Imperial Valley Solar 2, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization, 13979-13980 [2018-06626]
Download as PDF
daltland on DSKBBV9HB2PROD with NOTICES
Federal Register / Vol. 83, No. 63 / Monday, April 2, 2018 / Notices
Filed Date: 3/23/18.
Accession Number: 20180323–5211.
Comments Due: 5 p.m. ET 4/13/18.
Docket Numbers: ER18–1178–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original WMPA SA No. 5038; Queue
No. AC1–036 to be effective 3/15/2018.
Filed Date: 3/27/18.
Accession Number: 20180327–5003.
Comments Due: 5 p.m. ET 4/17/18.
Docket Numbers: ER18–1180–000.
Applicants: South Carolina Electric &
Gas Company.
Description: § 205(d) Rate Filing:
Attachment F to be effective 7/27/2015.
Filed Date: 3/27/18.
Accession Number: 20180327–5036.
Comments Due: 5 p.m. ET 4/17/18.
Take notice that the Commission
received the following public utility
holding company filings:
Docket Numbers: PH18–7–000.
Applicants: LS Power Development,
LLC.
Description: LS Power Development,
LLC submits FERC 65–B Non-Material
Change in Fact of Waiver Notification.
Filed Date: 3/23/18.
Accession Number: 20180323–5210.
Comments Due: 5 p.m. ET 4/13/18.
Take notice that the Commission
received the following electric
reliability filings:
Docket Numbers: RD18–5–000.
Applicants: North American Electric
Reliability Corporation, Western
Electricity Coordinating Council.
Description: Joint Petition of the
North American Electric Reliability
Corporation and Western Electricity
Coordinating Council for Approval of
Proposed Regional Reliability Standard
FAC–501–WECC–2.
Filed Date: 3/16/18.
Accession Number: 20180316–5246.
Comments Due: 5 p.m. ET 4/26/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
VerDate Sep<11>2014
19:06 Mar 30, 2018
Jkt 244001
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: March 27, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–06624 Filed 3–30–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14869–000]
Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing
Applications; RAMM Power Group,
LLC
On February 28, 2018, RAMM Power
Group LLC, filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act (FPA),
proposing to study the feasibility of the
Sacaton Energy Storage Project (Sacaton
Project or project), a closed-loop
pumped storage project to be located in
Pinal County, Arizona. The sole purpose
of a preliminary permit, if issued, is to
grant the permit holder priority to file
a license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed project would consist of
the following new facilities: (1) A 28foot-high dam with a total crest length
of 6,000 feet, creating a 1,300 acre-foot
upper reservoir with a maximum
surface elevation of 1,456 feet mean sea
level (MSL); (2) a 200-foot-long, 12-footdiameter steel penstock extending from
the upper reservoir dam to the
powerhouse; (3) an underground
powerhouse with two 75-megawatt
pump/turbine units; (4) a 2,200-footlong, 14-foot-diameter low pressure
draft tube extending from the
powerhouse to the lower reservoir; (5) a
1,500 acre-foot lower reservoir with a
maximum reservoir surface elevation of
455 feet MSL to be located within an
existing pit mine (no dam needed); (6)
a new 200-Megavolt-ampere substation
located adjacent to the upper reservoir;
(7) a 2,500-foot-long, 137-kilovolt (kV)
transmission line extending from the
project’s substation to existing 137-kV
transmission lines owned by Arizona
Public Service; and (8) appurtenant
facilities. The estimated average annual
PO 00000
Frm 00037
Fmt 4703
Sfmt 4703
13979
generation of the Sacaton Project would
be 400,000 megawatt-hours
Applicant Contact: Dr. Michael A.
Werner, RAMM Power Group, 7425 East
Columbia Drive, Spokane, Washington
99212; phone: (509) 280–7486.
FERC Contact: Khatoon Melick, (202)
502–8433, khatoon.melick@ferc.gov.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
Days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street, NE, Washington, DC 20426.
