Federal Register / Vol. 83, No. 54 / Tuesday, March 20, 2018 / Notices
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
p. Filing and Service of Responsive
Documents: Any filing must (1) bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘PROTEST’’, or
‘‘MOTION TO INTERVENE’’ as
applicable; (2) set forth in the heading
the name of the applicant and the
project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, motions to intervene, or
protests must set forth their evidentiary
basis and otherwise comply with the
requirements of 18 CFR 4.34(b). All
comments, motions to intervene, or
protests should relate to the surrender
application that is the subject of this
notice. Agencies may obtain copies of
the application directly from the
applicant. A copy of any protest or
motion to intervene must be served
upon each representative of the
applicant specified in the particular
application. If an intervener files
comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency. A copy of all
other filings in reference to this
application must be accompanied by
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
q. Agency Comments—Federal, state,
and local agencies are invited to file
comments on the described proceeding.
If any agency does not file comments
within the time specified for filing
comments, it will be presumed to have
no comments.
Dated: March 14, 2018..
Kimberly D. Bose,
Secretary.
daltland on DSKBBV9HB2PROD with NOTICES
[FR Doc. 2018–05622 Filed 3–19–18; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
19:08 Mar 19, 2018
Jkt 244001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC18–69–000.
Applicants: HIKO Energy, LLC.
Description: Application for
Authorization Under Section 203 of the
Federal Power Act and Requests for
Waiver of Filing Requirements and
Confidential Treatment of HIKO Energy,
LLC.
Filed Date: 3/13/18.
Accession Number: 20180313–5213.
Comments Due: 5 p.m. ET 4/3/18.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER18–1006–000.
Applicants: AEP Texas Inc.
Description: § 205(d) Rate Filing:
AEPTX-Central Texas Electric Co-op
Interconnection Agreement to be
effective 2/21/2018.
Filed Date: 3/13/18.
Accession Number: 20180313–5166.
Comments Due: 5 p.m. ET 4/3/18.
Docket Numbers: ER18–1009–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Third Revised ISA, SA No. 3808, Queue
No. AC1–134 to be effective 2/13/2018.
Filed Date: 3/14/18.
Accession Number: 20180314–5040.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18–1013–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
2632R1 MKEC, Westar Energy and
KG&E Interconnection Agr to be
effective 12/31/9998.
Filed Date: 3/14/18.
Accession Number: 20180314–5083.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18–1015–000.
Applicants: Atlantic Renewable
Projects II LLC.
Description: Compliance filing:
Compliance 2018 to be effective 5/14/
2018.
Filed Date: 3/14/18.
Accession Number: 20180314–5096.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18–1016–000.
Applicants: Avangrid Arizona
Renewables, LLC.
Description: Compliance filing:
Compliance 2018 to be effective 5/14/
2018.
Filed Date: 3/14/18.
PO 00000
Frm 00036
Fmt 4703
Sfmt 4703
Accession Number: 20180314–5097.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18–1017–000.
Applicants: Avangrid Renewables,
LLC.
Description: Compliance filing:
Compliance 2018 to be effective 5/14/
2018.
Filed Date: 3/14/18.
Accession Number: 20180314–5098.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18–1018–000.
Applicants: Barton Windpower LLC.
Description: Compliance filing:
Compliance 2018 to be effective 5/14/
2018.
Filed Date: 3/14/18.
Accession Number: 20180314–5100.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18–1019–000.
Applicants: Big Horn II Wind Project
LLC.
Description: Compliance filing:
Compliance 2018 to be effective 5/14/
2018.
Filed Date: 3/14/18.
Accession Number: 20180314–5101.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18–1020–000.
Applicants: Big Horn Wind Project
LLC.
Description: Compliance filing:
Compliance 2018 to be effective 5/14/
2018.
Filed Date: 3/14/18.
Accession Number: 20180314–5102.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18–1021–000.
Applicants: Blue Creek Wind Farm
LLC.
Description: Compliance filing:
Compliance 2018 to be effective 5/14/
2018.
Filed Date: 3/14/18.
Accession Number: 20180314–5103.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18–1022–000.
Applicants: Buffalo Ridge I LLC.
