Information Collection: Physical Protection of Plants and Materials, 13801-13802 [2018-06495]

Download as PDF Federal Register / Vol. 83, No. 62 / Friday, March 30, 2018 / Notices the Atomic Energy Act of 1954, as amended (the Act), and the Commission’s rules and regulations. The Commission has made appropriate findings as required by the Act and the Commission’s rules and regulations in 10 CFR chapter I, which are set forth in the license amendment. A notice of consideration of issuance of amendment to facility operating license or COL, as applicable, proposed no significant hazards consideration determination, and opportunity for a hearing in connection with these actions, was published in the Federal Register on October 5, 2017 (82 FR 46537). No comments were received during the 30-day comment period. The Commission has determined that these amendments satisfy the criteria for categorical exclusion in accordance with 10 CFR 51.22. Therefore, pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared for these amendments. IV. Conclusion Using the reasons set forth in the combined safety evaluation, the staff granted the exemption and issued these amendments on December 19, 2017, as part of a combined package to the licensee (ADAMS Accession No. ML17293A341). Dated at Rockville, Maryland, on March 26, 2018. For the Nuclear Regulatory Commission. Jennifer L. Dixon-Herrity, Chief, Licensing Branch 4, Division of New Reactor Licensing, Office of New Reactors. [FR Doc. 2018–06393 Filed 3–29–18; 8:45 am] BILLING CODE 7590–01–P NUCLEAR REGULATORY COMMISSION [NRC–2017–0218] Information Collection: Physical Protection of Plants and Materials Nuclear Regulatory Commission. ACTION: Renewal of existing information collection; request for comment. AGENCY: The U.S. Nuclear Regulatory Commission (NRC) invites public comment on the renewal of Office of Management and Budget (OMB) approval for an existing collection of information. The information collection is entitled, ‘‘Physical Protection of Plants and Materials.’’ DATES: Submit comments by May 29, 2018. Comments received after this date will be considered if it is practical to do amozie on DSK30RV082PROD with NOTICES SUMMARY: VerDate Sep<11>2014 18:57 Mar 29, 2018 Jkt 244001 so, but the Commission is able to ensure consideration only for comments received on or before this date. ADDRESSES: You may submit comments by any of the following methods: • Federal Rulemaking website: Go to https://www.regulations.gov and search for Docket ID NRC–2017–0218. Address questions about NRC dockets to Jennifer Borges; telephone: 301–287–9127; email: Jennifer.Borges@nrc.gov. For technical questions, contact the individual listed in the FOR FURTHER INFORMATION CONTACT section of this document. • Mail comments to: David Cullison, Office of the Chief Information Officer, Mail Stop: T–2 F43, U.S. Nuclear Regulatory Commission, Washington, DC 20555–0001. For additional direction on obtaining information and submitting comments, see ‘‘Obtaining Information and Submitting Comments’’ in the SUPPLEMENTARY INFORMATION section of this document. FOR FURTHER INFORMATION CONTACT: David Cullison, Office of the Chief Information Officer, U.S. Nuclear Regulatory Commission, Washington, DC 20555–0001; telephone: 301–415– 2084; email: INFOCOLLECTS.Resource@ nrc.gov. SUPPLEMENTARY INFORMATION: I. Obtaining Information and Submitting Comments A. Obtaining Information Please refer to Docket ID NRC–2017– 0218 when contacting the NRC about the availability of information for this action. You may obtain publiclyavailable information related to this action by any of the following methods: • Federal Rulemaking website: Go to https://www.regulations.gov and search for Docket ID NRC–2017–0218. • NRC’s Agencywide Documents Access and Management System (ADAMS): You may obtain publiclyavailable documents online in the ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/ adams.html. To begin the search, select ‘‘ADAMS Public Documents’’ and then select ‘‘Begin Web-based ADAMS Search.’’ For problems with ADAMS, please contact the NRC’s Public Document Room (PDR) reference staff at 1–800–397–4209, 301–415–4737, or by email to pdr.resource@nrc.gov. The supporting statement associated with the part 73 information collections and the burden table are available in ADAMS under Accession Nos. ML18018B146 and ML18018B223. • NRC’s PDR: You may examine and purchase copies of public documents at PO 00000 Frm 00081 Fmt 4703 Sfmt 4703 13801 the NRC’s PDR, Room O1–F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. • NRC’s Clearance Officer: A copy of the collection of information and related instructions may be obtained without charge by contacting the NRC’s Clearance Officer, David Cullison, Office of the Chief Information Officer, U.S. Nuclear Regulatory Commission, Washington, DC 20555–0001; telephone: 301–415–2084; email: Infocollects.Resource@nrc.gov. B. Submitting Comments The NRC cautions you not to include identifying or contact information in comment submissions that you do not want to be publicly disclosed in your comment submission. All comment submissions are posted at https:// www.regulations.gov and entered into ADAMS. Comment submissions are not routinely edited to remove identifying or contact information. If you are requesting or aggregating comments from other persons for submission to the OMB, then you should inform those persons not to include identifying or contact information that they do not want to be publicly disclosed in their comment submission. Your request should state that the NRC does not routinely edit comment submissions to remove such information before making the comment submissions available to the public or entering the comment submissions into ADAMS. II. Background In accordance with the Paperwork Reduction Act of 1995 (44 U.S.C. Chapter 35), the NRC is requesting public comment on its intention to request the OMB’s approval for the information collection summarized below. 1. The title of the information collection: 10 CFR part 73, ‘‘Physical Protection of Plants and Materials.’’ 2. OMB approval number: 3150–0002. 3. Type of submission: Extension. 4. The form number, if applicable: Not applicable. 5. How often the collection is required or requested: Once for the initial submittal of Cyber Security Plans, Physical Security Plans, Safeguards Contingency Plans, and Security Training and Qualification Plans and then on occasion when changes are made. Required reports are submitted and evaluated as events occur. 6. Who will be required or asked to respond: Nuclear power reactor licensees licensed under 10 CFR part 50 or 52 who possess, use, import, export, transport, or deliver to a carrier for E:\FR\FM\30MRN1.SGM 30MRN1 amozie on DSK30RV082PROD with NOTICES 13802 Federal Register / Vol. 83, No. 62 / Friday, March 30, 2018 / Notices transport, special nuclear material; actively decommissioning reactor licensees; Category I fuel facilities; Category II and III fuel facilities; nonpower reactors (research and test reactors); and other entities who mark and handle Safeguards Information. 7. The estimated number of annual responses: 177,986 (40,819 reporting responses + 136,957 third party disclosure responses + 210 recordkeepers). 8. The estimated number of annual respondents: 210 (60 power reactors; 10 decommissioning reactor facilities; 3 Category I fuel facilities; 4 Category II and III fuel facilities; 31 nonpower reactors; and 102 other entities who mark and handle Safeguards Information. 9. The estimated number of hours needed annually to comply with the information collection requirement or request: 541,406 hours (22,591 reporting + 475,852 recordkeeping + 42,963 third party disclosure). 10. Abstract: The NRC regulations in 10 CFR part 73 prescribe requirements to establish and maintain a physical protection system and security organization with capabilities for protection of (1) Special nuclear material (SNM) at fixed sites, (2) SNM in transit, and (3) plants in which SNM is used. Part 73 contains reporting and recordkeeping requirements which are necessary to help ensure that an adequate level of protection is provided for nuclear facilities and nuclear material, such as: Development and maintenance of security documents, including a physical security plan, training and qualification plan, safeguards contingency plan, cyber security plan, and security implementing procedures; notifications to the NRC regarding safeguards and cyber security events; notifications to state governors and tribes of shipments of irradiated reactor fuel; and requirements for conducting criminal history records checks of individuals granted unescorted access to a nuclear power facility, a non-power reactor, or access to Safeguards Information. The objective is to ensure that activities involving special nuclear material are consistent with interests of common defense and security and that these activities do not constitute an unreasonable risk to public health and safety. The information in the reports and records submitted by licensees is used by the NRC staff to ensure that the health and safety of the public and the environment are protected, and licensee possession and use of special nuclear material is in compliance with license and regulatory requirements. VerDate Sep<11>2014 18:57 Mar 29, 2018 Jkt 244001 III. Specific Requests for Comments The NRC is seeking comments that address the following questions: 1. Is the proposed collection of information necessary for the NRC to properly perform its functions? Does the information have practical utility? 