Notice of Schedule for Environmental Review of the Enbridge-Texas Eastern Transmission, L.P. Tx-La Markets Project, 15559-15560 [2018-07491]
Download as PDF
Federal Register / Vol. 83, No. 70 / Wednesday, April 11, 2018 / Notices
The Federal Register notice with a 60day comment period soliciting
comments on this collection of
information was published on January
12, 2018 (83 FR 1609). The Commission
did not receive any comments
addressing the 60-day Notice.
Burden Statement: The Commission
believes that the additional burden for
an exchange to add the two additional
elements in the contents of the
disciplinary or access denial notice is de
minimis.9 Accordingly, the Commission
is maintaining its current estimate of the
burden for both collections as result of
these reporting requirements. However,
the Commission is amending its
estimates for the collections to account
for the change in the number of DCMs
and SEFs currently registered with the
Commission. The current respondent
burden for these collections are
estimated to be as follows:
• OMB Control No. 3038–0052 (Core
Principles and Other Requirements
for Designated Contract Markets)
Number of Respondents: 15.
Estimated Annual Burden Hours per
Respondent: 490.5.
Estimated Total Annual Burden
Hours on Respondents: 7,357.5.
Frequency of Collection: As
applicable.
• OMB Control No. 3038–0074 (Core
Principles and Other Requirements
for Swap Execution Facilities)
Number of Respondents: 25.
Estimated Annual Burden Hours per
Respondent: 1,000.
Estimated Total Annual Burden
Hours on Respondents: 25,000.10
Frequency of Collection: As
applicable.
The regulations require no new
startup or operations and maintenance
costs.
DEPARTMENT OF DEFENSE
(Authority: 44 U.S.C. 3501 et seq.)
DEPARTMENT OF DEFENSE
Dated: April 5, 2018.
Robert N. Sidman,
Deputy Secretary of the Commission.
amozie on DSK30RV082PROD with NOTICES
9 The Commission stated in the Notice of
Proposed Rulemaking that the burden associated
with Commission regulation 9.11(b)(3)(ii) requiring
an exchange to specify the product involved in the
disciplinary or access denial action would be de
minimis. 82 FR 7745 (Jan. 23, 2017). The
Commission did not receive any comments
regarding this determination. The Commission
estimates that it will take an exchange just a few
seconds to add the product involved in the adverse
action and whether the violation underlying the
notice resulted in financial harm to any customers.
10 The Commission notes that collection 3038–
0074 includes an additional 1,200 burden hours for
SEF registration applicants that have not been
affected by this amendment. Therefore, the total
burden for this collection is 26,200 hours.
Jkt 244001
Department of the Navy, DoD.
Notice.
AGENCY:
ACTION:
The Department of the Navy
(DoN) announces the availability of the
inventions listed below, assigned to the
United States Government, as
represented by the Secretary of the
Navy, for domestic and foreign licensing
by the Department of the Navy.
ADDRESSES: Requests for copies of the
patents cited should be directed to
Naval Surface Warfare Center, Crane
Div, Code OOL, Bldg 2, 300 Highway
361, Crane, IN 47522–5001.
FOR FURTHER INFORMATION CONTACT: Mr.
Christopher Monsey, Naval Surface
Warfare Center, Crane Div, Code OOL,
Bldg 2, 300 Highway 361, Crane, IN
47522–5001, Email
Christopher.Monsey@navy.mil.
SUPPLEMENTARY INFORMATION: The
following patent is available for
licensing: Patent No. 9,927,482 (Navy
Case No. 200248): ELECTROSTATIC
PROTECTION TESTING,
MONITORING, AND HUMANMACHINE VISUAL INTERFACE
SYSTEM AND METHODS OF USE.
SUMMARY:
Authority: 35 U.S.C. 207, 37 CFR part 404.
Dated: April 5, 2018.
E.K. Baldini,
Lieutenant Commander, Judge Advocate
General’s Corps, U.S. Navy, Federal Register
Liaison Officer.
[FR Doc. 2018–07436 Filed 4–10–18; 8:45 am]
BILLING CODE 3810–FF–P
Notice of Availability of GovernmentOwned Inventions; Available for
Licensing
BILLING CODE 6351–01–P
17:17 Apr 10, 2018
Notice of Availability of GovernmentOwned Inventions; Available for
Licensing
Department of the Navy
[FR Doc. 2018–07365 Filed 4–10–18; 8:45 am]
VerDate Sep<11>2014
Department of the Navy
Department of the Navy, DoD.
Notice.
AGENCY:
ACTION:
The Department of the Navy
(DoN) announces the availability of the
inventions listed below, assigned to the
United States Government, as
represented by the Secretary of the
Navy, for domestic and foreign licensing
by the Department of the Navy.
ADDRESSES: Requests for copies of the
patent applications cited should be
directed to Naval Surface Warfare
Center, Crane Div, Code OOL, Bldg 2,
SUMMARY:
PO 00000
Frm 00010
Fmt 4703
Sfmt 4703
15559
300 Highway 361, Crane, IN 47522–
5001.
