Projects Rescinded for Consumptive Uses of Water, 12637 [2018-05758]

Download as PDF Federal Register / Vol. 83, No. 56 / Thursday, March 22, 2018 / Notices date of the exemption (30 days after the verified notice was filed). If the verified notice contains false or misleading information, the exemption is void ab initio. Petitions to revoke the exemption under 49 U.S.C. 10502(d) may be filed at any time. The filing of a petition to revoke will not automatically stay the effectiveness of the exemption. Petitions to stay must be filed no later than March 29, 2018 (at least seven days before the exemption becomes effective). An original and 10 copies of all pleadings, referring to Docket No. FD 36166, must be filed with the Surface Transportation Board, 395 E Street SW, Washington, DC 20423–0001. In addition, a copy of each pleading must be served on Eric M. Hocky, Clark Hill, PLC, One Commerce Square, 2005 Market Street, Suite 1000, Philadelphia, PA 19103–7031. Board decisions and notices are available on our website at WWW.STB.GOV. Decided: March 19, 2018. By the Board, Scott M. Zimmerman, Acting Director, Office of Proceedings. Jeffrey Herzig, Clearance Clerk. [FR Doc. 2018–05857 Filed 3–21–18; 8:45 am] BILLING CODE 4915–01–P SUSQUEHANNA RIVER BASIN COMMISSION Projects Approved for Consumptive Uses of Water Susquehanna River Basin Commission. ACTION: Notice. AGENCY: This notice lists the projects approved by rule by the Susquehanna River Basin Commission during the period set forth in DATES. DATES: January 1–31, 2018. ADDRESSES: Susquehanna River Basin Commission, 4423 North Front Street, Harrisburg, PA 17110–1788. FOR FURTHER INFORMATION CONTACT: Jason E. Oyler, General Counsel, 717– 238–0423, ext. 1312, joyler@srbc.net. Regular mail inquiries may be sent to the above address. SUPPLEMENTARY INFORMATION: This notice lists the projects, described below, receiving approval for the consumptive use of water pursuant to the Commission’s approval by rule process set forth in 18 CFR 806.22(e) and § 806.22 (f) for the time period specified above: Approvals By Rule Issued Under 18 CFR 806.22(f): daltland on DSKBBV9HB2PROD with NOTICES SUMMARY: VerDate Sep<11>2014 19:32 Mar 21, 2018 Jkt 244001 1. Cabot Oil & Gas Corporation, LLC, Pad ID: McLeanD P1, ABR– 201211009.R1, Lathrop and Lenox Townships, Susquehanna County, Pa.; Consumptive Use of Up to 5.0000 mgd; Approval Date: January 9, 2018. 2. Cabot Oil & Gas Corporation, LLC, Pad ID: HordisC P1, ABR– 201211016.R1, Lathrop Township, Susquehanna County, Pa.; Consumptive Use of Up to 5.0000 mgd; Approval Date: January 9, 2018. 3. Cabot Oil & Gas Corporation, LLC, Pad ID: LoffredoJ P1, ABR– 201211017.R1, Nicholson Township, Wyoming County, Pa.; Consumptive Use of Up to 5.0000 mgd; Approval Date: January 9, 2018. 4. Cabot Oil & Gas Corporation, LLC, Pad ID: TeddickM P3, ABR– 201212006.R1, Brooklyn Township, Susquehanna County, Pa.; Consumptive Use of Up to 5.0000 mgd; Approval Date: January 9, 2018. 5. Cabot Oil & Gas Corporation, LLC, Pad ID: ZickW P1, ABR–201212008.R1, Lenox Township, Susquehanna County, Pa.; Consumptive Use of Up to 5.0000 mgd; Approval Date: January 9, 2018. 6. Cabot Oil & Gas Corporation, LLC, Pad ID: KropaT P1, ABR–201301017.R1, Springville Township, Susquehanna County, Pa.; Consumptive Use of Up to 5.0000 mgd; Approval Date: January 9, 2018. 7. Chief Oil & Gas, LLC, Pad ID: Spencer Drilling Pad, ABR– 201306010.R1, Lenox Township, Susquehanna County, Pa.; Consumptive Use of Up to 2.0000 mgd; Approval Date: January 9, 2018. 8. SWN Production Company, LLC, Pad ID: Swisher (Pad R), ABR– 201212012.R1, Stevens Township, Bradford County, Pa.; Consumptive Use of Up to 4.9990 mgd; Approval Date: January 9, 2018. 9. Chesapeake Appalachia, LLC, Pad ID: Porter, ABR–201306001.R1, North Branch Township, Wyoming County, Pa.; Consumptive Use of Up to 7.5000 mgd; Approval Date: January 17, 2018. 10. Chesapeake Appalachia, LLC, Pad ID: Tinna, ABR–201306002.R1, Windham and Mehoopany Townships, Wyoming County, Pa.; Consumptive Use of Up to 7.5000 mgd; Approval Date: January 17, 2018. 11. Chesapeake Appalachia, LLC, Pad ID: Shamrock, ABR–201306003.R1, Windham Township, Wyoming County, Pa.; Consumptive Use of Up to 7.5000 mgd; Approval Date: January 17, 2018. 12. Chesapeake Appalachia, LLC, Pad ID: Brewer, ABR–201306007.R1, Meshoppen and Washington Townships, Wyoming County, Pa.; Consumptive Use of Up to 7.5000 mgd; Approval Date: January 17, 2018. PO 00000 Frm 00078 Fmt 4703 Sfmt 9990 12637 13. Chief Oil & Gas, LLC, Pad ID: SGL 12 N WEST DRILLING PAD, ABR– 201801001, Leroy Township, Bradford County, Pa.; Consumptive Use of Up to 2.5000 mgd; Approval Date: January 22, 2018. Authority: Pub. L. 91–575, 84 Stat. 1509 et seq., 18 CFR parts 806, 807, and 808. Dated: March 16, 2018. Stephanie L. Richardson, Secretary to the Commission. [FR Doc. 2018–05757 Filed 3–21–18; 8:45 am] BILLING CODE 7040–01–P SUSQUEHANNA RIVER BASIN COMMISSION Projects Rescinded for Consumptive Uses of Water Susquehanna River Basin Commission. AGENCY: ACTION: Notice. This notice lists the approved by rule projects rescinded by the Susquehanna River Basin Commission during the period set forth in DATES. SUMMARY: DATES: January 1–31, 2018. Susquehanna River Basin Commission, 4423 North Front Street, Harrisburg, PA 17110–1788. ADDRESSES: FOR FURTHER INFORMATION CONTACT: Jason E. Oyler, General Counsel, telephone: (717) 238–0423, ext. 1312; fax: (717) 238–2436; email: joyler@ srbc.net. Regular mail inquiries may be sent to the above address. This notice lists the projects, described below, being rescinded for the consumptive use of water pursuant to the Commission’s approval by rule process set forth in 18 CFR 806.22(e) and 806.22(f) for the time period specified above: SUPPLEMENTARY INFORMATION: Rescinded ABR Issued 1. Carrizo (Marcellus), LLC, Pad ID: EP Bender B (CC–03) Pad (2), ABR201201030.R1, Reade Township, Cambria County, Pa.; Rescind Date: January 26, 2018. Authority: Pub. L. 91–575, 84 Stat. 1509 et seq., 18 CFR parts 806, 807, and 808. Dated: March 16, 2018. Stephanie L. Richardson, Secretary to the Commission. [FR Doc. 2018–05758 Filed 3–21–18; 8:45 am] BILLING CODE 7040–01–P E:\FR\FM\22MRN1.SGM 22MRN1