2. Is the estimate of the burden of the information collection accurate? 3. Is there a way to enhance the quality, utility, and clarity of the information to be collected? 4. How can the burden of the information collection on respondents be minimized, including the use of automated collection techniques or other forms of information technology? Dated at Rockville, Maryland, this 26th day of March, 2018. For the Nuclear Regulatory Commission. David Cullison, NRC Clearance Officer, Office of the Chief Information Officer. [FR Doc. 2018–06495 Filed 3–29–18; 8:45 am] BILLING CODE 7590–01–P NUCLEAR REGULATORY COMMISSION [Docket No. 72–1051; NRC–2018–0052] Holtec International HI–STORE Consolidated Interim Storage Facility Project Nuclear Regulatory Commission. ACTION: Intent to prepare an environmental impact statement; conduct a scoping process; request for comment. AGENCY: The U.S. Nuclear Regulatory Commission (NRC) received a license application by letter dated March 30, 2017, from Holtec International (Holtec). By this application, Holtec is requesting authorization to construct and operate a HI–STORE consolidated interim storage facility (CISF) for spent nuclear fuel at a site in Lea County, New Mexico (the proposed action). Holtec intends to initially store 500 canisters or 8680 metric tons of uranium in the CISF and eventually store up to 10,000 canisters in the CISF. The NRC staff will prepare an EIS to document the potential environmental impacts from the proposed action. As part of the EIS development process, the NRC is seeking comments on the scope of its environmental review. DATES: Submit comments by May 29, 2018. Comments received after this date will be considered if it is practical to do so, but the Commission is able to ensure consideration only for comments received before this date. SUMMARY: PO 00000 Frm 00082 Fmt 4703 Sfmt 4703 You may submit comments by any of the following methods: • Federal Rulemaking website: Go to https://www.regulations.gov and search for Docket ID NRC–2018–0052. Address questions about NRC dockets to Jennifer Borges; telephone: 301–287–9127; email: Jennifer.Borges@nrc.gov. For technical questions, contact the individual(s) listed in the FOR FURTHER INFORMATION CONTACT section of this document. • Mail comments to: May Ma, Office of Administration, Mail Stop: TWFN–7– A60M, U.S. Nuclear Regulatory Commission, Washington, DC 20555– 0001. For additional direction on obtaining information and submitting comments, see ‘‘Obtaining Information and Submitting Comments’’ in the SUPPLEMENTARY INFORMATION section of this document. FOR FURTHER INFORMATION CONTACT: Jill Caverly, Office of Nuclear Material Safety and Safeguards, U.S. Nuclear Regulatory Commission, Washington DC, 20555–0001; telephone: 301–415– 7674; email: Jill.Caverly@nrc.gov. SUPPLEMENTARY INFORMATION: ADDRESSES: I. Obtaining Information and Submitting Comments A. Obtaining Information Please refer to Docket ID NRC–2018– 0052 when contacting the NRC about the availability of information regarding this document. You may obtain publicly-available information related to this action by the following methods: • Federal Rulemaking website: Go to https://www.regulations.gov and search for Docket ID NRC–2018–0052. • NRC’s Agencywide Documents Access and Management System (ADAMS): You may obtain publiclyavailable documents online in the ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/ adams.html. To begin the search, select ‘‘ADAMS Public Documents’’ and then select ‘‘Begin Web-based ADAMS Search.’’ For problems with ADAMS, please contact the NRC’s Public Document Room (PDR) reference staff at 1–800–397–4209, 301–415–4737, or by email to pdr.resource@nrc.gov. In addition, for the convenience of the reader, instructions about obtaining materials referenced in this document are provided in a table in Section VII of this notice entitled, Availability of Documents. • NRC’S PDR: You may examine and purchase copies of public documents at the NRC’s PDR, Room O1–F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. E:\FR\FM\30MRN1.SGM 30MRN1

