Notice of Intent To Prepare an Environmental Assessment for the Proposed Empire Pipeline, Inc. Empire North Project and Request for Comments on Environmental Issues, 16847-16849 [2018-07924]

Download as PDF Federal Register / Vol. 83, No. 74 / Tuesday, April 17, 2018 / Notices Commission, 888 First Street NE, Washington, DC 20426, (202) 502– 6260, susanna.ehrlich@ferc.gov Logistical Information: Sarah McKinley, Office of External Affairs, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, (202) 502–8368, sarah.mckinley@ferc.gov. Dated: April 10, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–07923 Filed 4–16–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Dated: April 11, 2018. Nathaniel J. Davis, Sr., Deputy Secretary. Combined Notice of Filings [FR Doc. 2018–07998 Filed 4–16–18; 8:45 am] Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: daltland on DSKBBV9HB2PROD with NOTICES Filings Instituting Proceedings Docket Numbers: RP18–228–001. Applicants: Rockies Express Pipeline LLC Description: Compliance filing Compliance to RP18–228 Monthly FL&U Postings to be effective 4/19/2018. Filed Date: 4/10/18. Accession Number: 20180410–5148. Comments Due: 5 p.m. ET 4/16/18. Docket Numbers: RP18–694–000. Applicants: Rockies Express Pipeline LLC.. Description: § 4(d) Rate Filing: Errata to RP18–228, Seneca Lateral to be effective 4/19/2018. Filed Date: 4/10/18. Accession Number: 20180410–5151. Comments Due: 5 p.m. ET 4/16/18. Docket Numbers: RP18–695–000. Applicants: Transcontinental Gas Pipe Line Company. Description: § 4(d) Rate Filing: NonConforming—Dalton (Cartersville, GA) to be effective 6/1/2018. Filed Date: 4/10/18. Accession Number: 20180410–5199. Comments Due: 5 p.m. ET 4/23/18. Docket Numbers: RP18–696–000. Applicants: El Paso Natural Gas Company, L.L.C. Description: § 4(d) Rate Filing: Negotiated Rate Update Filing (TGS Apr 18) to be effective 4/11/2018. Filed Date: 4/10/18. Accession Number: 20180410–5221. Comments Due: 5 p.m. ET 4/23/18. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. VerDate Sep<11>2014 19:20 Apr 16, 2018 Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Jkt 244001 BILLING CODE 6717–01–P DEPARTMENT OF ENERGY 16847 Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the website that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern time on May 7, 2018. Dated: April 10, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–07927 Filed 4–16–18; 8:45 am] BILLING CODE 6717–01–P Federal Energy Regulatory Commission [Docket No. OR18–20–000] DEPARTMENT OF ENERGY Notice of Petition for Declaratory Order; Marathon Pipe Line LLC, MPLX Ozark Pipe Line LLC Federal Energy Regulatory Commission Take notice that on April 6, 2018, pursuant to Rule 207(a)(2) of the Federal Energy Regulatory Commission’s (Commission) Rules of Practice and Procedure, 18 CFR 385.207(a)(2) (2017), Marathon Pipe Line LLC and MPLX Ozark Pipe Line LLC filed a joint petition for a declaratory order seeking approval of certain terms and conditions in the transportation services agreement, related to a joint expansion project, all as more fully explained in the petition. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Petitioner. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Notice of Intent To Prepare an Environmental Assessment for the Proposed Empire Pipeline, Inc. Empire North Project and Request for Comments on Environmental Issues PO 00000 Frm 00025 Fmt 4703 Sfmt 4703 [Docket No. CP18–89–000] The staff of the Federal Energy Regulatory Commission (FERC or Commission) will prepare an environmental assessment (EA) that will discuss the environmental impacts of the Empire North Project involving construction and operation of facilities by Empire Pipeline, Inc. (Empire) in Tioga County, Pennsylvania and in Ontario, Yates, Schuyler, Chemung, and Steuben Counties, New York. The Commission will use this EA in its decision-making process to determine whether the project is in the public convenience and necessity. This notice announces the opening of the scoping process the Commission will use to gather input from the public and interested agencies on the project. You can make a difference by providing us with your specific comments or concerns about the project. Your comments should focus on the potential environmental effects, reasonable alternatives, and measures to avoid or lessen environmental impacts. Your input will help the Commission