The first page of any filing should
include docket number P–14869–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s website at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–14869) in
the docket number field to access the
document. For assistance, contact FERC
Online Support.
Dated: March 26, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–06577 Filed 3–30–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER18–1174–000]
Imperial Valley Solar 2, LLC;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
This is a supplemental notice in the
above-referenced proceeding of Imperial
E:\FR\FM\02APN1.SGM
02APN1
daltland on DSKBBV9HB2PROD with NOTICES
13980
Federal Register / Vol. 83, No. 63 / Monday, April 2, 2018 / Notices
Valley Solar 2, LLC‘s application for
market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street, NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is April 16,
2018.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street, NE, Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: March 27, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–06626 Filed 3–30–18; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
19:06 Mar 30, 2018
Jkt 244001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #2
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC18–76–000.
Applicants: Entergy Arkansas, Inc.,
Entergy Mississippi, Inc.
Description: Joint Application of
Entergy Arkansas, Inc., et al. for
Approval under Section 203 of the
Federal Power Act.
Filed Date: 3/27/18.
Accession Number: 20180327–5079.
Comments Due: 5 p.m. ET 4/17/18.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER18–406–001.
Applicants: Brunner Island, LLC.
Description: Compliance filing:
Reactive Service Rate Schedule
Compliance Filing to be effective 2/25/
2018.
Filed Date: 3/27/18.
Accession Number: 20180327–5075.
Comments Due: 5 p.m. ET 4/17/18.
Docket Numbers: ER18–564–001.
Applicants: South Central MCN LLC.
Description: Compliance filing:
Wholesale Distribution ADIT Deficiency
Response to be effective 1/1/2018.
Filed Date: 3/27/18.
Accession Number: 20180327–5158.
Comments Due: 5 p.m. ET 4/17/18.
Docket Numbers: ER18–1181–000.
Applicants: San Diego Gas & Electric,
Energia Sierra Juarez 2 U.S., LLC.
Description: Joint Application of San
Diego Gas & Electric Company, et al for
Approval of Affiliate Transaction
Pursuant to Section 205 of the Federal
Power Act.
Filed Date: 3/26/18.
Accession Number: 20180326–5267.
Comments Due: 5 p.m. ET 4/16/18.
Docket Numbers: ER18–1182–000.
Applicants: System Energy Resources,
Inc.
Description: § 205(d) Rate Filing:
UPSA Amendment to Reflect Tax Cuts
and Jobs Act of 2017 to be effective 6/
1/2018.
Filed Date: 3/27/18.
Accession Number: 20180327–5074.
Comments Due: 5 p.m. ET 4/17/18.
Docket Numbers: ER18–1183–000.
Applicants: Delta Solar Power I, LLC.
Description: Baseline eTariff Filing:
Initial Market Based Rate Tariff to be
effective 5/21/2018.
Filed Date: 3/22/18.
Accession Number: 20180322–5321.
PO 00000
Frm 00038
Fmt 4703
Sfmt 4703
Comments Due: 5 p.m. ET 4/12/18.
Docket Numbers: ER18–1184–000.
Applicants: Delta Solar Power II, LLC.
Description: Baseline eTariff Filing:
Initial Market Based Rate Tariff to be
effective 5/21/2018.
Filed Date: 3/22/18.
Accession Number: 20180322–5322.
Comments Due: 5 p.m. ET 4/12/18.
Docket Numbers: ER18–1185–000.
Applicants: Duke Energy Progress,
LLC.
Description: § 205(d) Rate Filing:
DEP–PJM 2nd Amended and Restated
JOA Concurrence to be effective 4/1/
2018.
Filed Date: 3/27/18.
Accession Number: 20180327–5099.
Comments Due: 5 p.m. ET 4/17/18.
Docket Numbers: ER18–1186–000.
Applicants: Turtle Creek Wind Farm
LLC.