Agencies

[Federal Register Volume 83, Number 62 (Friday, March 30, 2018)]
[Notices]
[Pages 13801-13802]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-06495]


-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[NRC-2017-0218]


Information Collection: Physical Protection of Plants and 
Materials

AGENCY: Nuclear Regulatory Commission.

ACTION: Renewal of existing information collection; request for 
comment.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) invites public 
comment on the renewal of Office of Management and Budget (OMB) 
approval for an existing collection of information. The information 
collection is entitled, ``Physical Protection of Plants and 
Materials.''

DATES: Submit comments by May 29, 2018. Comments received after this 
date will be considered if it is practical to do so, but the Commission 
is able to ensure consideration only for comments received on or before 
this date.

ADDRESSES: You may submit comments by any of the following methods:
     Federal Rulemaking website: Go to https://www.regulations.gov and search for Docket ID NRC-2017-0218. Address 
questions about NRC dockets to Jennifer Borges; telephone: 301-287-
9127; email: [email protected]. For technical questions, contact 
the individual listed in the FOR FURTHER INFORMATION CONTACT section of 
this document.
     Mail comments to: David Cullison, Office of the Chief 
Information Officer, Mail Stop: T-2 F43, U.S. Nuclear Regulatory 
Commission, Washington, DC 20555-0001.
    For additional direction on obtaining information and submitting 
comments, see ``Obtaining Information and Submitting Comments'' in the 
SUPPLEMENTARY INFORMATION section of this document.

FOR FURTHER INFORMATION CONTACT: David Cullison, Office of the Chief 
Information Officer, U.S. Nuclear Regulatory Commission, Washington, DC 
20555-0001; telephone: 301-415-2084; email: 
[email protected].

SUPPLEMENTARY INFORMATION: 

I. Obtaining Information and Submitting Comments

A. Obtaining Information

    Please refer to Docket ID NRC-2017-0218 when contacting the NRC 
about the availability of information for this action. You may obtain 
publicly-available information related to this action by any of the 
following methods:
     Federal Rulemaking website: Go to https://www.regulations.gov and search for Docket ID NRC-2017-0218.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly-available documents online in the 
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and 
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS, 
please contact the NRC's Public Document Room (PDR) reference staff at 
1-800-397-4209, 301-415-4737, or by email to [email protected]. The 
supporting statement associated with the part 73 information 
collections and the burden table are available in ADAMS under Accession 
Nos. ML18018B146 and ML18018B223.
     NRC's PDR: You may examine and purchase copies of public 
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 
Rockville Pike, Rockville, Maryland 20852.
     NRC's Clearance Officer: A copy of the collection of 
information and related instructions may be obtained without charge by 
contacting the NRC's Clearance Officer, David Cullison, Office of the 
Chief Information Officer, U.S. Nuclear Regulatory Commission, 
Washington, DC 20555-0001; telephone: 301-415-2084; email: 
[email protected]

B. Submitting Comments

    The NRC cautions you not to include identifying or contact 
information in comment submissions that you do not want to be publicly 
disclosed in your comment submission. All comment submissions are 
posted at https://www.regulations.gov and entered into ADAMS. Comment 
submissions are not routinely edited to remove identifying or contact 
information.
    If you are requesting or aggregating comments from other persons 
for submission to the OMB, then you should inform those persons not to 
include identifying or contact information that they do not want to be 
publicly disclosed in their comment submission. Your request should 
state that the NRC does not routinely edit comment submissions to 
remove such information before making the comment submissions available 
to the public or entering the comment submissions into ADAMS.