staff E:\FR\FM\17APN1.SGM 17APN1 16848 Federal Register / Vol. 83, No. 74 / Tuesday, April 17, 2018 / Notices determine what issues they need to evaluate in the EA. To ensure that your comments are timely and properly recorded, please send your comments so that the Commission receives them in Washington, DC on or before May 10, 2018. If you sent comments on this project to the Commission before the opening of this docket on February 16, 2018, you will need to file those comments in Docket No. CP18–89–000 to ensure they are considered as part of this proceeding. This notice is being sent to the Commission’s current environmental mailing list for this project. State and local government representatives should notify their constituents of this proposed project and encourage them to comment on their areas of concern. If you are a landowner receiving this notice, a pipeline company representative may contact you about the acquisition of an easement to construct, operate, and maintain the proposed facilities. The company would seek to negotiate a mutually acceptable agreement. However, if the Commission approves the project, that approval conveys with it the right of eminent domain. Therefore, if easement negotiations fail to produce an agreement, the pipeline company could initiate condemnation proceedings where compensation would be determined in accordance with state law. Empire provided landowners with a fact sheet prepared by the FERC entitled ‘‘An Interstate Natural Gas Facility On My Land? What Do I Need To Know?’’ This fact sheet addresses a number of typically asked questions, including the use of eminent domain and how to participate in the Commission’s proceedings. It is also available for viewing on the FERC website (www.ferc.gov). daltland on DSKBBV9HB2PROD with NOTICES Public Participation For your convenience, there are three methods you can use to submit your comments to the Commission. The Commission encourages electronic filing of comments and has expert staff available to assist you at (202) 502–8258 or FercOnlineSupport@ferc.gov. Please carefully follow these instructions so that your comments are properly recorded. (1) You can file your comments electronically using the eComment feature on the Commission’s website (www.ferc.gov) under the link to Documents and Filings. This is an easy method for submitting brief, text-only comments on a project; VerDate Sep<11>2014 19:20 Apr 16, 2018 Jkt 244001 (2) You can file your comments electronically by using the eFiling feature on the Commission’s website (www.ferc.gov) under the link to Documents and Filings. With eFiling, you can provide comments in a variety of formats by attaching them as a file with your submission. New eFiling users must first create an account by clicking on ‘‘eRegister.’’ If you are filing a comment on a particular project, please select ‘‘Comment on a Filing’’ as the filing type; or (3) You can file a paper copy of your comments by mailing them to the following address. Be sure to reference the project docket number (CP18–89– 000) with your submission: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Summary of the Proposed Project Empire proposes to construct and operate gas compression facilities in Tioga County, Pennsylvania and in Ontario, New York. The Empire North Project would provide about 205 million cubic feet per day of incremental firm transportation capacity. The Empire North Project would consist of the following facilities: • A new 21,000 horsepower (hp) compressor station in Jackson Township, Tioga County, Pennsylvania; • a new 32,000 hp compressor station in the Town of Farmington, Ontario County, New York; • modifications of the existing regulator valves and station piping and installation of metering facilities at the existing New Victor Regulator Station in Ontario County, New York; • minor modifications to the existing Jackson Meter and Regulator Station in Jackson Township, Tioga County, Pennsylvania; and • upgrading the maximum allowable operating pressure of the Empire Connector Pipeline (ECP) from 1,290 pounds per square inch gauge (psig) to 1,440 psig. The ECP is an existing 76.6mile-long, 24-inch-diameter pipeline that runs from Victor, New York to Corning, New York in in Ontario, Yates, Schuyler, Chemung, and Steuben Counties, New York. The general location of the project facilities is shown in appendix A.1 1 The appendices referenced in