Imperial Valley Solar 2, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization, 13979-13980 [2018-06626]

Download as PDF daltland on DSKBBV9HB2PROD with NOTICES Federal Register / Vol. 83, No. 63 / Monday, April 2, 2018 / Notices Filed Date: 3/23/18. Accession Number: 20180323–5211. Comments Due: 5 p.m. ET 4/13/18. Docket Numbers: ER18–1178–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Original WMPA SA No. 5038; Queue No. AC1–036 to be effective 3/15/2018. Filed Date: 3/27/18. Accession Number: 20180327–5003. Comments Due: 5 p.m. ET 4/17/18. Docket Numbers: ER18–1180–000. Applicants: South Carolina Electric & Gas Company. Description: § 205(d) Rate Filing: Attachment F to be effective 7/27/2015. Filed Date: 3/27/18. Accession Number: 20180327–5036. Comments Due: 5 p.m. ET 4/17/18. Take notice that the Commission received the following public utility holding company filings: Docket Numbers: PH18–7–000. Applicants: LS Power Development, LLC. Description: LS Power Development, LLC submits FERC 65–B Non-Material Change in Fact of Waiver Notification. Filed Date: 3/23/18. Accession Number: 20180323–5210. Comments Due: 5 p.m. ET 4/13/18. Take notice that the Commission received the following electric reliability filings: Docket Numbers: RD18–5–000. Applicants: North American Electric Reliability Corporation, Western Electricity Coordinating Council. Description: Joint Petition of the North American Electric Reliability Corporation and Western Electricity Coordinating Council for Approval of Proposed Regional Reliability Standard FAC–501–WECC–2. Filed Date: 3/16/18. Accession Number: 20180316–5246. Comments Due: 5 p.m. ET 4/26/18. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ VerDate Sep<11>2014 19:06 Mar 30, 2018 Jkt 244001 docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: March 27, 2018. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2018–06624 Filed 3–30–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14869–000] Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications; RAMM Power Group, LLC On February 28, 2018, RAMM Power Group LLC, filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Sacaton Energy Storage Project (Sacaton Project or project), a closed-loop pumped storage project to be located in Pinal County, Arizona. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project would consist of the following new facilities: (1) A 28foot-high dam with a total crest length of 6,000 feet, creating a 1,300 acre-foot upper reservoir with a maximum surface elevation of 1,456 feet mean sea level (MSL); (2) a 200-foot-long, 12-footdiameter steel penstock extending from the upper reservoir dam to the powerhouse; (3) an underground powerhouse with two 75-megawatt pump/turbine units; (4) a 2,200-footlong, 14-foot-diameter low pressure draft tube extending from the powerhouse to the lower reservoir; (5) a 1,500 acre-foot lower reservoir with a maximum reservoir surface elevation of 455 feet MSL to be located within an existing pit mine (no dam needed); (6) a new 200-Megavolt-ampere substation located adjacent to the upper reservoir; (7) a 2,500-foot-long, 137-kilovolt (kV) transmission line extending from the project’s substation to existing 137-kV transmission lines owned by Arizona Public Service; and (8) appurtenant facilities. The estimated average annual PO 00000 Frm 00037 Fmt 4703 Sfmt 4703 13979 generation of the Sacaton Project would be 400,000 megawatt-hours Applicant Contact: Dr. Michael A. Werner, RAMM Power Group, 7425 East Columbia Drive, Spokane, Washington 99212; phone: (509) 280–7486. FERC Contact: Khatoon Melick, (202) 502–8433, khatoon.melick@ferc.gov. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 Days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, notices of intent, and competing applications using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street, NE, Washington, DC 20426. The first page of any filing should include docket number P–14869–000. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s website at https:// www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P–14869) in the docket number field to access the document. For assistance, contact FERC Online Support. Dated: March 26, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–06577 Filed 3–30–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER18–1174–000] Imperial Valley Solar 2, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding of Imperial E:\FR\FM\02APN1.SGM 02APN1 daltland on DSKBBV9HB2PROD with NOTICES 13980 Federal Register / Vol. 83, No. 63 / Monday, April 2, 2018 / Notices Valley Solar 2, LLC‘s application for market-based rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street, NE, Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability, is April 16, 2018. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 5 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street, NE, Washington, DC 20426. The filings in the above-referenced proceeding are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for electronic review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the website that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov. or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: March 27, 2018. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2018–06626 Filed 3–30–18; 8:45 am] BILLING CODE 6717–01–P VerDate Sep<11>2014 19:06 Mar 30, 2018 Jkt 244001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #2 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC18–76–000. Applicants: Entergy Arkansas, Inc., Entergy Mississippi, Inc. Description: Joint Application of Entergy Arkansas, Inc., et al. for Approval under Section 203 of the Federal Power Act. Filed Date: 3/27/18. Accession Number: 20180327–5079. Comments Due: 5 p.m. ET 4/17/18. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER18–406–001. Applicants: Brunner Island, LLC. Description: Compliance filing: Reactive Service Rate Schedule Compliance Filing to be effective 2/25/ 2018. Filed Date: 3/27/18. Accession Number: 20180327–5075. Comments Due: 5 p.m. ET 4/17/18. Docket Numbers: ER18–564–001. Applicants: South Central MCN LLC. Description: Compliance filing: Wholesale Distribution ADIT Deficiency Response to be effective 1/1/2018. Filed Date: 3/27/18. Accession Number: 20180327–5158. Comments Due: 5 p.m. ET 4/17/18. Docket Numbers: ER18–1181–000. Applicants: San Diego Gas & Electric, Energia Sierra Juarez 2 U.S., LLC. Description: Joint Application of San Diego Gas & Electric Company, et al for Approval of Affiliate Transaction Pursuant to Section 205 of the Federal Power Act. Filed Date: 3/26/18. Accession Number: 20180326–5267. Comments Due: 5 p.m. ET 4/16/18. Docket Numbers: ER18–1182–000. Applicants: System Energy Resources, Inc. Description: § 205(d) Rate Filing: UPSA Amendment to Reflect Tax Cuts and Jobs Act of 2017 to be effective 6/ 1/2018. Filed Date: 3/27/18. Accession Number: 20180327–5074. Comments Due: 5 p.m. ET 4/17/18. Docket Numbers: ER18–1183–000. Applicants: Delta Solar Power I, LLC. Description: Baseline eTariff Filing: Initial Market Based Rate Tariff to be effective 5/21/2018. Filed Date: 3/22/18. Accession Number: 20180322–5321. PO 00000 Frm 00038 Fmt 4703 Sfmt 4703 Comments Due: 5 p.m. ET 4/12/18. Docket Numbers: ER18–1184–000. Applicants: Delta Solar Power II, LLC. Description: Baseline eTariff Filing: Initial Market Based Rate Tariff to be effective 5/21/2018. Filed Date: 3/22/18. Accession Number: 20180322–5322. Comments Due: 5 p.m. ET 4/12/18. Docket Numbers: ER18–1185–000. Applicants: Duke Energy Progress, LLC. Description: § 205(d) Rate Filing: DEP–PJM 2nd Amended and Restated JOA Concurrence to be effective 4/1/ 2018. Filed Date: 3/27/18. Accession Number: 20180327–5099. Comments Due: 5 p.m. ET 4/17/18. Docket Numbers: ER18–1186–000. Applicants: Turtle Creek Wind Farm LLC. Description: Baseline eTariff Filing: Market Based Rate Application to be effective 5/27/2018. Filed Date: 3/27/18. Accession Number: 20180327–5101. Comments Due: 5 p.m. ET 4/17/18. Docket Numbers: ER18–1187–000. Applicants: Eagle’s View Partners, Ltd. Description: Baseline eTariff Filing: Eagles View MBR Application to be effective 3/28/2018. Filed Date: 3/27/18. Accession Number: 20180327–5102. Comments Due: 5 p.m. ET 4/17/18. Docket Numbers: ER18–1188–000. Applicants: Prairie Queen Wind Farm LLC. Description: Baseline eTariff Filing: Market Based Rate Application to be effective 5/27/2018. Filed Date: 3/27/18. Accession Number: 20180327–5103. Comments Due: 5 p.m. ET 4/17/18. Docket Numbers: ER18–1189–000. Applicants: Meadow Lake Wind Farm VI LLC. Description: Baseline eTariff Filing: Market Based Rate Application to be effective 5/27/2018. Filed Date: 3/27/18. Accession Number: 20180327–5110. Comments Due: 5 p.m. ET 4/17/18. Docket Numbers: ER18–1190–000. Applicants: Entergy Arkansas, Inc. Description: § 205(d) Rate Filing: Amended Distribution Agreement to Reflect Tax Cuts and Jobs Act of 2017 to be effective 6/1/2018. Filed Date: 3/27/18. Accession Number: 20180327–5111. Comments Due: 5 p.m. ET 4/17/18. Docket Numbers: ER18–1191–000. Applicants: Wisconsin Public Service Corporation. E:\FR\FM\02APN1.SGM 02APN1

