Combined Notice of Filings #1, 13984-13985 [2018-06575]

Download as PDF daltland on DSKBBV9HB2PROD with NOTICES 13984 Federal Register / Vol. 83, No. 63 / Monday, April 2, 2018 / Notices Docket Numbers: ER17–419–005. Applicants: Transource Pennsylvania, LLC, Transource Maryland, LLC, PJM Interconnection, L.L.C. Description: Compliance filing: Transource PA and MD submit Amendments to 1/1/18 Compliance Filing in ER17–419 to be effective 2/1/2017. Filed Date: 3/23/18. Accession Number: 20180323–5115. Comments Due: 5 p.m. ET 4/13/18. Docket Numbers: ER18–836–000. Applicants: Energia Sierra Juarez 2 U.S., LLC. Description: Supplement to February 9, 2018 Energia Sierra Juarez U.S. 2, LLC tariff filing (Corrected Attachment B). Filed Date: 3/22/18. Accession Number: 20180322–5291. Comments Due: 5 p.m. ET 4/2/18. Docket Numbers: ER18–1162–000. Applicants: Orange and Rockland Utilities, Inc. Description: § 205(d) Rate Filing: Attachment J—Municipal Underground Surcharge Revision to be effective 4/1/2018. Filed Date: 3/22/18. Accession Number: 20180322–5281. Comments Due: 5 p.m. ET 4/12/18. Docket Numbers: ER18–1163–000. Applicants: Avista Corporation. Description: § 205(d) Rate Filing: Avista Corp NITSA SA T–1092 Low Voltage Facilities Revisions to be effective 4/1/2018. Filed Date: 3/23/18. Accession Number: 20180323–5025. Comments Due: 5 p.m. ET 4/13/18. Docket Numbers: ER18–1165–000. Applicants: Shoreham Solar Commons LLC. Description: § 205(d) Rate Filing: Amendments to MBR Tariff to Reflect Affiliation to be effective 3/7/2018. Filed Date: 3/23/18. Accession Number: 20180323–5027. Comments Due: 5 p.m. ET 4/13/18. Docket Numbers: ER18–1166–000. Applicants: Wisconsin Public Service Corporation. Description: § 205(d) Rate Filing: Filing of Amended and Restated Service Agreement with MG&E to be effective 1/1/2018. Filed Date: 3/23/18. Accession Number: 20180323–5091. Comments Due: 5 p.m. ET 4/13/18. Docket Numbers: ER18–1167–000. Applicants: Nevada Power Company. Description: Compliance filing: OATT Revisions Attachments N–v6 and O–v8 to be effective 5/15/2018. Filed Date: 3/23/18. Accession Number: 20180323–5097. Comments Due: 5 p.m. ET 4/13/18. VerDate Sep<11>2014 19:06 Mar 30, 2018 Jkt 244001 The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: March 23, 2018. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2018–06621 Filed 3–30–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC18–75–000. Applicants: Stuttgart Solar, LLC. Description: Application of Stuttgart Solar, LLC for Authorization under Section 203 of the Federal Power Act. Filed Date: 3/23/18. Accession Number: 20180323–5194. Comments Due: 5 p.m. ET 4/13/18. Take notice that the Commission received the following exempt wholesale generator filings: Docket Numbers: EG18–64–000. Applicants: SP Sandhills Solar, LLC. Description: Self-Certification of EG or FC of SP Sandhills Solar, LLC. Filed Date: 3/23/18. Accession Number: 20180323–5159. Comments Due: 5 p.m. ET 4/13/18. Docket Numbers: EG18–65–000. Applicants: SP Butler Solar, LLC. Description: Self-Certification of EG or FC of SP Butler Solar, LLC. Filed Date: 3/23/18. Accession Number: 20180323–5160. Comments Due: 5 p.m. ET 4/13/18. Docket Numbers: EG18–66–000. Applicants: SP Pawpaw Solar, LLC. Description: Self-Certification of EG or FC of SP Pawpaw Solar, LLC. PO 00000 Frm 00042 Fmt 4703 Sfmt 4703 Filed Date: 3/23/18. Accession Number: 20180323–5161. Comments Due: 5 p.m. ET 4/13/18. Docket Numbers: EG18–67–000. Applicants: SP Decatur Parkway Solar, LLC. Description: Self-Certification of EG or FC of SP Decatur Parkway Solar, LLC. Filed Date: 3/23/18. Accession Number: 20180323–5162. Comments Due: 5 p.m. ET 4/13/18. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER10–1437–006. Applicants: Tampa Electric Company. Description: Supplement to June 30, 2017 Triennial Market Power Update for the Southeast Region [Exhibit TEC11] of Tampa Electric Company. Filed Date: 3/22/18. Accession Number: 20180322–5304. Comments Due: 5 p.m. ET 4/12/18. Docket Numbers: ER10–2465–010; ER11–2657–011; ER11–2107–015; ER11–2108–015. Applicants: Milford Wind Corridor Phase I, LLC., Milford Wind Corridor Phase II, LLC., North Community Turbines LLC., North Wind Turbines LLC. Description: Notice of Non-Material Change in Status of Milford Wind Corridor Phase I, LLC., et al. Filed Date: 3/22/18. Accession Number: 20180322–5306. Comments Due: 5 p.m. ET 4/12/18. Docket Numbers: ER17–775–003. Applicants: PJM Interconnection, L.L.C. Description: Compliance filing: Further Compliance Filing Pursuant to 2/21/18 Order in Docket No. ER17–775 to