Notice of Attendance at PJM Interconnection, L.L.C. Meetings, 15827-15828 [2018-07557]
Download as PDF
Federal Register / Vol. 83, No. 71 / Thursday, April 12, 2018 / Notices
Power Operating Company, LLC, et al.,
163 FERC ¶ 61, 014 (2018).
The refund effective date in Docket
Nos. EL18–126–000, EL18–127–000,
EL18–128–000, EL18–129–000, and
EL18–130–000, established pursuant to
section 206(b) of the FPA, will be the
date of publication of this notice in the
Federal Register.
Any interested person desiring to be
heard in Docket Nos. EL18–126–000,
EL18–127–000, EL18–128–000, EL18–
129–000, and EL18–130–000 must file a
notice of intervention or motion to
intervene, as appropriate, with the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426, in accordance with Rule 214 of
the Commission’s Rules of Practice and
Procedure, 18 CFR 385.214, within 21
days of the date of issuance of the order.
Dated: April 6, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–07554 Filed 4–11–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RA16–2–000]
sradovich on DSK3GMQ082PROD with NOTICES
Fluke Corporation; Notice of
Termination of Proceeding
On July 8, 2016, Fluke Corporation
(Fluke) filed a Petition for Review of
Denial of Adjustment Request, Request
for Hearing, and Request for
Confidential Treatment (Petition) under
Subpart J of the Commission’s Rules of
Practice and Procedure.1 Fluke’s
Petition alleged that the Department of
Energy (DOE) Office of Hearings and
Appeals (OHA) inappropriately denied
applications for various forms of relief
from DOE energy conservation
standards applicable to external power
supplies.
On January 19, 2018, the
Administrative Law Judge designated to
serve as the presiding officer, Judge
David H. Coffman, issued a Report to
the Commission and reported that on
January 16, 2018, Fluke and DOE filed
a Joint Notice of Satisfaction
representing that OHA vacated its
orders denying Fluke’s applications for
relief. Accordingly, consistent with the
Proposed Settlement filed on November
20, 2017, the Judge deemed the Petition
and Fluke’s applications to OHA to be
withdrawn.
1 18
CFR 385.1004 and 385.1006 (2017).
VerDate Sep<11>2014
19:20 Apr 11, 2018
Jkt 244001
Take notice that the proceeding in
Docket No. RA16–2–000 is, as a
consequence, deemed terminated.
Dated: April 6, 2018.
Kimberly D. Bose,
Secretary.
15827
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Attendance at PJM
Interconnection, L.L.C. Meetings
[FR Doc. 2018–07553 Filed 4–11–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RA16–3–000]
Avocent Corporation; Notice of
Termination of Proceeding
On August 4, 2016, Avocent
Corporation (Avocent) filed a Petition
for Review of Denial of Adjustment
Request, Request for Hearing, and
Request for Confidential Treatment
(Petition) under Subpart J of the
Commission’s Rules of Practice and
Procedure.1 Avocent’s Petition alleged
that the Department of Energy (DOE)
Office of Hearings and Appeals (OHA)
inappropriately denied Avocent’s
February 9, 2016 applications for
various forms of relief from DOE energy
conservation standards applicable to
external power supplies.
On March 23, 2017, the
Administrative Law Judge designated to
serve as the presiding officer, Judge
David H. Coffman, issued a Report to
the Commission and reported that on
March 17, 2017, Avocent and DOE filed
a Joint Notice of Satisfaction
representing that OHA vacated its
orders denying Avocent’s applications
for relief. Accordingly, consistent with
the Proposed Settlement filed on
February 6, 2017, the Judge deemed the
Petition and Avocent’s applications to
OHA to be withdrawn.
Take notice that the proceeding in
Docket No. RA16–3–000 is, as a
consequence, deemed terminated.
Dated: April 6, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–07560 Filed 4–11–18; 8:45 am]
The Federal Energy Regulatory
Commission (Commission) hereby gives
notice that members of the Commission
and Commission staff may attend
upcoming PJM Interconnection, L.L.C.
