Notice Approving Use of the Traditional Licensing Process; Jason and Carol Victoria Presley, 12746 [2018-05950]
Download as PDF
amozie on DSK30RV082PROD with NOTICES
12746
Federal Register / Vol. 83, No. 57 / Friday, March 23, 2018 / Notices
Filed Date: 3/16/18.
Accession Number: 20180316–5192.
Comments Due: 5 p.m. ET 4/6/18.
Docket Numbers: ER18–585–001.
Applicants: Public Service Company
of New Mexico.
Description: Tariff Amendment:
Response to Deficiency Letters to be
effective 12/20/2017.
Filed Date: 3/16/18.
Accession Number: 20180316–5198.
Comments Due: 5 p.m. ET 4/6/18.
Docket Numbers: ER18–832–001.
Applicants: Public Service Company
of New Mexico.
Description: Tariff Amendment:
Response to Deficiency Letters to be
effective 1/29/2018.
Filed Date: 3/16/18.
Accession Number: 20180316–5201.
Comments Due: 5 p.m. ET 4/6/18.
Docket Numbers: ER18–907–001.
Applicants: Public Service Company
of New Mexico.
Description: Tariff Amendment:
Response to Deficiency Letters to be
effective 2/9/2018.
Filed Date: 3/16/18.
Accession Number: 20180316–5202.
Comments Due: 5 p.m. ET 4/6/18.
Docket Numbers: ER18–1128–001.
Applicants: Portland General Electric
Company.
Description: Tariff Amendment:
Amended NTTG Funding Agreement—
Amendment Filing to be effective 5/15/
2018.
Filed Date: 3/16/18.
Accession Number: 20180316–5174.
Comments Due: 5 p.m. ET 4/6/18.
Docket Numbers: ER18–1139–000.
Applicants: Northern Indiana Public
Service Company.
Description: § 205(d) Rate Filing:
Revisions to MBR Tariff to be effective
2/16/2018.
Filed Date: 3/19/18.
Accession Number: 20180319–5071.
Comments Due: 5 p.m. ET 4/9/18.
Docket Numbers: ER18–1140–000.
Applicants: NorthWestern
Corporation.
Description: § 205(d) Rate Filing: SA
305 10th Rev—NITSA with Stillwater
Mining Company to be effective 5/19/
2018.
Filed Date: 3/19/18.
Accession Number: 20180319–5157.
Comments Due: 5 p.m. ET 4/9/18.
Docket Numbers: ER18–1141–000.
Applicants: Greenidge Generation
LLC.
Description: § 205(d) Rate Filing:
Notice of Material Change to be effective
1/10/2018.
Filed Date: 3/19/18.
Accession Number: 20180319–5167.
VerDate Sep<11>2014
21:54 Mar 22, 2018
Jkt 244001
Comments Due: 5 p.m. ET 4/9/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: March 19, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–05954 Filed 3–22–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 3102–025]
Notice Approving Use of the
Traditional Licensing Process; Jason
and Carol Victoria Presley
a. Type of Filing: Notice Approving
the Use of the Traditional Licensing
Process
b. Project No.: 3102–025.
c. Date Filed: November 1, 2017.
d. Submitted By: Jason and Carol
Victoria Presley.
e. Name of Project: High Shoals
Project.
f. Location: On the Apalachee River in
Walton, Morgan, and Oconee Counties,
Georgia. The project does not occupy
federal lands.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Mr. Jason
Presley and Ms. Carol Victoria Presley,
110 Frazier Hill Road, Bishop, GA.
30621, (706) 769–8293, email: jason@
presley.us, victoria@presley.us.
i. FERC Contact: Michael Spencer at
(202) 502–6093 or email at
michael.spencer@ferc.gov.
j. In a letter dated March 1, 2018, the
Director of the Division of Hydropower
Licensing approved Jason and Carol
Victoria Presley’s request to use the
Traditional Licensing Process.