be effective 5/11/2017. Filed Date: 3/23/18. Accession Number: 20180323–5158. Comments Due: 5 p.m. ET 4/13/18. Docket Numbers: ER18–1168–000. Applicants: New York Independent System Operator, Inc. Description: § 205(d) Rate Filing: NYISO 205 filing re: market party fuel cost adjustments to be effective 5/23/2018. Filed Date: 3/23/18. Accession Number: 20180323–5148. Comments Due: 5 p.m. ET 4/13/18. Docket Numbers: ER18–1169–000. Applicants: California Independent System Operator Corporation. Description: § 205(d) Rate Filing: 2018–03–23 Commitment Cost Enhancements Phase 3 Amendment to be effective 11/1/2018. Filed Date: 3/23/18. Accession Number: 20180323–5168. Comments Due: 5 p.m. ET 4/13/18. E:\FR\FM\02APN1.SGM 02APN1 daltland on DSKBBV9HB2PROD with NOTICES Federal Register / Vol. 83, No. 63 / Monday, April 2, 2018 / Notices Docket Numbers: ER18–1170–000. Applicants: NSTAR Electric Company. Description: § 205(d) Rate Filing: Transfer Agreement between NSTAR and NEMC for the transfer of CMEEC’s Use Rights to be effective 5/23/2018. Filed Date: 3/23/18. Accession Number: 20180323–5173. Comments Due: 5 p.m. ET 4/13/18. Docket Numbers: ER18–1171–000. Applicants: Tampa Electric Company. Description: § 205(d) Rate Filing: LGIA IRS Update to be effective 3/27/2018. Filed Date: 3/26/18. Accession Number: 20180326–5109 Comments Due: 5 p.m. ET 4/16/18. Docket Numbers: ER18–1172–000. Applicants: Southern California Edison Company. Description: § 205(d) Rate Filing: GIA & DSA Santa Ana Storage Project SA Nos. 1006–1007 to be effective 3/14/2018. Filed Date: 3/26/18. Accession Number: 20180326–5114 Comments Due: 5 p.m. ET 4/16/18. Docket Numbers: ER18–1173–000. Applicants: Midcontinent Independent System Operator. Description: § 205(d) Rate Filing: 2018–03–26_Enhance Locational Aspect of Resource Adequacy Construct to be effective 5/30/2018. Filed Date: 3/26/18. Accession Number: 20180326–5174. Comments Due: 5 p.m. ET 4/16/18. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: March 26, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–06575 Filed 3–30–18; 8:45 am] BILLING CODE 6717–01–P VerDate Sep<11>2014 19:06 Mar 30, 2018 Jkt 244001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP18–116–000] Texas Gas Transmission, LLC; Notice of Application Take notice that on March 14, 2018, Texas Gas Transmission, LLC (Texas Gas), 9 Greenway Plaza, Suite 2800, Houston, Texas 77046, filed in Docket No. CP18–116–000, an application pursuant to section 7(b) of the Natural Gas Act (NGA) requesting to abandon approximately 11.0 miles of its 16-inchdiameter North Lake Pagie pipeline and approximately 5.7 miles of its 16-inchdiameter Bay Junop-Bay Round pipeline, including all appurtenant and auxiliary facilities. The facilities are located approximately 22.1 miles southwest of Houma, Louisiana, extending offshore in Terrebonne Parish, Louisiana, as part of Texas Gas’ Southeast Supply Lateral, all as more fully set forth in the application which is on file with the Commission and open to public inspection. The filing is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s website web at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. Any questions concerning this application may be directed to Juan Eligio Jr, Supervisor of Regulatory Affairs, Texas Gas Transmission, LLC, 9 Greenway Plaza, Suite 2800, Houston, Texas 77046, by telephone at (713) 479– 3480, by fax at (713) 479–1818, or by email at Juan.Eligio@bwpmlp.com. Pursuant to section 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: Complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and PO 00000 Frm 00043 Fmt 4703 Sfmt 4703 13985 the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s EA. There are two ways to become involved in the Commission’s review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the comment date stated below file with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission’s Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit seven copies of filings made in the proceeding with the Commission and must mail a copy to the applicant and to every other party. Only parties to the proceeding can ask for court review of Commission orders in the proceeding. However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission’s rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commentors will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commentors will not be required to serve copies of filed documents on all other parties. However, the non-party commentors will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right E:\FR\FM\02APN1.SGM 02APN1