Agencies

[Federal Register Volume 83, Number 63 (Monday, April 2, 2018)]
[Notices]
[Pages 13979-13980]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-06626]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. ER18-1174-000]


Imperial Valley Solar 2, LLC; Supplemental Notice That Initial 
Market-Based Rate Filing Includes Request for Blanket Section 204 
Authorization

    This is a supplemental notice in the above-referenced proceeding of 
Imperial

[[Page 13980]]

Valley Solar 2, LLC`s application for market-based rate authority, with 
an accompanying rate tariff, noting that such application includes a 
request for blanket authorization, under 18 CFR part 34, of future 
issuances of securities and assumptions of liability.
    Any person desiring to intervene or to protest should file with the 
Federal Energy Regulatory Commission, 888 First Street, NE, Washington, 
DC 20426, in accordance with Rules 211 and 214 of the Commission's 
Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone 
filing a motion to intervene or protest must serve a copy of that 
document on the Applicant.
    Notice is hereby given that the deadline for filing protests with 
regard to the applicant's request for blanket authorization, under 18 
CFR part 34, of future issuances of securities and assumptions of 
liability, is April 16, 2018.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper, using the FERC Online links at https://www.ferc.gov. To facilitate electronic service, persons with internet 
access who will eFile a document and/or be listed as a contact for an 
intervenor must create and validate an eRegistration account using the 
eRegistration link. Select the eFiling link to log on and submit the 
intervention or protests.
    Persons unable to file electronically should submit an original and 
5 copies of the intervention or protest to the Federal Energy 
Regulatory Commission, 888 First Street, NE, Washington, DC 20426.
    The filings in the above-referenced proceeding are accessible in 
the Commission's eLibrary system by clicking on the appropriate link in 
the above list. They are also available for electronic review in the 
Commission's Public Reference Room in Washington, DC. There is an 
eSubscription link on the website that enables subscribers to receive 
email notification when a document is added to a subscribed docket(s). 
For assistance with any FERC Online service, please email 
[email protected]. or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.

    Dated: March 27, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-06626 Filed 3-30-18; 8:45 am]
 BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.