Erie Boulevard Hydropower, L.P.; Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests and Establishing Procedural Schedule for Relicensing and a Deadline for Submission of Final Amendments, 16351-16352 [2018-07780]
Download as PDF
Federal Register / Vol. 83, No. 73 / Monday, April 16, 2018 / Notices
Dated: April 5, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–07876 Filed 4–13–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
srobinson on DSK3G9T082PROD with NOTICES
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Number: PR18–40–000.
Applicants: Columbia Gas of
Maryland, Inc.
Description: Tariff filing per
284.123(b),(e)/.224: CMD SOC Rates,
Effective April 2, 2018.
Filed Date: 4/3/18.
Accession Number: 201804035071.
Comments/Protests Due: 5 p.m. ET
4/24/18.
Docket Numbers: RP18–680–000.
Applicants: Dogwood Energy LLC,
Missouri Joint Municipal Electric Util.
Description: Request for Waiver and
Expedited Action of Dogwood Energy
LLC, et al.
Filed Date: 4/3/18.
Accession Number: 20180403–5197.
Comments Due: 5 p.m. ET 4/16/18.
Docket Numbers: RP18–681–000.
Applicants: Guardian Pipeline, L.L.C.
Description: § 4(d) Rate Filing:
Revision to Rate Schedule PAL to be
effective 5/4/2018.
Filed Date: 4/4/18.
Accession Number: 20180404–5072.
Comments Due: 5 p.m. ET 4/16/18.
Docket Numbers: RP18–682–000.
Applicants: Gulf Crossing Pipeline
Company LLC.
Description: § 4(d) Rate Filing:
Amendment to Neg Rate Agmt (BP 37–
26) to be effective 4/5/2018.
Filed Date: 4/4/18.
Accession Number: 20180404–5075.
Comments Due: 5 p.m. ET 4/16/18.
Docket Numbers: RP18–683–000.
Applicants: Gulf Crossing Pipeline
Company LLC.
Description: § 4(d) Rate Filing: Cap
Rel Neg Rate Agmts (Newfield 18 to BP
1968, 1969) to be effective 4/3/2018.
Filed Date: 4/4/18.
Accession Number: 20180404–5080.
Comments Due: 5 p.m. ET 4/16/18.
Docket Numbers: RP18–684–000.
Applicants: Midwestern Gas
Transmission Company.
Description: § 4(d) Rate Filing:
Revision to Rate Schedules FPAL & PAL
to be effective 5/4/2018.
VerDate Sep<11>2014
19:42 Apr 13, 2018
Jkt 244001
Filed Date: 4/4/18.
Accession Number: 20180404–5083.
Comments Due: 5 p.m. ET 4/16/18.
Docket Numbers: RP18–685–000.
Applicants: Viking Gas Transmission
Company.
Description: § 4(d) Rate Filing:
Revision to Rate Schedule PAL to be
effective 5/4/2018.
Filed Date: 4/4/18.
Accession Number: 20180404–5087.
Comments Due: 5 p.m. ET 4/16/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified date(s). Protests
may be considered, but intervention is
necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: April 5, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–07881 Filed 4–13–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2837–033]
Erie Boulevard Hydropower, L.P.;
Notice of Application Tendered for
Filing With the Commission and
Soliciting Additional Study Requests
and Establishing Procedural Schedule
for Relicensing and a Deadline for
Submission of Final Amendments
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: New Major
License.
b. Project No.: 2837–033.
c. Date Filed: March 29, 2018.
d. Applicant: Erie Boulevard
Hydropower, L.P. (Erie).
e. Name of Project: Granby
Hydroelectric Project.
f. Location: On the Oswego River in
the town of Fulton in Oswego County,
PO 00000
Frm 00067
Fmt 4703
Sfmt 4703
16351
New York. The project does not affect
federal lands.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Steven P.
Murphy, Director, U.S. Licensing, Erie
Boulevard Hydropower, L.P., 33 West
1st Street South, Fulton, NY 13069;
(315) 598–6130.
i. FERC Contact: Allyson Conner,
(202) 502–6082 or allyson.conner@
ferc.gov.
j. Cooperating agencies: Federal, state,
local, and tribal agencies with
jurisdiction and/or special expertise
with respect to environmental issues
that wish to cooperate in the
preparation of the environmental
document should follow the
instructions for filing such requests
described in item l below. Cooperating
agencies should note the Commission’s
policy that agencies that cooperate in
the preparation of the environmental
document cannot also intervene. See, 94
FERC ¶ 61,076 (2001).
k. Pursuant to section 4.32(b)(7) of 18
CFR of the Commission’s regulations, if
any resource agency, Indian Tribe, or
person believes that an additional
scientific study should be conducted in
order to form an adequate factual basis
for a complete analysis of the
application on its merit, the resource
agency, Indian Tribe, or person must file
a request for a study with the
Commission not later than 60 days from
the date of filing of the application, and
serve a copy of the request on the
applicant.
l. Deadline for filing additional study
requests and requests for cooperating
agency status: May 29, 2018.