Description: Compliance filing:
Compliance 2018 to be effective 5/14/
2018.
Filed Date: 3/14/18.
Accession Number: 20180314–5106.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18–1023–000.
Applicants: Buffalo Ridge II LLC.
Description: Compliance filing:
Compliance 2018 to be effective 5/14/
2018.
Filed Date: 3/14/18.
Accession Number: 20180314–5107.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18–1024–000.
Applicants: Colorado Green Holdings
LLC.
Description: Compliance filing:
Compliance 2018 to be effective 5/14/
2018.
E:\FR\FM\20MRN1.SGM
20MRN1
daltland on DSKBBV9HB2PROD with NOTICES
Federal Register / Vol. 83, No. 54 / Tuesday, March 20, 2018 / Notices
Filed Date: 3/14/18.
Accession Number: 20180314–5109.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18–1027–000.
Applicants: Dillon Wind LLC.
Description: Compliance filing:
Compliance 2018 to be effective 5/14/
2018.
Filed Date: 3/14/18.
Accession Number: 20180314–5111.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18–1028–000.
Applicants: Elm Creek Wind, LLC.
Description: Compliance filing:
Compliance 2018 to be effective 5/14/
2018.
Filed Date: 3/14/18.
Accession Number: 20180314–5114.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18–1030–000.
Applicants: Elm Creek Wind II LLC.
Description: Compliance filing:
Compliance 2018 to be effective 5/14/
2018.
Filed Date: 3/14/18.
Accession Number: 20180314–5116.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18–1032–000.
Applicants: Farmers City Wind, LLC.
Description: Compliance filing:
Compliance 2018 to be effective 5/14/
2018.
Filed Date: 3/14/18.
Accession Number: 20180314–5118.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18–1034–000.
Applicants: Flying Cloud Power
Partners, LLC.
Description: Compliance filing:
Compliance 2018 to be effective 5/14/
2018.
Filed Date: 3/14/18.
Accession Number: 20180314–5120.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18–1035–000.
Applicants: Groton Wind, LLC.
Description: Compliance filing:
Compliance 2018 to be effective 5/14/
2018.
Filed Date: 3/14/18.
Accession Number: 20180314–5121.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18–1036–000.
Applicants: Hardscrabble Wind Power
LLC.
Description: Compliance filing:
Compliance 2018 to be effective 5/14/
2018.
Filed Date: 3/14/18.
Accession Number: 20180314–5122.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18–1038–000.
Applicants: Hay Canyon Wind LLC.
Description: Compliance filing:
Compliance 2018 to be effective 5/14/
2018.
Filed Date: 3/14/18.
VerDate Sep<11>2014
19:08 Mar 19, 2018
Jkt 244001
Accession Number: 20180314–5124.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18–1039–000.
Applicants: Juniper Canyon Wind
Power LLC.
Description: Compliance filing:
Compliance 2018 to be effective 5/14/
2018.
Filed Date: 3/14/18.
Accession Number: 20180314–5127.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18–1040–000.
Applicants: Klamath Energy LLC.
Description: Compliance filing:
Compliance 2018 to be effective 5/14/
2018.
Filed Date: 3/14/18.
Accession Number: 20180314–5129.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18–1041–000.
Applicants: Klamath Generation LLC.
Description: Compliance filing:
Compliance 2018 to be effective 5/14/
2018.
Filed Date: 3/14/18.
Accession Number: 20180314–5130.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18–1042–000.
Applicants: Klondike Wind Power
LLC.
Description: Compliance filing:
Compliance 2018 to be effective 5/14/
2018.
Filed Date: 3/14/18.
Accession Number: 20180314–5132.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18–1043–000.
Applicants: Klondike Wind Power II
LLC.
Description: Compliance filing:
Compliance 2018 to be effective 5/14/
2018.
Filed Date: 3/14/18.
Accession Number: 20180314–5133.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18–1044–000.
Applicants: Klondike Wind Power III
LLC.
Description: Compliance filing:
Compliance 2018 to be effective 5/14/
2018.
Filed Date: 3/14/18.
Accession Number: 20180314–5134.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18–1045–000.
Applicants: Leaning Juniper Wind
Power II LLC.