this notice will not appear in the Federal Register. Copies of appendices were sent to all those receiving this notice in the mail and are available at www.ferc.gov using the link called ‘‘eLibrary’’ or from the Commission’s Public Reference Room, 888 First Street NE, Washington, DC 20426, or call (202) 502– 8371. For instructions on connecting to eLibrary, refer to the last page of this notice. PO 00000 Frm 00026 Fmt 4703 Sfmt 4703 Land Requirements for Construction Construction of the proposed facilities would disturb about 50.4 acres of land for the aboveground facilities. Following construction, Empire would maintain about 17.5 acres for permanent operation of the project’s facilities; the remaining acreage would be restored and revert to former uses. The EA Process The National Environmental Policy Act (NEPA) requires the Commission to take into account the environmental impacts that could result from an action whenever it considers the issuance of a Certificate of Public Convenience and Necessity. NEPA also requires us 2 to discover and address concerns the public may have about proposals. This process is referred to as ‘‘scoping.’’ The main goal of the scoping process is to focus the analysis in the EA on the important environmental issues. By this notice, the Commission requests public comments on the scope of the issues to address in the EA. We will consider all filed comments during the preparation of the EA. In the EA we will discuss impacts that could occur as a result of the construction and operation of the proposed project under these general headings: • Geology and soils; • water resources, fisheries, and wetlands; • vegetation and wildlife; • endangered and threatened species; • cultural resources; • land use; • socioeconomics; • air quality and noise; • public safety; and • cumulative impacts. We will also evaluate reasonable alternatives to the proposed project or portions of the project, and make recommendations on how to lessen or avoid impacts on the various resource areas. The EA will present our independent analysis of the issues. The EA will be available in the public record through eLibrary. Depending on the comments received during the scoping process, we may also publish and distribute the EA to the public for an allotted comment period. We will consider all comments on the EA before making our recommendations to the Commission. To ensure we have the opportunity to consider and address your comments, please carefully follow the instructions in the Public Participation section, beginning on page 2. 2 ‘‘We,’’ ‘‘us,’’ and ‘‘our’’ refer to the environmental staff of the Commission’s Office of Energy Projects. E:\FR\FM\17APN1.SGM 17APN1 Federal Register / Vol. 83, No. 74 / Tuesday, April 17, 2018 / Notices With this notice, we are asking agencies with jurisdiction by law and/ or special expertise with respect to the environmental issues of this project to formally cooperate with us in the preparation of the EA.3 Agencies that would like to request cooperating agency status should follow the instructions for filing comments provided under the Public Participation section of this notice. Consultations Under Section 106 of the National Historic Preservation Act In accordance with the Advisory Council on Historic Preservation’s implementing regulations for section 106 of the National Historic Preservation Act, we are using this notice to initiate consultation with the applicable State Historic Preservation Offices (SHPO), and to solicit their views and those of other government agencies, interested Indian tribes, and the public on the project’s potential effects on historic properties.4 We will define the project-specific Area of Potential Effects (APE) in consultation with the SHPOs as the project develops. On natural gas facility projects, the APE at a minimum encompasses all areas subject to ground disturbance (examples include construction right-of-way, contractor/pipe storage yards, compressor stations, and access roads). Our EA for this project will document our findings on the impacts on historic properties and summarize the status of consultations under section 106. Environmental Mailing List daltland on DSKBBV9HB2PROD with NOTICES The environmental mailing list includes federal, state, and local government representatives and agencies; elected officials; Native American Tribes; other interested parties; and local libraries and newspapers. This list also includes all affected landowners (as defined in the Commission’s regulations) who are potential right-of-way grantors, whose property may be used temporarily for 3 The Council on Environmental Quality regulations addressing cooperating agency responsibilities are at Title 40, Code of Federal Regulations, Part 1501.6. 