Notice of Institution of Section 206 Proceeding and Refund Effective Date, 12378-12379 [2018-05675]

Download as PDF 12378 Federal Register / Vol. 83, No. 55 / Wednesday, March 21, 2018 / Notices Docket Numbers: ER18–1070–000. Applicants: ReEnergy Black River LLC. Description: § 205(d) Rate Filing: Market-Based Rate Tariff Revisions to be effective 3/15/2018. Filed Date: 3/14/18. Accession Number: 20180314–5181. Comments Due: 5 p.m. ET 4/4/18. Docket Numbers: ER18–1071–000. Applicants: ReEnergy Fort Fairfield LLC. Description: § 205(d) Rate Filing: Market-Based Rate Tariff Revisions to be effective 3/15/2018. Filed Date: 3/14/18. Accession Number: 20180314–5182. Comments Due: 5 p.m. ET 4/4/18. Docket Numbers: ER18–1072–000. Applicants: MinnDakota Wind LLC. Description: Compliance filing: Compliance 2018 to be effective 5/14/ 2018. Filed Date: 3/14/18. Accession Number: 20180314–5184. Comments Due: 5 p.m. ET 4/4/18. Docket Numbers: ER18–1073–000. Applicants: ReEnergy Livermore Falls LLC. Description: § 205(d) Rate Filing: Market-Based Rate Tariff Revisions to be effective 3/15/2018. Filed Date: 3/14/18. Accession Number: 20180314–5188. Comments Due: 5 p.m. ET 4/4/18. Docket Numbers: ER18–1074–000. Applicants: ReEnergy Stratton LLC. Description: § 205(d) Rate Filing: Market-Based Rate Tariff Revisions to be effective 3/15/2018. Filed Date: 3/14/18. Accession Number: 20180314–5190. Comments Due: 5 p.m. ET 4/4/18. Docket Numbers: ER18–1075–000. Applicants: Public Service Company of New Mexico. Description: § 205(d) Rate Filing: eTariff Administrative Filing of OATT Revisions to be effective 11/1/2013. Filed Date: 3/14/18. Accession Number: 20180314–5196. Comments Due: 5 p.m. ET 4/4/18. Docket Numbers: ER18–1076–000. Applicants: GASNA 6P, LLC. Description: Baseline eTariff Filing: GASNA 6P, LLC MBR Tariff to be effective 3/15/2018. Filed Date: 3/14/18. Accession Number: 20180314–5200. Comments Due: 5 p.m. ET 4/4/18. Docket Numbers: ER18–1077–000. Applicants: GASNA 36P, LLC. Description: Baseline eTariff Filing: GASNA 36P, LLC MBR Tariff to be effective 3/15/2018. Filed Date: 3/14/18. Accession Number: 20180314–5201. Comments Due: 5 p.m. ET 4/4/18. Docket Numbers: ER18–1078–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) Rate Filing: Revisions to Require Phasor Measuring Units at New Generator Interconnections to be effective 5/13/ 2018. Filed Date: 3/14/18. Accession Number: 20180314–5205. Comments Due: 5 p.m. ET 4/4/18. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: March 15, 2018. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2018–05671 Filed 3–20–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Institution of Section 206 Proceeding and Refund Effective Date sradovich on DSK3GMQ082PROD with NOTICES Docket No. Alcoa Power Generating Inc.—Long Sault Division ................................................................................................................ Alcoa Power Generating Inc.—Tapoco Division ..................................................................................................................... Avista Corporation ................................................................................................................................................................... Black Hills/Colorado Electric Utility Company, L.P ................................................................................................................. Central Hudson Gas & Electric Corporation ........................................................................................................................... Cheyenne Light, Fuel and Power Company ........................................................................................................................... Consolidated Edison Company of New York, Inc ................................................................................................................... Cube Yadkin Transmission LLC .............................................................................................................................................. DATC Path 15, LLC ................................................................................................................................................................. Deseret Generation and Transmission Co-operative, Inc ....................................................................................................... El Paso Electric Company ....................................................................................................................................................... Electric Energy, Inc .................................................................................................................................................................. Essential Power Rock Springs, LLC ....................................................................................................................................... Florida Power & Light Company ............................................................................................................................................. Monongahela Power Company ............................................................................................................................................... Potomac Edison Company. West Penn Power Company. Nevada Power Company ......................................................................................................................................................... Sierra Pacific Power Company. New York State Electric & Gas Corporation ........................................................................................................................... NorthWestern Corporation ....................................................................................................................................................... Ohio Valley Electric Corporation ............................................................................................................................................. Orange & Rockland Utilities, Inc ............................................................................................................................................. Pacific Gas and Electric Company .......................................................................................................................................... Portland General Electric Company ........................................................................................................................................ Rochester Gas and Electric Corporation ................................................................................................................................. Rockland Electric Company .................................................................................................................................................... Sky River LLC .......................................................................................................................................................................... Smoky Mountain Transmission LLC ........................................................................................................................................ Startrans, IO, LLC .................................................................................................................................................................... VerDate Sep<11>2014 18:34 Mar 20, 2018 Jkt 244001 PO 00000 Frm 00046 Fmt 4703 Sfmt 4703 E:\FR\FM\21MRN1.SGM 21MRN1 EL18–72–000 EL18–73–000 EL18–75–000 EL18–76–000 EL18–77–000 EL18–79–000 EL18–89–000 EL18–90–000 EL18–91–000 EL18–93–000 EL18–95–000 EL18–96–000 EL18–97–000 EL18–98–000 EL18–101–000 EL18–102–000 EL18–103–000 EL18–104–000 EL18–105–000 EL18–107–000 EL18–108–000 EL18–109–000 EL18–110–000 EL18–111–000 EL18–112–000 EL18–113–000 EL18–115–000 12379 Federal Register / Vol. 83, No. 55 / Wednesday, March 21, 2018 / Notices Docket No. sradovich on DSK3GMQ082PROD with NOTICES The Dayton Power & Light Company ...................................................................................................................................... Trans Bay Cable LLC .............................................................................................................................................................. Tucson Electric Power Company ............................................................................................................................................ On March 15, 2018, the Commission issued an order in Docket Nos. EL18– 72–000, EL18–73–000, EL18–75–000, EL18–76–000, EL18–77–000, EL18–79– 000, EL18–89–000, EL18–90–000, EL18– 91–000, EL18–93–000, EL18–95–000, EL18–96–000, EL18–97–000, EL18–98– 000, EL18–101–000, EL18–102–000, EL18–103–000, EL18–104–000, EL18– 105–000, EL18–107–000, EL18–108– 000, EL18–109–000, EL18–110–000, EL18–111–000, EL18–112–000, EL18– 113–000, EL18–115–000, EL18–117– 000, EL18–118–000, and EL18–119–000, pursuant to section 206 of the Federal Power Act (FPA), 16 U.S.C. 824e (2012), instituting an investigation into the justness and reasonableness of each of the above-captioned public utilities’ stated transmission rates under its open access transmission tariff or transmission owner tariff on file with the Commission. Alcoa Power Generating Inc.—Long Sault Division, et al., 162 FERC 61,224 (2018). The refund effective date in Docket Nos. EL18–72–000, EL18–73–000, EL18–75–000, EL18–76–000, EL18–77– 000, EL18–79–000, EL18–89–000, EL18– 90–000, EL18–91–000, EL18–93–000, EL18–95–000, EL18–96–000, EL18–97– 000, EL18–98–000, EL18–101–000, EL18–102–000, EL18–103–000, EL18– 104–000, EL18–105–000, EL18–107– 000, EL18–108–000, EL18–109–000, EL18–110–000, EL18–111–000, EL18– 112–000, EL18–113–000, EL18–115– 000, EL18–117–000, EL18–118–000, and EL18–119–000, established pursuant to section 206(b) of the FPA, will be the date of publication of this notice in the Federal Register. Any interested person desiring to be heard in Docket Nos. EL18–72–000, EL18–73–000, EL18–75–000, EL18–76– 000, EL18–77–000, EL18–79–000, EL18– 89–000, EL18–90–000, EL18–91–000, EL18–93–000, EL18–95–000, EL18–96– 000, EL18–97–000, EL18–98–000, EL18– 101–000, EL18–102–000, EL18–103– 000, EL18–104–000, EL18–105–000, EL18–107–000, EL18–108–000, EL18– 109–000, EL18–110–000, EL18–111– 000, EL18–112–000, EL18–113–000, EL18–115–000, EL18–117–000, EL18– 118–000, and EL18–119–000 must file a notice of intervention or motion to intervene, as appropriate, with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, in accordance with Rule 214 of VerDate Sep<11>2014 18:34 Mar 20, 2018 Jkt 244001 the Commission’s Rules of Practice and Procedure, 18 CFR 385.214, within 21 days of the date of issuance of the order. Dated: March 15, 2018. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2018–05675 Filed 3–20–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2520–076] Great Lakes Hydro America, LLC; Notice of Availability of Draft Environmental Assessment In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission’s (Commission) regulations, 18 CFR part 380, the Office of Energy Projects has reviewed the application for new license for the Mattaceunk Hydroelectric Project, located on the Penobscot River in Aroostook and Penobscot Counties, Maine, and has prepared a Draft Environmental Assessment (DEA) for the project. The project does not occupy federal land. The DEA contains Commission staff’s analysis of the potential effects of continued operation and maintenance of the project. The DEA concludes that relicensing the project, with appropriate environmental protective measures, would not constitute a major federal action that would significantly affect the quality of the human environment. A copy of the DEA is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s website at https:// www.ferc.gov, using the eLibrary link. Enter the docket number, excluding the last three digits, in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ ferc.gov, or toll-free at 1–866–208–3676, or for TTY, (202) 502–8659. You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. PO 00000 Frm 00047 Fmt 4703 Sfmt 4703 EL18–117–000 EL18–118–000 EL18–119–000 For assistance, contact FERC Online Support. Any comments should be filed within 45 days from the date of this notice. The Commission strongly encourages electronic filing. Please file comments using the Commission’s eFiling system at https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support. In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The first page of any filing should include docket number P–2520–076. For further information, contact Adam Peer at (202) 502–8449, or by email at adam.peer@ferc.gov. Dated: March 15, 2018. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2018–05680 Filed 3–20–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 3267–017] ECOsponsible, LLC; Notice Of Intent To File License Application, Filing of Pre-Application Document, and Approving Use of The Traditional Licensing Process a. Type of Filing: Notice of Intent to File License Application and Request to Use the Traditional Licensing Process. b. Project No.: 3267–017. c. Date Filed: August 14, 2017. d. Submitted By: ECOsponsible, LLC. e. Name of Project: Ballard Mill Hydroelectric Project. f. Location: On the Salmon River, in Franklin County, New York. No federal lands are occupied by the project works or located within the project boundary. g. Filed Pursuant to: 18 CFR 5.3 of the Commission’s regulations. h. Potential Applicant Contact: Dennis Ryan, Manager, ECOsponsible, E:\FR\FM\21MRN1.SGM 21MRN1

