Federal Register / Vol. 83, No. 65 / Wednesday, April 4, 2018 / Notices
has been transferred to Hossic River
Hydro, LLC. The project is located on
the Hoosic River in Bennington, County,
Vermont. The transfer of an exemption
does not require Commission approval.
2. Hoosic River Hydro, LLC is now the
exemptee of the Pownal Hydroelectric
Project No. 6795. All correspondence
should be forwarded to: Mr. William
Scully, Hoosic River Hydro, LLC, P.O.
Box 338, North Bennington, VT 05257,
Phone: 802–379–2469.
Dated: March 29, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–06799 Filed 4–3–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL18–135–000]
amozie on DSK30RV082PROD with NOTICES
Ohio Valley Electric Corporation v.
First Energy Solutions Corp.; Notice of
Complaint
Take notice that on March 26, 2018,
pursuant to section 306 of the Federal
Power Act, 16 U.S.C. 825e, and Rule 206
of the Federal Energy Regulatory
Commission’s (Commission) Rules of
Practice and Procedure, 18 CFR 385.206
(2018), the Ohio Valley Electric
Corporation and its wholly-owned
subsidiary, Indiana-Kentucky Electric
Corporation (collectively, Complainant),
filed a formal complaint against
FirstEnergy Solutions Corp.
(Respondent) asserting that the
Respondent will breach the InterCompany Power Agreement, and also
alleges that said breach will constitute
a violation of its obligations under that
agreement, all as more fully explained
in the complaint.
Complainant certifies that copies of
the complaint were served on the
contacts for Respondent as listed on the
Commission’s list of Corporate Officials.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. The Respondent’s answer
and all interventions, or protests must
Pownal Hydropower Corporation, 23 FERC 62,004
(1983).
VerDate Sep<11>2014
18:12 Apr 03, 2018
Jkt 244001
be filed on or before the comment date.
The Respondent’s answer, motions to
intervene, and protests must be served
on the Complainant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on April 16, 2018.
Dated: March 28, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–06784 Filed 4–3–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP18–145–000]
Notice of Application; Transcontinental
Gas Pipe Line Company, LLC
Take notice that on March 27, 2018,
Transcontinental Gas Pipe Line
Company, LLC (Transco), Post Office
Box 1396, Houston, Texas 77251, filed
in Docket No. CP18–145–000, an
application pursuant to sections 7(b)
and 7(c) of the Natural Gas Act (NGA)
requesting an order permitting and
approving revised certificated pressures
and storage capacity parameters at its
Eminence Storage Field, located in
Covington County, Mississippi, all as
more fully set forth in the application
which is on file with the Commission
and open to public inspection. The
filing is available for review at the
Commission in the Public Reference
Room or may be viewed on the
Commission’s website web at https://
www.ferc.gov using the eLibrary link.
Enter the docket number excluding the
last three digits in the docket number
PO 00000
Frm 00044
Fmt 4703
Sfmt 4703
14453
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Any questions concerning this
application may be directed to Ingrid
Germany, Staff Regulatory Analyst,
Transcontinental Gas Pipe Line Co.,
P.O. Box 1396, Houston, Texas 77251–
1396 at (713) 215–4015.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the EA
for this proposal. The filing of the EA
in the Commission’s public record for
this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
seven copies of filings made in the
proceeding with the Commission and
must mail a copy to the applicant and
to every other party. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
E:\FR\FM\04APN1.SGM
04APN1
14454
Federal Register / Vol. 83, No. 65 / Wednesday, April 4, 2018 / Notices
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commentors will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commentors will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentors
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the eFiling link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
Comment Date: 5:00 p.m. Eastern
Time on April 19, 2018.
Dated: March 29, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–06797 Filed 4–3–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
amozie on DSK30RV082PROD with NOTICES
[Docket No. CP18–135–000]
National Fuel Gas Supply Company;
Notice of Request Under Blanket
Authorization
Take notice that on March 23, 2018,
National Fuel Gas Supply Company
(National Fuel), 6363 Main Street,
Williamsville, New York 14221–5887,
filed in Docket No. CP18–135–000 a
VerDate Sep<11>2014
18:12 Apr 03, 2018
Jkt 244001
prior notice request pursuant to sections
157.205, 157.208, 157.210 and 157.211
of the Commission’s regulations under
the Natural Gas Act (NGA), requesting
authorization to construct, own, and
operate: (1) Approximately 4.5 miles of
12-inch-diameter pipeline and
appurtenances; (2) a metering and
regulating station/delivery point; (3) a
pipeline connection; and (4)
modifications to certain existing
facilities and appurtenances, all located
in Beaver and Washington Counties,
Pennsylvania (Line N to Monaca
Project). The Line N to Monaca Project
would deliver 133,000 dekatherms per
day of firm transportation service. The
cost of the Line N to Monaca Project is
estimated to be $20,200,000, all as more
fully set forth in the application which
is on file with the Commission and open
to public inspection.
The filing may also be viewed on the
web at https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, please contact
FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at (866) 208–3676, or TTY, contact
(202) 502–8659.
Any questions concerning this
application may be directed to Randy C.
