Florida Southeast Connection, LLC; Notice of Application, 13274 [2018-06186]

Download as PDF 13274 Federal Register / Vol. 83, No. 60 / Wednesday, March 28, 2018 / Notices applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). All comments, motions to intervene, or protests should relate to project works which are the subject of the temporary variance request. Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. If an intervener files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. Dated: March 22, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–06188 Filed 3–27–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP18–108–000] daltland on DSKBBV9HB2PROD with NOTICES Florida Southeast Connection, LLC; Notice of Application Take notice that on March 9, 2018, Florida Southeast Connection, LLC (FSC), 700 Universe Boulevard, Juno Beach, Florida 33408, filed an application under sections 7(c) and 7(e) of the Natural Gas Act (NGA), and Part 157 of the Commission’s regulations, requesting authorization to acquire, operate, and maintain approximately 38 miles of existing natural gas pipeline, three 3,500 brake horsepower (bhp) electric-powered compressors, and related facilities (Riviera Lateral), located in Martin and Palm Beach Counties, Florida, which are currently owned by Florida Power & Light VerDate Sep<11>2014 20:30 Mar 27, 2018 Jkt 244001 Company (FPL) and operated as nonjurisdictional facilities. The facilities currently have a capacity of 384 million cubic feet per day (MMcf/d), all as more fully set forth in the application which is on file with the Commission and open for public inspection. The filing may also be viewed on the web at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, please contact FERC at FERCOnlineSupport@ferc.gov or toll free at (866) 208–3676, or TTY, (202) 502–8659. Any questions regarding the proposed project should be directed to William Lavarco, Attorney, Florida Southeast Connection, LLC, 700 Universe Boulevard, Juno Beach, Florida 33408, or by calling (202) 347–7127 or by email at William.lavarco@nee.com. Pursuant to section 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. There are two ways to become involved in the Commission’s review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the comment date stated below, file with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission’s Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit 7 copies of filings made with the PO 00000 Frm 00053 Fmt 4703 Sfmt 9990 Commission and must mail a copy to the applicant and to every other party in the proceeding. Only parties to the proceeding can ask for court review of Commission orders in the proceeding. However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission’s rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commenters will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commenters will not be required to serve copies of filed documents on all other parties. However, the non-party commenters will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https:// www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. Comment Date: 5:00 p.m. Eastern Time on April 12, 2018. Dated: March 22, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–06186 Filed 3–27–18; 8:45 am] BILLING CODE 6717–01–P E:\FR\FM\28MRN1.SGM 28MRN1

Agencies

[Federal Register Volume 83, Number 60 (Wednesday, March 28, 2018)]
[Notices]
[Page 13274]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-06186]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP18-108-000]


Florida Southeast Connection, LLC; Notice of Application

    Take notice that on March 9, 2018, Florida Southeast Connection, 
LLC (FSC), 700 Universe Boulevard, Juno Beach, Florida 33408, filed an 
application under sections 7(c) and 7(e) of the Natural Gas Act (NGA), 
and Part 157 of the Commission's regulations, requesting authorization 
to acquire, operate, and maintain approximately 38 miles of existing 
natural gas pipeline, three 3,500 brake horsepower (bhp) electric-
powered compressors, and related facilities (Riviera Lateral), located 
in Martin and Palm Beach Counties, Florida, which are currently owned 
by Florida Power & Light Company (FPL) and operated as non-
jurisdictional facilities. The facilities currently have a capacity of 
384 million cubic feet per day (MMcf/d), all as more fully set forth in 
the application which is on file with the Commission and open for 
public inspection.
    The filing may also be viewed on the web at https://www.ferc.gov 
using the ``eLibrary'' link. Enter the docket number excluding the last 
three digits in the docket number field to access the document. For 
assistance, please contact FERC at [email protected] or toll 
free at (866) 208-3676, or TTY, (202) 502-8659.
    Any questions regarding the proposed project should be directed to 
William Lavarco, Attorney, Florida Southeast Connection, LLC, 700 
Universe Boulevard, Juno Beach, Florida 33408, or by calling (202) 347-
7127 or by email at [email protected].
    Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, 
within 90 days of this Notice the Commission staff will either: 
complete its environmental assessment (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding; or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the final environmental impact statement (FEIS) or EA for this 
proposal. The filing of the EA in the Commission's public record for 
this proceeding or the issuance of a Notice of Schedule for 
Environmental Review will serve to notify federal and state agencies of 
the timing for the completion of all necessary reviews, and the 
subsequent need to complete all federal authorizations within 90 days 
of the date of issuance of the Commission staff's FEIS or EA.
    There are two ways to become involved in the Commission's review of 
this project. First, any person wishing to obtain legal status by 
becoming a party to the proceedings for this project should, on or 
before the comment date stated below, file with the Federal Energy 
Regulatory Commission, 888 First Street NE, Washington, DC 20426, a 
motion to intervene in accordance with the requirements of the 
Commission's Rules of Practice and Procedure (18 CFR 385.214 or 
385.211) and the Regulations under the NGA (18 CFR 157.10). A person 
obtaining party status will be placed on the service list maintained by 
the Secretary of the Commission and will receive copies of all 
documents filed by the applicant and by all other parties. A party must 
submit 7 copies of filings made with the Commission and must mail a 
copy to the applicant and to every other party in the proceeding. Only 
parties to the proceeding can ask for court review of Commission orders 
in the proceeding.
    However, a person does not have to intervene in order to have 
comments considered. The second way to participate is by filing with 
the Secretary of the Commission, as soon as possible, an original and 
two copies of comments in support of or in opposition to this project. 
The Commission will consider these comments in determining the 
appropriate action to be taken, but the filing of a comment alone will 
not serve to make the filer a party to the proceeding. The Commission's 
rules require that persons filing comments in opposition to the project 
provide copies of their protests only to the party or parties directly 
involved in the protest.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commenters will be 
placed on the Commission's environmental mailing list, will receive 
copies of the environmental documents, and will be notified of meetings 
associated with the Commission's environmental review process. 
Environmental commenters will not be required to serve copies of filed 
documents on all other parties. However, the non-party commenters will 
not receive copies of all documents filed by other parties or issued by 
the Commission (except for the mailing of environmental documents 
issued by the Commission) and will not have the right to seek court 
review of the Commission's final order.
    The Commission strongly encourages electronic filings of comments, 
protests and interventions in lieu of paper using the ``eFiling'' link 
at https://www.ferc.gov. Persons unable to file electronically should 
submit an original and 5 copies of the protest or intervention to the 
Federal Energy Regulatory Commission, 888 First Street NE, Washington, 
DC 20426.
    Comment Date: 5:00 p.m. Eastern Time on April 12, 2018.

     Dated: March 22, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-06186 Filed 3-27-18; 8:45 am]