Agencies

[Federal Register Volume 83, Number 55 (Wednesday, March 21, 2018)]
[Notices]
[Pages 12378-12379]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-05675]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Notice of Institution of Section 206 Proceeding and Refund 
Effective Date

------------------------------------------------------------------------
                                                  Docket No.
------------------------------------------------------------------------
Alcoa Power Generating Inc.--Long     EL18-72-000
 Sault Division.
Alcoa Power Generating Inc.--Tapoco   EL18-73-000
 Division.
Avista Corporation..................  EL18-75-000
Black Hills/Colorado Electric         EL18-76-000
 Utility Company, L.P.
Central Hudson Gas & Electric         EL18-77-000
 Corporation.
Cheyenne Light, Fuel and Power        EL18-79-000
 Company.
Consolidated Edison Company of New    EL18-89-000
 York, Inc.
Cube Yadkin Transmission LLC........  EL18-90-000
DATC Path 15, LLC...................  EL18-91-000
Deseret Generation and Transmission   EL18-93-000
 Co-operative, Inc.
El Paso Electric Company............  EL18-95-000
Electric Energy, Inc................  EL18-96-000
Essential Power Rock Springs, LLC...  EL18-97-000
Florida Power & Light Company.......  EL18-98-000
Monongahela Power Company...........  EL18-101-000
Potomac Edison Company..............
West Penn Power Company.............
Nevada Power Company................  EL18-102-000
Sierra Pacific Power Company........
New York State Electric & Gas         EL18-103-000
 Corporation.
NorthWestern Corporation............  EL18-104-000
Ohio Valley Electric Corporation....  EL18-105-000
Orange & Rockland Utilities, Inc....  EL18-107-000
Pacific Gas and Electric Company....  EL18-108-000
Portland General Electric Company...  EL18-109-000
Rochester Gas and Electric            EL18-110-000
 Corporation.
Rockland Electric Company...........  EL18-111-000
Sky River LLC.......................  EL18-112-000
Smoky Mountain Transmission LLC.....  EL18-113-000
Startrans, IO, LLC..................  EL18-115-000

