Pioneer Valley Renewables; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 11192 [2018-05110]
Download as PDF
11192
Federal Register / Vol. 83, No. 50 / Wednesday, March 14, 2018 / Notices
identifying information requested by the
Department while processing the
request, to distinguish between
individuals with the same name. Your
request must meet the requirements of
the Department’s Privacy Act
regulations at 34 CFR 5b.5, including
proof of identity.
EXEMPTIONS PROMULGATED FOR THE SYSTEM:
None.
HISTORY:
None.
[FR Doc. 2018–05195 Filed 3–13–18; 8:45 am]
BILLING CODE 4000–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14868–000]
daltland on DSKBBV9HB2PROD with NOTICES
Pioneer Valley Renewables; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On February 13, 2018, Pioneer Valley
Renewables, filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act (FPA),
proposing to study the feasibility of the
Scotlandville Bend Project
(Scotlandville Project or project) to be
located on the Mississippi River, in
West Baton Rouge and East Baton Rouge
Parishes, Louisiana. The sole purpose of
a preliminary permit, if issued, is to
grant the permit holder priority to file
a license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed project would consist of
the following: (1) Four underwater,
carbon fiber shroud and blade design
turbine-generating units, each with a
diameter of 18 meters and a cross
section of 4 meters; (2) each pair of units
will be mounted on a riverbed secured
piling, 30 meters apart; (3) flexible
cables would convey power to a
metering station; and (4) a transmission
line would interconnect with the power
grid. Each unit would have an installed
capacity of 1.5 megawatts for a total
generating capacity of 6 megawatts. The
proposed project would have an
estimated average annual generation of
40,000 megawatt-hours, which would be
sold.
Applicant Contact: Mr. Mark D. Farb,
Pioneer Valley Renewables, 240 Central
VerDate Sep<11>2014
18:17 Mar 13, 2018
Jkt 244001
Avenue, 1J, Lawrence, New York 11559;
phone: (631) 552–0284.
FERC Contact: Michael Spencer, (202)
502–6093, michael.spencer@ferc.gov
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket number P–14868–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the eLibrary
link of Commission’s website at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–14868) in
the docket number field to access the
document. For assistance, contact FERC
Online Support.
Dated: March 7, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–05110 Filed 3–13–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Attendance at the Colorado
Public Utilities Commission’s Fifth
Commissioner Information Meeting
The Federal Energy Regulatory
Commission (Commission) hereby gives
notice that members of its staff may
attend the Colorado Public Utilities
Commission’s Commissioner
Information Meeting (CIM) as noted
below. Their attendance is part of the
Commission’s ongoing outreach efforts.
The CIM will be held on March 20,
2018 from 9:00 a.m. until 3:00 p.m.
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
Mountain Time at the Colorado Public
Utilities Commission, Hearing Room A,
1560 Broadway, Suite 250, Denver, CO
80202. The phone number is (303) 894–
2533.
The discussions may address matters
at issue in the following proceedings:
Docket No. ER12–1179, Southwest Power
Pool, Inc.
Docket No. ER15–1809, ATX Southwest, LLC
Docket No. ER15–2028, Southwest Power
Pool, Inc.
Docket No. ER15–2115, Southwest Power
Pool, Inc.
Docket No. ER15–2236, Midwest Power
Transmission Arkansas, LLC
Docket No. ER15–2237, Kanstar
Transmission, LLC
Docket No. ER15–2324, Southwest Power
Pool, Inc.
Docket No. ER15–2594, South Central MCN
LLC
Docket No. EL16–91, Southwest Power Pool,
Inc.
Docket No. EL18–19, Southwest Power Pool,
Inc.
Docket No. EL16–108, Tilton Energy v.
Midcontinent Independent System
Operator, Inc.
Docket No. EL16–110, Southwest Power Pool,
Inc.
Docket No. ER16–204, Southwest Power Pool,
Inc.
Docket No. ER16–2522, Southwest Power
Pool, Inc.
Docket No. ER16–2523, Southwest Power
Pool, Inc.
Docket No. EL17–11, Alabama Power Co. v.
Southwest Power Pool, Inc.
Docket No. EL17–21, Kansas Electric Co. v.
Southwest Power Pool, Inc.
Docket No. EL17–69, Buffalo Dunes et al. v.
Southwest Power Pool, Inc.
Docket No. EL17–86, Nebraska Public Power
District v. Southwest Power Pool, Inc.
Docket No. ER17–426, Southwest Power Pool,
Inc.
Docket No. ER17–428, Southwest Power Pool,
Inc.
Docket No. ER17–469, Southwest Power Pool,
Inc.
Docket No. ER17–772, Southwest Power Pool,
Inc.
Docket No. ER17–889, Southwest Power Pool,
Inc.
Docket No. ER17–953, South Central MCN
LLC
Docket No. ER17–1092, Southwest Power
Pool, Inc.
Docket No. ER17–1575, Southwest Power
Pool, Inc.
Docket No. ER17–2229, Southwest Power
Pool, Inc.
Docket No. ER18–171, Southwest Power Pool,
Inc.
Docket No. ER18–194, Southwest Power Pool,
Inc.
Docket No. ER18–195, Southwest Power Pool,
Inc.
Docket No. ER18–374, Southwest Power Pool,
Inc.
Docket No. ER18–381, Southwest Power Pool,
Inc.
Docket No. ER18–499, Southwestern Electric
Power Company
E:\FR\FM\14MRN1.SGM
14MRN1
Agencies
[Federal Register Volume 83, Number 50 (Wednesday, March 14, 2018)]
[Notices]
[Page 11192]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-05110]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14868-000]
Pioneer Valley Renewables; Notice of Preliminary Permit
Application Accepted for Filing and Soliciting Comments, Motions To
Intervene, and Competing Applications
On February 13, 2018, Pioneer Valley Renewables, filed an
application for a preliminary permit, pursuant to section 4(f) of the
Federal Power Act (FPA), proposing to study the feasibility of the
Scotlandville Bend Project (Scotlandville Project or project) to be
located on the Mississippi River, in West Baton Rouge and East Baton
Rouge Parishes, Louisiana. The sole purpose of a preliminary permit, if
issued, is to grant the permit holder priority to file a license
application during the permit term. A preliminary permit does not
authorize the permit holder to perform any land-disturbing activities
or otherwise enter upon lands or waters owned by others without the
owners' express permission.
The proposed project would consist of the following: (1) Four
underwater, carbon fiber shroud and blade design turbine-generating
units, each with a diameter of 18 meters and a cross section of 4
meters; (2) each pair of units will be mounted on a riverbed secured
piling, 30 meters apart; (3) flexible cables would convey power to a
metering station; and (4) a transmission line would interconnect with
the power grid. Each unit would have an installed capacity of 1.5
megawatts for a total generating capacity of 6 megawatts. The proposed
project would have an estimated average annual generation of 40,000
megawatt-hours, which would be sold.
Applicant Contact: Mr. Mark D. Farb, Pioneer Valley Renewables, 240
Central Avenue, 1J, Lawrence, New York 11559; phone: (631) 552-0284.
FERC Contact: Michael Spencer, (202) 502-6093,
[email protected]
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, notices of intent, and competing
applications using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You
must include your name and contact information at the end of your
comments. For assistance, please contact FERC Online Support at
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE,
Washington, DC 20426. The first page of any filing should include
docket number P-14868-000.
More information about this project, including a copy of the
application, can be viewed or printed on the eLibrary link of
Commission's website at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-14868) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Dated: March 7, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-05110 Filed 3-13-18; 8:45 am]
BILLING CODE 6717-01-P