FOR FURTHER INFORMATION CONTACT: Mr.
Christopher Monsey, Naval Surface
Warfare Center, Crane Div, Code OOL,
Bldg 2, 300 Highway 361, Crane, IN
47522–5001, Email
Christopher.Monsey@navy.mil, 812–
854–2777.
SUPPLEMENTARY INFORMATION: The
following patent application is available
for licensing: Patent Application No. 62/
632,550 (Navy Case No. 200456):
HYPER-COMPACT ELECTRIC ALLTERRAIN VEHICLE DRIVETRAIN AND
CONVERSION KIT.
Authority: 35 U.S.C. 207, 37 CFR part 404.
Dated: April 5, 2018.
E.K. Baldini,
Lieutenant Commander, Judge Advocate
General’s Corps, U.S. Navy, Federal Register
Liaison Officer.
[FR Doc. 2018–07453 Filed 4–10–18; 8:45 am]
BILLING CODE 3810–FF–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP18–10–000]
Notice of Schedule for Environmental
Review of the Enbridge—Texas
Eastern Transmission, L.P. Tx—La
Markets Project
On October 19, 2017, Enbridge—
Texas Eastern Transmission, L.P. (Texas
Eastern) filed an application in Docket
No. CP18–10–000 requesting a
Certificate of Public Convenience and
Necessity pursuant to section 7(c) of the
Natural Gas Act to construct and operate
certain natural gas facilities. The
proposed project is known as the TX—
LA Markets Project (Project), and would
involve modifications to Texas Eastern’s
existing Gillis Compressor Station in
Beauregard Parish, Louisiana.
On October 31, 2017, the Federal
Energy Regulatory Commission
(Commission or FERC) issued its Notice
of Application for the Project. Among
other things, that notice alerted agencies
issuing federal authorizations of the
requirement to complete all necessary
reviews and to reach a final decision on
a request for a federal authorization
within 90 days of the date of issuance
of the Commission staff’s Environmental
Assessment (EA) for the Project. This
instant notice identifies the FERC staff’s
planned schedule for the completion of
the EA for the Project.
Schedule for Environmental Review
Issuance of EA May 31, 2018
E:\FR\FM\11APN1.SGM
11APN1
15560
Federal Register / Vol. 83, No. 70 / Wednesday, April 11, 2018 / Notices
90-day Federal Authorization Decision
Deadline August 29, 2018
If a schedule change becomes
necessary, additional notice will be
provided so that the relevant agencies
are kept informed of the Project’s
progress.
Project Description
The proposed modifications to the
Gillis Compressor Station in Beauregard
Parish, Louisiana would consist of the
installation of two gas cooling bays and
installation of two new impellers for the
existing compressor units.
amozie on DSK30RV082PROD with NOTICES
Background
On December 6, 2017, the
Commission issued a Notice of Intent to
Prepare an Environmental Assessment
for the Proposed TX—LA Markets
Project and Request for Comments on
Environmental Issues (NOI). The NOI
was sent to affected landowners; federal,
state, and local government agencies;
elected officials; environmental and
public interest groups; Native American
tribes; other interested parties; and local
libraries and newspapers. No comments
were received in response to the NOI.
Additional Information
In order to receive notification of the
issuance of the EA and to keep track of
all formal issuances and submittals in
specific dockets, the Commission offers
a free service called eSubscription. This
can reduce the amount of time you
spend researching proceedings by
automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to www.ferc.gov/docsfiling/esubscription.asp.
Additional information about the
Project is available from the
Commission’s Office of External Affairs
at (866) 208–FERC or on the FERC
website (www.ferc.gov). Using the
‘‘eLibrary’’ link, select ‘‘General Search’’
from the eLibrary menu, enter the
selected date range and ‘‘Docket
Number’’ excluding the last three digits
(i.e., CP18–10), and follow the
instructions. For assistance with access
to eLibrary, the helpline can be reached
at (866) 208–3676, TTY (202) 502–8659,
or at FERCOnlineSupport@ferc.gov. The
eLibrary link on the FERC website also
provides access to the texts of formal
documents issued by the Commission,
such as orders, notices, and rule
makings.
Dated: April 5, 2018.
Kimberly D. Bose,
Secretary.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL18–133–000]
Notice of Institution of Section 206
Proceeding and Refund Effective Date;
Illinois Power Resources Generating,
LLC
On April 5, 2018, the Commission
issued an order in Docket No. EL18–
133–000, pursuant to section 206 of the
Federal Power Act (FPA), 16 U.S.C.
824e (2012), instituting an investigation
into whether Illinois Power Resources
Generating, LLC’s rates for Reactive
Service may be unjust and
unreasonable. Illinois Power Resources
Generating, LLC, 163 FERC ¶ 61, 015
(2018).
The refund effective date in Docket
No. EL18–133–000, established
pursuant to section 206(b) of the FPA,
will be the date of publication of this
notice in the Federal Register.