(PJM) Members Committee and Markets
and Reliability Committee meetings, as
well as other PJM committee,
subcommittee or task force meetings.1
The Commission and Commission staff
may attend the following meetings:
PJM Members Committee
• April 19, 2018 (Wilmington, DE)
• May 14–16, 2018 (National Harbor,
MD)
• June 21, 2018 (Wilmington, DE)
• July 26, 2018 (Wilmington, DE)
• September 27, 2018 (Audubon, PA)
• October 25, 2018 (Wilmington, DE)
• December 6, 2018 (Wilmington, DE)
PJM Markets and Reliability Committee
•
•
•
•
•
•
•
•
•
April 19, 2018 (Wilmington, DE)
May 24, 2018 (Wilmington, DE)
June 21, 2018 (Wilmington, DE)
July 26, 2018 (Wilmington, DE)
August 23, 2018 (Audubon, PA)
September 27, 2018 (Audubon, PA)
October 25, 2018 (Wilmington, DE)
December 6, 2018 (Wilmington, DE)
December 20, 2018 (Audubon, PA)
PJM Market Implementation Committee
•
•
•
•
•
•
•
•
May 2, 2018 (Audubon, PA)
June 6, 2018 (Audubon, PA)
July 11, 2018 (Audubon, PA)
August 8, 2018 (Audubon, PA)
September 12, 2018 (Audubon, PA)
October 10, 2018 (Audubon, PA)
November 7, 2018 (Audubon, PA)
December 12, 2018 (Audubon, PA)
The discussions at each of the
meetings described above may address
matters at issue in pending proceedings
before the Commission, including the
following currently pending
proceedings:
Docket No. EL05–121, PJM
Interconnection, L.L.C.
Docket No. ER12–2708, PotomacAppalachian Transmission Highline,
LLC. et al.
BILLING CODE 6717–01–P
1 18
PO 00000
CFR 385.1004 and 385.1006 (2017).
Frm 00044
Fmt 4703
Sfmt 4703
1 For example, PJM subcommittees and task
forces of the standing committees (Operating,
Planning and Market Implementation) and senior
standing committees (Members and Markets and
Reliability) meet on a variety of different topics;
they convene and dissolve on an as-needed basis.
Therefore, the Commission and Commission staff
may monitor the various meetings posted on the
PJM website.
E:\FR\FM\12APN1.SGM
12APN1
sradovich on DSK3GMQ082PROD with NOTICES
15828
Federal Register / Vol. 83, No. 71 / Thursday, April 12, 2018 / Notices
Docket No. ER13–535, PJM
Interconnection, L.L.C.
Docket No. EL14–37, PJM
Interconnection, L.L.C.
Docket No. ER14–972, PJM
Interconnection, L.L.C.
Docket Nos. ER14–1461, EL14–48, PJM
Interconnection, L.L.C.
Docket No. EL15–18, Consolidated
Edison Company of New York, Inc. v.
PJM Interconnection, L.L.C.
Docket No. EL15–67, Linden VFT, LLC
v. PJM Interconnection, L.L.C.
Docket Nos. EL15–73, ER16–372, PJM
Interconnection, L.L.C.
Docket No. EL15–79, TranSource, LLC
v. PJM Interconnection, L.L.C.
Docket No. EL15–95, Maryland and
Delaware State Commissions v. PJM
Interconnection, L.L.C.
Docket No. ER15–1387, PJM
Interconnection, L.L.C.
Docket Nos. ER15–2562, ER15–2563,
PJM Interconnection, L.L.C.
Docket No. EL16–49, Calpine
Corporation, et al., v. PJM
Interconnection, L.L.C.
Docket Nos. EL16–71, ER17–179,
Monongahela Power Company, et al.,
PPL Electric Utilities Corporation
Docket Nos. EL16–96, ER16–736, ER16–
2401, PJM Interconnection, L.L.C.
Docket No. EL17–22, Independent
Market Monitor for PJM
Interconnection, L.L.C. v. American
Electric Power Corporation
Docket No. EL17–31, Northern Illinois
Municipal Power Agency v. PJM
Interconnection, L.L.C.
Docket No. EL17–32, Old Dominion
Electric Cooperative v. PJM
Interconnection, L.L.C.
Docket No. EL17–36, Advanced Energy
Management Alliance v. PJM
Interconnection, L.L.C.
Docket No. EL17–37, American
Municipal Power, Inc. v. PJM
Interconnection, L.L.C.
Docket No. EL17–62, Potomac
Economics, Ltd. v. PJM
Interconnection, L.L.C.
Docket No. EL17–64, Energy Storage
Association v. PJM Interconnection,
L.L.C.
Docket No. EL17–65, Renewable Energy
Systems America v. PJM
Interconnection, L.L.C.
Docket No. EL17–68, Linden VFT, LLC
v. PJM Interconnection, L.L.C.
Docket No. EL17–75, Advanced Energy
Economy
Docket No. EL17–82, The Independent
Market Monitor for PJM v. PJM
Interconnection, L.L.C.