Description: Compliance filing:
Compliance 2018 to be effective 5/14/
2018.
Filed Date: 3/14/18.
Accession Number: 20180314–5135.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18–1046–000.
Applicants: Lempster Wind, LLC.
Description: Compliance filing:
Compliance 2018 to be effective 5/14/
2018.
PO 00000
Frm 00037
Fmt 4703
Sfmt 4703
12183
Filed Date: 3/14/18.
Accession Number: 20180314–5136.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18–1047–000.
Applicants: Locust Ridge Wind Farm,
LLC.
Description: Compliance filing:
Compliance 2018 to be effective 5/14/
2018.
Filed Date: 3/14/18.
Accession Number: 20180314–5137.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18–1048–000.
Applicants: Locust Ridge II, LLC.
Description: Compliance filing:
Compliance 2018 to be effective 5/14/
2018.
Filed Date: 3/14/18.
Accession Number: 20180314–5139.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18–1049–000.
Applicants: Manzana Wind LLC.
Description: Compliance filing:
Compliance 2018 to be effective 5/14/
2018.
Filed Date: 3/14/18.
Accession Number: 20180314–5142.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18–1050–000.
Applicants: Moraine Wind LLC.
Description: Compliance filing:
Compliance 2018 to be effective 5/14/
2018.
Filed Date: 3/14/18.
Accession Number: 20180314–5144.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18–1051–000.
Applicants: Mountain View Power
Partners III, LLC.
Description: Compliance filing:
Compliance 2018 to be effective 5/14/
2018.
Filed Date: 3/14/18.
Accession Number: 20180314–5145.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18–1052–000.
Applicants: New England Wind, LLC.
Description: Compliance filing:
Compliance 2018 to be effective 5/14/
2018.
Filed Date: 3/14/18.
Accession Number: 20180314–5146.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18–1053–000.
Applicants: New Harvest Wind
Project LLC.
Description: Compliance filing:
Compliance 2018 to be effective 5/14/
2018.
Filed Date: 3/14/18.
Accession Number: 20180314–5147.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18–1054–000.
Applicants: Northern Iowa
Windpower II LLC.
Description: Compliance filing:
Compliance 2018 to be effective 5/14/
2018.
E:\FR\FM\20MRN1.SGM
20MRN1
daltland on DSKBBV9HB2PROD with NOTICES
12184
Federal Register / Vol. 83, No. 54 / Tuesday, March 20, 2018 / Notices
Filed Date: 3/14/18.
Accession Number: 20180314–5150.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18–1055–000.
Applicants: Pebble Springs Wind
LLC.
Description: Compliance filing:
Compliance 2018 to be effective 5/14/
2018.
Filed Date: 3/14/18.
Accession Number: 20180314–5155.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18–1056–000.
Applicants: Providence Heights Wind,
LLC.
Description: Compliance filing:
Compliance 2018 to be effective 5/14/
2018.
Filed Date: 3/14/18.
Accession Number: 20180314–5159.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18–1057–000.
Applicants: Rugby Wind LLC.
Description: Compliance filing:
Compliance 2018 to be effective 5/14/
2018.
Filed Date: 3/14/18.
Accession Number: 20180314–5161.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18–1058–000.
Applicants: San Luis Solar LLC.
Description: Compliance filing:
Compliance 2018 to be effective 5/14/
2018.
Filed Date: 3/14/18.
Accession Number: 20180314–5162.
Comments Due: 5 p.m. ET 4/4/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
Dated: March 14, 2018.
Kimberly D. Bose,
Secretary.
Dated: March 14, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–05619 Filed 3–19–18; 8:45 am]
[FR Doc. 2018–05621 Filed 3–19–18; 8:45 am]
BILLING CODE 6717–01–P
BILLING CODE 6717–01–P
VerDate Sep<11>2014
19:08 Mar 19, 2018
Jkt 244001
[Docket No. AD18–6–000]
[Docket No. AC18–56–000]
Notice of Request for Waiver; Southern
California Edison Company
Take notice that on March 13, 2018,
Southern California Edison Company,
filed a request for waiver of the use of
the equity method of accounting for
Edison Material Supply, LLC, including
FERC Form No. 1 and 3–Q, as required
by 18 CFR 141.1 and 18 CFR 141.400.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comments: 5:00 p.m. Eastern Time on
March 29, 2018.