4 The Advisory Council on Historic Preservation’s regulations are at Title 36, Code of Federal Regulations, Part 800. Those regulations define historic properties as any prehistoric or historic district, site, building, structure, or object included in or eligible for inclusion in the National Register of Historic Places. VerDate Sep<11>2014 21:16 Apr 16, 2018 Jkt 244001 project purposes, or who own homes within certain distances of aboveground facilities, and anyone who submits comments on the project. We will update the environmental mailing list as the analysis proceeds to ensure that we send the information related to this environmental review to all individuals, organizations, and government entities interested in and/or potentially affected by the proposed project. If we publish and distribute the EA, copies of the EA will be sent to the environmental mailing list for public review and comment. If you would prefer to receive a paper copy of the document instead of the CD version or would like to remove your name from the mailing list, please return the attached Information Request (appendix 2). In addition to involvement in the EA scoping process, you may want to become an ‘‘intervenor’’ which is an official party to the Commission’s proceeding. Intervenors play a more formal role in the process and are able to file briefs, appear at hearings, and be heard by the courts if they choose to appeal the Commission’s final ruling. An intervenor formally participates in the proceeding by filing a request to intervene. Instructions for becoming an intervenor are in the ‘‘Document-less Intervention Guide’’ under the ‘‘e-filing’’ link on the Commission’s website. Motions to intervene are more fully described at https://www.ferc.gov/ resources/guides/how-to/intervene.asp. Additional Information Additional information about the project is available from the Commission’s Office of External Affairs, at (866) 208–FERC, or on the FERC website at www.ferc.gov using the ‘‘eLibrary’’ link. Click on the eLibrary link, click on ‘‘General Search’’ and enter the docket number, excluding the last three digits in the Docket Number field (i.e., CP18–89). Be sure you have selected an appropriate date range. For assistance, please contact FERC Online Support at FercOnlineSupport@ferc.gov or toll free at (866) 208–3676, or for TTY, contact (202) 502–8659. The eLibrary link also provides access to the texts of formal documents issued by the Commission, such as orders, notices, and rulemakings. Frm 00027 Fmt 4703 Sfmt 4703 In addition, the Commission offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. Go to www.ferc.gov/docsfiling/esubscription.asp. Finally, public sessions or site visits will be posted on the Commission’s calendar located at www.ferc.gov/ EventCalendar/EventsList.aspx along with other related information. Dated: April 10, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–07924 Filed 4–16–18; 8:45 am] BILLING CODE 6717–01–P Becoming an Intervenor PO 00000 16849 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Sunshine Act Meeting Notice The following notice of meeting is published pursuant to section 3(a) of the government in the Sunshine Act (Pub. L. 94–409), 5 U.S.C. 552b: AGENCY HOLDING MEETING: Federal Energy Regulatory Commission. DATE AND TIME: April 19, 2018, 10:00 a.m. Room 2C, 888 First Street NE, Washington, DC 20426. PLACE: STATUS: Open. Agenda. * Note—Items listed on the agenda may be deleted without further notice. MATTERS TO BE CONSIDERED: CONTACT PERSON FOR MORE INFORMATION: Kimberly D. Bose, Secretary, Telephone (202) 502–8400. For a recorded message listing items struck from or added to the meeting, call (202) 502–8627. This is a list of matters to be considered by the Commission. It does not include a listing of all documents relevant to the items on the agenda. All public documents, however, may be viewed on line at the Commission’s website at https:// ferc.capitolconnection.org/ sing the eLibrary link, or may be examined in the Commission’s Public Reference Room. E:\FR\FM\17APN1.SGM 17APN1