The Commission strongly encourages
electronic filing. Please file additional
study requests and requests for
cooperating agency status using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). In lieu of
electronic filing, please send a paper
copy to: Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426. The first
page of any filing should include docket
number P–2837–033.
m. This application is not ready for
environmental analysis at this time.
n. The existing Granby Hydroelectric
Project (Granby Project) consists of: (1)
An 88-foot-wide reinforced concrete
intake structure that includes four 15.5foot-wide by 20-foot-high bays each
containing trashracks and fixed-roller
vertical-lift type gates; (2) a 17-foot-wide
sluice opening adjacent to the intake
E:\FR\FM\16APN1.SGM
16APN1
srobinson on DSK3G9T082PROD with NOTICES
16352
Federal Register / Vol. 83, No. 73 / Monday, April 16, 2018 / Notices
structure; (3) a 112-foot-long, 88-footwide, 46-foot-high powerhouse
containing two 5.04-megawatt (MW)
turbine-generator units, with a total
capacity of 10.08 MW; (4) a 3,000-footlong, 100-foot-wide tailrace; (5) two
4.16-kilovolt, 120-foot-long
underground generator leads; (6) a 60foot-long by 48-foot-wide electrical
switchyard; and (7) appurtenant
facilities.
The Granby Project is operated in a
modified run-of-river mode. The Granby
Project and the Fulton Development at
Erie’s Oswego River Hydroelectric
Project (FERC Project No. 2474) are
located at opposite ends of the same
dam and share a single bypassed reach
and reservoir. The flow and
impoundment elevation requirements in
the Oswego Project license,1 which were
based on a 2004 Offer of Settlement,
affect the Granby Project. The average
annual generation at the Granby Project
is estimated to be 44,181 megawatthours.
o. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s website at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support. A copy is also available
for inspection and reproduction at the
address in item h above.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
p. Procedural schedule and final
amendments: The application will be
processed according to the following
preliminary schedule. Revisions to the
schedule will be made as appropriate.
Issue Deficiency Letter (if necessary)—
June 2018
Request Additional Information—June
2018
Issue Acceptance Letter—September
2018
Issue Scoping Document 1—September
2018
Comments on Scoping Document 1
due—October 2018
Issue Scoping Document 2 (if
necessary)—December 2018
Issue Notice of Ready for Environmental
Analysis—January 2019
Commission issues EA—June 2019
Comments on EA—July 2019
1 109
FERC ¶ 62, 141 (2004).
VerDate Sep<11>2014
19:42 Apr 13, 2018
Jkt 244001
q. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of the notice of ready
for environmental analysis.
Dated: April 9, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–07780 Filed 4–13–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. CP18–137–000 PF17–6–000]
Columbia Gas Transmission, LLC;
Notice of Application
Take notice that on March 26, 2018,
Columbia Gas Transmission, LLC
(Columbia), 700 Louisiana Street, Suite
700, Houston, Texas 77002–2700, filed
in Docket No. CP18–137–000, an
application pursuant to sections 7(b)
and 7(c) of the Natural Gas Act (NGA)
for its proposed Buckeye XPress Project.
Specifically, Columbia proposes to: (i)
Construct approximately 66.2 miles of
36-inch-diameter pipeline and
appurtenances; and (ii) abandon
approximately 60.8 miles of 20- and 24inch-diameter pipeline and
appurtenances, all located in Vinton,
Jackson, Gallia, and Lawrence Counties,
Ohio and Wayne County, West Virginia.
The project would provide 275,000
dekatherms per day of firm
transportation service. Columbia
estimates the cost of the Buckeye XPress
Project to be $709,200,216, all as more
fully set forth in the application which
is on file with the Commission and open
to public inspection. The filing is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s website
web at https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
at FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Any questions concerning this
application may be directed to Robert
Jackson, Manager, Certificates &
Regulatory Administration, Columbia
Gas Transmission, LLC, 700 Louisiana
Street, Suite 700, Houston, Texas
77002–2700, by telephone at (832) 320–
5487 or by email at robert_jackson@
transcanada.com.
On August 1, 2017, Commission staff
granted Columbia’s request to utilize the
PO 00000
Frm 00068
Fmt 4703
Sfmt 4703
Pre-Filing Process and assigned Docket
No. PF17–6–000 to staff activities
involved in the Buckeye XPress Project.
Now, as of the March 26, 2018
application, the Pre-Filing Process for
this project has ended. From this time
forward, this proceeding will be
conducted in CP18–137–000, as noted
in the caption of the Notice.
