Great Lakes Hydro America, LLC; Notice of Availability of Draft Environmental Assessment, 12379 [2018-05680]
Download as PDF
12379
Federal Register / Vol. 83, No. 55 / Wednesday, March 21, 2018 / Notices
Docket No.
sradovich on DSK3GMQ082PROD with NOTICES
The Dayton Power & Light Company ......................................................................................................................................
Trans Bay Cable LLC ..............................................................................................................................................................
Tucson Electric Power Company ............................................................................................................................................
On March 15, 2018, the Commission
issued an order in Docket Nos. EL18–
72–000, EL18–73–000, EL18–75–000,
EL18–76–000, EL18–77–000, EL18–79–
000, EL18–89–000, EL18–90–000, EL18–
91–000, EL18–93–000, EL18–95–000,
EL18–96–000, EL18–97–000, EL18–98–
000, EL18–101–000, EL18–102–000,
EL18–103–000, EL18–104–000, EL18–
105–000, EL18–107–000, EL18–108–
000, EL18–109–000, EL18–110–000,
EL18–111–000, EL18–112–000, EL18–
113–000, EL18–115–000, EL18–117–
000, EL18–118–000, and EL18–119–000,
pursuant to section 206 of the Federal
Power Act (FPA), 16 U.S.C. 824e (2012),
instituting an investigation into the
justness and reasonableness of each of
the above-captioned public utilities’
stated transmission rates under its open
access transmission tariff or
transmission owner tariff on file with
the Commission. Alcoa Power
Generating Inc.—Long Sault Division, et
al., 162 FERC 61,224 (2018).
The refund effective date in Docket
Nos. EL18–72–000, EL18–73–000,
EL18–75–000, EL18–76–000, EL18–77–
000, EL18–79–000, EL18–89–000, EL18–
90–000, EL18–91–000, EL18–93–000,
EL18–95–000, EL18–96–000, EL18–97–
000, EL18–98–000, EL18–101–000,
EL18–102–000, EL18–103–000, EL18–
104–000, EL18–105–000, EL18–107–
000, EL18–108–000, EL18–109–000,
EL18–110–000, EL18–111–000, EL18–
112–000, EL18–113–000, EL18–115–
000, EL18–117–000, EL18–118–000, and
EL18–119–000, established pursuant to
section 206(b) of the FPA, will be the
date of publication of this notice in the
Federal Register.
Any interested person desiring to be
heard in Docket Nos. EL18–72–000,
EL18–73–000, EL18–75–000, EL18–76–
000, EL18–77–000, EL18–79–000, EL18–
89–000, EL18–90–000, EL18–91–000,
EL18–93–000, EL18–95–000, EL18–96–
000, EL18–97–000, EL18–98–000, EL18–
101–000, EL18–102–000, EL18–103–
000, EL18–104–000, EL18–105–000,
EL18–107–000, EL18–108–000, EL18–
109–000, EL18–110–000, EL18–111–
000, EL18–112–000, EL18–113–000,
EL18–115–000, EL18–117–000, EL18–
118–000, and EL18–119–000 must file a
notice of intervention or motion to
intervene, as appropriate, with the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426, in accordance with Rule 214 of
VerDate Sep<11>2014
18:34 Mar 20, 2018
Jkt 244001
the Commission’s Rules of Practice and
Procedure, 18 CFR 385.214, within 21
days of the date of issuance of the order.
Dated: March 15, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–05675 Filed 3–20–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2520–076]
Great Lakes Hydro America, LLC;
Notice of Availability of Draft
Environmental Assessment
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission’s (Commission)
regulations, 18 CFR part 380, the Office
of Energy Projects has reviewed the
application for new license for the
Mattaceunk Hydroelectric Project,
located on the Penobscot River in
Aroostook and Penobscot Counties,
Maine, and has prepared a Draft
Environmental Assessment (DEA) for
the project. The project does not occupy
federal land.
