Drawbridge Operation Regulation; Hackensack River, Jersey City, New Jersey, 13865 [2018-06540]
Download as PDF
Federal Register / Vol. 83, No. 63 / Monday, April 2, 2018 / Rules and Regulations
the radiation protection provided by the
beam attenuator.
*
*
*
*
*
(g) * * *
(10) Label specifications. Labels
required by this section and § 1040.11
shall be permanently affixed to, or
inscribed on, the laser product, legible,
and clearly visible during operation,
maintenance, or service, as appropriate.
If the size, configuration, design, or
function of the laser product would
preclude compliance with the
requirements for any required label or
would render the required wording of
such label inappropriate or ineffective,
the Director, Center for Devices and
Radiological Health, on the Director’s
own initiative or upon written
application by the manufacturer, may
approve alternate means of providing
such label(s) or alternate wording for
such label(s) as applicable.
*
*
*
*
*
■ 10. In § 1040.20 revise paragraphs
(d)(3)(iii) and (iv) to read as follows:
§ 1040.20 Sunlamp products and
ultraviolet lamps intended for use in
sunlamp products.
daltland on DSKBBV9HB2PROD with RULES
*
*
*
*
*
(d) * * *
(3) * * *
(iii) If the size, configuration, design,
or function of the sunlamp product or
ultraviolet lamp would preclude
compliance with the requirements for
any required label or would render the
required wording of such label
inappropriate or ineffective, or would
render the required label unnecessary,
the Director, Center for Devices and
Radiological Health, on the center’s own
initiative or upon written application by
the manufacturer, may approve alternate
means of providing such label(s),
alternate wording for such label(s), or
deletion, as applicable.
(iv) In lieu of permanently affixing or
inscribing tags or labels on the
ultraviolet lamp as required by
§§ 1010.2(b) and 1010.3(a), the
manufacturer of the ultraviolet lamp
may permanently affix or inscribe such
required tags or labels on the lamp
packaging uniquely associated with the
lamp, if the name of the manufacturer
and month and year of manufacture are
permanently affixed or inscribed on the
exterior surface of the ultraviolet lamp
so as to be legible and readily accessible
to view. The name of the manufacturer
and month and year of manufacture
affixed or inscribed on the exterior
surface of the lamp may be expressed in
code or symbols, if the manufacturer has
previously supplied the Director, Center
for Devices and Radiological Health,
VerDate Sep<11>2014
16:23 Mar 30, 2018
Jkt 244001
with the key to such code or symbols
and the location of the coded
information or symbols on the
ultraviolet lamp. The label or tag affixed
or inscribed on the lamp packaging may
provide either the month and year of
manufacture without abbreviation, or
information to allow the date to be
readily decoded.
*
*
*
*
*
Dated: March 22, 2018.
Leslie Kux,
Associate Commissioner for Policy.
[FR Doc. 2018–06308 Filed 3–30–18; 8:45 am]
BILLING CODE 4164–01–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2018–0110]
Drawbridge Operation Regulation;
Hackensack River, Jersey City, New
Jersey
Coast Guard, DHS.
Notice of deviation from
drawbridge regulation.
AGENCY:
ACTION:
The Coast Guard has issued a
temporary deviation from the operating
schedule that governs the PATH Bridge
across the Hackensack River, mile 3.0, at
Jersey City, New Jersey. This temporary
deviation is necessary to allow the
bridge to remain in the closed-tonavigation position to facilitate the
replacement of rails and timbers across
the length of the span of the bridge.
DATES: This deviation is effective from
12:01 a.m. on March 31, 2018, to 12:01
a.m. on September 26, 2018.
ADDRESSES: The docket for this
deviation, USCG–2018–0110 is available
at https://www.regulations.gov. Type the
docket number in the ‘‘SEARCH’’ box
and click ‘‘SEARCH.’’ Click on Open
Docket Folder on the line associated
with this deviation.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this temporary
deviation, call or email Judy Leung-Yee,
Project Officer, First Coast Guard
District, telephone 212–514–4330, email
Judy.K.Leung-yee@uscg.mil.
SUPPLEMENTARY INFORMATION: The Port
Authority Trans-Hudson Corporation,
the owner of the bridge, requested a
temporary deviation from the normal
operating schedule to facilitate the
replacement of rails and timbers across
the length of the span of the bridge. The
PATH Bridge across the Hackensack
SUMMARY:
PO 00000
Frm 00049
Fmt 4700
Sfmt 4700
13865
River, mile 3.0, has a vertical clearance
in the closed position of 40 feet at mean
high water and 45 feet at mean low
water. The existing bridge operating
regulations are listed at 33 CFR
117.723(b).
Under this temporary deviation, the
PATH Bridge shall remain in the closed
position between 12:01 a.m. Saturday
and 12:01 a.m. Monday as follows:
March 31–April 2, 2018; April 7–9, 14–
16, 21–23, and 28–30, 2018; May 5–7,
12–14, and 19–21, 2018; June 2–4, 9–11,
16–18, 23–25, and 30-July 2, 2018; July
7–9, 14–16, 21–23, and 28–30, 2018;
August 4–6, 11–13, 18–20, and 25–27,
2018; September 8–10, 15–17, 22–24,
2018.