Rucinski, Deputy General Counsel,
National Fuel Gas Supply Corporation,
6363 Main Street, Williamsville, New
York 14221–5887, by telephone at (716)
857–7237, by fax at (716) 857–7206, or
by email at rucinskir@natfuel.com; or
Janet R. Bayer, Senior Regulatory
Analyst, National Fuel Gas Supply
Corporation, 6363 Main Street,
Williamsville, New York 14221–5887,
by telephone at (716) 857–7429, by fax
at (716) 857–7206, or by email at
jrbferc@natfuel.com.
Any person or the Commission’s staff
may, within 60 days after issuance of
the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and pursuant to section
157.205 of the regulations under the
NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the
time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for filing a protest. If a
protest is filed and not withdrawn
within 30 days after the allowed time
for filing a protest, the instant request
shall be treated as an application for
authorization pursuant to section 7 of
the NGA.
PO 00000
Frm 00045
Fmt 4703
Sfmt 4703
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the EA
for this proposal. The filing of the EA
in the Commission’s public record for
this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s EA.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenter’s will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commenter’s will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentary,
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 7 copies of the protest or
intervention to the Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426.
Dated: March 28, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–06787 Filed 4–3–18; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\04APN1.SGM
04APN1
Agencies
[Federal Register Volume 83, Number 65 (Wednesday, April 4, 2018)]
[Notices]
[Pages 14453-14454]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-06797]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP18-145-000]
Notice of Application; Transcontinental Gas Pipe Line Company,
LLC
Take notice that on March 27, 2018, Transcontinental Gas Pipe Line
Company, LLC (Transco), Post Office Box 1396, Houston, Texas 77251,
filed in Docket No. CP18-145-000, an application pursuant to sections
7(b) and 7(c) of the Natural Gas Act (NGA) requesting an order
permitting and approving revised certificated pressures and storage
capacity parameters at its Eminence Storage Field, located in Covington
County, Mississippi, all as more fully set forth in the application
which is on file with the Commission and open to public inspection. The
filing is available for review at the Commission in the Public
Reference Room or may be viewed on the Commission's website web at
https://www.ferc.gov using the eLibrary link. Enter the docket number
excluding the last three digits in the docket number field to access
the document. For assistance, contact FERC at
[email protected] or call toll-free, (886) 208-3676 or TYY,
(202) 502-8659.
Any questions concerning this application may be directed to Ingrid
Germany, Staff Regulatory Analyst, Transcontinental Gas Pipe Line Co.,
P.O. Box 1396, Houston, Texas 77251-1396 at (713) 215-4015.
Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9,
within 90 days of this Notice the Commission staff will either:
Complete its environmental assessment (EA) and place it into the
Commission's public record (eLibrary) for this proceeding; or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the EA for this proposal. The filing of the EA in the Commission's
public record for this proceeding or the issuance of a Notice of
Schedule for Environmental Review will serve to notify federal and
state agencies of the timing for the completion of all necessary
reviews, and the subsequent need to complete all federal authorizations
within 90 days of the date of issuance of the Commission staff's EA.
There are two ways to become involved in the Commission's review of
this project. First, any person wishing to obtain legal status by
becoming a party to the proceedings for this project should, on or
before the comment date stated below file with the Federal Energy
Regulatory Commission, 888 First Street NE, Washington, DC 20426, a
motion to intervene in accordance with the requirements of the
Commission's Rules of Practice and Procedure (18 CFR 385.214 or
385.211) and the Regulations under the NGA (18 CFR 157.10). A person
obtaining party status will be placed on the service list maintained by
the Secretary of the Commission and will receive copies of all
documents filed by the applicant and by all other parties. A party must
submit seven copies of filings made in the proceeding with the
Commission and must mail a copy to the applicant and to every other
party. Only parties to the proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to intervene in order to have
comments considered. The second way to participate is by filing with
the Secretary of the Commission, as soon as possible, an original and
two copies of comments in support of or in opposition to this project.
The Commission will
[[Page 14454]]
consider these comments in determining the appropriate action to be
taken, but the filing of a comment alone will not serve to make the
filer a party to the proceeding. The Commission's rules require that
persons filing comments in opposition to the project provide copies of
their protests only to the party or parties directly involved in the
protest.
Persons who wish to comment only on the environmental review of
this project should submit an original and two copies of their comments
to the Secretary of the Commission. Environmental commentors will be
placed on the Commission's environmental mailing list, will receive
copies of the environmental documents, and will be notified of meetings
associated with the Commission's environmental review process.
Environmental commentors will not be required to serve copies of filed
documents on all other parties. However, the non-party commentors will
not receive copies of all documents filed by other parties or issued by
the Commission (except for the mailing of environmental documents
issued by the Commission) and will not have the right to seek court
review of the Commission's final order.
The Commission strongly encourages electronic filings of comments,
protests and interventions in lieu of paper using the eFiling link at
https://www.ferc.gov. Persons unable to file electronically should
submit an original and 5 copies of the protest or intervention to the
Federal Energy Regulatory Commission, 888 First Street NE, Washington,
DC 20426.
Comment Date: 5:00 p.m. Eastern Time on April 19, 2018.
Dated: March 29, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-06797 Filed 4-3-18; 8:45 am]
BILLING CODE 6717-01-P