Scott's Mill Hydro, LLC; Notice of Intent To File License Application, Filing of Pre-Application Document, Approving Use of the Traditional Licensing Process, 12008-12009 [2018-05493]
Download as PDF
12008
Federal Register / Vol. 83, No. 53 / Monday, March 19, 2018 / Notices
agency status should follow the
instructions for filing comments
provided under the Public Participation
section of this notice. Currently no
agencies has expressed their intention to
participate as a cooperating agency in
the preparation of the EA to satisfy their
NEPA responsibilities related to the
Project.
sradovich on DSK3GMQ082PROD with NOTICES
Consultations Under Section 106 of the
National Historic Preservation Act
In accordance with the Advisory
Council on Historic Preservation’s
implementing regulations for section
106 of the National Historic
Preservation Act, we are using this
notice to initiate consultation with the
applicable State Historic Preservation
Office (SHPO), and to solicit their views
and those of other government agencies,
interested Indian tribes, and the public
on the project’s potential effects on
historic properties.4 We will define the
project-specific Area of Potential Effects
(APE) in consultation with the SHPO as
the project develops. On natural gas
facility projects, the APE at a minimum
encompasses all areas subject to ground
disturbance (examples include
construction right-of-way, contractor/
pipe storage yards, compressor stations,
and access roads). Our EA for this
project will document our findings on
the impacts on historic properties and
summarize the status of consultations
under section 106.
Environmental Mailing List
The environmental mailing list
includes federal, state, and local
government representatives and
agencies; elected officials;
environmental and public interest
groups; Native American Tribes; other
interested parties; and local libraries
and newspapers. This list also includes
all affected landowners (as defined in
the Commission’s regulations) who are
potential right-of-way grantors, whose
property may be used temporarily for
project purposes, or who own homes
within certain distances of aboveground
facilities, and anyone who submits
comments on the project. We will
update the environmental mailing list as
the analysis proceeds to ensure that we
send the information related to this
environmental review to all individuals,
organizations, and government entities
interested in and/or potentially affected
by the proposed project.
4 The Advisory Council on Historic Preservation’s
regulations are at Title 36, Code of Federal
Regulations, Part 800. Those regulations define
historic properties as any prehistoric or historic
district, site, building, structure, or object included
in or eligible for inclusion in the National Register
of Historic Places.
VerDate Sep<11>2014
16:43 Mar 16, 2018
Jkt 244001
Becoming an Intervenor
DEPARTMENT OF ENERGY
In addition to involvement in the EA
scoping process, you may want to
become an ‘‘intervenor’’ which is an
official party to the Commission’s
proceeding. Intervenors play a more
formal role in the process and are able
to file briefs, appear at hearings, and be
heard by the courts if they choose to
appeal the Commission’s final ruling.
An intervenor formally participates in
the proceeding by filing a request to
intervene. Instructions for becoming an
intervenor are in the ‘‘Document-less
Intervention Guide’’ under the ‘‘e-filing’’
link on the Commission’s website.
Motions to intervene are more fully
described at https://www.ferc.gov/
resources/guides/how-to/intervene.asp.
Federal Energy Regulatory
Commission
Additional Information
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC
website at www.ferc.gov using the
‘‘eLibrary’’ link. Click on the eLibrary
link, click on ‘‘General Search’’ and
enter the docket number, excluding the
last three digits in the Docket Number
field (i.e., CP18–45). Be sure you have
selected an appropriate date range. For
assistance, please contact FERC Online
Support at FercOnlineSupport@ferc.gov
or toll free at (866) 208–3676, or for
TTY, contact (202) 502–8659. The
eLibrary link also provides access to the
texts of formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to www.ferc.gov/docsfiling/esubscription.asp.
Finally, public sessions or site visits
will be posted on the Commission’s
calendar located at www.ferc.gov/
EventCalendar/EventsList.aspx along
with other related information.
Dated: March 13, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–05494 Filed 3–16–18; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00055
Fmt 4703
Sfmt 4703
[Project No. 14867–000]
Scott’s Mill Hydro, LLC; Notice of
Intent To File License Application,
Filing of Pre-Application Document,
Approving Use of the Traditional
Licensing Process
a. Type of Filing: Notice of Intent to
File License Application and Request to
Use the Traditional Licensing Process.
b. Project No.: 14867–000.
c. Date Filed: January 11, 2018.
d. Submitted By: Scott’s Mill Hydro,
LLC.
e. Name of Project: Scott’s Mill
Hydroelectric Project.
f. Location: On the James River, in
Amherst and Bedford Counties,
Virginia. No federal lands are occupied
by the project works or located within
the project boundary.
g. Filed Pursuant to: 18 CFR 5.3 of the
Commission’s regulations.
h. Potential Applicant Contact: Mark
Fendig, Scott’s Mill Hydro, LLC., P.O.
