Drawbridge Operation Regulation; Willamette River at Portland, OR, 13866 [2018-06561]
Download as PDF
13866
Federal Register / Vol. 83, No. 63 / Monday, April 2, 2018 / Rules and Regulations
Notice of deviation from
drawbridge regulation.
ACTION:
The Coast Guard has issued a
temporary deviation from the operating
schedule that governs the Fremont
Bridge, mile 2.6, and the University
Bridge, mile 4.3, both crossing the Lake
Washington Ship Canal at Seattle, WA.
The deviation is necessary to
accommodate the Tenacious Ten run
event. This deviation allows the bridges
to remain in the closed-to-navigation
position to allow for the safe movement
of event participants.
DATES: This deviation is effective from
8 a.m. to 10:15 a.m. on April 21, 2018.
ADDRESSES: The docket for this
deviation, USCG–2018–0253 is available
at https://www.regulations.gov. Type the
docket number in the ‘‘SEARCH’’ box
and click ‘‘SEARCH.’’ Click on Open
Docket Folder on the line associated
with this deviation.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this temporary
deviation, call or email Mr. Steven
Fischer, Bridge Administrator,
Thirteenth Coast Guard District;
telephone 206–220–7282, email d13-pfd13bridges@uscg.mil.
SUPPLEMENTARY INFORMATION: The
Seattle Department of Transportation,
bridge owner, requested a temporary
deviation from the operating schedule
for the Fremont Bridge, mile 2.6, and
the University Bridge, mile 4.3, both
crossing the Lake Washington Ship
Canal at Seattle, WA, to facilitate safe
passage of participants in the Tenacious
Ten run event. The Fremont Bridge
provides a vertical clearance of 14 feet
(31 feet of vertical clearance for the
center 36 horizontal feet) in the closedto-navigation position. The University
Bridge provides a vertical clearance of
30 feet in the closed-to-navigation
position. Both bridge clearances are
referenced to the mean water elevation
of Lake Washington. The normal
operating schedule for both the Fremont
Bridge and the University Bridge is in
33 CFR 117.1051. During this deviation
period, the Fremont Bridge need not
open to marine vessels from 8:15 a.m. to
10:15 a.m. on April 21, 2018, and the
University Bridge need not open to
marine vessel from 8 a.m. to 8:30 a.m.
on April 21, 2018. Waterway usage on
the Lake Washington Ship Canal ranges
from commercial tug and barge to small
pleasure craft.
Vessels able to pass through the
bridges in the closed-to-navigation
positions may do so at any time. Both
bridges will be able to open for
emergencies, and there is no immediate
alternate route for vessels to pass. The
daltland on DSKBBV9HB2PROD with RULES
SUMMARY:
VerDate Sep<11>2014
16:23 Mar 30, 2018
Jkt 244001
Coast Guard will also inform the users
of the waterway through our Local and
Broadcast Notices to Mariners of the
change in operating schedule for the
bridge so that vessels can arrange their
transits to minimize any impact caused
by the temporary deviation.
In accordance with 33 CFR 117.35(e),
both drawbridges must return to their
regular operating schedule immediately
at the end of the designated time period.
This deviation from the operating
regulations is authorized under 33 CFR
117.35.
Dated: March 21, 2018.
Steven M. Fischer,
Bridge Administrator, Thirteenth Coast Guard
District.
[FR Doc. 2018–06562 Filed 3–30–18; 8:45 am]
BILLING CODE 9110–04–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2018–0195]
Drawbridge Operation Regulation;
Willamette River at Portland, OR
Coast Guard, DHS.
Notice of deviation from
drawbridge regulation.
AGENCY:
ACTION:
The Coast Guard has issued a
temporary deviation from the operating
schedule that governs the Hawthorne
Bridge across the Willamette River, mile
13.1, at Portland, OR. The deviation is
necessary to accommodate the Walk MS
Portland event. This deviation
authorizes the bridge to remain in the
closed-to-navigation position to allow
safe roadway movement of event
participants.
DATES: This deviation is effective from
9 a.m. to 11:30 a.m. on April 7, 2018.
ADDRESSES: The docket for this
deviation, USCG–2018–0195 is available
at https://www.regulations.gov. Type the
docket number in the ‘‘SEARCH’’ box
and click ‘‘SEARCH.’’ Click on Open
Docket Folder on the line associated
with this deviation.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this temporary
deviation, call or email Mr. Steven
Fischer, Bridge Administrator,
Thirteenth Coast Guard District;
telephone 206–220–7282, email d13-pfd13bridges@uscg.mil.
SUPPLEMENTARY INFORMATION:
Multnomah County, the bridge owner,
has requested a temporary deviation
from the operating schedule for the
SUMMARY:
PO 00000
Frm 00050
Fmt 4700
Sfmt 4700
Hawthorne Bridge across the Willamette
River, mile 13.1, at Portland, OR. The
requested deviation is to accommodate
the Walk MS Portland event. To
facilitate this event, the draw of the
subject bridge will be allowed to remain
in the closed-to-navigation position and
need not open to marine traffic from 7
a.m. to 11:30 on April 7, 2018. The
Hawthorne Bridge provides a vertical
clearance of 49 feet in the closed-tonavigation position referenced to the
vertical clearance above Columbia River
Datum 0.0. The normal operating
schedule is in 33 CFR 117.897(c)(3(v).