Agencies

[Federal Register Volume 83, Number 74 (Tuesday, April 17, 2018)]
[Notices]
[Pages 16847-16849]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-07924]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP18-89-000]


Notice of Intent To Prepare an Environmental Assessment for the 
Proposed Empire Pipeline, Inc. Empire North Project and Request for 
Comments on Environmental Issues

    The staff of the Federal Energy Regulatory Commission (FERC or 
Commission) will prepare an environmental assessment (EA) that will 
discuss the environmental impacts of the Empire North Project involving 
construction and operation of facilities by Empire Pipeline, Inc. 
(Empire) in Tioga County, Pennsylvania and in Ontario, Yates, Schuyler, 
Chemung, and Steuben Counties, New York. The Commission will use this 
EA in its decision-making process to determine whether the project is 
in the public convenience and necessity.
    This notice announces the opening of the scoping process the 
Commission will use to gather input from the public and interested 
agencies on the project. You can make a difference by providing us with 
your specific comments or concerns about the project. Your comments 
should focus on the potential environmental effects, reasonable 
alternatives, and measures to avoid or lessen environmental impacts. 
Your input will help the Commission staff

[[Page 16848]]

determine what issues they need to evaluate in the EA. To ensure that 
your comments are timely and properly recorded, please send your 
comments so that the Commission receives them in Washington, DC on or 
before May 10, 2018.
    If you sent comments on this project to the Commission before the 
opening of this docket on February 16, 2018, you will need to file 
those comments in Docket No. CP18-89-000 to ensure they are considered 
as part of this proceeding.
    This notice is being sent to the Commission's current environmental 
mailing list for this project. State and local government 
representatives should notify their constituents of this proposed 
project and encourage them to comment on their areas of concern.
    If you are a landowner receiving this notice, a pipeline company 
representative may contact you about the acquisition of an easement to 
construct, operate, and maintain the proposed facilities. The company 
would seek to negotiate a mutually acceptable agreement. However, if 
the Commission approves the project, that approval conveys with it the 
right of eminent domain. Therefore, if easement negotiations fail to 
produce an agreement, the pipeline company could initiate condemnation 
proceedings where compensation would be determined in accordance with 
state law.
    Empire provided landowners with a fact sheet prepared by the FERC 
entitled ``An Interstate Natural Gas Facility On My Land? What Do I 
Need To Know?'' This fact sheet addresses a number of typically asked 
questions, including the use of eminent domain and how to participate 
in the Commission's proceedings. It is also available for viewing on 
the FERC website (www.ferc.gov).

Public Participation

    For your convenience, there are three methods you can use to submit 
your comments to the Commission. The Commission encourages electronic 
filing of comments and has expert staff available to assist you at 
(202) 502-8258 or [email protected]. Please carefully follow 
these instructions so that your comments are properly recorded.
    (1) You can file your comments electronically using the eComment 
feature on the Commission's website (www.ferc.gov) under the link to 
Documents and Filings. This is an easy method for submitting brief, 
text-only comments on a project;
    (2) You can file your comments electronically by using the eFiling 
feature on the Commission's website (www.ferc.gov) under the link to 
Documents and Filings. With eFiling, you can provide comments in a 
variety of formats by attaching them as a file with your submission. 
New eFiling users must first create an account by clicking on 
``eRegister.'' If you are filing a comment on a particular project, 
please select ``Comment on a Filing'' as the filing type; or
    (3) You can file a paper copy of your comments by mailing them to 
the following address. Be sure to reference the project docket number 
(CP18-89-000) with your submission: Kimberly D. Bose, Secretary, 
Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, 
Washington, DC 20426.

