Notice Approving Use of the Traditional Licensing Process; Jason and Carol Victoria Presley, 12746 [2018-05950]

Download as PDF amozie on DSK30RV082PROD with NOTICES 12746 Federal Register / Vol. 83, No. 57 / Friday, March 23, 2018 / Notices Filed Date: 3/16/18. Accession Number: 20180316–5192. Comments Due: 5 p.m. ET 4/6/18. Docket Numbers: ER18–585–001. Applicants: Public Service Company of New Mexico. Description: Tariff Amendment: Response to Deficiency Letters to be effective 12/20/2017. Filed Date: 3/16/18. Accession Number: 20180316–5198. Comments Due: 5 p.m. ET 4/6/18. Docket Numbers: ER18–832–001. Applicants: Public Service Company of New Mexico. Description: Tariff Amendment: Response to Deficiency Letters to be effective 1/29/2018. Filed Date: 3/16/18. Accession Number: 20180316–5201. Comments Due: 5 p.m. ET 4/6/18. Docket Numbers: ER18–907–001. Applicants: Public Service Company of New Mexico. Description: Tariff Amendment: Response to Deficiency Letters to be effective 2/9/2018. Filed Date: 3/16/18. Accession Number: 20180316–5202. Comments Due: 5 p.m. ET 4/6/18. Docket Numbers: ER18–1128–001. Applicants: Portland General Electric Company. Description: Tariff Amendment: Amended NTTG Funding Agreement— Amendment Filing to be effective 5/15/ 2018. Filed Date: 3/16/18. Accession Number: 20180316–5174. Comments Due: 5 p.m. ET 4/6/18. Docket Numbers: ER18–1139–000. Applicants: Northern Indiana Public Service Company. Description: § 205(d) Rate Filing: Revisions to MBR Tariff to be effective 2/16/2018. Filed Date: 3/19/18. Accession Number: 20180319–5071. Comments Due: 5 p.m. ET 4/9/18. Docket Numbers: ER18–1140–000. Applicants: NorthWestern Corporation. Description: § 205(d) Rate Filing: SA 305 10th Rev—NITSA with Stillwater Mining Company to be effective 5/19/ 2018. Filed Date: 3/19/18. Accession Number: 20180319–5157. Comments Due: 5 p.m. ET 4/9/18. Docket Numbers: ER18–1141–000. Applicants: Greenidge Generation LLC. Description: § 205(d) Rate Filing: Notice of Material Change to be effective 1/10/2018. Filed Date: 3/19/18. Accession Number: 20180319–5167. VerDate Sep<11>2014 21:54 Mar 22, 2018 Jkt 244001 Comments Due: 5 p.m. ET 4/9/18. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: March 19, 2018. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2018–05954 Filed 3–22–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 3102–025] Notice Approving Use of the Traditional Licensing Process; Jason and Carol Victoria Presley a. Type of Filing: Notice Approving the Use of the Traditional Licensing Process b. Project No.: 3102–025. c. Date Filed: November 1, 2017. d. Submitted By: Jason and Carol Victoria Presley. e. Name of Project: High Shoals Project. f. Location: On the Apalachee River in Walton, Morgan, and Oconee Counties, Georgia. The project does not occupy federal lands. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)–825(r). h. Applicant Contact: Mr. Jason Presley and Ms. Carol Victoria Presley, 110 Frazier Hill Road, Bishop, GA. 30621, (706) 769–8293, email: jason@ presley.us, victoria@presley.us. i. FERC Contact: Michael Spencer at (202) 502–6093 or email at michael.spencer@ferc.gov. j. In a letter dated March 1, 2018, the Director of the Division of Hydropower Licensing approved Jason and Carol Victoria Presley’s request to use the Traditional Licensing Process. PO 00000 Frm 00033 Fmt 4703 Sfmt 9990 k. With this notice, we are initiating informal consultation with the U.S. Fish and Wildlife Service and/or NOAA Fisheries under section 7 of the Endangered Species Act and the joint agency regulations thereunder at 50 CFR, Part 402; and NOAA Fisheries under section 305(b) of the MagnusonStevens Fishery Conservation and Management Act and implementing regulations at 50 CFR 600.920. We are also initiating consultation with the Georgia State Historic Preservation Officer, as required by section 106, National Historic Preservation Act, and the implementing regulations of the Advisory Council on Historic Preservation at 36 CFR 800.2. l. Jason and Carol Victoria Presley filed a Pre-Application Document (PAD; including a proposed process plan and schedule) with the Commission, pursuant to 18 CFR 5.6 of the Commission’s regulations. m. A copy of the PAD is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s website (https:// www.ferc.gov), using the eLibrary link. Enter the docket number, excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCONlineSupport@ ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). A copy is also available for inspection and reproduction at the address in paragraph h. n. The licensee states its unequivocal intent to submit an application for a new license for Project No. 3102. Pursuant to 18 CFR 16.8, 16.9, and 16.10 each application for a new license and any competing license applications must be filed with the Commission at least 24 months prior to the expiration of the existing license. All applications for license for this project must be filed by August 30, 2019. o. Register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filing and issuances related to this or other pending projects. For assistance, contact FERC Online Support. Dated: March 16, 2018. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2018–05950 Filed 3–22–18; 8:45 am] BILLING CODE 6717–01–P E:\FR\FM\23MRN1.SGM 23MRN1