Agencies

[Federal Register Volume 83, Number 63 (Monday, April 2, 2018)]
[Notices]
[Pages 13984-13985]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-06575]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #1

    Take notice that the Commission received the following electric 
corporate filings:

    Docket Numbers: EC18-75-000.
    Applicants: Stuttgart Solar, LLC.
    Description: Application of Stuttgart Solar, LLC for Authorization 
under Section 203 of the Federal Power Act.
    Filed Date: 3/23/18.
    Accession Number: 20180323-5194.
    Comments Due: 5 p.m. ET 4/13/18.
    Take notice that the Commission received the following exempt 
wholesale generator filings:

    Docket Numbers: EG18-64-000.
    Applicants: SP Sandhills Solar, LLC.
    Description: Self-Certification of EG or FC of SP Sandhills Solar, 
LLC.
    Filed Date: 3/23/18.
    Accession Number: 20180323-5159.
    Comments Due: 5 p.m. ET 4/13/18.

    Docket Numbers: EG18-65-000.
    Applicants: SP Butler Solar, LLC.
    Description: Self-Certification of EG or FC of SP Butler Solar, 
LLC.
    Filed Date: 3/23/18.
    Accession Number: 20180323-5160.
    Comments Due: 5 p.m. ET 4/13/18.

    Docket Numbers: EG18-66-000.
    Applicants: SP Pawpaw Solar, LLC.
    Description: Self-Certification of EG or FC of SP Pawpaw Solar, 
LLC.
    Filed Date: 3/23/18.
    Accession Number: 20180323-5161.
    Comments Due: 5 p.m. ET 4/13/18.

    Docket Numbers: EG18-67-000.
    Applicants: SP Decatur Parkway Solar, LLC.
    Description: Self-Certification of EG or FC of SP Decatur Parkway 
Solar, LLC.
    Filed Date: 3/23/18.
    Accession Number: 20180323-5162.
    Comments Due: 5 p.m. ET 4/13/18.

