Midwestern Gas Transmission Company; Notice of Initiation of Section 5 Proceeding, 12370-12371 [2018-05678]
Download as PDF
12370
Federal Register / Vol. 83, No. 55 / Wednesday, March 21, 2018 / Notices
on industry-wide oil pipeline costs in
the 2020 five-year review of the oil
pipeline index level.85 In this way the
Commission will ensure that the
industry-wide reduced costs are
incorporated on an industry-wide basis
as part of the index review. To the
extent the Commission issues
subsequent orders affecting the income
tax policy for other partnership or passthrough business forms, oil pipelines
should similarly reflect those policy
changes on Form No. 6, page 700.
47. In addition, the Commission
emphasizes that the post-United
Airlines’ policy changes (as well as the
Tax Cuts and Jobs Act of 2017) will be
reflected in initial oil and gas pipeline
cost-of-service rates and cost-of-service
rate changes on a going-forward basis
under the Commission’s existing
ratemaking policies,86 including cost-ofservice rate proceedings resulting from
shipper-initiated complaints.
III. Document Availability
sradovich on DSK3GMQ082PROD with NOTICES
48. In addition to publishing the full
text of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through
FERC’s Home Page (https://
www.ferc.gov) and in FERC’s Public
Reference Room during normal business
hours (8:30 a.m. to 5:00 p.m. Eastern
time) at 888 First Street NE, Room 2A,
Washington, DC 20426.
49. From FERC’s Home Page on the
internet, this information is available on
eLibrary. The full text of this document
is available on eLibrary in PDF and
Microsoft Word format for viewing,
printing, and/or downloading. To access
this document in eLibrary, type the
docket number excluding the last three
digits of this document in the docket
number field.
data reported in Form No. 6, page 700, to be filed
on April 18, 2019.
85 The overwhelming majority of oil pipelines set
their rates using indexing, not cost-of-service
ratemaking using an oil pipeline’s particular costs.
Under indexing, oil pipelines may adjust their rates
annually, so long as those rates remain at or below
the applicable ceiling levels. The ceiling levels
change every July 1 based on an index that tracks
industry-wide cost changes. 18 CFR 342.3.
Currently, the index level is based upon the
Producer’s Price Index for Finished Goods plus
1.23. The index will be re-assessed in 2020 based
upon industry-wide oil pipeline cost changes
between 2014 and 2019. E.g. Five-Year Review of
the Oil Pipeline Index, 153 FERC ¶ 61,312 (2015)
aff’d, Assoc. of Oil Pipe Lines v. FERC, 876 F.3d 336
(D.C. Cir. 2017). The industry-wide data filed in the
latter years of the 2014–2019 period should reflect
the Commission’s post-United Airlines policy
changes as well as the Tax Cuts and Jobs Act.
86 See, e.g., 18 CFR 154.312(m), 154.313(e)(13),
384.123; 342.2, 342.4(a); 18 CFR part 346.
VerDate Sep<11>2014
18:34 Mar 20, 2018
Jkt 244001
50. User assistance is available for
eLibrary and the FERC’s website during
normal business hours from FERC
Online Support at 202–502–6652 (toll
free at 1–866–208–3676) or email at
ferconlinesupport@ferc.gov, or the
Public Reference Room at (202) 502–
8371, TTY (202) 502–8659. Email the
Public Reference Room at
public.referenceroom@ferc.gov.
IV. Effective Date
51. This Revised Policy Statement
will become applicable March 21, 2018.
By the Commission.
Issued: March 15, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–05668 Filed 3–20–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER18–1077–000]
GASNA 36P, LLC ; Supplemental
Notice That Initial Market-Based Rate
Filing Includes Request for Blanket
Section 204 Authorization
This is a supplemental notice in the
above-referenced proceeding of GASNA
36P, LLC‘s application for market-based
rate authority, with an accompanying
rate tariff, noting that such application
includes a request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is April 4,
2018.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
PO 00000
Frm 00038
Fmt 4703
Sfmt 4703
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: March 15, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–05677 Filed 3–20–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RP18–441–000]
Midwestern Gas Transmission
Company; Notice of Initiation of
Section 5 Proceeding
On March 15, 2018, the Commission
issued an order in Docket No. RP18–
441–000, pursuant to section 5 of the
Natural Gas Act, 15 U.S.C. 717d (2012),
instituting an investigation into the
justness and reasonableness of
Midwestern Gas Transmission
Company’s (Midwestern) currently
effective tariff rates. The Commission’s
order directs Midwestern to file a full
cost and revenue study within 75 days
of the issuance of the order. Midwestern
Gas Transmission Company, 162 FERC
61,219 (2018).
Any interested person desiring to be
heard in Docket No. RP18–441–000
must file a notice of intervention or
motion to intervene, as appropriate,
with the Federal Energy Regulatory
Commission, 888 First Street NE,
Washington, DC 20426, in accordance
with Rule 214 of the Commission’s
Rules of Practice and Procedure, 18 CFR
385.214, within 30 days of the date of
issuance of the order.
E:\FR\FM\21MRN1.SGM
21MRN1
12371
Federal Register / Vol. 83, No. 55 / Wednesday, March 21, 2018 / Notices
Dated: March 15, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–05678 Filed 3–20–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP17–363–006.
Applicants: Eastern Shore Natural Gas
Company.
Description: Compliance filing
Settlement Compliance Filing to be
effective 4/1/2018.
Filed Date: 3/1/18.
Accession Number: 20180301–5260.