Summary of the Proposed Project

    Empire proposes to construct and operate gas compression facilities 
in Tioga County, Pennsylvania and in Ontario, New York. The Empire 
North Project would provide about 205 million cubic feet per day of 
incremental firm transportation capacity. The Empire North Project 
would consist of the following facilities:
     A new 21,000 horsepower (hp) compressor station in Jackson 
Township, Tioga County, Pennsylvania;
     a new 32,000 hp compressor station in the Town of 
Farmington, Ontario County, New York;
     modifications of the existing regulator valves and station 
piping and installation of metering facilities at the existing New 
Victor Regulator Station in Ontario County, New York;
     minor modifications to the existing Jackson Meter and 
Regulator Station in Jackson Township, Tioga County, Pennsylvania; and
     upgrading the maximum allowable operating pressure of the 
Empire Connector Pipeline (ECP) from 1,290 pounds per square inch gauge 
(psig) to 1,440 psig. The ECP is an existing 76.6-mile-long, 24-inch-
diameter pipeline that runs from Victor, New York to Corning, New York 
in in Ontario, Yates, Schuyler, Chemung, and Steuben Counties, New 
York.
    The general location of the project facilities is shown in appendix 
A.\1\
---------------------------------------------------------------------------

    \1\ The appendices referenced in this notice will not appear in 
the Federal Register. Copies of appendices were sent to all those 
receiving this notice in the mail and are available at www.ferc.gov 
using the link called ``eLibrary'' or from the Commission's Public 
Reference Room, 888 First Street NE, Washington, DC 20426, or call 
(202) 502-8371. For instructions on connecting to eLibrary, refer to 
the last page of this notice.
---------------------------------------------------------------------------

Land Requirements for Construction

    Construction of the proposed facilities would disturb about 50.4 
acres of land for the aboveground facilities. Following construction, 
Empire would maintain about 17.5 acres for permanent operation of the 
project's facilities; the remaining acreage would be restored and 
revert to former uses.

The EA Process

    The National Environmental Policy Act (NEPA) requires the 
Commission to take into account the environmental impacts that could 
result from an action whenever it considers the issuance of a 
Certificate of Public Convenience and Necessity. NEPA also requires us 
\2\ to discover and address concerns the public may have about 
proposals. This process is referred to as ``scoping.'' The main goal of 
the scoping process is to focus the analysis in the EA on the important 
environmental issues. By this notice, the Commission requests public 
comments on the scope of the issues to address in the EA. We will 
consider all filed comments during the preparation of the EA.
---------------------------------------------------------------------------

    \2\ ``We,'' ``us,'' and ``our'' refer to the environmental staff 
of the Commission's Office of Energy Projects.
---------------------------------------------------------------------------

    In the EA we will discuss impacts that could occur as a result of 
the construction and operation of the proposed project under these 
general headings:
     Geology and soils;
     water resources, fisheries, and wetlands;
     vegetation and wildlife;
     endangered and threatened species;
     cultural resources;
     land use;
     socioeconomics;
     air quality and noise;
     public safety; and
     cumulative impacts.
    We will also evaluate reasonable alternatives to the proposed 
project or portions of the project, and make recommendations on how to 
lessen or avoid impacts on the various resource areas.
    The EA will present our independent analysis of the issues. The EA 
will be available in the public record through eLibrary. Depending on 
the comments received during the scoping process, we may also publish 
and distribute the EA to the public for an allotted comment period. We 
will consider all comments on the EA before making our recommendations 
to the Commission. To ensure we have the opportunity to consider and 
address your comments, please carefully follow the instructions in the 
Public Participation section, beginning on page 2.

[[Page 16849]]

    With this notice, we are asking agencies with jurisdiction by law 
and/or special expertise with respect to the environmental issues of 
this project to formally cooperate with us in the preparation of the 
EA.\3\ Agencies that would like to request cooperating agency status 
should follow the instructions for filing comments provided under the 
Public Participation section of this notice.
---------------------------------------------------------------------------

    \3\ The Council on Environmental Quality regulations addressing 
cooperating agency responsibilities are at Title 40, Code of Federal 
Regulations, Part 1501.6.
---------------------------------------------------------------------------

