Dominion Energy Cove Point LNG, LP; Notice of Technical Conference, 12377 [2018-05683]
Download as PDF
Federal Register / Vol. 83, No. 55 / Wednesday, March 21, 2018 / Notices
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: March 15, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–05672 Filed 3–20–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RP18–419–000]
Dominion Energy Cove Point LNG, LP;
Notice of Technical Conference
Take notice that a technical
conference will be held on Tuesday,
April 17, 2018 at 10:00 a.m. (Eastern
Standard Time), in a room to be
designated at the offices of the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
At the technical conference, the
Commission staff and the parties to the
proceeding should be prepared to
discuss all issues in this proceeding as
established in the March 5, 2018 Order.1
Federal Energy Regulatory
Commission conferences are accessible
under section 508 of the Rehabilitation
Act of 1973. For accessibility
accommodations please send an email
to accessibility@ferc.gov or call toll free
(866) 208–3372 (voice) or (202) 502–
8659 (TTY), or send a fax to (202) 208–
2106 with the required
accommodations.
All interested persons and staff are
permitted to attend. For further
information please contact Alex
Schroeder at (202) 502–6291 or email
Walter.Schroeder@ferc.gov.
Dated: March 15, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
sradovich on DSK3GMQ082PROD with NOTICES
[FR Doc. 2018–05683 Filed 3–20–18; 8:45 am]
BILLING CODE 6717–01–P
1 Dominion Energy Cove Point LNG, LP, 162 FERC
61,199 (2018).
VerDate Sep<11>2014
18:34 Mar 20, 2018
Jkt 244001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG18–53–000.
Applicants: Meadow Lake Wind Farm
VI LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of Meadow Lake Wind
Farm VI LLC.
Filed Date: 3/14/18.
Accession Number: 20180314–5202.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: EG18–54–000.
Applicants: Prairie Queen Wind Farm
LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of Prairie Queen Wind
Farm LLC.
Filed Date: 3/14/18.
Accession Number: 20180314–5207.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: EG18–55–000.
Applicants: Turtle Creek Wind Farm
LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of Turtle Creek Wind
Farm LLC.
Filed Date: 3/14/18.
Accession Number: 20180314–5212.
Comments Due: 5 p.m. ET 4/4/18.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER18–1059–000.
Applicants: Shiloh I Wind Project,
LLC.
Description: Compliance filing:
Compliance 2018 to be effective 5/14/
2018.
Filed Date: 3/14/18.
Accession Number: 20180314–5163.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18–1060–000.
Applicants: South Chestnut LLC.
Description: Compliance filing:
Compliance 2018 to be effective 5/14/
2018.
Filed Date: 3/14/18.
Accession Number: 20180314–5164.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18–1061–000.
Applicants: Star Point Wind Project
LLC.
Description: Compliance filing:
Compliance 2018 to be effective 5/14/
2018.
Filed Date: 3/14/18.
Accession Number: 20180314–5166.
PO 00000
Frm 00045
Fmt 4703
Sfmt 4703
12377
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18–1062–000.
Applicants: Streator-Cayuga Ridge
Wind Power LLC.
Description: Compliance filing:
Compliance 2018 to be effective 5/14/
2018.
Filed Date: 3/14/18.
Accession Number: 20180314–5167.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18–1063–000.
Applicants: Trimont Wind I LLC.
Description: Compliance filing:
Compliance 2018 to be effective 5/14/
2018.
Filed Date: 3/14/18.
Accession Number: 20180314–5168.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18–1064–000.
Applicants: Twin Buttes Wind LLC.
Description: Compliance filing:
Compliance 2018 to be effective 5/14/
2018.
Filed Date: 3/14/18.
Accession Number: 20180314–5169.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18–1065–000.
Applicants: Casselman Windpower
LLC.
Description: Compliance filing:
Compliance 2018 to be effective 5/14/
2018.
Filed Date: 3/14/18.
Accession Number: 20180314–5171.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18–1066–000.
Applicants: Moraine Wind II LLC.
Description: Compliance filing:
Compliance 2018 to be effective 5/14/
2018.
Filed Date: 3/14/18.
Accession Number: 20180314–5173.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18–1067–000.
Applicants: Elk River Windfarm, LLC.
Description: Compliance filing:
Compliance 2018 to be effective 5/14/
2018.
Filed Date: 3/14/18.
Accession Number: 20180314–5177.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18–1068–000.
Applicants: Lyonsdale Biomass, LLC.
Description: § 205(d) Rate Filing:
Market-Based Rate Tariff Revisions to be
effective 3/15/2018.
Filed Date: 3/14/18.
Accession Number: 20180314–5179.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18–1069–000.
Applicants: ReEnergy Ashland LLC.
Description: § 205(d) Rate Filing:
Market-Based Rate Tariff Revisions to be
effective 3/15/2018.
Filed Date: 3/14/18.
Accession Number: 20180314–5180.
Comments Due: 5 p.m. ET 4/4/18.
E:\FR\FM\21MRN1.SGM
21MRN1
Agencies
[Federal Register Volume 83, Number 55 (Wednesday, March 21, 2018)]
[Notices]
[Page 12377]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-05683]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. RP18-419-000]
Dominion Energy Cove Point LNG, LP; Notice of Technical
Conference
Take notice that a technical conference will be held on Tuesday,
April 17, 2018 at 10:00 a.m. (Eastern Standard Time), in a room to be
designated at the offices of the Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC 20426.
At the technical conference, the Commission staff and the parties
to the proceeding should be prepared to discuss all issues in this
proceeding as established in the March 5, 2018 Order.\1\
---------------------------------------------------------------------------
\1\ Dominion Energy Cove Point LNG, LP, 162 FERC 61,199 (2018).
---------------------------------------------------------------------------
Federal Energy Regulatory Commission conferences are accessible
under section 508 of the Rehabilitation Act of 1973. For accessibility
accommodations please send an email to [email protected] or call
toll free (866) 208-3372 (voice) or (202) 502-8659 (TTY), or send a fax
to (202) 208-2106 with the required accommodations.
All interested persons and staff are permitted to attend. For
further information please contact Alex Schroeder at (202) 502-6291 or
email [email protected].
Dated: March 15, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-05683 Filed 3-20-18; 8:45 am]
BILLING CODE 6717-01-P