II. Background

    In accordance with the Paperwork Reduction Act of 1995 (44 U.S.C. 
Chapter 35), the NRC is requesting public comment on its intention to 
request the OMB's approval for the information collection summarized 
below.
    1. The title of the information collection: 10 CFR part 73, 
``Physical Protection of Plants and Materials.''
    2. OMB approval number: 3150-0002.
    3. Type of submission: Extension.
    4. The form number, if applicable: Not applicable.
    5. How often the collection is required or requested: Once for the 
initial submittal of Cyber Security Plans, Physical Security Plans, 
Safeguards Contingency Plans, and Security Training and Qualification 
Plans and then on occasion when changes are made. Required reports are 
submitted and evaluated as events occur.
    6. Who will be required or asked to respond: Nuclear power reactor 
licensees licensed under 10 CFR part 50 or 52 who possess, use, import, 
export, transport, or deliver to a carrier for

[[Page 13802]]

transport, special nuclear material; actively decommissioning reactor 
licensees; Category I fuel facilities; Category II and III fuel 
facilities; nonpower reactors (research and test reactors); and other 
entities who mark and handle Safeguards Information.
    7. The estimated number of annual responses: 177,986 (40,819 
reporting responses + 136,957 third party disclosure responses + 210 
recordkeepers).
    8. The estimated number of annual respondents: 210 (60 power 
reactors; 10 decommissioning reactor facilities; 3 Category I fuel 
facilities; 4 Category II and III fuel facilities; 31 nonpower 
reactors; and 102 other entities who mark and handle Safeguards 
Information.
    9. The estimated number of hours needed annually to comply with the 
information collection requirement or request: 541,406 hours (22,591 
reporting + 475,852 recordkeeping + 42,963 third party disclosure).
    10. Abstract: The NRC regulations in 10 CFR part 73 prescribe 
requirements to establish and maintain a physical protection system and 
security organization with capabilities for protection of (1) Special 
nuclear material (SNM) at fixed sites, (2) SNM in transit, and (3) 
plants in which SNM is used. Part 73 contains reporting and 
recordkeeping requirements which are necessary to help ensure that an 
adequate level of protection is provided for nuclear facilities and 
nuclear material, such as: Development and maintenance of security 
documents, including a physical security plan, training and 
qualification plan, safeguards contingency plan, cyber security plan, 
and security implementing procedures; notifications to the NRC 
regarding safeguards and cyber security events; notifications to state 
governors and tribes of shipments of irradiated reactor fuel; and 
requirements for conducting criminal history records checks of 
individuals granted unescorted access to a nuclear power facility, a 
non-power reactor, or access to Safeguards Information. The objective 
is to ensure that activities involving special nuclear material are 
consistent with interests of common defense and security and that these 
activities do not constitute an unreasonable risk to public health and 
safety. The information in the reports and records submitted by 
licensees is used by the NRC staff to ensure that the health and safety 
of the public and the environment are protected, and licensee 
possession and use of special nuclear material is in compliance with 
license and regulatory requirements.

III. Specific Requests for Comments

    The NRC is seeking comments that address the following questions:
    1. Is the proposed collection of information necessary for the NRC 
to properly perform its functions? Does the information have practical 
utility?
    2. Is the estimate of the burden of the information collection 
accurate?
    3. Is there a way to enhance the quality, utility, and clarity of 
the information to be collected?
    4. How can the burden of the information collection on respondents 
be minimized, including the use of automated collection techniques or 
other forms of information technology?

    Dated at Rockville, Maryland, this 26th day of March, 2018.

    For the Nuclear Regulatory Commission.
David Cullison,
NRC Clearance Officer, Office of the Chief Information Officer.
[FR Doc. 2018-06495 Filed 3-29-18; 8:45 am]
 BILLING CODE 7590-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.