Combined Notice of Filings #2, 10469-10470 [2018-04738]

Download as PDF amozie on DSK30RV082PROD with NOTICES Federal Register / Vol. 83, No. 47 / Friday, March 9, 2018 / Notices 1001 Louisiana Street, Suite 1000, Houston, TX 77002 and National Fuel Gas Supply Corporation (National Fuel), 6363 Main Street, Williamsville, NY 14221, jointly filed an application in Docket No. CP18–84–000 pursuant to section 7(c) of the Natural Gas Act (NGA), and Part 157 of the Commission’s regulations, for a certificate of public convenience and/or necessity requesting authorization to establish a protective boundary around the active limit of the Ellisburg Storage Pool located in Potter, Pennsylvania. The proposed expansion would establish a 2,000-foot buffer area around the reservoir containing 6,394.57 acres, all as more fully set forth in the application which is on file with the Commission and open for public inspection. The filing may also be viewed on the web at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (866) 208–3676 or TTY, (202) 502–8659. Any questions regarding this application may be directed to Matthew R. Bley, Director, Gas Transmission Certificates, Dominion Energy Transmission, Inc., 707 East Main Street, Richmond, Virginia 23219, or by calling 866–319–3382, or email at Matthew.R.Bley@DominionEnergy.com. Pursuant to section 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: Complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. There are two ways to become involved in the Commission’s review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the comment date VerDate Sep<11>2014 16:47 Mar 08, 2018 Jkt 244001 stated below, file with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission’s Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit 7 copies of filings made with the Commission and must mail a copy to the applicant and to every other party in the proceeding. Only parties to the proceeding can ask for court review of Commission orders in the proceeding. However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission’s rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commenter’s will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commenter’s will not be required to serve copies of filed documents on all other parties. However, the non-party commentary, will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and ill not have the right to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the eFiling link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, PO 00000 Frm 00047 Fmt 4703 Sfmt 4703 10469 888 First Street NE, Washington, DC 20426. See, 18 CFR 385.2001(a) (1) (iii) and the instructions on the Commission’s website under the eFiling link. Comment Date: 5:00 p.m. Eastern Time on March 15, 2018. Dated: February 22, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–04708 Filed 3–8–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #2 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER10–1532–003; ER10–1541–004; ER10–1642–005; ER10–1763–003; ER10–1766–003; ER10–1767–003; ER13–2349–002; ER13–2350–002; ER16–221–001; ER17– 1757–001. Applicants: Entergy Arkansas, Inc., Entergy Louisiana, LLC, Entergy Mississippi, Inc., Entergy New Orleans, LLC, Entergy Texas, Inc., Entergy Nuclear Palisades, LLC, Entergy Power, LLC, EWO Marketing, LLC, EAM Nelson Holding, LLC, RS Cogen, LLC, Entergy Services, Inc. Description: Supplement to December 28, 2017 Triennial Market Power Update for the Central Region of the Entergy MBR Utilities. Filed Date: 3/1/18. Accession Number: 20180301–5319. Comments Due: 5 p.m. ET 3/22/18. Docket Numbers: ER17–481–000. Applicants: CPV Maryland, LLC. Description: Report Filing: Refund Report to be effective N/A. Filed Date: 3/5/18. Accession Number: 20180305–5323. Comments Due: 5 p.m. ET 3/26/18. Docket Numbers: ER18–958–000. Applicants: Duke Energy Florida, LLC. Description: § 205(d) Rate Filing: DEF–DEF E&P Agreement—Hamilton Solar to be effective 3/6/2018. Filed Date: 3/5/18. Accession Number: 20180305–5284. Comments Due: 5 p.m. ET 3/26/18. Docket Numbers: ER18–959–000. Applicants: Bayonne Plant Holding, L.L.C. Description: Tariff Cancellation: Notice of Cancellation of Rate Schedule and Request for Waiver to be effective 6/1/2018. E:\FR\FM\09MRN1.SGM 09MRN1 10470 Federal Register / Vol. 83, No. 47 / Friday, March 9, 2018 / Notices Filed Date: 3/5/18. Accession Number: 20180305–5286. Comments Due: 5 p.m. ET 3/26/18. Docket Numbers: ER18–961–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Original Service Agreement No. 4955— NITSA among PJM and AEP EP to be effective 6/1/2014. Filed Date: 3/5/18. Accession Number: 20180305–5288. Comments Due: 5 p.m. ET 3/26/18. Docket Numbers: ER18–962–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Original Service Agreement No. 4956— NITSA among PJM and AEPSC to be effective 1/1/2017. Filed Date: 3/5/18. Accession Number: 20180305–5290. Comments Due: 5 p.m. ET 3/26/18. amozie on DSK30RV082PROD with NOTICES Docket Numbers: ER18–963–000. Applicants: Southern Maryland Electric Cooperative, Inc., PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: SMECO submits revisions to OATT, Att. H–9C re: Transmission Revenue Requirement to be effective 5/1/2018. Filed Date: 3/5/18. Accession Number: 20180305–5293. Comments Due: 5 p.m. ET 3/26/18. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: March 5, 2018. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2018–04738 Filed 3–8–18; 8:45 am] BILLING CODE 6717–01–P VerDate Sep<11>2014 16:47 Mar 08, 2018 Jkt 244001 Dated: February 22, 2018. Kimberly D. Bose, Secretary. DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [FR Doc. 2018–04707 Filed 3–8–18; 8:45 am] [Docket No. CP18–42–000] BILLING CODE 6717–01–P Transcontinental Gas Pipe Line Company, LLC; Notice of Filing DEPARTMENT OF ENERGY Take notice that on January 2, 2018, pursuant to Rule 212 of the Commission’s Rules of Practice and Procedure (18 CFR 385.212), the North Carolina Utilities Commission (NCUC) filed a motion for order to show cause regarding: (1) Whether Transcontinental Gas Pipe Line Company, LLC (Transco) has been operating, and is continuing to operate, its Eminence Salt Dome Storage Field, located near the Town of Seminary in Covington County, Mississippi, in accordance with the amended certificate issued in Docket No. CP11–151; 1 and, (2) whether Transco should be allowed to assess demand charges for the amount of firm service from the Eminence Salt Dome Storage Field under Rate Schedule ESS and Rate Schedule EESWS that Transco allegedly has been and is currently unable to provide given the revised operating parameters of the Eminence Salt Dome Storage Field. The filing may also be viewed on the web at https://www.ferc.gov using the eLibrary link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at (866) 208–3676, or TTY, contact (202) 502–8659. Any person wishing to obtain legal status by becoming a party to this proceeding should, on or before the comment date listed below, file with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission’s Rules of Practice and Procedure (18 CFR 385.214). The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the eFiling link at https://www.ferc.gov. Persons unable to file electronically should submit an original and five copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. Comment Date: 5:00 p.m. Eastern Time on March 15, 2018. 1 Transcontinental Gas Pipe Line Co., LLC, 142 FERC 61,095 (2013), order on reh’g, 147 FERC 61,091 (2014). PO 00000 Frm 00048 Fmt 4703 Sfmt 4703 Federal Energy Regulatory Commission [Docket No. PF17–8–000] Commonwealth LNG LLC; Notice of Intent To Prepare an Environmental Impact Statement for the Planned Commonwealth LNG Project, Request for Comments on Environmental Issues, and Notice of Public Scoping Session The staff of the Federal Energy Regulatory Commission (FERC or Commission) will prepare an environmental impact statement (EIS) that will discuss the environmental impacts of the Commonwealth LNG Project involving construction and operation of facilities by Commonwealth LNG LLC (Commonwealth LNG) in Cameron Parish, Louisiana. The Commission will use this EIS in its decision-making process to determine whether the project is in the public interest. This notice announces the opening of the scoping process the Commission will use to gather input from the public and interested agencies on the project. You can make a difference by providing us with your specific comments or concerns about the project. Your comments should focus on the potential environmental effects, reasonable alternatives, and measures to avoid or lessen environmental impacts. Your input will help the Commission staff determine what issues they need to evaluate in the EIS. To ensure that your comments are timely and properly recorded, please send your comments so that the Commission receives them in Washington, DC on or before March 26, 2018. If you sent comments on this project to the Commission before the opening of this docket on July 28, 2017, you will need to file those comments in Docket No. PF17–8–000 to ensure they are considered as part of this proceeding. This notice is being sent to the Commission’s current environmental mailing list for this project. State and local government representatives should notify their constituents of this planned project and encourage them to comment on their areas of concern. A fact sheet prepared by the FERC entitled An Interstate Natural Gas E:\FR\FM\09MRN1.SGM 09MRN1