PO 00000
Frm 00033
Fmt 4703
Sfmt 9990
k. With this notice, we are initiating
informal consultation with the U.S. Fish
and Wildlife Service and/or NOAA
Fisheries under section 7 of the
Endangered Species Act and the joint
agency regulations thereunder at 50
CFR, Part 402; and NOAA Fisheries
under section 305(b) of the MagnusonStevens Fishery Conservation and
Management Act and implementing
regulations at 50 CFR 600.920. We are
also initiating consultation with the
Georgia State Historic Preservation
Officer, as required by section 106,
National Historic Preservation Act, and
the implementing regulations of the
Advisory Council on Historic
Preservation at 36 CFR 800.2.
l. Jason and Carol Victoria Presley
filed a Pre-Application Document (PAD;
including a proposed process plan and
schedule) with the Commission,
pursuant to 18 CFR 5.6 of the
Commission’s regulations.
m. A copy of the PAD is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s website (https://
www.ferc.gov), using the eLibrary link.
Enter the docket number, excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC Online
Support at FERCONlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). A copy is also
available for inspection and
reproduction at the address in
paragraph h.
n. The licensee states its unequivocal
intent to submit an application for a
new license for Project No. 3102.
Pursuant to 18 CFR 16.8, 16.9, and 16.10
each application for a new license and
any competing license applications
must be filed with the Commission at
least 24 months prior to the expiration
of the existing license. All applications
for license for this project must be filed
by August 30, 2019.
o. Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filing and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Dated: March 16, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–05950 Filed 3–22–18; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\23MRN1.SGM
23MRN1
Agencies
[Federal Register Volume 83, Number 57 (Friday, March 23, 2018)]
[Notices]
[Page 12746]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-05950]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 3102-025]
Notice Approving Use of the Traditional Licensing Process; Jason
and Carol Victoria Presley
a. Type of Filing: Notice Approving the Use of the Traditional
Licensing Process
b. Project No.: 3102-025.
c. Date Filed: November 1, 2017.
d. Submitted By: Jason and Carol Victoria Presley.
e. Name of Project: High Shoals Project.
f. Location: On the Apalachee River in Walton, Morgan, and Oconee
Counties, Georgia. The project does not occupy federal lands.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Mr. Jason Presley and Ms. Carol Victoria
Presley, 110 Frazier Hill Road, Bishop, GA. 30621, (706) 769-8293,
email: [email protected], [email protected].
i. FERC Contact: Michael Spencer at (202) 502-6093 or email at
[email protected].
j. In a letter dated March 1, 2018, the Director of the Division of
Hydropower Licensing approved Jason and Carol Victoria Presley's
request to use the Traditional Licensing Process.
k. With this notice, we are initiating informal consultation with
the U.S. Fish and Wildlife Service and/or NOAA Fisheries under section
7 of the Endangered Species Act and the joint agency regulations
thereunder at 50 CFR, Part 402; and NOAA Fisheries under section 305(b)
of the Magnuson-Stevens Fishery Conservation and Management Act and
implementing regulations at 50 CFR 600.920. We are also initiating
consultation with the Georgia State Historic Preservation Officer, as
required by section 106, National Historic Preservation Act, and the
implementing regulations of the Advisory Council on Historic
Preservation at 36 CFR 800.2.
l. Jason and Carol Victoria Presley filed a Pre-Application
Document (PAD; including a proposed process plan and schedule) with the
Commission, pursuant to 18 CFR 5.6 of the Commission's regulations.
m. A copy of the PAD is available for review at the Commission in
the Public Reference Room or may be viewed on the Commission's website
(https://www.ferc.gov), using the eLibrary link. Enter the docket
number, excluding the last three digits in the docket number field to
access the document. For assistance, contact FERC Online Support at
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). A copy is also available for inspection and reproduction at
the address in paragraph h.
n. The licensee states its unequivocal intent to submit an
application for a new license for Project No. 3102. Pursuant to 18 CFR
16.8, 16.9, and 16.10 each application for a new license and any
competing license applications must be filed with the Commission at
least 24 months prior to the expiration of the existing license. All
applications for license for this project must be filed by August 30,
2019.
o. Register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filing and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
Dated: March 16, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-05950 Filed 3-22-18; 8:45 am]
BILLING CODE 6717-01-P