individuals,
organizations, and government entities
interested in and/or potentially affected
by the proposed project.
If we publish and distribute the EA,
copies of the EA will be sent to the
environmental mailing list for public
review and comment. If you would
prefer to receive a paper copy of the
document instead of the CD version or
would like to remove your name from
the mailing list, please return the
attached Information Request
(appendix 2).
In addition to involvement in the EA
scoping process, you may want to
become an ‘‘intervenor’’ which is an
official party to the Commission’s
proceeding. Intervenors play a more
formal role in the process and are able
to file briefs, appear at hearings, and be
heard by the courts if they choose to
appeal the Commission’s final ruling.
An intervenor formally participates in
the proceeding by filing a request to
intervene. Instructions for becoming an
intervenor are in the ‘‘Document-less
Intervention Guide’’ under the ‘‘e-filing’’
link on the Commission’s website.
Motions to intervene are more fully
described at https://www.ferc.gov/
resources/guides/how-to/intervene.asp.
Additional Information
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC
website at www.ferc.gov using the
‘‘eLibrary’’ link. Click on the eLibrary
link, click on ‘‘General Search’’ and
enter the docket number, excluding the
last three digits in the Docket Number
field (i.e., CP18–89). Be sure you have
selected an appropriate date range. For
assistance, please contact FERC Online
Support at FercOnlineSupport@ferc.gov
or toll free at (866) 208–3676, or for
TTY, contact (202) 502–8659. The
eLibrary link also provides access to the
texts of formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
Frm 00027
Fmt 4703
Sfmt 4703
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to www.ferc.gov/docsfiling/esubscription.asp.
Finally, public sessions or site visits
will be posted on the Commission’s
calendar located at www.ferc.gov/
EventCalendar/EventsList.aspx along
with other related information.
Dated: April 10, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–07924 Filed 4–16–18; 8:45 am]
BILLING CODE 6717–01–P
Becoming an Intervenor
PO 00000
16849
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Sunshine Act Meeting Notice
The following notice of meeting is
published pursuant to section 3(a) of the
government in the Sunshine Act (Pub.
L. 94–409), 5 U.S.C. 552b:
AGENCY HOLDING MEETING: Federal
Energy Regulatory Commission.
DATE AND TIME:
April 19, 2018, 10:00
a.m.
Room 2C, 888 First Street NE,
Washington, DC 20426.
PLACE:
STATUS:
Open.
Agenda.
* Note—Items listed on the agenda
may be deleted without further notice.
MATTERS TO BE CONSIDERED:
CONTACT PERSON FOR MORE INFORMATION:
Kimberly D. Bose, Secretary, Telephone
(202) 502–8400.
For a recorded message listing items
struck from or added to the meeting, call
(202) 502–8627.
This is a list of matters to be considered
by the Commission. It does not include a
listing of all documents relevant to the items
on the agenda. All public documents,
however, may be viewed on line at the
Commission’s website at https://
ferc.capitolconnection.org/ sing the eLibrary
link, or may be examined in the
Commission’s Public Reference Room.
E:\FR\FM\17APN1.SGM
17APN1
16850
Federal Register / Vol. 83, No. 74 / Tuesday, April 17, 2018 / Notices
1042ND—MEETING
Regular Meeting
[April 19, 2018, 10:00 a.m.]
Item No.
Docket No.
Company
Administrative
A–1 ........
A–2 ........
A–3 ........
AD18–1–000 ................................................
AD18–2–000 ................................................
AD06–3–000 ................................................
Agency Administrative Matters.
Customer Matters, Reliability, Security and Market Operations.
Market Update.
Electric
E–1 ........
RM17–2–000 ...............................................
E–2 ........
E–3 ........
RM17–8–000 ...............................................
RM17–11–000 .............................................
E–4
E–5
E–6
E–7
E–8
Omitted.
ER18–459–000, ER18–460–000 ................
ER17–1016–001 ..........................................
ER17–219–002 ............................................
ER17–2229–001 ..........................................
........
........
........
........
........
Uplift Cost Allocation and Transparency in Markets Operated by Regional Transmission Organizations and Independent System Operators.
Reform of Generator Interconnection Procedures and Agreements.
Revised Critical Infrastructure Protection Reliability Standard CIP–003–7—Cyber Security—Security Management Controls.
PJM Interconnection L.L.C. and Ohio Valley Electric Corporation.
PJM Interconnection, L.L.C.
PacifiCorp.
Southwest Power Pool, Inc.
Hydro
H–1 ........
