Notice of Institution of Section 206 Proceeding and Refund Effective Date, 12378-12379 [2018-05675]
Download as PDF
12378
Federal Register / Vol. 83, No. 55 / Wednesday, March 21, 2018 / Notices
Docket Numbers: ER18–1070–000.
Applicants: ReEnergy Black River
LLC.
Description: § 205(d) Rate Filing:
Market-Based Rate Tariff Revisions to be
effective 3/15/2018.
Filed Date: 3/14/18.
Accession Number: 20180314–5181.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18–1071–000.
Applicants: ReEnergy Fort Fairfield
LLC.
Description: § 205(d) Rate Filing:
Market-Based Rate Tariff Revisions to be
effective 3/15/2018.
Filed Date: 3/14/18.
Accession Number: 20180314–5182.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18–1072–000.
Applicants: MinnDakota Wind LLC.
Description: Compliance filing:
Compliance 2018 to be effective 5/14/
2018.
Filed Date: 3/14/18.
Accession Number: 20180314–5184.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18–1073–000.
Applicants: ReEnergy Livermore Falls
LLC.
Description: § 205(d) Rate Filing:
Market-Based Rate Tariff Revisions to be
effective 3/15/2018.
Filed Date: 3/14/18.
Accession Number: 20180314–5188.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18–1074–000.
Applicants: ReEnergy Stratton LLC.
Description: § 205(d) Rate Filing:
Market-Based Rate Tariff Revisions to be
effective 3/15/2018.
Filed Date: 3/14/18.
Accession Number: 20180314–5190.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18–1075–000.
Applicants: Public Service Company
of New Mexico.
Description: § 205(d) Rate Filing:
eTariff Administrative Filing of OATT
Revisions to be effective 11/1/2013.
Filed Date: 3/14/18.
Accession Number: 20180314–5196.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18–1076–000.
Applicants: GASNA 6P, LLC.
Description: Baseline eTariff Filing:
GASNA 6P, LLC MBR Tariff to be
effective 3/15/2018.
Filed Date: 3/14/18.
Accession Number: 20180314–5200.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18–1077–000.
Applicants: GASNA 36P, LLC.
Description: Baseline eTariff Filing:
GASNA 36P, LLC MBR Tariff to be
effective 3/15/2018.
Filed Date: 3/14/18.
Accession Number: 20180314–5201.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18–1078–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
Revisions to Require Phasor Measuring
Units at New Generator
Interconnections to be effective 5/13/
2018.
Filed Date: 3/14/18.
Accession Number: 20180314–5205.
Comments Due: 5 p.m. ET 4/4/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: March 15, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–05671 Filed 3–20–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Institution of Section 206
Proceeding and Refund Effective Date
sradovich on DSK3GMQ082PROD with NOTICES
Docket No.
Alcoa Power Generating Inc.—Long Sault Division ................................................................................................................
Alcoa Power Generating Inc.—Tapoco Division .....................................................................................................................
Avista Corporation ...................................................................................................................................................................
Black Hills/Colorado Electric Utility Company, L.P .................................................................................................................
Central Hudson Gas & Electric Corporation ...........................................................................................................................
Cheyenne Light, Fuel and Power Company ...........................................................................................................................
Consolidated Edison Company of New York, Inc ...................................................................................................................
Cube Yadkin Transmission LLC ..............................................................................................................................................
DATC Path 15, LLC .................................................................................................................................................................
Deseret Generation and Transmission Co-operative, Inc .......................................................................................................
El Paso Electric Company .......................................................................................................................................................
Electric Energy, Inc ..................................................................................................................................................................
Essential Power Rock Springs, LLC .......................................................................................................................................
Florida Power & Light Company .............................................................................................................................................
Monongahela Power Company ...............................................................................................................................................
Potomac Edison Company.
West Penn Power Company.
Nevada Power Company .........................................................................................................................................................
Sierra Pacific Power Company.
New York State Electric & Gas Corporation ...........................................................................................................................
NorthWestern Corporation .......................................................................................................................................................
Ohio Valley Electric Corporation .............................................................................................................................................