Agencies

[Federal Register Volume 83, Number 57 (Friday, March 23, 2018)]
[Notices]
[Page 12746]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-05950]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 3102-025]


Notice Approving Use of the Traditional Licensing Process; Jason 
and Carol Victoria Presley

    a. Type of Filing: Notice Approving the Use of the Traditional 
Licensing Process
    b. Project No.: 3102-025.
    c. Date Filed: November 1, 2017.
    d. Submitted By: Jason and Carol Victoria Presley.
    e. Name of Project: High Shoals Project.
    f. Location: On the Apalachee River in Walton, Morgan, and Oconee 
Counties, Georgia. The project does not occupy federal lands.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Mr. Jason Presley and Ms. Carol Victoria 
Presley, 110 Frazier Hill Road, Bishop, GA. 30621, (706) 769-8293, 
email: [email protected], [email protected].
    i. FERC Contact: Michael Spencer at (202) 502-6093 or email at 
[email protected].
    j. In a letter dated March 1, 2018, the Director of the Division of 
Hydropower Licensing approved Jason and Carol Victoria Presley's 
request to use the Traditional Licensing Process.
    k. With this notice, we are initiating informal consultation with 
the U.S. Fish and Wildlife Service and/or NOAA Fisheries under section 
7 of the Endangered Species Act and the joint agency regulations 
thereunder at 50 CFR, Part 402; and NOAA Fisheries under section 305(b) 
of the Magnuson-Stevens Fishery Conservation and Management Act and 
implementing regulations at 50 CFR 600.920. We are also initiating 
consultation with the Georgia State Historic Preservation Officer, as 
required by section 106, National Historic Preservation Act, and the 
implementing regulations of the Advisory Council on Historic 
Preservation at 36 CFR 800.2.
    l. Jason and Carol Victoria Presley filed a Pre-Application 
Document (PAD; including a proposed process plan and schedule) with the 
Commission, pursuant to 18 CFR 5.6 of the Commission's regulations.
    m. A copy of the PAD is available for review at the Commission in 
the Public Reference Room or may be viewed on the Commission's website 
(https://www.ferc.gov), using the eLibrary link. Enter the docket 
number, excluding the last three digits in the docket number field to 
access the document. For assistance, contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). A copy is also available for inspection and reproduction at 
the address in paragraph h.
    n. The licensee states its unequivocal intent to submit an 
application for a new license for Project No. 3102. Pursuant to 18 CFR 
16.8, 16.9, and 16.10 each application for a new license and any 
competing license applications must be filed with the Commission at 
least 24 months prior to the expiration of the existing license. All 
applications for license for this project must be filed by August 30, 
2019.
    o. Register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filing and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.

    Dated: March 16, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-05950 Filed 3-22-18; 8:45 am]
 BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.