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER10-1437-006.
    Applicants: Tampa Electric Company.
    Description: Supplement to June 30, 2017 Triennial Market Power 
Update for the Southeast Region [Exhibit TEC11] of Tampa Electric 
Company.
    Filed Date: 3/22/18.
    Accession Number: 20180322-5304.
    Comments Due: 5 p.m. ET 4/12/18.

    Docket Numbers: ER10-2465-010; ER11-2657-011; ER11-2107-015; ER11-
2108-015.
    Applicants: Milford Wind Corridor Phase I, LLC., Milford Wind 
Corridor Phase II, LLC., North Community Turbines LLC., North Wind 
Turbines LLC.
    Description: Notice of Non-Material Change in Status of Milford 
Wind Corridor Phase I, LLC., et al.
    Filed Date: 3/22/18.
    Accession Number: 20180322-5306.
    Comments Due: 5 p.m. ET 4/12/18.

    Docket Numbers: ER17-775-003.
    Applicants: PJM Interconnection, L.L.C.
    Description: Compliance filing: Further Compliance Filing Pursuant 
to 2/21/18 Order in Docket No. ER17-775 to be effective 5/11/2017.
    Filed Date: 3/23/18.
    Accession Number: 20180323-5158.
    Comments Due: 5 p.m. ET 4/13/18.

    Docket Numbers: ER18-1168-000.
    Applicants: New York Independent System Operator, Inc.
    Description: Sec.  205(d) Rate Filing: NYISO 205 filing re: market 
party fuel cost adjustments to be effective 5/23/2018.
    Filed Date: 3/23/18.
    Accession Number: 20180323-5148.
    Comments Due: 5 p.m. ET 4/13/18.

    Docket Numbers: ER18-1169-000.
    Applicants: California Independent System Operator Corporation.
    Description: Sec.  205(d) Rate Filing: 2018-03-23 Commitment Cost 
Enhancements Phase 3 Amendment to be effective 11/1/2018.
    Filed Date: 3/23/18.
    Accession Number: 20180323-5168.
    Comments Due: 5 p.m. ET 4/13/18.


[[Page 13985]]


    Docket Numbers: ER18-1170-000.
    Applicants: NSTAR Electric Company.
    Description: Sec.  205(d) Rate Filing: Transfer Agreement between 
NSTAR and NEMC for the transfer of CMEEC's Use Rights to be effective 
5/23/2018.
    Filed Date: 3/23/18.
    Accession Number: 20180323-5173.
    Comments Due: 5 p.m. ET 4/13/18.

    Docket Numbers: ER18-1171-000.
    Applicants: Tampa Electric Company.
    Description: Sec.  205(d) Rate Filing: LGIA IRS Update to be 
effective 3/27/2018.
    Filed Date: 3/26/18.
    Accession Number: 20180326-5109
    Comments Due: 5 p.m. ET 4/16/18.

    Docket Numbers: ER18-1172-000.
    Applicants: Southern California Edison Company.
    Description: Sec.  205(d) Rate Filing: GIA & DSA Santa Ana Storage 
Project SA Nos. 1006-1007 to be effective 3/14/2018.
    Filed Date: 3/26/18.
    Accession Number: 20180326-5114
    Comments Due: 5 p.m. ET 4/16/18.

    Docket Numbers: ER18-1173-000.
    Applicants: Midcontinent Independent System Operator.
    Description: Sec.  205(d) Rate Filing: 2018-03-26_Enhance 
Locational Aspect of Resource Adequacy Construct to be effective 5/30/
2018.
    Filed Date: 3/26/18.
    Accession Number: 20180326-5174.
    Comments Due: 5 p.m. ET 4/16/18.

    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: March 26, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-06575 Filed 3-30-18; 8:45 am]
 BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.