[[Page 12379]]

 
The Dayton Power & Light Company....  EL18-117-000
Trans Bay Cable LLC.................  EL18-118-000
Tucson Electric Power Company.......  EL18-119-000
------------------------------------------------------------------------

    On March 15, 2018, the Commission issued an order in Docket Nos. 
EL18-72-000, EL18-73-000, EL18-75-000, EL18-76-000, EL18-77-000, EL18-
79-000, EL18-89-000, EL18-90-000, EL18-91-000, EL18-93-000, EL18-95-
000, EL18-96-000, EL18-97-000, EL18-98-000, EL18-101-000, EL18-102-000, 
EL18-103-000, EL18-104-000, EL18-105-000, EL18-107-000, EL18-108-000, 
EL18-109-000, EL18-110-000, EL18-111-000, EL18-112-000, EL18-113-000, 
EL18-115-000, EL18-117-000, EL18-118-000, and EL18-119-000, pursuant to 
section 206 of the Federal Power Act (FPA), 16 U.S.C. 824e (2012), 
instituting an investigation into the justness and reasonableness of 
each of the above-captioned public utilities' stated transmission rates 
under its open access transmission tariff or transmission owner tariff 
on file with the Commission. Alcoa Power Generating Inc.--Long Sault 
Division, et al., 162 FERC 61,224 (2018).
    The refund effective date in Docket Nos. EL18-72-000, EL18-73-000, 
EL18-75-000, EL18-76-000, EL18-77-000, EL18-79-000, EL18-89-000, EL18-
90-000, EL18-91-000, EL18-93-000, EL18-95-000, EL18-96-000, EL18-97-
000, EL18-98-000, EL18-101-000, EL18-102-000, EL18-103-000, EL18-104-
000, EL18-105-000, EL18-107-000, EL18-108-000, EL18-109-000, EL18-110-
000, EL18-111-000, EL18-112-000, EL18-113-000, EL18-115-000, EL18-117-
000, EL18-118-000, and EL18-119-000, established pursuant to section 
206(b) of the FPA, will be the date of publication of this notice in 
the Federal Register.
    Any interested person desiring to be heard in Docket Nos. EL18-72-
000, EL18-73-000, EL18-75-000, EL18-76-000, EL18-77-000, EL18-79-000, 
EL18-89-000, EL18-90-000, EL18-91-000, EL18-93-000, EL18-95-000, EL18-
96-000, EL18-97-000, EL18-98-000, EL18-101-000, EL18-102-000, EL18-103-
000, EL18-104-000, EL18-105-000, EL18-107-000, EL18-108-000, EL18-109-
000, EL18-110-000, EL18-111-000, EL18-112-000, EL18-113-000, EL18-115-
000, EL18-117-000, EL18-118-000, and EL18-119-000 must file a notice of 
intervention or motion to intervene, as appropriate, with the Federal 
Energy Regulatory Commission, 888 First Street NE, Washington, DC 
20426, in accordance with Rule 214 of the Commission's Rules of 
Practice and Procedure, 18 CFR 385.214, within 21 days of the date of 
issuance of the order.

    Dated: March 15, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-05675 Filed 3-20-18; 8:45 am]
 BILLING CODE 6717-01-P