Download as PDF 14452 Federal Register / Vol. 83, No. 65 / Wednesday, April 4, 2018 / Notices or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the eFiling link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the eLibrary link and is available for review in the Commission’s Public Reference Room in Washington, DC There is an ‘‘eSubscription’’ link on the website that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern Time on April 18, 2018. Dated: March 29, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–06800 Filed 4–3–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP18–130–000] amozie on DSK30RV082PROD with NOTICES ANR Storage Company; Notice of Request Under Blanket Authorization Take notice that on March 22, 2018, ANR Storage Company (ANR Storage), 700 Louisiana Street, Houston, Texas 77002–2700, filed in Docket No. CP18– 130–000, a prior notice request pursuant to sections 157.205 and 157.213(b) of the Federal Energy Regulatory Commission’s (Commission) regulations under the Natural Gas Act (NGA) and ANR Storage’s blanket authorizations issued in Docket No. CP82–523–000. ANR Storage seeks authorization to construct and operate one new injection/withdrawal (I/W) well, all as more fully set forth in the application which is on file with the Commission and open to public inspection. The filing may also be viewed on the web at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call VerDate Sep<11>2014 18:12 Apr 03, 2018 Jkt 244001 toll-free, (866) 208–3676 or TTY, (202) 502–8659. ANR Storage proposes to construct and operate in Kalkaska County, Michigan, one new horizontal I/W well, designated Cold Springs 12–17, and related pipelines and appurtenances at ANR Storage’s Cold Springs 12 Storage Field, located in Kalkaska County, Michigan. ANR Storage states that the new well is to replace the plugged and abandoned CS12–2 and to improve the field’s deliverability. There will be no change in the certificated physical parameters of the field, including existing boundary, total inventory, reservoir pressure, reservoir and buffer boundaries, or the certificated storage capacity, as a result of the proposed project. The total cost is approximately $4,250,000. Any questions regarding this Application should be directed to Linda Farquhar, Manager, Project Determinations & Regulatory Administration, ANR Storage Company, 700 Louisiana Street, Suite 700, Houston, Texas, 77002–2700, by phone (832) 320–5685, by fax (832) 320–6685, or by email at linda_farquhar@ transcanada.com. Any person or the Commission’s Staff may, within 60 days after the issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission’s Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention and, pursuant to section 157.205 of the Commission’s Regulations under the NGA (18 CFR 157.205) a protest to the request. If no protest is filed within the time allowed therefore, the proposed activity shall be deemed to be authorized effective the day after the time allowed for protest. If a protest is filed and not withdrawn within 30 days after the time allowed for filing a protest, the instant request shall be treated as an application for authorization pursuant to section 7 of the NGA. Pursuant to section 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: Complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding, or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental PO 00000 Frm 00043 Fmt 4703 Sfmt 4703 Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commenters will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commenters will not be required to serve copies of filed documents on all other parties. However, the non-party commenters will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests, and interventions via the internet in lieu of paper. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s website (www.ferc.gov) under the ‘‘e-Filing’’ link. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. Dated: March 28, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–06786 Filed 4–3–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 6795–023] Notice of Transfer of Exemption; Town of Pownal, Hoosic River Hydro, LLC 1. By letter filed December 15, 2017, William F. Scully, on behalf of the Town of Pownal and the Hoosic River Hydro, LLC, informed the Commission that the exemption from licensing for the Pownal Hydroelectric Project No. 6795, originally issued April 1, 1983,1 1 Order Granting Exemption from Licensing of a Small Hydroelectric Project of 5 Megawatts or Less. E:\FR\FM\04APN1.SGM 04APN1

Agencies

[Federal Register Volume 83, Number 65 (Wednesday, April 4, 2018)]
[Notices]
[Page 14452]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-06786]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP18-130-000]


ANR Storage Company; Notice of Request Under Blanket 
Authorization

    Take notice that on March 22, 2018, ANR Storage Company (ANR 
Storage), 700 Louisiana Street, Houston, Texas 77002-2700, filed in 
Docket No. CP18-130-000, a prior notice request pursuant to sections 
157.205 and 157.213(b) of the Federal Energy Regulatory Commission's 
(Commission) regulations under the Natural Gas Act (NGA) and ANR 
Storage's blanket authorizations issued in Docket No. CP82-523-000. ANR 
Storage seeks authorization to construct and operate one new injection/
withdrawal (I/W) well, all as more fully set forth in the application 
which is on file with the Commission and open to public inspection. The 
filing may also be viewed on the web at https://www.ferc.gov using the 
``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. For 
assistance, contact FERC at [email protected] or call toll-
free, (866) 208-3676 or TTY, (202) 502-8659.
    ANR Storage proposes to construct and operate in Kalkaska County, 
Michigan, one new horizontal I/W well, designated Cold Springs 12-17, 
and related pipelines and appurtenances at ANR Storage's Cold Springs 
12 Storage Field, located in Kalkaska County, Michigan. ANR Storage 
states that the new well is to replace the plugged and abandoned CS12-2 
and to improve the field's deliverability. There will be no change in 
the certificated physical parameters of the field, including existing 
boundary, total inventory, reservoir pressure, reservoir and buffer 
boundaries, or the certificated storage capacity, as a result of the 
proposed project. The total cost is approximately $4,250,000.
    Any questions regarding this Application should be directed to 
Linda Farquhar, Manager, Project Determinations & Regulatory 
Administration, ANR Storage Company, 700 Louisiana Street, Suite 700, 
Houston, Texas, 77002-2700, by phone (832) 320-5685, by fax (832) 320-
6685, or by email at [email protected].
    Any person or the Commission's Staff may, within 60 days after the 
issuance of the instant notice by the Commission, file pursuant to Rule 
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to 
intervene or notice of intervention and, pursuant to section 157.205 of 
the Commission's Regulations under the NGA (18 CFR 157.205) a protest 
to the request. If no protest is filed within the time allowed 
therefore, the proposed activity shall be deemed to be authorized 
effective the day after the time allowed for protest. If a protest is 
filed and not withdrawn within 30 days after the time allowed for 
filing a protest, the instant request shall be treated as an 
application for authorization pursuant to section 7 of the NGA.
    Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, 
within 90 days of this Notice the Commission staff will either: 
Complete its environmental assessment (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding, or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the final environmental impact statement (FEIS) or EA for this 
proposal. The filing of the EA in the Commission's public record for 
this proceeding or the issuance of a Notice of Schedule for 
Environmental Review will serve to notify federal and state agencies of 
the timing for the completion of all necessary reviews, and the 
subsequent need to complete all federal authorizations within 90 days 
of the date of issuance of the Commission staff's FEIS or EA.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commenters will be 
placed on the Commission's environmental mailing list, will receive 
copies of the environmental documents, and will be notified of meetings 
associated with the Commission's environmental review process. 
Environmental commenters will not be required to serve copies of filed 
documents on all other parties. However, the non-party commenters will 
not receive copies of all documents filed by other parties or issued by 
the Commission (except for the mailing of environmental documents 
issued by the Commission) and will not have the right to seek court 
review of the Commission's final order.
    The Commission strongly encourages electronic filings of comments, 
protests, and interventions via the internet in lieu of paper. See 18 
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's 
website (www.ferc.gov) under the ``e-Filing'' link. Persons unable to 
file electronically should submit an original and 5 copies of the 
protest or intervention to the Federal Energy Regulatory Commission, 
888 First Street NE, Washington, DC 20426.

    Dated: March 28, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-06786 Filed 4-3-18; 8:45 am]
 BILLING CODE 6717-01-P