Docket No. EL17–94, New York Power
Authority v. PJM Interconnection,
L.L.C. and PJM Transmission Owners
Docket No. ER17–211, Mid-Atlantic
Interstate Transmission, LLC
VerDate Sep<11>2014
19:20 Apr 11, 2018
Jkt 244001
Docket Nos. ER17–214, ER17–216, PJM
Interconnection, L.L.C.
Docket No. ER17–217, PJM
Interconnection, L.L.C.
Docket No. ER17–349, PJM
Interconnection, L.L.C.
Docket No. ER17–725, PJM
Interconnection, L.L.C.
Docket No. ER17–775, PJM
Interconnection, L.L.C.
Docket No. ER17–905, New York
Independent System Operator, Inc. v.
PJM Interconnection, L.L.C.
Docket No. ER17–950, PJM
Interconnection, L.L.C.
Docket No. ER17–1016, PJM
Interconnection, L.L.C.
Docket No. ER17–1138, PJM
Interconnection, L.L.C.
Docket No. ER17–1420, PJM
Interconnection, L.L.C.
Docket No. ER17–1567, PJM
Interconnection, L.L.C.
Docket No. ER17–2073, PJM
Interconnection, L.L.C.
Docket No. ER17–2267, PJM
Interconnection, L.L.C.
Docket No. ER17–2218, PJM
Interconnection, L.L.C.
Docket No. ER17–2220, Midcontinent
Independent System Operator, Inc.
Docket No. ER17–2291, PJM
Interconnection, L.L.C.
Docket No. EL18–7, American Electric
Power Service Corporation v.
Midcontinent Independent System
Operator, Inc.
Docket No. EL18–26, EDF Renewable
Energy, Inc. v. Midcontinent
Independent System Operator, Inc.,
Southwest Power Pool, Inc. and PJM
Interconnection, L.L.C.
Docket No. EL18–34, PJM
Interconnection, L.L.C.
Docket No. EL18–61, Public Citizen, Inc.
v. PJM Interconnection, L.L.C.
Docket No. ER18–86, PJM
Interconnection, L.L.C.
Docket No. ER18–87, PJM
Interconnection, L.L.C.
Docket No. ER18–88, PJM
Interconnection, L.L.C.
Docket No. ER18–136, Midcontinent
Independent System Operator, Inc.
Docket No. ER18–137, PJM
Interconnection, L.L.C.
Docket No. ER18–815, PJM
Interconnection, L.L.C.
Docket Nos. ER18–459, ER18–460, PJM
Interconnection, L.L.C. and Ohio
Valley Electric Corporation
Docket No. ER18–579, PJM
Interconnection, L.L.C.
Docket No. ER18–614, PJM
Interconnection, L.L.C.
Docket No. ER18–663, PJM
Interconnection, L.L.C.
Docket No. ER18–932, PJM
Interconnection, L.L.C.
PO 00000
Frm 00045
Fmt 4703
Sfmt 4703
Docket No. ER18–934, PJM
Interconnection, L.L.C.
Docket No. ER18–680, PJM
Interconnection, L.L.C.
Docket No. ER18–870, PJM
Interconnection, L.L.C.
Docket No. ER18–988, PJM
Interconnection, L.L.C.
Docket No. ER18–1131, PJM
Interconnection, L.L.C.
Docket No. ER18–1148, PJM
Interconnection, L.L.C.
Docket No. ER18–1175, PJM
Interconnection, L.L.C.
Docket No. ER18–1245, PJM
Interconnection, L.L.C.
For additional meeting information,
see: https://www.pjm.com/committeesand-groups.aspx and https://
www.pjm.com/Calendar.aspx.
The meetings are open to
stakeholders. For more information,
contact Valerie Martin, Office of Energy
Market Regulation, Federal Energy
Regulatory Commission at (202) 502–
6139 or Valerie.Martin@ferc.gov.
Dated: April 6, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–07557 Filed 4–11–18; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[FRL 9976–67–OW]
Notice of Funding Availability (NOFA)
for Applications for Credit Assistance
Under the Water Infrastructure Finance
and Innovation Act (WIFIA) Program
Environmental Protection
Agency (EPA).
ACTION: Notice of funding availability.