Orange & Rockland Utilities, Inc .............................................................................................................................................
Pacific Gas and Electric Company ..........................................................................................................................................
Portland General Electric Company ........................................................................................................................................
Rochester Gas and Electric Corporation .................................................................................................................................
Rockland Electric Company ....................................................................................................................................................
Sky River LLC ..........................................................................................................................................................................
Smoky Mountain Transmission LLC ........................................................................................................................................
Startrans, IO, LLC ....................................................................................................................................................................
VerDate Sep<11>2014
18:34 Mar 20, 2018
Jkt 244001
PO 00000
Frm 00046
Fmt 4703
Sfmt 4703
E:\FR\FM\21MRN1.SGM
21MRN1
EL18–72–000
EL18–73–000
EL18–75–000
EL18–76–000
EL18–77–000
EL18–79–000
EL18–89–000
EL18–90–000
EL18–91–000
EL18–93–000
EL18–95–000
EL18–96–000
EL18–97–000
EL18–98–000
EL18–101–000
EL18–102–000
EL18–103–000
EL18–104–000
EL18–105–000
EL18–107–000
EL18–108–000
EL18–109–000
EL18–110–000
EL18–111–000
EL18–112–000
EL18–113–000
EL18–115–000
12379
Federal Register / Vol. 83, No. 55 / Wednesday, March 21, 2018 / Notices
Docket No.
sradovich on DSK3GMQ082PROD with NOTICES
The Dayton Power & Light Company ......................................................................................................................................
Trans Bay Cable LLC ..............................................................................................................................................................
Tucson Electric Power Company ............................................................................................................................................
On March 15, 2018, the Commission
issued an order in Docket Nos. EL18–
72–000, EL18–73–000, EL18–75–000,
EL18–76–000, EL18–77–000, EL18–79–
000, EL18–89–000, EL18–90–000, EL18–
91–000, EL18–93–000, EL18–95–000,
EL18–96–000, EL18–97–000, EL18–98–
000, EL18–101–000, EL18–102–000,
EL18–103–000, EL18–104–000, EL18–
105–000, EL18–107–000, EL18–108–
000, EL18–109–000, EL18–110–000,
EL18–111–000, EL18–112–000, EL18–
113–000, EL18–115–000, EL18–117–
000, EL18–118–000, and EL18–119–000,
pursuant to section 206 of the Federal
Power Act (FPA), 16 U.S.C. 824e (2012),
instituting an investigation into the
justness and reasonableness of each of
the above-captioned public utilities’
stated transmission rates under its open
access transmission tariff or
transmission owner tariff on file with
the Commission. Alcoa Power
Generating Inc.—Long Sault Division, et
al., 162 FERC 61,224 (2018).
The refund effective date in Docket
Nos. EL18–72–000, EL18–73–000,
EL18–75–000, EL18–76–000, EL18–77–
000, EL18–79–000, EL18–89–000, EL18–
90–000, EL18–91–000, EL18–93–000,
EL18–95–000, EL18–96–000, EL18–97–
000, EL18–98–000, EL18–101–000,
EL18–102–000, EL18–103–000, EL18–
104–000, EL18–105–000, EL18–107–
000, EL18–108–000, EL18–109–000,
EL18–110–000, EL18–111–000, EL18–
112–000, EL18–113–000, EL18–115–
000, EL18–117–000, EL18–118–000, and
EL18–119–000, established pursuant to
section 206(b) of the FPA, will be the
date of publication of this notice in the
Federal Register.
Any interested person desiring to be
heard in Docket Nos. EL18–72–000,
EL18–73–000, EL18–75–000, EL18–76–
000, EL18–77–000, EL18–79–000, EL18–
89–000, EL18–90–000, EL18–91–000,
EL18–93–000, EL18–95–000, EL18–96–
000, EL18–97–000, EL18–98–000, EL18–
101–000, EL18–102–000, EL18–103–
000, EL18–104–000, EL18–105–000,
EL18–107–000, EL18–108–000, EL18–
109–000, EL18–110–000, EL18–111–
000, EL18–112–000, EL18–113–000,
EL18–115–000, EL18–117–000, EL18–
118–000, and EL18–119–000 must file a
notice of intervention or motion to
intervene, as appropriate, with the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426, in accordance with Rule 214 of
VerDate Sep<11>2014
18:34 Mar 20, 2018
Jkt 244001
the Commission’s Rules of Practice and
Procedure, 18 CFR 385.214, within 21
days of the date of issuance of the order.