Waterway usage on this part of the
Willamette River includes vessels
ranging from commercial tug and barge
to small pleasure craft. The Coast Guard
requested objections to this deviation
from local mariners via the Local Notice
Mariners, and email. No objections were
submitted to the Coast Guard.
Vessels able to pass through the
bridge in the closed-to-navigation
position may do so at any time. The
bridge will be able to open for
emergencies, and there is no immediate
alternate route for vessels to pass. The
Coast Guard will inform the users of the
waterway, through our Local and
Broadcast Notices to Mariners, of the
change in operating schedule for the
bridge so that vessel operators can
arrange their transits to minimize any
impact caused by the temporary
deviation.
In accordance with 33 CFR 117.35(e),
the drawbridge must return to its regular
operating schedule immediately at the
end of the effective period of this
temporary deviation. This deviation
from the operating regulations is
authorized under 33 CFR 117.35.
Dated: March 8, 2018.
Steven M. Fischer,
Bridge Administrator, Thirteenth Coast Guard
District.
[FR Doc. 2018–06561 Filed 3–30–18; 8:45 am]
BILLING CODE 9110–04–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2018–0122]
Drawbridge Operation Regulation;
Sacramento River, Sacramento, CA
Coast Guard, DHS.
Notice of deviation from
drawbridge regulation.
AGENCY:
ACTION:
The Coast Guard has issued a
temporary deviation from the operating
SUMMARY:
E:\FR\FM\02APR1.SGM
02APR1
Agencies
[Federal Register Volume 83, Number 63 (Monday, April 2, 2018)]
[Rules and Regulations]
[Page 13866]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-06561]
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG-2018-0195]
Drawbridge Operation Regulation; Willamette River at Portland, OR
AGENCY: Coast Guard, DHS.
ACTION: Notice of deviation from drawbridge regulation.
-----------------------------------------------------------------------
SUMMARY: The Coast Guard has issued a temporary deviation from the
operating schedule that governs the Hawthorne Bridge across the
Willamette River, mile 13.1, at Portland, OR. The deviation is
necessary to accommodate the Walk MS Portland event. This deviation
authorizes the bridge to remain in the closed-to-navigation position to
allow safe roadway movement of event participants.
DATES: This deviation is effective from 9 a.m. to 11:30 a.m. on April
7, 2018.
ADDRESSES: The docket for this deviation, USCG-2018-0195 is available
at https://www.regulations.gov. Type the docket number in the ``SEARCH''
box and click ``SEARCH.'' Click on Open Docket Folder on the line
associated with this deviation.
FOR FURTHER INFORMATION CONTACT: If you have questions on this
temporary deviation, call or email Mr. Steven Fischer, Bridge
Administrator, Thirteenth Coast Guard District; telephone 206-220-7282,
email [email protected].
SUPPLEMENTARY INFORMATION: Multnomah County, the bridge owner, has
requested a temporary deviation from the operating schedule for the
Hawthorne Bridge across the Willamette River, mile 13.1, at Portland,
OR. The requested deviation is to accommodate the Walk MS Portland
event. To facilitate this event, the draw of the subject bridge will be
allowed to remain in the closed-to-navigation position and need not
open to marine traffic from 7 a.m. to 11:30 on April 7, 2018. The
Hawthorne Bridge provides a vertical clearance of 49 feet in the
closed-to-navigation position referenced to the vertical clearance
above Columbia River Datum 0.0. The normal operating schedule is in 33
CFR 117.897(c)(3(v). Waterway usage on this part of the Willamette
River includes vessels ranging from commercial tug and barge to small
pleasure craft. The Coast Guard requested objections to this deviation
from local mariners via the Local Notice Mariners, and email. No
objections were submitted to the Coast Guard.
Vessels able to pass through the bridge in the closed-to-navigation
position may do so at any time. The bridge will be able to open for
emergencies, and there is no immediate alternate route for vessels to
pass. The Coast Guard will inform the users of the waterway, through
our Local and Broadcast Notices to Mariners, of the change in operating
schedule for the bridge so that vessel operators can arrange their
transits to minimize any impact caused by the temporary deviation.
In accordance with 33 CFR 117.35(e), the drawbridge must return to
its regular operating schedule immediately at the end of the effective
period of this temporary deviation. This deviation from the operating
regulations is authorized under 33 CFR 117.35.
Dated: March 8, 2018.
Steven M. Fischer,
Bridge Administrator, Thirteenth Coast Guard District.
[FR Doc. 2018-06561 Filed 3-30-18; 8:45 am]
BILLING CODE 9110-04-P