Comments Due: 5 p.m. ET 3/13/18.
Docket Numbers: RP18–558–000.
Applicants: Midcontinent Express
Pipeline LLC.
Description: Compliance filing 2018
Annual Penalty Revenue Crediting
Report.
Filed Date: 3/13/18.
Accession Number: 20180313–5064.
Comments Due: 5 p.m. ET 3/26/18.
Docket Numbers: RP18–560–000.
Applicants: Texas Eastern
Transmission, LP.
Description: § 4(d) Rate Filing:
Negotiated Rates—Colonial Energy
K911486 eff 4–1–2018 to be effective
4/1/2018.
Filed Date: 3/15/18.
Accession Number: 20180315–5003.
Comments Due: 5 p.m. ET 3/27/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: March 15, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–05673 Filed 3–20–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Institution of Section 206
Proceeding and Refund Effective Date
Docket No.
sradovich on DSK3GMQ082PROD with NOTICES
AEP Appalachian Transmission Company, Inc .........................................................................................................................
AEP Indiana Michigan Transmission Company, Inc .................................................................................................................
AEP Kentucky Transmission Company, Inc ..............................................................................................................................
AEP Ohio Transmission Company, Inc .....................................................................................................................................
AEP West Virginia Transmission Company, Inc .......................................................................................................................
AEP Oklahoma Transmission Company, Inc ............................................................................................................................
AEP Southwestern Transmission Company, Inc .......................................................................................................................
Baltimore Gas and Electric Company .......................................................................................................................................
Black Hills Power, Inc ................................................................................................................................................................
Citizens Sunrise Transmission LLC ...........................................................................................................................................
San Diego Gas & Electric Company .........................................................................................................................................
Transource Maryland, LLC ........................................................................................................................................................
Transource Pennsylvania, LLC ..................................................................................................................................................
Transource West Virginia, LLC ..................................................................................................................................................
UNS Electric, Inc ........................................................................................................................................................................
On March 15, 2018, the Commission
issued an order in Docket Nos. EL18–
62–000, EL18–63–000, EL18–64–000,
EL18–65–000, EL18–66–000, EL18–67–
000, EL18–68–000, EL18–69–000, EL18–
70–000, and EL18–71–000 pursuant to
section 206 of the Federal Power Act
(FPA), 16 U.S.C. 824e (2012), instituting
an investigation into the justness and
reasonableness of each of the abovecaptioned public utilities’ transmission
formula rates under its open access
transmission tariff or transmission
owner tariff on file with the
Commission. AEP Appalachian
Transmission Company, Inc., et al., 162
FERC 61,225 (2018).
The refund effective date in Docket
Nos. EL18–62–000, EL18–63–000,
EL18–64–000, EL18–65–000, EL18–66–
000, EL18–67–000, EL18–68–000, EL18–
VerDate Sep<11>2014
18:34 Mar 20, 2018
Jkt 244001
69–000, EL18–70–000, and EL18–71–
000, established pursuant to section
206(b) of the FPA, will be the date of
publication of this notice in the Federal
Register.
Any interested person desiring to be
heard in Docket Nos. EL18–62–000,
EL18–63–000, EL18–64–000, EL18–65–
000, EL18–66–000, EL18–67–000, EL18–
68–000, EL18–69–000, EL18–70–000,
and EL18–71–000 must file a notice of
intervention or motion to intervene, as
appropriate, with the Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426, in
accordance with Rule 214 of the
Commission’s Rules of Practice and
Procedure, 18 CFR 385.214, within 21
days of the date of issuance of the order.
PO 00000
Frm 00039
Fmt 4703
Sfmt 4703
EL18–62–000
EL18–63–000
EL18–64–000
EL18–65–000
EL18–66–000
EL18–67–000
EL18–68–000
EL18–69–000
EL18–70–000
EL18–71–000, (not
consolidated)
Dated: March 15, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–05674 Filed 3–20–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RM18–12–000]
Inquiry Regarding the Effect of the Tax
Cuts and Jobs Act on CommissionJurisdictional Rates
Federal Energy Regulatory
Commission, Department of Energy.
ACTION: Notice of inquiry.
AGENCY:
E:\FR\FM\21MRN1.SGM
21MRN1
Agencies
[Federal Register Volume 83, Number 55 (Wednesday, March 21, 2018)]
[Notices]
[Pages 12370-12371]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-05678]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. RP18-441-000]
Midwestern Gas Transmission Company; Notice of Initiation of
Section 5 Proceeding
On March 15, 2018, the Commission issued an order in Docket No.
RP18-441-000, pursuant to section 5 of the Natural Gas Act, 15 U.S.C.
717d (2012), instituting an investigation into the justness and
reasonableness of Midwestern Gas Transmission Company's (Midwestern)
currently effective tariff rates. The Commission's order directs
Midwestern to file a full cost and revenue study within 75 days of the
issuance of the order. Midwestern Gas Transmission Company, 162 FERC
61,219 (2018).
Any interested person desiring to be heard in Docket No. RP18-441-
000 must file a notice of intervention or motion to intervene, as
appropriate, with the Federal Energy Regulatory Commission, 888 First
Street NE, Washington, DC 20426, in accordance with Rule 214 of the
Commission's Rules of Practice and Procedure, 18 CFR 385.214, within 30
days of the date of issuance of the order.
[[Page 12371]]
Dated: March 15, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-05678 Filed 3-20-18; 8:45 am]
BILLING CODE 6717-01-P