Any interested person desiring to be
heard in Docket No. EL18–133–000
must file a notice of intervention or
motion to intervene, as appropriate,
with the Federal Energy Regulatory
Commission, 888 First Street NE,
Washington, DC 20426, in accordance
with Rule 214 of the Commission’s
Rules of Practice and Procedure, 18 CFR
385.214, within 21 days of the date of
issuance of the order.
Dated: April 5, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–07492 Filed 4–10–18; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
17:17 Apr 10, 2018
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
ENVIRONMENTAL PROTECTION
AGENCY
[Docket No. AC18–57–000]
[EPA–HQ–OAR–2008–0707; FRL–9976–27–
OAR]
Notice of Petition for Waiver; Black
Hills Shoshone Pipeline, LLC
Take notice that on March 13, 2018,
Black Hills Shoshone Pipeline, LLC
filed a petition for a new two-year
waiver of the requirement that an
independent certified public accountant
attest to the conformity of the content
set out in Black Hills Shoshone’s FERC
Form No. 2–A, reflecting activity for
2017.1
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
1 18
Jkt 244001
Dated: April 5, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–07490 Filed 4–10–18; 8:45 am]
[FR Doc. 2018–07491 Filed 4–10–18; 8:45 am]
BILLING CODE 6717–01–P
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Petitioner.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comments: 5:00 p.m. Eastern Time on
May 7, 2018.
PO 00000
CFR 158.11.
Frm 00011
Fmt 4703
Sfmt 4703
Proposed Information Collection
Request; Comment Request; Data
Reporting Requirements for State and
Local Vehicle Emission Inspection and
Maintenance (I/M) Programs
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
The Environmental Protection
Agency is planning to submit an
information collection request (ICR),
‘‘Data Reporting Requirements for State
and Local Vehicle Emission Inspection
and Maintenance (I/M) Programs’’ (EPA
ICR No.1613.06, OMB Control No.
SUMMARY:
E:\FR\FM\11APN1.SGM
11APN1
Agencies
[Federal Register Volume 83, Number 70 (Wednesday, April 11, 2018)]
[Notices]
[Pages 15559-15560]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-07491]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP18-10-000]
Notice of Schedule for Environmental Review of the Enbridge--
Texas Eastern Transmission, L.P. Tx--La Markets Project
On October 19, 2017, Enbridge--Texas Eastern Transmission, L.P.
(Texas Eastern) filed an application in Docket No. CP18-10-000
requesting a Certificate of Public Convenience and Necessity pursuant
to section 7(c) of the Natural Gas Act to construct and operate certain
natural gas facilities. The proposed project is known as the TX--LA
Markets Project (Project), and would involve modifications to Texas
Eastern's existing Gillis Compressor Station in Beauregard Parish,
Louisiana.
On October 31, 2017, the Federal Energy Regulatory Commission
(Commission or FERC) issued its Notice of Application for the Project.
Among other things, that notice alerted agencies issuing federal
authorizations of the requirement to complete all necessary reviews and
to reach a final decision on a request for a federal authorization
within 90 days of the date of issuance of the Commission staff's
Environmental Assessment (EA) for the Project. This instant notice
identifies the FERC staff's planned schedule for the completion of the
EA for the Project.
Schedule for Environmental Review
Issuance of EA May 31, 2018
[[Page 15560]]
90-day Federal Authorization Decision Deadline August 29, 2018
If a schedule change becomes necessary, additional notice will be
provided so that the relevant agencies are kept informed of the
Project's progress.
Project Description
The proposed modifications to the Gillis Compressor Station in
Beauregard Parish, Louisiana would consist of the installation of two
gas cooling bays and installation of two new impellers for the existing
compressor units.
Background
On December 6, 2017, the Commission issued a Notice of Intent to
Prepare an Environmental Assessment for the Proposed TX--LA Markets
Project and Request for Comments on Environmental Issues (NOI). The NOI
was sent to affected landowners; federal, state, and local government
agencies; elected officials; environmental and public interest groups;
Native American tribes; other interested parties; and local libraries
and newspapers. No comments were received in response to the NOI.
Additional Information
In order to receive notification of the issuance of the EA and to
keep track of all formal issuances and submittals in specific dockets,
the Commission offers a free service called eSubscription. This can
reduce the amount of time you spend researching proceedings by
automatically providing you with notification of these filings,
document summaries, and direct links to the documents. Go to
www.ferc.gov/docs-filing/esubscription.asp.
Additional information about the Project is available from the
Commission's Office of External Affairs at (866) 208-FERC or on the
FERC website (www.ferc.gov). Using the ``eLibrary'' link, select
``General Search'' from the eLibrary menu, enter the selected date
range and ``Docket Number'' excluding the last three digits (i.e.,
CP18-10), and follow the instructions. For assistance with access to
eLibrary, the helpline can be reached at (866) 208-3676, TTY (202) 502-
8659, or at [email protected]. The eLibrary link on the FERC
website also provides access to the texts of formal documents issued by
the Commission, such as orders, notices, and rule makings.
Dated: April 5, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-07491 Filed 4-10-18; 8:45 am]