H–2 ........
H–3 ........
P–12715–013 ..............................................
P–785–034 ..................................................
P–14856–001 ..............................................
Fairlawn Hydroelectric Company, LLC.
Consumers Energy Company.
America First Hydro LLC.
Certificates
daltland on DSKBBV9HB2PROD with NOTICES
C–1
C–2
C–3
C–4
C–5
C–6
........
........
........
........
........
........
PL18–1–000 ................................................
CP17–469–000 ............................................
CP16–20–001 ..............................................
CP14–497–001 ............................................
CP15–77–001 ..............................................
CP15–148–001 ............................................
Dated: April 12, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
A free webcast of this event is available
through https://ferc.capitolconnection.org/.
Anyone with internet access who desires to
view this event can do so by navigating to
www.ferc.gov’s Calendar of Events and
locating this event in the Calendar. The event
will contain a link to its webcast. The Capitol
Connection provides technical support for
the free webcasts. It also offers access to this
event via television in the DC area and via
phone bridge for a fee. If you have any
questions, visit https://
ferc.capitolconnection.org/ or contact Danelle
Springer or David Reininger at 703–993–
3100.
Immediately following the conclusion of
the Commission Meeting, a press briefing
will be held in the Commission Meeting
Room. Members of the public may view this
briefing in the designated overflow room.
This statement is intended to notify the
public that the press briefings that follow
Commission meetings may now be viewed
remotely at Commission headquarters, but
will not be telecast through the Capitol
Connection service.
[FR Doc. 2018–08082 Filed 4–13–18; 11:15 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
19:20 Apr 16, 2018
Jkt 244001
Certification of New Interstate Natural Gas Facilities.
WBI Energy Transmission, Inc.
High Island Offshore System, LLC.
Dominion Transmission, Inc.
Tennessee Gas Pipeline Company, L.L.C.
Tennessee Gas Pipeline Company, L.L.C.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER13–1485–009;
ER10–1992–018; ER10–3230–009;
ER10–3232–008; ER10–3237–009;
ER10–3239–009; ER10–3240–009;
ER10–3251–011; ER10–3253–009;
ER13–1586–012; ER14–1777–008;
ER14–2382–011; ER14–2871–011;
ER15–110–010; ER15–2722–005; ER15–
463–010; ER15–621–010; ER15–622–
010; ER16–1129–004; ER16–1130–004;
ER16–1131–004; ER16–1132–004;
ER16–182–006; ER16–72–006; ER16–
902–002; ER17–1574–001; ER17–1785–
001; ER17–47–003; ER17–48–003;
ER18–47–001
Applicants: Wheelabrator Baltimore,
L.P., Wheelabrator Bridgeport, L.P.,
Wheelabrator Falls Inc., Wheelabrator
Frackville Energy Company Inc.,
Wheelabrator North Andover Inc.,
Wheelabrator Portsmouth Inc.,
PO 00000
Frm 00028
Fmt 4703
Sfmt 4703
Wheelabrator Saugus Inc., Wheelabrator
Shasta Energy Company Inc.,
Wheelabrator Westchester, L.P.,
Cameron Ridge, LLC, Cameron Ridge II,
LLC, Coachella Wind, LLC, DifWind
Farms Limited I, DifWind Farms
Limited II, DifWind Farms Limited V,
DifWind Farms LTD VI, EUI Affiliate
LLC, Oak Creek Wind Power, LLC, ON
Wind Energy LLC, Pacific Crest Power,
LLC, Ridgetop Energy, LLC, San
Gorgonio Westwinds II, LLC, San
Gorgonio Westwinds II—Windustries,
LLC, Terra-Gen Energy Services, LLC,
Terra-Gen Mojave Windfarms, LLC, TGP
Energy Management, LLC, Victory
Garden Phase IV, LLC, Voyager Wind I,
LLC, Voyager Wind II, LLC, VPI
Enterprises, LLC.
Description: Notice of Change in
Status of the ECP MBR Sellers.
Filed Date: 4/9/18.
Accession Number: 20180409–5338.
Comments Due: 5 p.m. ET 4/30/18.
Docket Numbers: ER14–1619–004.
Applicants: Cottonwood Energy
Company LP.
Description: Compliance filing:
Informational Filing Regarding
Upstream Change in Control to be
effective N/A.
E:\FR\FM\17APN1.SGM
17APN1
Agencies
[Federal Register Volume 83, Number 74 (Tuesday, April 17, 2018)]
[Notices]
[Pages 16849-16850]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-08082]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Sunshine Act Meeting Notice
The following notice of meeting is published pursuant to section
3(a) of the government in the Sunshine Act (Pub. L. 94-409), 5 U.S.C.