Consultations Under Section 106 of the National Historic Preservation 
Act

    In accordance with the Advisory Council on Historic Preservation's 
implementing regulations for section 106 of the National Historic 
Preservation Act, we are using this notice to initiate consultation 
with the applicable State Historic Preservation Offices (SHPO), and to 
solicit their views and those of other government agencies, interested 
Indian tribes, and the public on the project's potential effects on 
historic properties.\4\ We will define the project-specific Area of 
Potential Effects (APE) in consultation with the SHPOs as the project 
develops. On natural gas facility projects, the APE at a minimum 
encompasses all areas subject to ground disturbance (examples include 
construction right-of-way, contractor/pipe storage yards, compressor 
stations, and access roads). Our EA for this project will document our 
findings on the impacts on historic properties and summarize the status 
of consultations under section 106.
---------------------------------------------------------------------------

    \4\ The Advisory Council on Historic Preservation's regulations 
are at Title 36, Code of Federal Regulations, Part 800. Those 
regulations define historic properties as any prehistoric or 
historic district, site, building, structure, or object included in 
or eligible for inclusion in the National Register of Historic 
Places.
---------------------------------------------------------------------------

Environmental Mailing List

    The environmental mailing list includes federal, state, and local 
government representatives and agencies; elected officials; Native 
American Tribes; other interested parties; and local libraries and 
newspapers. This list also includes all affected landowners (as defined 
in the Commission's regulations) who are potential right-of-way 
grantors, whose property may be used temporarily for project purposes, 
or who own homes within certain distances of aboveground facilities, 
and anyone who submits comments on the project. We will update the 
environmental mailing list as the analysis proceeds to ensure that we 
send the information related to this environmental review to all 
individuals, organizations, and government entities interested in and/
or potentially affected by the proposed project.
    If we publish and distribute the EA, copies of the EA will be sent 
to the environmental mailing list for public review and comment. If you 
would prefer to receive a paper copy of the document instead of the CD 
version or would like to remove your name from the mailing list, please 
return the attached Information Request (appendix 2).

Becoming an Intervenor

    In addition to involvement in the EA scoping process, you may want 
to become an ``intervenor'' which is an official party to the 
Commission's proceeding. Intervenors play a more formal role in the 
process and are able to file briefs, appear at hearings, and be heard 
by the courts if they choose to appeal the Commission's final ruling. 
An intervenor formally participates in the proceeding by filing a 
request to intervene. Instructions for becoming an intervenor are in 
the ``Document-less Intervention Guide'' under the ``e-filing'' link on 
the Commission's website. Motions to intervene are more fully described 
at https://www.ferc.gov/resources/guides/how-to/intervene.asp.

Additional Information

    Additional information about the project is available from the 
Commission's Office of External Affairs, at (866) 208-FERC, or on the 
FERC website at www.ferc.gov using the ``eLibrary'' link. Click on the 
eLibrary link, click on ``General Search'' and enter the docket number, 
excluding the last three digits in the Docket Number field (i.e., CP18-
89). Be sure you have selected an appropriate date range. For 
assistance, please contact FERC Online Support at 
[email protected] or toll free at (866) 208-3676, or for TTY, 
contact (202) 502-8659. The eLibrary link also provides access to the 
texts of formal documents issued by the Commission, such as orders, 
notices, and rulemakings.
    In addition, the Commission offers a free service called 
eSubscription which allows you to keep track of all formal issuances 
and submittals in specific dockets. This can reduce the amount of time 
you spend researching proceedings by automatically providing you with 
notification of these filings, document summaries, and direct links to 
the documents. Go to www.ferc.gov/docs-filing/esubscription.asp.
    Finally, public sessions or site visits will be posted on the 
Commission's calendar located at www.ferc.gov/EventCalendar/EventsList.aspx along with other related information.

    Dated: April 10, 2018.
Kimberly D. Bose,
 Secretary.
[FR Doc. 2018-07924 Filed 4-16-18; 8:45 am]
 BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.