PO 00000
Frm 00038
Fmt 4703
Sfmt 4703
Notice of Availability of the Final
Engineering Guidelines for the
Evaluation of Hydropower Projects:
Chapter 11—Arch Dams
The staff of the Federal Energy
Regulatory Commission’s (FERC or
Commission) Office of Energy Projects
has finalized its revised Engineering
Guidelines for the Evaluation of
Hydropower Projects: Chapter 11—Arch
Dams (Guidelines), which was issued in
draft form on December 7, 2017, for
comment. The Guidelines revision
reflects the most current thinking and
practices of the Division of Dam Safety
and Inspections.
The Guidelines can be found in
Docket Number AD18–6–000. The full
text of the Guidelines can be viewed on
the Commission’s website at https://
www.ferc.gov/industries/hydropower/
safety/guidelines/eng-guide/chap11.asp.
The Guidelines are intended to
provide guidance to the industry. This
document does not substitute for,
amend, or supersede the Commission’s
regulations under 18 CFR part 12—
Safety of Water Power Projects and
Project Works. The Guidelines impose
no new legal obligations and grants no
additional rights.
In response to the draft Guidelines,
Commission staff received comments
from federal and state agencies,
licensees whose portfolio includes arch
dams, independent consultants and
inspectors, and other interested parties.
Staff reviewed and considered each
comment and modified several portions
of the document in response. Staff
declined to modify the document where
comments either were already
adequately/accurately addressed as
written, or regarded topics that were not
relevant to the Guidelines.
All of the information related to the
proposed updates to the Guidelines and
submitted comments can be found on
the FERC website (www.ferc.gov) using
the eLibrary link. Click on the eLibrary
link, click on ‘‘Docket Search’’ and in
the Docket Number field enter the
docket number ‘‘AD18–6,’’ excluding
the last three digits. For assistance,
please contact FERC Online Support at
FercOnlineSupport@ferc.gov or toll free
at (866) 208–3676, or for TTY, contact
(202) 502–8659. The eLibrary link also
provides access to formal documents
issued by the Commission, such as
orders, notices, and rulemakings.
E:\FR\FM\20MRN1.SGM
20MRN1
Agencies
[Federal Register Volume 83, Number 54 (Tuesday, March 20, 2018)]
[Notices]
[Pages 12182-12184]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-05619]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
corporate filings:
Docket Numbers: EC18-69-000.
Applicants: HIKO Energy, LLC.
Description: Application for Authorization Under Section 203 of the
Federal Power Act and Requests for Waiver of Filing Requirements and
Confidential Treatment of HIKO Energy, LLC.
Filed Date: 3/13/18.
Accession Number: 20180313-5213.
Comments Due: 5 p.m. ET 4/3/18.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER18-1006-000.
Applicants: AEP Texas Inc.
Description: Sec. 205(d) Rate Filing: AEPTX-Central Texas Electric
Co-op Interconnection Agreement to be effective 2/21/2018.
Filed Date: 3/13/18.
Accession Number: 20180313-5166.
Comments Due: 5 p.m. ET 4/3/18.
Docket Numbers: ER18-1009-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Third Revised ISA, SA No.
3808, Queue No. AC1-134 to be effective 2/13/2018.
Filed Date: 3/14/18.
Accession Number: 20180314-5040.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18-1013-000.
Applicants: Southwest Power Pool, Inc.
Description: Sec. 205(d) Rate Filing: 2632R1 MKEC, Westar Energy
and KG&E Interconnection Agr to be effective 12/31/9998.
Filed Date: 3/14/18.
Accession Number: 20180314-5083.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18-1015-000.
Applicants: Atlantic Renewable Projects II LLC.
Description: Compliance filing: Compliance 2018 to be effective 5/
14/2018.
Filed Date: 3/14/18.
Accession Number: 20180314-5096.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18-1016-000.
Applicants: Avangrid Arizona Renewables, LLC.
Description: Compliance filing: Compliance 2018 to be effective 5/
14/2018.
Filed Date: 3/14/18.