Description: Baseline eTariff Filing:
Market Based Rate Application to be
effective 5/27/2018.
Filed Date: 3/27/18.
Accession Number: 20180327–5101.
Comments Due: 5 p.m. ET 4/17/18.
Docket Numbers: ER18–1187–000.
Applicants: Eagle’s View Partners,
Ltd.
Description: Baseline eTariff Filing:
Eagles View MBR Application to be
effective 3/28/2018.
Filed Date: 3/27/18.
Accession Number: 20180327–5102.
Comments Due: 5 p.m. ET 4/17/18.
Docket Numbers: ER18–1188–000.
Applicants: Prairie Queen Wind Farm
LLC.
Description: Baseline eTariff Filing:
Market Based Rate Application to be
effective 5/27/2018.
Filed Date: 3/27/18.
Accession Number: 20180327–5103.
Comments Due: 5 p.m. ET 4/17/18.
Docket Numbers: ER18–1189–000.
Applicants: Meadow Lake Wind Farm
VI LLC.
Description: Baseline eTariff Filing:
Market Based Rate Application to be
effective 5/27/2018.
Filed Date: 3/27/18.
Accession Number: 20180327–5110.
Comments Due: 5 p.m. ET 4/17/18.
Docket Numbers: ER18–1190–000.
Applicants: Entergy Arkansas, Inc.
Description: § 205(d) Rate Filing:
Amended Distribution Agreement to
Reflect Tax Cuts and Jobs Act of 2017
to be effective 6/1/2018.
Filed Date: 3/27/18.
Accession Number: 20180327–5111.
Comments Due: 5 p.m. ET 4/17/18.
Docket Numbers: ER18–1191–000.
Applicants: Wisconsin Public Service
Corporation.
E:\FR\FM\02APN1.SGM
02APN1
Agencies
[Federal Register Volume 83, Number 63 (Monday, April 2, 2018)]
[Notices]
[Pages 13979-13980]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-06626]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. ER18-1174-000]
Imperial Valley Solar 2, LLC; Supplemental Notice That Initial
Market-Based Rate Filing Includes Request for Blanket Section 204
Authorization
This is a supplemental notice in the above-referenced proceeding of
Imperial
[[Page 13980]]
Valley Solar 2, LLC`s application for market-based rate authority, with
an accompanying rate tariff, noting that such application includes a
request for blanket authorization, under 18 CFR part 34, of future
issuances of securities and assumptions of liability.
Any person desiring to intervene or to protest should file with the
Federal Energy Regulatory Commission, 888 First Street, NE, Washington,
DC 20426, in accordance with Rules 211 and 214 of the Commission's
Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone
filing a motion to intervene or protest must serve a copy of that
document on the Applicant.
Notice is hereby given that the deadline for filing protests with
regard to the applicant's request for blanket authorization, under 18
CFR part 34, of future issuances of securities and assumptions of
liability, is April 16, 2018.
The Commission encourages electronic submission of protests and
interventions in lieu of paper, using the FERC Online links at https://www.ferc.gov. To facilitate electronic service, persons with internet
access who will eFile a document and/or be listed as a contact for an
intervenor must create and validate an eRegistration account using the
eRegistration link. Select the eFiling link to log on and submit the
intervention or protests.
Persons unable to file electronically should submit an original and
5 copies of the intervention or protest to the Federal Energy
Regulatory Commission, 888 First Street, NE, Washington, DC 20426.
The filings in the above-referenced proceeding are accessible in
the Commission's eLibrary system by clicking on the appropriate link in
the above list. They are also available for electronic review in the
Commission's Public Reference Room in Washington, DC. There is an
eSubscription link on the website that enables subscribers to receive
email notification when a document is added to a subscribed docket(s).
For assistance with any FERC Online service, please email
[email protected]. or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Dated: March 27, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-06626 Filed 3-30-18; 8:45 am]
BILLING CODE 6717-01-P