AGENCY:
In the Consolidated
Appropriations Act, 2018, signed by the
President on March 23, 2018, Congress
provided at least $55 million in budget
authority for the Water Infrastructure
Finance and Innovation Act of 2014
(WIFIA) program to cover the subsidy
required to provide a much larger
amount of credit assistance. The
Environmental Protection Agency (EPA)
estimates that this budget authority may
provide approximately $5.5 billion in
credit assistance and may finance
approximately $11 billion in water
infrastructure investment, while
covering increased costs associated with
implementing a larger program. The
purpose of this notice of funding
availability (NOFA) is to solicit letters of
interest (LOIs) from prospective
borrowers seeking credit assistance from
EPA.
SUMMARY:
E:\FR\FM\12APN1.SGM
12APN1
Agencies
[Federal Register Volume 83, Number 71 (Thursday, April 12, 2018)]
[Notices]
[Pages 15827-15828]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-07557]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Attendance at PJM Interconnection, L.L.C. Meetings
The Federal Energy Regulatory Commission (Commission) hereby gives
notice that members of the Commission and Commission staff may attend
upcoming PJM Interconnection, L.L.C. (PJM) Members Committee and
Markets and Reliability Committee meetings, as well as other PJM
committee, subcommittee or task force meetings.\1\ The Commission and
Commission staff may attend the following meetings:
---------------------------------------------------------------------------
\1\ For example, PJM subcommittees and task forces of the
standing committees (Operating, Planning and Market Implementation)
and senior standing committees (Members and Markets and Reliability)
meet on a variety of different topics; they convene and dissolve on
an as-needed basis. Therefore, the Commission and Commission staff
may monitor the various meetings posted on the PJM website.
---------------------------------------------------------------------------
PJM Members Committee
April 19, 2018 (Wilmington, DE)
May 14-16, 2018 (National Harbor, MD)
June 21, 2018 (Wilmington, DE)
July 26, 2018 (Wilmington, DE)
September 27, 2018 (Audubon, PA)
October 25, 2018 (Wilmington, DE)
December 6, 2018 (Wilmington, DE)
PJM Markets and Reliability Committee
April 19, 2018 (Wilmington, DE)
May 24, 2018 (Wilmington, DE)
June 21, 2018 (Wilmington, DE)
July 26, 2018 (Wilmington, DE)
August 23, 2018 (Audubon, PA)
September 27, 2018 (Audubon, PA)
October 25, 2018 (Wilmington, DE)
December 6, 2018 (Wilmington, DE)
December 20, 2018 (Audubon, PA)
PJM Market Implementation Committee
May 2, 2018 (Audubon, PA)
June 6, 2018 (Audubon, PA)
July 11, 2018 (Audubon, PA)
August 8, 2018 (Audubon, PA)
September 12, 2018 (Audubon, PA)
October 10, 2018 (Audubon, PA)
November 7, 2018 (Audubon, PA)
December 12, 2018 (Audubon, PA)
The discussions at each of the meetings described above may address
matters at issue in pending proceedings before the Commission,
including the following currently pending proceedings:
Docket No. EL05-121, PJM Interconnection, L.L.C.
Docket No. ER12-2708, Potomac-Appalachian Transmission Highline, LLC.
et al.
[[Page 15828]]
Docket No. ER13-535, PJM Interconnection, L.L.C.
Docket No. EL14-37, PJM Interconnection, L.L.C.
Docket No. ER14-972, PJM Interconnection, L.L.C.
Docket Nos. ER14-1461, EL14-48, PJM Interconnection, L.L.C.
Docket No. EL15-18, Consolidated Edison Company of New York, Inc. v.
PJM Interconnection, L.L.C.
Docket No. EL15-67, Linden VFT, LLC v. PJM Interconnection, L.L.C.
Docket Nos. EL15-73, ER16-372, PJM Interconnection, L.L.C.
Docket No. EL15-79, TranSource, LLC v. PJM Interconnection, L.L.C.
Docket No. EL15-95, Maryland and Delaware State Commissions v. PJM
Interconnection, L.L.C.
Docket No. ER15-1387, PJM Interconnection, L.L.C.
Docket Nos. ER15-2562, ER15-2563, PJM Interconnection, L.L.C.
Docket No. EL16-49, Calpine Corporation, et al., v. PJM
Interconnection, L.L.C.
Docket Nos. EL16-71, ER17-179, Monongahela Power Company, et al., PPL
Electric Utilities Corporation
Docket Nos. EL16-96, ER16-736, ER16-2401, PJM Interconnection, L.L.C.
Docket No. EL17-22, Independent Market Monitor for PJM Interconnection,
L.L.C. v. American Electric Power Corporation
Docket No. EL17-31, Northern Illinois Municipal Power Agency v. PJM
Interconnection, L.L.C.