Box 13, Coleman Falls, VA 24536; (540)
320–6762; email—mfendig@aisva.net.
i. FERC Contact: Jody Callihan at
(202) 502–8278; or email at
jody.callihan@ferc.gov.
j. Scott’s Mill Hydro, LLC filed its
request to use the Traditional Licensing
Process on January 11, 2018. Scott’s Mill
Hydro, LLC provided public notice of its
request on January 27, 2018. In a letter
dated March 13, 2018, the Director of
the Division of Hydropower Licensing
approved Scott’s Mill Hydro, LLC’s
request to use the Traditional Licensing
Process.
k. With this notice, we are initiating
informal consultation with the U.S. Fish
and Wildlife Service and/or NOAA
Fisheries under section 7 of the
Endangered Species Act and the joint
agency regulations thereunder at 50
CFR, Part 402; NOAA Fisheries under
section 305(b) of the Magnuson-Stevens
Fishery Conservation and Management
Act and implementing regulations at 50
CFR 600.920. We are also initiating
consultation with the Virginia State
Historic Preservation Officer, as
required by section 106 of the National
Historic Preservation Act and the
implementing regulations at 36 CFR
800.2.
l. With this notice, we are designating
Scott’s Mill Hydro, LLC as the
Commission’s non-federal
representative for carrying out informal
consultation pursuant to section 7 of the
Endangered Species Act and section
305(b) of the Magnuson-Stevens Fishery
E:\FR\FM\19MRN1.SGM
19MRN1
Federal Register / Vol. 83, No. 53 / Monday, March 19, 2018 / Notices
Conservation and Management Act; and
consultation pursuant to section 106 of
the National Historic Preservation Act.
m. Scott’s Mill Hydro, LLC filed a PreApplication Document (PAD; including
a proposed process plan and schedule)
with the Commission, pursuant to 18
CFR 5.6 of the Commission’s
regulations.
n. A copy of the PAD is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s website (https://
www.ferc.gov), using the ‘‘eLibrary’’
link. Enter the docket number,
excluding the last three digits in the
docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCONlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). Copies are also available for
inspection and reproduction at 912
Wilson Highway, Mouth-of-Wilson, VA
24363.
o. Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Dated: March 13, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–05493 Filed 3–16–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP18–100–000]
sradovich on DSK3GMQ082PROD with NOTICES
Notice of Request Under Blanket
Authorization; Columbia Gas
Transmission, LLC
Take notice that on March 1, 2018,
Columbia Gas Transmission, LLC
(Columbia), 700 Louisiana Street,
Houston, Texas 77002–2700, filed in
Docket No. CP18–100–000 a prior notice
request pursuant to sections 157.205
and 157.208 of the Commission’s
regulations under the Natural Gas Act
(NGA), as amended, for authorization to
perform certain installations and
activities to enable the in-line
inspection of a portion of its 24-inchdiameter Line 1983. The proposed
activities include installing two
launcher/receivers, removal of two
existing drips, and replacement of four
mainline valves in Gilmer, Doddridge,
and Wetzel Counties, West Virginia.
Columbia estimates the cost of the
VerDate Sep<11>2014
16:43 Mar 16, 2018
Jkt 244001
proposed project to be approximately
$15.6 million, all as more fully set forth
in the application which is on file with
the Commission and open to public
inspection. The filing may also be
viewed on the web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov or toll free at (866) 208–3676, or
TTY, contact (202) 502–8659.
Any questions concerning this
application may be directed to Linda
Farquhar, Manager, Project
Determinations & Regulatory
Administration, Columbia Gas
Transmission, LLC, 700 Louisiana
Street, Suite 700, Houston, Texas
77002–2700, by telephone at (832) 320–
5685, by fax at (832) 320–6685, or by
email at linda_farquhar@
transcanada.com.