Accession Number: 20180314-5097.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18-1017-000.
Applicants: Avangrid Renewables, LLC.
Description: Compliance filing: Compliance 2018 to be effective 5/
14/2018.
Filed Date: 3/14/18.
Accession Number: 20180314-5098.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18-1018-000.
Applicants: Barton Windpower LLC.
Description: Compliance filing: Compliance 2018 to be effective 5/
14/2018.
Filed Date: 3/14/18.
Accession Number: 20180314-5100.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18-1019-000.
Applicants: Big Horn II Wind Project LLC.
Description: Compliance filing: Compliance 2018 to be effective 5/
14/2018.
Filed Date: 3/14/18.
Accession Number: 20180314-5101.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18-1020-000.
Applicants: Big Horn Wind Project LLC.
Description: Compliance filing: Compliance 2018 to be effective 5/
14/2018.
Filed Date: 3/14/18.
Accession Number: 20180314-5102.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18-1021-000.
Applicants: Blue Creek Wind Farm LLC.
Description: Compliance filing: Compliance 2018 to be effective 5/
14/2018.
Filed Date: 3/14/18.
Accession Number: 20180314-5103.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18-1022-000.
Applicants: Buffalo Ridge I LLC.
Description: Compliance filing: Compliance 2018 to be effective 5/
14/2018.
Filed Date: 3/14/18.
Accession Number: 20180314-5106.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18-1023-000.
Applicants: Buffalo Ridge II LLC.
Description: Compliance filing: Compliance 2018 to be effective 5/
14/2018.
Filed Date: 3/14/18.
Accession Number: 20180314-5107.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18-1024-000.
Applicants: Colorado Green Holdings LLC.
Description: Compliance filing: Compliance 2018 to be effective 5/
14/2018.
[[Page 12183]]
Filed Date: 3/14/18.
Accession Number: 20180314-5109.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18-1027-000.
Applicants: Dillon Wind LLC.
Description: Compliance filing: Compliance 2018 to be effective 5/
14/2018.
Filed Date: 3/14/18.
Accession Number: 20180314-5111.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18-1028-000.
Applicants: Elm Creek Wind, LLC.
Description: Compliance filing: Compliance 2018 to be effective 5/
14/2018.
Filed Date: 3/14/18.
Accession Number: 20180314-5114.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18-1030-000.
Applicants: Elm Creek Wind II LLC.
Description: Compliance filing: Compliance 2018 to be effective 5/
14/2018.
Filed Date: 3/14/18.
Accession Number: 20180314-5116.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18-1032-000.
Applicants: Farmers City Wind, LLC.
Description: Compliance filing: Compliance 2018 to be effective 5/
14/2018.
Filed Date: 3/14/18.
Accession Number: 20180314-5118.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18-1034-000.
Applicants: Flying Cloud Power Partners, LLC.
Description: Compliance filing: Compliance 2018 to be effective 5/
14/2018.
Filed Date: 3/14/18.
Accession Number: 20180314-5120.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18-1035-000.
Applicants: Groton Wind, LLC.
Description: Compliance filing: Compliance 2018 to be effective 5/
14/2018.
Filed Date: 3/14/18.
Accession Number: 20180314-5121.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18-1036-000.
Applicants: Hardscrabble Wind Power LLC.
Description: Compliance filing: Compliance 2018 to be effective 5/
14/2018.
Filed Date: 3/14/18.
Accession Number: 20180314-5122.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18-1038-000.
Applicants: Hay Canyon Wind LLC.
Description: Compliance filing: Compliance 2018 to be effective 5/
14/2018.
Filed Date: 3/14/18.
Accession Number: 20180314-5124.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18-1039-000.
Applicants: Juniper Canyon Wind Power LLC.
Description: Compliance filing: Compliance 2018 to be effective 5/
14/2018.
Filed Date: 3/14/18.
Accession Number: 20180314-5127.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18-1040-000.
Applicants: Klamath Energy LLC.
Description: Compliance filing: Compliance 2018 to be effective 5/
14/2018.
Filed Date: 3/14/18.
Accession Number: 20180314-5129.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18-1041-000.
Applicants: Klamath Generation LLC.