The waterway is transited by
commercial and recreational traffic. The
Coast Guard notified known companies
of the commercial vessels that transit
the area, including the Sandy Hook
Pilots and the local Tug/Tow
Committee; there were no objections to
this temporary deviation. Vessels able to
pass under the bridge in the closed
position may do so at any time. The
bridge will not be able to open for
emergencies and there is no immediate
alternate route for vessels to pass.
The Coast Guard will inform the users
of the waterways through our Local and
Broadcast Notices to Mariners of the
change in operating schedule for the
bridge so that vessel operations can
arrange their transits to minimize any
impact caused by the temporary
deviation.
In accordance with 33 CFR 117.35(e),
the drawbridge must return to its regular
operating schedule immediately at the
end of the effective period of this
temporary deviation. This deviation
from the operating regulations is
authorized under 33 CFR 117.35.
Dated: March 27, 2018.
Christopher J. Bisignano,
Supervisory Bridge Management Specialist,
First Coast Guard District.
[FR Doc. 2018–06540 Filed 3–30–18; 8:45 am]
BILLING CODE 9110–04–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2018–0253]
Drawbridge Operation Regulation;
Lake Washington Ship Canal, Seattle,
WA
AGENCY:
E:\FR\FM\02APR1.SGM
Coast Guard, DHS.
02APR1
Agencies
[Federal Register Volume 83, Number 63 (Monday, April 2, 2018)]
[Rules and Regulations]
[Page 13865]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-06540]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG-2018-0110]
Drawbridge Operation Regulation; Hackensack River, Jersey City,
New Jersey
AGENCY: Coast Guard, DHS.
ACTION: Notice of deviation from drawbridge regulation.
-----------------------------------------------------------------------
SUMMARY: The Coast Guard has issued a temporary deviation from the
operating schedule that governs the PATH Bridge across the Hackensack
River, mile 3.0, at Jersey City, New Jersey. This temporary deviation
is necessary to allow the bridge to remain in the closed-to-navigation
position to facilitate the replacement of rails and timbers across the
length of the span of the bridge.
DATES: This deviation is effective from 12:01 a.m. on March 31, 2018,
to 12:01 a.m. on September 26, 2018.
ADDRESSES: The docket for this deviation, USCG-2018-0110 is available
at https://www.regulations.gov. Type the docket number in the ``SEARCH''
box and click ``SEARCH.'' Click on Open Docket Folder on the line
associated with this deviation.
FOR FURTHER INFORMATION CONTACT: If you have questions on this
temporary deviation, call or email Judy Leung-Yee, Project Officer,
First Coast Guard District, telephone 212-514-4330, email [email protected].
SUPPLEMENTARY INFORMATION: The Port Authority Trans-Hudson Corporation,
the owner of the bridge, requested a temporary deviation from the
normal operating schedule to facilitate the replacement of rails and
timbers across the length of the span of the bridge. The PATH Bridge
across the Hackensack River, mile 3.0, has a vertical clearance in the
closed position of 40 feet at mean high water and 45 feet at mean low
water. The existing bridge operating regulations are listed at 33 CFR
117.723(b).
Under this temporary deviation, the PATH Bridge shall remain in the
closed position between 12:01 a.m. Saturday and 12:01 a.m. Monday as
follows: March 31-April 2, 2018; April 7-9, 14-16, 21-23, and 28-30,
2018; May 5-7, 12-14, and 19-21, 2018; June 2-4, 9-11, 16-18, 23-25,
and 30-July 2, 2018; July 7-9, 14-16, 21-23, and 28-30, 2018; August 4-
6, 11-13, 18-20, and 25-27, 2018; September 8-10, 15-17, 22-24, 2018.
The waterway is transited by commercial and recreational traffic.
The Coast Guard notified known companies of the commercial vessels that
transit the area, including the Sandy Hook Pilots and the local Tug/Tow
Committee; there were no objections to this temporary deviation.
Vessels able to pass under the bridge in the closed position may do so
at any time. The bridge will not be able to open for emergencies and
there is no immediate alternate route for vessels to pass.
The Coast Guard will inform the users of the waterways through our
Local and Broadcast Notices to Mariners of the change in operating
schedule for the bridge so that vessel operations can arrange their
transits to minimize any impact caused by the temporary deviation.
In accordance with 33 CFR 117.35(e), the drawbridge must return to
its regular operating schedule immediately at the end of the effective
period of this temporary deviation. This deviation from the operating
regulations is authorized under 33 CFR 117.35.
Dated: March 27, 2018.
Christopher J. Bisignano,
Supervisory Bridge Management Specialist, First Coast Guard District.
[FR Doc. 2018-06540 Filed 3-30-18; 8:45 am]
BILLING CODE 9110-04-P