The DEA contains Commission staff’s
analysis of the potential effects of
continued operation and maintenance of
the project. The DEA concludes that
relicensing the project, with appropriate
environmental protective measures,
would not constitute a major federal
action that would significantly affect the
quality of the human environment.
A copy of the DEA is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s website at https://
www.ferc.gov, using the eLibrary link.
Enter the docket number, excluding the
last three digits, in the docket number
field to access the document. For
assistance, contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, or toll-free at 1–866–208–3676,
or for TTY, (202) 502–8659.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
PO 00000
Frm 00047
Fmt 4703
Sfmt 4703
EL18–117–000
EL18–118–000
EL18–119–000
For assistance, contact FERC Online
Support.
Any comments should be filed within
45 days from the date of this notice.
The Commission strongly encourages
electronic filing. Please file comments
using the Commission’s eFiling system
at https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support. In
lieu of electronic filing, please send a
paper copy to: Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426. The first
page of any filing should include docket
number P–2520–076.
For further information, contact Adam
Peer at (202) 502–8449, or by email at
adam.peer@ferc.gov.
Dated: March 15, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–05680 Filed 3–20–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 3267–017]
ECOsponsible, LLC; Notice Of Intent
To File License Application, Filing of
Pre-Application Document, and
Approving Use of The Traditional
Licensing Process
a. Type of Filing: Notice of Intent to
File License Application and Request to
Use the Traditional Licensing Process.
b. Project No.: 3267–017.
c. Date Filed: August 14, 2017.
d. Submitted By: ECOsponsible, LLC.
e. Name of Project: Ballard Mill
Hydroelectric Project.
f. Location: On the Salmon River, in
Franklin County, New York. No federal
lands are occupied by the project works
or located within the project boundary.
g. Filed Pursuant to: 18 CFR 5.3 of the
Commission’s regulations.
h. Potential Applicant Contact:
Dennis Ryan, Manager, ECOsponsible,
E:\FR\FM\21MRN1.SGM
21MRN1
Agencies
[Federal Register Volume 83, Number 55 (Wednesday, March 21, 2018)]
[Notices]
[Page 12379]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-05680]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2520-076]
Great Lakes Hydro America, LLC; Notice of Availability of Draft
Environmental Assessment
In accordance with the National Environmental Policy Act of 1969
and the Federal Energy Regulatory Commission's (Commission)
regulations, 18 CFR part 380, the Office of Energy Projects has
reviewed the application for new license for the Mattaceunk
Hydroelectric Project, located on the Penobscot River in Aroostook and
Penobscot Counties, Maine, and has prepared a Draft Environmental
Assessment (DEA) for the project. The project does not occupy federal
land.
The DEA contains Commission staff's analysis of the potential
effects of continued operation and maintenance of the project. The DEA
concludes that relicensing the project, with appropriate environmental
protective measures, would not constitute a major federal action that
would significantly affect the quality of the human environment.
A copy of the DEA is available for review at the Commission in the
Public Reference Room or may be viewed on the Commission's website at
https://www.ferc.gov, using the eLibrary link. Enter the docket number,
excluding the last three digits, in the docket number field to access
the document. For assistance, contact FERC Online Support at
[email protected], or toll-free at 1-866-208-3676, or for TTY,
(202) 502-8659.
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
Any comments should be filed within 45 days from the date of this
notice.
The Commission strongly encourages electronic filing. Please file
comments using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to
6,000 characters, without prior registration, using the eComment system
at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your
name and contact information at the end of your comments. For
assistance, please contact FERC Online Support. In lieu of electronic
filing, please send a paper copy to: Secretary, Federal Energy
Regulatory Commission, 888 First Street NE, Washington, DC 20426. The
first page of any filing should include docket number P-2520-076.
For further information, contact Adam Peer at (202) 502-8449, or by
email at [email protected].
Dated: March 15, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-05680 Filed 3-20-18; 8:45 am]
BILLING CODE 6717-01-P