Description: Compliance filing: Compliance 2018 to be effective 5/
14/2018.
Filed Date: 3/14/18.
Accession Number: 20180314-5130.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18-1042-000.
Applicants: Klondike Wind Power LLC.
Description: Compliance filing: Compliance 2018 to be effective 5/
14/2018.
Filed Date: 3/14/18.
Accession Number: 20180314-5132.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18-1043-000.
Applicants: Klondike Wind Power II LLC.
Description: Compliance filing: Compliance 2018 to be effective 5/
14/2018.
Filed Date: 3/14/18.
Accession Number: 20180314-5133.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18-1044-000.
Applicants: Klondike Wind Power III LLC.
Description: Compliance filing: Compliance 2018 to be effective 5/
14/2018.
Filed Date: 3/14/18.
Accession Number: 20180314-5134.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18-1045-000.
Applicants: Leaning Juniper Wind Power II LLC.
Description: Compliance filing: Compliance 2018 to be effective 5/
14/2018.
Filed Date: 3/14/18.
Accession Number: 20180314-5135.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18-1046-000.
Applicants: Lempster Wind, LLC.
Description: Compliance filing: Compliance 2018 to be effective 5/
14/2018.
Filed Date: 3/14/18.
Accession Number: 20180314-5136.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18-1047-000.
Applicants: Locust Ridge Wind Farm, LLC.
Description: Compliance filing: Compliance 2018 to be effective 5/
14/2018.
Filed Date: 3/14/18.
Accession Number: 20180314-5137.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18-1048-000.
Applicants: Locust Ridge II, LLC.
Description: Compliance filing: Compliance 2018 to be effective 5/
14/2018.
Filed Date: 3/14/18.
Accession Number: 20180314-5139.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18-1049-000.
Applicants: Manzana Wind LLC.
Description: Compliance filing: Compliance 2018 to be effective 5/
14/2018.
Filed Date: 3/14/18.
Accession Number: 20180314-5142.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18-1050-000.
Applicants: Moraine Wind LLC.
Description: Compliance filing: Compliance 2018 to be effective 5/
14/2018.
Filed Date: 3/14/18.
Accession Number: 20180314-5144.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18-1051-000.
Applicants: Mountain View Power Partners III, LLC.
Description: Compliance filing: Compliance 2018 to be effective 5/
14/2018.
Filed Date: 3/14/18.
Accession Number: 20180314-5145.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18-1052-000.
Applicants: New England Wind, LLC.
Description: Compliance filing: Compliance 2018 to be effective 5/
14/2018.
Filed Date: 3/14/18.
Accession Number: 20180314-5146.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18-1053-000.
Applicants: New Harvest Wind Project LLC.
Description: Compliance filing: Compliance 2018 to be effective 5/
14/2018.
Filed Date: 3/14/18.
Accession Number: 20180314-5147.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18-1054-000.
Applicants: Northern Iowa Windpower II LLC.
Description: Compliance filing: Compliance 2018 to be effective 5/
14/2018.
[[Page 12184]]
Filed Date: 3/14/18.
Accession Number: 20180314-5150.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18-1055-000.
Applicants: Pebble Springs Wind LLC.
Description: Compliance filing: Compliance 2018 to be effective 5/
14/2018.
Filed Date: 3/14/18.
Accession Number: 20180314-5155.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18-1056-000.
Applicants: Providence Heights Wind, LLC.
Description: Compliance filing: Compliance 2018 to be effective 5/
14/2018.
Filed Date: 3/14/18.
Accession Number: 20180314-5159.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18-1057-000.
Applicants: Rugby Wind LLC.
Description: Compliance filing: Compliance 2018 to be effective 5/
14/2018.
Filed Date: 3/14/18.
Accession Number: 20180314-5161.
Comments Due: 5 p.m. ET 4/4/18.
Docket Numbers: ER18-1058-000.
Applicants: San Luis Solar LLC.
Description: Compliance filing: Compliance 2018 to be effective 5/
14/2018.
Filed Date: 3/14/18.
Accession Number: 20180314-5162.
Comments Due: 5 p.m. ET 4/4/18.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: March 14, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-05619 Filed 3-19-18; 8:45 am]