ANR Storage Company; Notice of Request Under Blanket Authorization, 14452 [2018-06786]
Download as PDF
14452
Federal Register / Vol. 83, No. 65 / Wednesday, April 4, 2018 / Notices
or protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
eFiling link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the eLibrary
link and is available for review in the
Commission’s Public Reference Room in
Washington, DC There is an
‘‘eSubscription’’ link on the website that
enables subscribers to receive email
notification when a document is added
to a subscribed docket(s). For assistance
with any FERC Online service, please
email FERCOnlineSupport@ferc.gov, or
call (866) 208–3676 (toll free). For TTY,
call (202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on April 18, 2018.
Dated: March 29, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–06800 Filed 4–3–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP18–130–000]
amozie on DSK30RV082PROD with NOTICES
ANR Storage Company; Notice of
Request Under Blanket Authorization
Take notice that on March 22, 2018,
ANR Storage Company (ANR Storage),
700 Louisiana Street, Houston, Texas
77002–2700, filed in Docket No. CP18–
130–000, a prior notice request pursuant
to sections 157.205 and 157.213(b) of
the Federal Energy Regulatory
Commission’s (Commission) regulations
under the Natural Gas Act (NGA) and
ANR Storage’s blanket authorizations
issued in Docket No. CP82–523–000.
ANR Storage seeks authorization to
construct and operate one new
injection/withdrawal (I/W) well, all as
more fully set forth in the application
which is on file with the Commission
and open to public inspection. The
filing may also be viewed on the web at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
at FERCOnlineSupport@ferc.gov or call
VerDate Sep<11>2014
18:12 Apr 03, 2018
Jkt 244001
toll-free, (866) 208–3676 or TTY, (202)
502–8659.
ANR Storage proposes to construct
and operate in Kalkaska County,
Michigan, one new horizontal I/W well,
designated Cold Springs 12–17, and
related pipelines and appurtenances at
ANR Storage’s Cold Springs 12 Storage
Field, located in Kalkaska County,
Michigan. ANR Storage states that the
new well is to replace the plugged and
abandoned CS12–2 and to improve the
field’s deliverability. There will be no
change in the certificated physical
parameters of the field, including
existing boundary, total inventory,
reservoir pressure, reservoir and buffer
boundaries, or the certificated storage
capacity, as a result of the proposed
project. The total cost is approximately
$4,250,000.
Any questions regarding this
Application should be directed to Linda
Farquhar, Manager, Project
Determinations & Regulatory
Administration, ANR Storage Company,
700 Louisiana Street, Suite 700,
Houston, Texas, 77002–2700, by phone
(832) 320–5685, by fax (832) 320–6685,
or by email at linda_farquhar@
transcanada.com.
Any person or the Commission’s Staff
may, within 60 days after the issuance
of the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and, pursuant to section
157.205 of the Commission’s
Regulations under the NGA (18 CFR
157.205) a protest to the request. If no
protest is filed within the time allowed
therefore, the proposed activity shall be
deemed to be authorized effective the
day after the time allowed for protest. If
a protest is filed and not withdrawn
within 30 days after the time allowed
for filing a protest, the instant request
shall be treated as an application for
authorization pursuant to section 7 of
the NGA.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding, or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
PO 00000
Frm 00043
Fmt 4703
Sfmt 4703
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenters will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commenters will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commenters
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests,
and interventions via the internet in lieu
of paper. See 18 CFR 385.2001(a)(1)(iii)
and the instructions on the
Commission’s website (www.ferc.gov)
under the ‘‘e-Filing’’ link. Persons
unable to file electronically should
submit an original and 5 copies of the
protest or intervention to the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
Dated: March 28, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–06786 Filed 4–3–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 6795–023]
Notice of Transfer of Exemption; Town
of Pownal, Hoosic River Hydro, LLC
1. By letter filed December 15, 2017,
William F. Scully, on behalf of the
Town of Pownal and the Hoosic River
Hydro, LLC, informed the Commission
that the exemption from licensing for
the Pownal Hydroelectric Project No.