Dated: March 15, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–05675 Filed 3–20–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2520–076]
Great Lakes Hydro America, LLC;
Notice of Availability of Draft
Environmental Assessment
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission’s (Commission)
regulations, 18 CFR part 380, the Office
of Energy Projects has reviewed the
application for new license for the
Mattaceunk Hydroelectric Project,
located on the Penobscot River in
Aroostook and Penobscot Counties,
Maine, and has prepared a Draft
Environmental Assessment (DEA) for
the project. The project does not occupy
federal land.
The DEA contains Commission staff’s
analysis of the potential effects of
continued operation and maintenance of
the project. The DEA concludes that
relicensing the project, with appropriate
environmental protective measures,
would not constitute a major federal
action that would significantly affect the
quality of the human environment.
A copy of the DEA is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s website at https://
www.ferc.gov, using the eLibrary link.
Enter the docket number, excluding the
last three digits, in the docket number
field to access the document. For
assistance, contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, or toll-free at 1–866–208–3676,
or for TTY, (202) 502–8659.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
PO 00000
Frm 00047
Fmt 4703
Sfmt 4703
EL18–117–000
EL18–118–000
EL18–119–000
For assistance, contact FERC Online
Support.
Any comments should be filed within
45 days from the date of this notice.
The Commission strongly encourages
electronic filing. Please file comments
using the Commission’s eFiling system
at https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support. In
lieu of electronic filing, please send a
paper copy to: Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426. The first
page of any filing should include docket
number P–2520–076.
For further information, contact Adam
Peer at (202) 502–8449, or by email at
adam.peer@ferc.gov.
Dated: March 15, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–05680 Filed 3–20–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 3267–017]
ECOsponsible, LLC; Notice Of Intent
To File License Application, Filing of
Pre-Application Document, and
Approving Use of The Traditional
Licensing Process
a. Type of Filing: Notice of Intent to
File License Application and Request to
Use the Traditional Licensing Process.
b. Project No.: 3267–017.
c. Date Filed: August 14, 2017.
d. Submitted By: ECOsponsible, LLC.
e. Name of Project: Ballard Mill
Hydroelectric Project.
f. Location: On the Salmon River, in
Franklin County, New York. No federal
lands are occupied by the project works
or located within the project boundary.
g. Filed Pursuant to: 18 CFR 5.3 of the
Commission’s regulations.
h. Potential Applicant Contact:
Dennis Ryan, Manager, ECOsponsible,
E:\FR\FM\21MRN1.SGM
21MRN1
Agencies
[Federal Register Volume 83, Number 55 (Wednesday, March 21, 2018)]
[Notices]
[Pages 12378-12379]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-05675]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Institution of Section 206 Proceeding and Refund
Effective Date
------------------------------------------------------------------------
Docket No.
------------------------------------------------------------------------
Alcoa Power Generating Inc.--Long EL18-72-000
Sault Division.
Alcoa Power Generating Inc.--Tapoco EL18-73-000
Division.
Avista Corporation.................. EL18-75-000
Black Hills/Colorado Electric EL18-76-000
Utility Company, L.P.
Central Hudson Gas & Electric EL18-77-000
Corporation.
Cheyenne Light, Fuel and Power EL18-79-000
Company.
Consolidated Edison Company of New EL18-89-000
York, Inc.
Cube Yadkin Transmission LLC........ EL18-90-000
DATC Path 15, LLC................... EL18-91-000
Deseret Generation and Transmission EL18-93-000
Co-operative, Inc.