Agencies

[Federal Register Volume 83, Number 47 (Friday, March 9, 2018)]
[Notices]
[Pages 10469-10470]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-04738]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #2

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER10-1532-003; ER10-1541-004; ER10-1642-005; ER10-
1763-003; ER10-1766-003; ER10-1767-003; ER13-2349-002; ER13-2350-002; 
ER16-221-001; ER17-1757-001.
    Applicants: Entergy Arkansas, Inc., Entergy Louisiana, LLC, Entergy 
Mississippi, Inc., Entergy New Orleans, LLC, Entergy Texas, Inc., 
Entergy Nuclear Palisades, LLC, Entergy Power, LLC, EWO Marketing, LLC, 
EAM Nelson Holding, LLC, RS Cogen, LLC, Entergy Services, Inc.
    Description: Supplement to December 28, 2017 Triennial Market Power 
Update for the Central Region of the Entergy MBR Utilities.
    Filed Date: 3/1/18.
    Accession Number: 20180301-5319.
    Comments Due: 5 p.m. ET 3/22/18.

    Docket Numbers: ER17-481-000.
    Applicants: CPV Maryland, LLC.
    Description: Report Filing: Refund Report to be effective N/A.
    Filed Date: 3/5/18.
    Accession Number: 20180305-5323.
    Comments Due: 5 p.m. ET 3/26/18.

    Docket Numbers: ER18-958-000.
    Applicants: Duke Energy Florida, LLC.
    Description: Sec.  205(d) Rate Filing: DEF-DEF E&P Agreement--
Hamilton Solar to be effective 3/6/2018.
    Filed Date: 3/5/18.
    Accession Number: 20180305-5284.
    Comments Due: 5 p.m. ET 3/26/18.

    Docket Numbers: ER18-959-000.
    Applicants: Bayonne Plant Holding, L.L.C.
    Description: Tariff Cancellation: Notice of Cancellation of Rate 
Schedule and Request for Waiver to be effective 6/1/2018.

[[Page 10470]]

    Filed Date: 3/5/18.
    Accession Number: 20180305-5286.
    Comments Due: 5 p.m. ET 3/26/18.

    Docket Numbers: ER18-961-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Original Service Agreement 
No. 4955--NITSA among PJM and AEP EP to be effective 6/1/2014.
    Filed Date: 3/5/18.
    Accession Number: 20180305-5288.
    Comments Due: 5 p.m. ET 3/26/18.

    Docket Numbers: ER18-962-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Original Service Agreement 
No. 4956--NITSA among PJM and AEPSC to be effective 1/1/2017.
    Filed Date: 3/5/18.
    Accession Number: 20180305-5290.
    Comments Due: 5 p.m. ET 3/26/18.

    Docket Numbers: ER18-963-000.
    Applicants: Southern Maryland Electric Cooperative, Inc., PJM 
Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: SMECO submits revisions to 
OATT, Att. H-9C re: Transmission Revenue Requirement to be effective 5/
1/2018.
    Filed Date: 3/5/18.
    Accession Number: 20180305-5293.
    Comments Due: 5 p.m. ET 3/26/18.

    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: March 5, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-04738 Filed 3-8-18; 8:45 am]
 BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.