Agencies

[Federal Register Volume 83, Number 56 (Thursday, March 22, 2018)]
[Notices]
[Page 12637]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-05758]


-----------------------------------------------------------------------

SUSQUEHANNA RIVER BASIN COMMISSION


Projects Rescinded for Consumptive Uses of Water

AGENCY: Susquehanna River Basin Commission.

ACTION: Notice.

-----------------------------------------------------------------------

SUMMARY: This notice lists the approved by rule projects rescinded by 
the Susquehanna River Basin Commission during the period set forth in 
DATES.

DATES: January 1-31, 2018.

ADDRESSES: Susquehanna River Basin Commission, 4423 North Front Street, 
Harrisburg, PA 17110-1788.

FOR FURTHER INFORMATION CONTACT: Jason E. Oyler, General Counsel, 
telephone: (717) 238-0423, ext. 1312; fax: (717) 238-2436; email: 
[email protected]. Regular mail inquiries may be sent to the above 
address.

SUPPLEMENTARY INFORMATION: This notice lists the projects, described 
below, being rescinded for the consumptive use of water pursuant to the 
Commission's approval by rule process set forth in 18 CFR 806.22(e) and 
806.22(f) for the time period specified above:

Rescinded ABR Issued

    1. Carrizo (Marcellus), LLC, Pad ID: EP Bender B (CC-03) Pad (2), 
ABR- 201201030.R1, Reade Township, Cambria County, Pa.; Rescind Date: 
January 26, 2018.

    Authority: Pub. L. 91-575, 84 Stat. 1509 et seq., 18 CFR parts 
806, 807, and 808.

    Dated: March 16, 2018.
Stephanie L. Richardson,
Secretary to the Commission.
[FR Doc. 2018-05758 Filed 3-21-18; 8:45 am]
 BILLING CODE 7040-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.