6795, originally issued April 1, 1983,1
1 Order Granting Exemption from Licensing of a
Small Hydroelectric Project of 5 Megawatts or Less.
E:\FR\FM\04APN1.SGM
04APN1
Agencies
[Federal Register Volume 83, Number 65 (Wednesday, April 4, 2018)]
[Notices]
[Page 14452]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-06786]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP18-130-000]
ANR Storage Company; Notice of Request Under Blanket
Authorization
Take notice that on March 22, 2018, ANR Storage Company (ANR
Storage), 700 Louisiana Street, Houston, Texas 77002-2700, filed in
Docket No. CP18-130-000, a prior notice request pursuant to sections
157.205 and 157.213(b) of the Federal Energy Regulatory Commission's
(Commission) regulations under the Natural Gas Act (NGA) and ANR
Storage's blanket authorizations issued in Docket No. CP82-523-000. ANR
Storage seeks authorization to construct and operate one new injection/
withdrawal (I/W) well, all as more fully set forth in the application
which is on file with the Commission and open to public inspection. The
filing may also be viewed on the web at https://www.ferc.gov using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. For
assistance, contact FERC at [email protected] or call toll-
free, (866) 208-3676 or TTY, (202) 502-8659.
ANR Storage proposes to construct and operate in Kalkaska County,
Michigan, one new horizontal I/W well, designated Cold Springs 12-17,
and related pipelines and appurtenances at ANR Storage's Cold Springs
12 Storage Field, located in Kalkaska County, Michigan. ANR Storage
states that the new well is to replace the plugged and abandoned CS12-2
and to improve the field's deliverability. There will be no change in
the certificated physical parameters of the field, including existing
boundary, total inventory, reservoir pressure, reservoir and buffer
boundaries, or the certificated storage capacity, as a result of the
proposed project. The total cost is approximately $4,250,000.
Any questions regarding this Application should be directed to
Linda Farquhar, Manager, Project Determinations & Regulatory
Administration, ANR Storage Company, 700 Louisiana Street, Suite 700,
Houston, Texas, 77002-2700, by phone (832) 320-5685, by fax (832) 320-
6685, or by email at [email protected].
Any person or the Commission's Staff may, within 60 days after the
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to
intervene or notice of intervention and, pursuant to section 157.205 of
the Commission's Regulations under the NGA (18 CFR 157.205) a protest
to the request. If no protest is filed within the time allowed
therefore, the proposed activity shall be deemed to be authorized
effective the day after the time allowed for protest. If a protest is
filed and not withdrawn within 30 days after the time allowed for
filing a protest, the instant request shall be treated as an
application for authorization pursuant to section 7 of the NGA.
Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9,
within 90 days of this Notice the Commission staff will either:
Complete its environmental assessment (EA) and place it into the
Commission's public record (eLibrary) for this proceeding, or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the final environmental impact statement (FEIS) or EA for this
proposal. The filing of the EA in the Commission's public record for
this proceeding or the issuance of a Notice of Schedule for
Environmental Review will serve to notify federal and state agencies of
the timing for the completion of all necessary reviews, and the
subsequent need to complete all federal authorizations within 90 days
of the date of issuance of the Commission staff's FEIS or EA.
Persons who wish to comment only on the environmental review of
this project should submit an original and two copies of their comments
to the Secretary of the Commission. Environmental commenters will be
placed on the Commission's environmental mailing list, will receive
copies of the environmental documents, and will be notified of meetings
associated with the Commission's environmental review process.
Environmental commenters will not be required to serve copies of filed
documents on all other parties. However, the non-party commenters will
not receive copies of all documents filed by other parties or issued by
the Commission (except for the mailing of environmental documents
issued by the Commission) and will not have the right to seek court
review of the Commission's final order.
The Commission strongly encourages electronic filings of comments,
protests, and interventions via the internet in lieu of paper. See 18
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's
website (www.ferc.gov) under the ``e-Filing'' link. Persons unable to
file electronically should submit an original and 5 copies of the
protest or intervention to the Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC 20426.
Dated: March 28, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-06786 Filed 4-3-18; 8:45 am]