Pursuant to section 157.9 of the
Commission’s rules (18 CFR 157.9),
within 90 days of this Notice, the
Commission staff will issue a Notice of
Schedule for Environmental Review. If
a Notice of Schedule for Environmental
Review is issued, it will indicate, among
other milestones, the anticipated date
for the Commission staff’s issuance of
the environmental assessment (EA) for
this proposal. The issuance of a Notice
of Schedule for Environmental Review
will serve to notify federal and state
agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
seven copies of filings made in the
proceeding with the Commission and
must mail a copy to the applicant and
to every other party. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
E:\FR\FM\16APN1.SGM
16APN1
Agencies
[Federal Register Volume 83, Number 73 (Monday, April 16, 2018)]
[Notices]
[Pages 16351-16352]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-07780]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2837-033]
Erie Boulevard Hydropower, L.P.; Notice of Application Tendered
for Filing With the Commission and Soliciting Additional Study Requests
and Establishing Procedural Schedule for Relicensing and a Deadline for
Submission of Final Amendments
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: New Major License.
b. Project No.: 2837-033.
c. Date Filed: March 29, 2018.
d. Applicant: Erie Boulevard Hydropower, L.P. (Erie).
e. Name of Project: Granby Hydroelectric Project.
f. Location: On the Oswego River in the town of Fulton in Oswego
County, New York. The project does not affect federal lands.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Steven P. Murphy, Director, U.S. Licensing,
Erie Boulevard Hydropower, L.P., 33 West 1st Street South, Fulton, NY
13069; (315) 598-6130.
i. FERC Contact: Allyson Conner, (202) 502-6082 or
[email protected].
j. Cooperating agencies: Federal, state, local, and tribal agencies
with jurisdiction and/or special expertise with respect to
environmental issues that wish to cooperate in the preparation of the
environmental document should follow the instructions for filing such
requests described in item l below. Cooperating agencies should note
the Commission's policy that agencies that cooperate in the preparation
of the environmental document cannot also intervene. See, 94 FERC ]
61,076 (2001).
k. Pursuant to section 4.32(b)(7) of 18 CFR of the Commission's
regulations, if any resource agency, Indian Tribe, or person believes
that an additional scientific study should be conducted in order to
form an adequate factual basis for a complete analysis of the
application on its merit, the resource agency, Indian Tribe, or person
must file a request for a study with the Commission not later than 60
days from the date of filing of the application, and serve a copy of
the request on the applicant.
l. Deadline for filing additional study requests and requests for
cooperating agency status: May 29, 2018.
The Commission strongly encourages electronic filing. Please file
additional study requests and requests for cooperating agency status
using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. For assistance, please contact FERC Online Support
at [email protected], (866) 208-3676 (toll free), or (202)
502-8659 (TTY). In lieu of electronic filing, please send a paper copy
to: Secretary, Federal Energy Regulatory Commission, 888 First Street
NE, Washington, DC 20426. The first page of any filing should include
docket number P-2837-033.
m. This application is not ready for environmental analysis at this
time.
n. The existing Granby Hydroelectric Project (Granby Project)
consists of: (1) An 88-foot-wide reinforced concrete intake structure
that includes four 15.5-foot-wide by 20-foot-high bays each containing
trashracks and fixed-roller vertical-lift type gates; (2) a 17-foot-
wide sluice opening adjacent to the intake
[[Page 16352]]
structure; (3) a 112-foot-long, 88-foot-wide, 46-foot-high powerhouse
containing two 5.04-megawatt (MW) turbine-generator units, with a total
capacity of 10.08 MW; (4) a 3,000-foot-long, 100-foot-wide tailrace;
(5) two 4.16-kilovolt, 120-foot-long underground generator leads; (6) a
60-foot-long by 48-foot-wide electrical switchyard; and (7) appurtenant
facilities.
The Granby Project is operated in a modified run-of-river mode. The
Granby Project and the Fulton Development at Erie's Oswego River
Hydroelectric Project (FERC Project No. 2474) are located at opposite
ends of the same dam and share a single bypassed reach and reservoir.
The flow and impoundment elevation requirements in the Oswego Project
license,\1\ which were based on a 2004 Offer of Settlement, affect the
Granby Project. The average annual generation at the Granby Project is
estimated to be 44,181 megawatt-hours.
---------------------------------------------------------------------------
\1\ 109 FERC ] 62, 141 (2004).
---------------------------------------------------------------------------
o. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's website at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC Online Support. A copy is also available for inspection and
reproduction at the address in item h above.
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
p. Procedural schedule and final amendments: The application will
be processed according to the following preliminary schedule. Revisions
to the schedule will be made as appropriate.
Issue Deficiency Letter (if necessary)--June 2018
Request Additional Information--June 2018
Issue Acceptance Letter--September 2018
Issue Scoping Document 1--September 2018
Comments on Scoping Document 1 due--October 2018
Issue Scoping Document 2 (if necessary)--December 2018
Issue Notice of Ready for Environmental Analysis--January 2019
Commission issues EA--June 2019
Comments on EA--July 2019
q. Final amendments to the application must be filed with the
Commission no later than 30 days from the issuance date of the notice
of ready for environmental analysis.
Dated: April 9, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-07780 Filed 4-13-18; 8:45 am]
BILLING CODE 6717-01-P