Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications; RAMM Power Group, LLC, 13979 [2018-06577]
Download as PDF
daltland on DSKBBV9HB2PROD with NOTICES
Federal Register / Vol. 83, No. 63 / Monday, April 2, 2018 / Notices
Filed Date: 3/23/18.
Accession Number: 20180323–5211.
Comments Due: 5 p.m. ET 4/13/18.
Docket Numbers: ER18–1178–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original WMPA SA No. 5038; Queue
No. AC1–036 to be effective 3/15/2018.
Filed Date: 3/27/18.
Accession Number: 20180327–5003.
Comments Due: 5 p.m. ET 4/17/18.
Docket Numbers: ER18–1180–000.
Applicants: South Carolina Electric &
Gas Company.
Description: § 205(d) Rate Filing:
Attachment F to be effective 7/27/2015.
Filed Date: 3/27/18.
Accession Number: 20180327–5036.
Comments Due: 5 p.m. ET 4/17/18.
Take notice that the Commission
received the following public utility
holding company filings:
Docket Numbers: PH18–7–000.
Applicants: LS Power Development,
LLC.
Description: LS Power Development,
LLC submits FERC 65–B Non-Material
Change in Fact of Waiver Notification.
Filed Date: 3/23/18.
Accession Number: 20180323–5210.
Comments Due: 5 p.m. ET 4/13/18.
Take notice that the Commission
received the following electric
reliability filings:
Docket Numbers: RD18–5–000.
Applicants: North American Electric
Reliability Corporation, Western
Electricity Coordinating Council.
Description: Joint Petition of the
North American Electric Reliability
Corporation and Western Electricity
Coordinating Council for Approval of
Proposed Regional Reliability Standard
FAC–501–WECC–2.
Filed Date: 3/16/18.
Accession Number: 20180316–5246.
Comments Due: 5 p.m. ET 4/26/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
VerDate Sep<11>2014
19:06 Mar 30, 2018
Jkt 244001
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: March 27, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–06624 Filed 3–30–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14869–000]
Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing
Applications; RAMM Power Group,
LLC
On February 28, 2018, RAMM Power
Group LLC, filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act (FPA),
proposing to study the feasibility of the
Sacaton Energy Storage Project (Sacaton
Project or project), a closed-loop
pumped storage project to be located in
Pinal County, Arizona. The sole purpose
of a preliminary permit, if issued, is to
grant the permit holder priority to file
a license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed project would consist of
the following new facilities: (1) A 28foot-high dam with a total crest length
of 6,000 feet, creating a 1,300 acre-foot
upper reservoir with a maximum
surface elevation of 1,456 feet mean sea
level (MSL); (2) a 200-foot-long, 12-footdiameter steel penstock extending from
the upper reservoir dam to the
powerhouse; (3) an underground
powerhouse with two 75-megawatt
pump/turbine units; (4) a 2,200-footlong, 14-foot-diameter low pressure
draft tube extending from the
powerhouse to the lower reservoir; (5) a
1,500 acre-foot lower reservoir with a
maximum reservoir surface elevation of
455 feet MSL to be located within an
existing pit mine (no dam needed); (6)
a new 200-Megavolt-ampere substation
located adjacent to the upper reservoir;
(7) a 2,500-foot-long, 137-kilovolt (kV)
transmission line extending from the
project’s substation to existing 137-kV
transmission lines owned by Arizona
Public Service; and (8) appurtenant
facilities. The estimated average annual
PO 00000
Frm 00037
Fmt 4703
Sfmt 4703
13979
generation of the Sacaton Project would
be 400,000 megawatt-hours
Applicant Contact: Dr. Michael A.
Werner, RAMM Power Group, 7425 East
Columbia Drive, Spokane, Washington
99212; phone: (509) 280–7486.
FERC Contact: Khatoon Melick, (202)
502–8433, khatoon.melick@ferc.gov.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
Days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street, NE, Washington, DC 20426.
The first page of any filing should
include docket number P–14869–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s website at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–14869) in
the docket number field to access the
document. For assistance, contact FERC
Online Support.
Dated: March 26, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–06577 Filed 3–30–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER18–1174–000]
Imperial Valley Solar 2, LLC;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
This is a supplemental notice in the
above-referenced proceeding of Imperial
E:\FR\FM\02APN1.SGM
02APN1
Agencies
[Federal Register Volume 83, Number 63 (Monday, April 2, 2018)]
[Notices]
[Page 13979]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-06577]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14869-000]
Notice of Preliminary Permit Application Accepted for Filing and
Soliciting Comments, Motions To Intervene, and Competing Applications;
RAMM Power Group, LLC
On February 28, 2018, RAMM Power Group LLC, filed an application
for a preliminary permit, pursuant to section 4(f) of the Federal Power
Act (FPA), proposing to study the feasibility of the Sacaton Energy
Storage Project (Sacaton Project or project), a closed-loop pumped
storage project to be located in Pinal County, Arizona. The sole
purpose of a preliminary permit, if issued, is to grant the permit
holder priority to file a license application during the permit term. A
preliminary permit does not authorize the permit holder to perform any
land-disturbing activities or otherwise enter upon lands or waters
owned by others without the owners' express permission.
The proposed project would consist of the following new facilities:
(1) A 28-foot-high dam with a total crest length of 6,000 feet,
creating a 1,300 acre-foot upper reservoir with a maximum surface
elevation of 1,456 feet mean sea level (MSL); (2) a 200-foot-long, 12-
foot-diameter steel penstock extending from the upper reservoir dam to
the powerhouse; (3) an underground powerhouse with two 75-megawatt
pump/turbine units; (4) a 2,200-foot-long, 14-foot-diameter low
pressure draft tube extending from the powerhouse to the lower
reservoir; (5) a 1,500 acre-foot lower reservoir with a maximum
reservoir surface elevation of 455 feet MSL to be located within an
existing pit mine (no dam needed); (6) a new 200-Megavolt-ampere
substation located adjacent to the upper reservoir; (7) a 2,500-foot-
long, 137-kilovolt (kV) transmission line extending from the project's
substation to existing 137-kV transmission lines owned by Arizona
Public Service; and (8) appurtenant facilities. The estimated average
annual generation of the Sacaton Project would be 400,000 megawatt-
hours
Applicant Contact: Dr. Michael A. Werner, RAMM Power Group, 7425
East Columbia Drive, Spokane, Washington 99212; phone: (509) 280-7486.
FERC Contact: Khatoon Melick, (202) 502-8433,
[email protected].
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 Days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, notices of intent, and competing
applications using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You
must include your name and contact information at the end of your
comments. For assistance, please contact FERC Online Support at
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street, NE,
Washington, DC 20426. The first page of any filing should include
docket number P-14869-000.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of
Commission's website at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-14869) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Dated: March 26, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-06577 Filed 3-30-18; 8:45 am]