Docket No. EL17-32, Old Dominion Electric Cooperative v. PJM
Interconnection, L.L.C.
Docket No. EL17-36, Advanced Energy Management Alliance v. PJM
Interconnection, L.L.C.
Docket No. EL17-37, American Municipal Power, Inc. v. PJM
Interconnection, L.L.C.
Docket No. EL17-62, Potomac Economics, Ltd. v. PJM Interconnection,
L.L.C.
Docket No. EL17-64, Energy Storage Association v. PJM Interconnection,
L.L.C.
Docket No. EL17-65, Renewable Energy Systems America v. PJM
Interconnection, L.L.C.
Docket No. EL17-68, Linden VFT, LLC v. PJM Interconnection, L.L.C.
Docket No. EL17-75, Advanced Energy Economy
Docket No. EL17-82, The Independent Market Monitor for PJM v. PJM
Interconnection, L.L.C.
Docket No. EL17-94, New York Power Authority v. PJM Interconnection,
L.L.C. and PJM Transmission Owners
Docket No. ER17-211, Mid-Atlantic Interstate Transmission, LLC
Docket Nos. ER17-214, ER17-216, PJM Interconnection, L.L.C.
Docket No. ER17-217, PJM Interconnection, L.L.C.
Docket No. ER17-349, PJM Interconnection, L.L.C.
Docket No. ER17-725, PJM Interconnection, L.L.C.
Docket No. ER17-775, PJM Interconnection, L.L.C.
Docket No. ER17-905, New York Independent System Operator, Inc. v. PJM
Interconnection, L.L.C.
Docket No. ER17-950, PJM Interconnection, L.L.C.
Docket No. ER17-1016, PJM Interconnection, L.L.C.
Docket No. ER17-1138, PJM Interconnection, L.L.C.
Docket No. ER17-1420, PJM Interconnection, L.L.C.
Docket No. ER17-1567, PJM Interconnection, L.L.C.
Docket No. ER17-2073, PJM Interconnection, L.L.C.
Docket No. ER17-2267, PJM Interconnection, L.L.C.
Docket No. ER17-2218, PJM Interconnection, L.L.C.
Docket No. ER17-2220, Midcontinent Independent System Operator, Inc.
Docket No. ER17-2291, PJM Interconnection, L.L.C.
Docket No. EL18-7, American Electric Power Service Corporation v.
Midcontinent Independent System Operator, Inc.
Docket No. EL18-26, EDF Renewable Energy, Inc. v. Midcontinent
Independent System Operator, Inc., Southwest Power Pool, Inc. and PJM
Interconnection, L.L.C.
Docket No. EL18-34, PJM Interconnection, L.L.C.
Docket No. EL18-61, Public Citizen, Inc. v. PJM Interconnection, L.L.C.
Docket No. ER18-86, PJM Interconnection, L.L.C.
Docket No. ER18-87, PJM Interconnection, L.L.C.
Docket No. ER18-88, PJM Interconnection, L.L.C.
Docket No. ER18-136, Midcontinent Independent System Operator, Inc.
Docket No. ER18-137, PJM Interconnection, L.L.C.
Docket No. ER18-815, PJM Interconnection, L.L.C.
Docket Nos. ER18-459, ER18-460, PJM Interconnection, L.L.C. and Ohio
Valley Electric Corporation
Docket No. ER18-579, PJM Interconnection, L.L.C.
Docket No. ER18-614, PJM Interconnection, L.L.C.
Docket No. ER18-663, PJM Interconnection, L.L.C.
Docket No. ER18-932, PJM Interconnection, L.L.C.
Docket No. ER18-934, PJM Interconnection, L.L.C.
Docket No. ER18-680, PJM Interconnection, L.L.C.
Docket No. ER18-870, PJM Interconnection, L.L.C.
Docket No. ER18-988, PJM Interconnection, L.L.C.
Docket No. ER18-1131, PJM Interconnection, L.L.C.
Docket No. ER18-1148, PJM Interconnection, L.L.C.
Docket No. ER18-1175, PJM Interconnection, L.L.C.
Docket No. ER18-1245, PJM Interconnection, L.L.C.
For additional meeting information, see: https://www.pjm.com/committees-and-groups.aspx and https://www.pjm.com/Calendar.aspx.
The meetings are open to stakeholders. For more information,
contact Valerie Martin, Office of Energy Market Regulation, Federal
Energy Regulatory Commission at (202) 502-6139 or
[email protected].
Dated: April 6, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-07557 Filed 4-11-18; 8:45 am]
BILLING CODE 6717-01-P