552b:
AGENCY HOLDING MEETING: Federal Energy Regulatory Commission.
DATE AND TIME: April 19, 2018, 10:00 a.m.
PLACE: Room 2C, 888 First Street NE, Washington, DC 20426.
STATUS: Open.
MATTERS TO BE CONSIDERED: Agenda.
* Note--Items listed on the agenda may be deleted without further
notice.
CONTACT PERSON FOR MORE INFORMATION: Kimberly D. Bose, Secretary,
Telephone (202) 502-8400.
For a recorded message listing items struck from or added to the
meeting, call (202) 502-8627.
This is a list of matters to be considered by the Commission. It
does not include a listing of all documents relevant to the items on
the agenda. All public documents, however, may be viewed on line at
the Commission's website at https://ferc.capitolconnection.org/ sing
the eLibrary link, or may be examined in the Commission's Public
Reference Room.
[[Page 16850]]
1042nd--Meeting
Regular Meeting
[April 19, 2018, 10:00 a.m.]
----------------------------------------------------------------------------------------------------------------
Item No. Docket No. Company
----------------------------------------------------------------------------------------------------------------
Administrative
----------------------------------------------------------------------------------------------------------------
A-1..................... AD18-1-000...................... Agency Administrative Matters.
A-2..................... AD18-2-000...................... Customer Matters, Reliability, Security and Market
Operations.
A-3..................... AD06-3-000...................... Market Update.
----------------------------------------------------------------------------------------------------------------
Electric
----------------------------------------------------------------------------------------------------------------
E-1..................... RM17-2-000...................... Uplift Cost Allocation and Transparency in Markets
Operated by Regional Transmission Organizations and
Independent System Operators.
E-2..................... RM17-8-000...................... Reform of Generator Interconnection Procedures and
Agreements.
E-3..................... RM17-11-000..................... Revised Critical Infrastructure Protection
Reliability Standard CIP-003-7--Cyber Security--
Security Management Controls.
E-4..................... Omitted.........................
E-5..................... ER18-459-000, ER18-460-000...... PJM Interconnection L.L.C. and Ohio Valley Electric
Corporation.
E-6..................... ER17-1016-001................... PJM Interconnection, L.L.C.
E-7..................... ER17-219-002.................... PacifiCorp.
E-8..................... ER17-2229-001................... Southwest Power Pool, Inc.
----------------------------------------------------------------------------------------------------------------
Hydro
----------------------------------------------------------------------------------------------------------------
H-1..................... P-12715-013..................... Fairlawn Hydroelectric Company, LLC.
H-2..................... P-785-034....................... Consumers Energy Company.
H-3..................... P-14856-001..................... America First Hydro LLC.
----------------------------------------------------------------------------------------------------------------
Certificates
----------------------------------------------------------------------------------------------------------------
C-1..................... PL18-1-000...................... Certification of New Interstate Natural Gas
Facilities.
C-2..................... CP17-469-000.................... WBI Energy Transmission, Inc.
C-3..................... CP16-20-001..................... High Island Offshore System, LLC.
C-4..................... CP14-497-001.................... Dominion Transmission, Inc.
C-5..................... CP15-77-001..................... Tennessee Gas Pipeline Company, L.L.C.
C-6..................... CP15-148-001.................... Tennessee Gas Pipeline Company, L.L.C.
----------------------------------------------------------------------------------------------------------------
Dated: April 12, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
A free webcast of this event is available through https://ferc.capitolconnection.org/. Anyone with internet access who desires
to view this event can do so by navigating to www.ferc.gov's
Calendar of Events and locating this event in the Calendar. The
event will contain a link to its webcast. The Capitol Connection
provides technical support for the free webcasts. It also offers
access to this event via television in the DC area and via phone
bridge for a fee. If you have any questions, visit https://ferc.capitolconnection.org/ or contact Danelle Springer or David
Reininger at 703-993-3100.
Immediately following the conclusion of the Commission Meeting,
a press briefing will be held in the Commission Meeting Room.
Members of the public may view this briefing in the designated
overflow room. This statement is intended to notify the public that
the press briefings that follow Commission meetings may now be
viewed remotely at Commission headquarters, but will not be telecast
through the Capitol Connection service.
[FR Doc. 2018-08082 Filed 4-13-18; 11:15 am]
BILLING CODE 6717-01-P