Any person or the Commission’s staff
may, within 60 days after issuance of
the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and pursuant to section
157.205 of the regulations under the
NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the
time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for filing a protest. If a
protest is filed and not withdrawn
within 30 days after the allowed time
for filing a protest, the instant request
shall be treated as an application for
authorization pursuant to section 7 of
the NGA.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
PO 00000
Frm 00056
Fmt 4703
Sfmt 4703
12009
the date of issuance of the Commission
staff’s FEIS or EA.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenter’s will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commenter’s will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentary,
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 7 copies of the protest or
intervention to the Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426.
Dated: March 12, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–05426 Filed 3–16–18; 8:45 am]
BILLING CODE 6717–01–P
FEDERAL RESERVE SYSTEM
Formations of, Acquisitions by, and
Mergers of Bank Holding Companies
The companies listed in this notice
have applied to the Board for approval,
pursuant to the Bank Holding Company
Act of 1956 (12 U.S.C. 1841 et seq.)
(BHC Act), Regulation Y (12 CFR part
225), and all other applicable statutes
and regulations to become a bank
holding company and/or to acquire the
assets or the ownership of, control of, or
the power to vote shares of a bank or
bank holding company and all of the
banks and nonbanking companies
owned by the bank holding company,
including the companies listed below.
The applications listed below, as well
as other related filings required by the
Board, are available for immediate
inspection at the Federal Reserve Bank
indicated. The applications will also be
available for inspection at the offices of
the Board of Governors. Interested
E:\FR\FM\19MRN1.SGM
19MRN1
Agencies
[Federal Register Volume 83, Number 53 (Monday, March 19, 2018)]
[Notices]
[Pages 12008-12009]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-05493]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14867-000]
Scott's Mill Hydro, LLC; Notice of Intent To File License
Application, Filing of Pre-Application Document, Approving Use of the
Traditional Licensing Process
a. Type of Filing: Notice of Intent to File License Application and
Request to Use the Traditional Licensing Process.
b. Project No.: 14867-000.
c. Date Filed: January 11, 2018.
d. Submitted By: Scott's Mill Hydro, LLC.
e. Name of Project: Scott's Mill Hydroelectric Project.
f. Location: On the James River, in Amherst and Bedford Counties,
Virginia. No federal lands are occupied by the project works or located
within the project boundary.
g. Filed Pursuant to: 18 CFR 5.3 of the Commission's regulations.
h. Potential Applicant Contact: Mark Fendig, Scott's Mill Hydro,
LLC., P.O. Box 13, Coleman Falls, VA 24536; (540) 320-6762; email_
[email protected]
i. FERC Contact: Jody Callihan at (202) 502-8278; or email at
[email protected].
j. Scott's Mill Hydro, LLC filed its request to use the Traditional
Licensing Process on January 11, 2018. Scott's Mill Hydro, LLC provided
public notice of its request on January 27, 2018. In a letter dated
March 13, 2018, the Director of the Division of Hydropower Licensing
approved Scott's Mill Hydro, LLC's request to use the Traditional
Licensing Process.
k. With this notice, we are initiating informal consultation with
the U.S. Fish and Wildlife Service and/or NOAA Fisheries under section
7 of the Endangered Species Act and the joint agency regulations
thereunder at 50 CFR, Part 402; NOAA Fisheries under section 305(b) of
the Magnuson-Stevens Fishery Conservation and Management Act and
implementing regulations at 50 CFR 600.920. We are also initiating
consultation with the Virginia State Historic Preservation Officer, as
required by section 106 of the National Historic Preservation Act and
the implementing regulations at 36 CFR 800.2.
l. With this notice, we are designating Scott's Mill Hydro, LLC as
the Commission's non-federal representative for carrying out informal
consultation pursuant to section 7 of the Endangered Species Act and
section 305(b) of the Magnuson-Stevens Fishery
[[Page 12009]]
Conservation and Management Act; and consultation pursuant to section
106 of the National Historic Preservation Act.
m. Scott's Mill Hydro, LLC filed a Pre-Application Document (PAD;
including a proposed process plan and schedule) with the Commission,
pursuant to 18 CFR 5.6 of the Commission's regulations.
n. A copy of the PAD is available for review at the Commission in
the Public Reference Room or may be viewed on the Commission's website
(https://www.ferc.gov), using the ``eLibrary'' link. Enter the docket
number, excluding the last three digits in the docket number field to
access the document. For assistance, contact FERC Online Support at
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). Copies are also available for inspection and reproduction
at 912 Wilson Highway, Mouth-of-Wilson, VA 24363.
o. Register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
Dated: March 13, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-05493 Filed 3-16-18; 8:45 am]
BILLING CODE 6717-01-P