El Paso Electric Company............ EL18-95-000
Electric Energy, Inc................ EL18-96-000
Essential Power Rock Springs, LLC... EL18-97-000
Florida Power & Light Company....... EL18-98-000
Monongahela Power Company........... EL18-101-000
Potomac Edison Company..............
West Penn Power Company.............
Nevada Power Company................ EL18-102-000
Sierra Pacific Power Company........
New York State Electric & Gas EL18-103-000
Corporation.
NorthWestern Corporation............ EL18-104-000
Ohio Valley Electric Corporation.... EL18-105-000
Orange & Rockland Utilities, Inc.... EL18-107-000
Pacific Gas and Electric Company.... EL18-108-000
Portland General Electric Company... EL18-109-000
Rochester Gas and Electric EL18-110-000
Corporation.
Rockland Electric Company........... EL18-111-000
Sky River LLC....................... EL18-112-000
Smoky Mountain Transmission LLC..... EL18-113-000
Startrans, IO, LLC.................. EL18-115-000
[[Page 12379]]
The Dayton Power & Light Company.... EL18-117-000
Trans Bay Cable LLC................. EL18-118-000
Tucson Electric Power Company....... EL18-119-000
------------------------------------------------------------------------
On March 15, 2018, the Commission issued an order in Docket Nos.
EL18-72-000, EL18-73-000, EL18-75-000, EL18-76-000, EL18-77-000, EL18-
79-000, EL18-89-000, EL18-90-000, EL18-91-000, EL18-93-000, EL18-95-
000, EL18-96-000, EL18-97-000, EL18-98-000, EL18-101-000, EL18-102-000,
EL18-103-000, EL18-104-000, EL18-105-000, EL18-107-000, EL18-108-000,
EL18-109-000, EL18-110-000, EL18-111-000, EL18-112-000, EL18-113-000,
EL18-115-000, EL18-117-000, EL18-118-000, and EL18-119-000, pursuant to
section 206 of the Federal Power Act (FPA), 16 U.S.C. 824e (2012),
instituting an investigation into the justness and reasonableness of
each of the above-captioned public utilities' stated transmission rates
under its open access transmission tariff or transmission owner tariff
on file with the Commission. Alcoa Power Generating Inc.--Long Sault
Division, et al., 162 FERC 61,224 (2018).
The refund effective date in Docket Nos. EL18-72-000, EL18-73-000,
EL18-75-000, EL18-76-000, EL18-77-000, EL18-79-000, EL18-89-000, EL18-
90-000, EL18-91-000, EL18-93-000, EL18-95-000, EL18-96-000, EL18-97-
000, EL18-98-000, EL18-101-000, EL18-102-000, EL18-103-000, EL18-104-
000, EL18-105-000, EL18-107-000, EL18-108-000, EL18-109-000, EL18-110-
000, EL18-111-000, EL18-112-000, EL18-113-000, EL18-115-000, EL18-117-
000, EL18-118-000, and EL18-119-000, established pursuant to section
206(b) of the FPA, will be the date of publication of this notice in
the Federal Register.
Any interested person desiring to be heard in Docket Nos. EL18-72-
000, EL18-73-000, EL18-75-000, EL18-76-000, EL18-77-000, EL18-79-000,
EL18-89-000, EL18-90-000, EL18-91-000, EL18-93-000, EL18-95-000, EL18-
96-000, EL18-97-000, EL18-98-000, EL18-101-000, EL18-102-000, EL18-103-
000, EL18-104-000, EL18-105-000, EL18-107-000, EL18-108-000, EL18-109-
000, EL18-110-000, EL18-111-000, EL18-112-000, EL18-113-000, EL18-115-
000, EL18-117-000, EL18-118-000, and EL18-119-000 must file a notice of
intervention or motion to intervene, as appropriate, with the Federal
Energy Regulatory Commission, 888 First Street NE, Washington, DC
20426, in accordance with Rule 214 of the Commission's Rules of
Practice and Procedure, 18 CFR 385.214, within 21 days of the date of
issuance of the order.
Dated: March 15, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-05675 Filed 3-20-18; 8:45 am]
BILLING CODE 6717-01-P