Combined Notice of Filings #2, 10469-10470 [2018-04738]
Download as PDF
amozie on DSK30RV082PROD with NOTICES
Federal Register / Vol. 83, No. 47 / Friday, March 9, 2018 / Notices
1001 Louisiana Street, Suite 1000,
Houston, TX 77002 and National Fuel
Gas Supply Corporation (National Fuel),
6363 Main Street, Williamsville, NY
14221, jointly filed an application in
Docket No. CP18–84–000 pursuant to
section 7(c) of the Natural Gas Act
(NGA), and Part 157 of the
Commission’s regulations, for a
certificate of public convenience and/or
necessity requesting authorization to
establish a protective boundary around
the active limit of the Ellisburg Storage
Pool located in Potter, Pennsylvania.
The proposed expansion would
establish a 2,000-foot buffer area around
the reservoir containing 6,394.57 acres,
all as more fully set forth in the
application which is on file with the
Commission and open for public
inspection. The filing may also be
viewed on the web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TTY, (202)
502–8659.
Any questions regarding this
application may be directed to Matthew
R. Bley, Director, Gas Transmission
Certificates, Dominion Energy
Transmission, Inc., 707 East Main
Street, Richmond, Virginia 23219, or by
calling 866–319–3382, or email at
Matthew.R.Bley@DominionEnergy.com.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
VerDate Sep<11>2014
16:47 Mar 08, 2018
Jkt 244001
stated below, file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
7 copies of filings made with the
Commission and must mail a copy to
the applicant and to every other party in
the proceeding. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenter’s will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commenter’s will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentary,
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and ill not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the eFiling link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
PO 00000
Frm 00047
Fmt 4703
Sfmt 4703
10469
888 First Street NE, Washington, DC
20426. See, 18 CFR 385.2001(a) (1) (iii)
and the instructions on the
Commission’s website under the eFiling link.
Comment Date: 5:00 p.m. Eastern
Time on March 15, 2018.
Dated: February 22, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–04708 Filed 3–8–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #2
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–1532–003;
ER10–1541–004; ER10–1642–005;
ER10–1763–003; ER10–1766–003;
ER10–1767–003; ER13–2349–002;
ER13–2350–002; ER16–221–001; ER17–
1757–001.
Applicants: Entergy Arkansas, Inc.,
Entergy Louisiana, LLC, Entergy
Mississippi, Inc., Entergy New Orleans,
LLC, Entergy Texas, Inc., Entergy
Nuclear Palisades, LLC, Entergy Power,
LLC, EWO Marketing, LLC, EAM Nelson
Holding, LLC, RS Cogen, LLC, Entergy
Services, Inc.
Description: Supplement to December
28, 2017 Triennial Market Power
Update for the Central Region of the
Entergy MBR Utilities.
Filed Date: 3/1/18.
Accession Number: 20180301–5319.
Comments Due: 5 p.m. ET 3/22/18.
Docket Numbers: ER17–481–000.
Applicants: CPV Maryland, LLC.
Description: Report Filing: Refund
Report to be effective N/A.
Filed Date: 3/5/18.
Accession Number: 20180305–5323.
Comments Due: 5 p.m. ET 3/26/18.
Docket Numbers: ER18–958–000.
Applicants: Duke Energy Florida,
LLC.
Description: § 205(d) Rate Filing:
DEF–DEF E&P Agreement—Hamilton
Solar to be effective 3/6/2018.
Filed Date: 3/5/18.
Accession Number: 20180305–5284.
Comments Due: 5 p.m. ET 3/26/18.
Docket Numbers: ER18–959–000.
Applicants: Bayonne Plant Holding,
L.L.C.
Description: Tariff Cancellation:
Notice of Cancellation of Rate Schedule
and Request for Waiver to be effective
6/1/2018.
E:\FR\FM\09MRN1.SGM
09MRN1
10470
Federal Register / Vol. 83, No. 47 / Friday, March 9, 2018 / Notices
Filed Date: 3/5/18.
Accession Number: 20180305–5286.
Comments Due: 5 p.m. ET 3/26/18.
Docket Numbers: ER18–961–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original Service Agreement No. 4955—
NITSA among PJM and AEP EP to be
effective 6/1/2014.
Filed Date: 3/5/18.
Accession Number: 20180305–5288.
Comments Due: 5 p.m. ET 3/26/18.
Docket Numbers: ER18–962–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original Service Agreement No. 4956—
NITSA among PJM and AEPSC to be
effective 1/1/2017.
Filed Date: 3/5/18.
Accession Number: 20180305–5290.
Comments Due: 5 p.m. ET 3/26/18.
amozie on DSK30RV082PROD with NOTICES
Docket Numbers: ER18–963–000.
Applicants: Southern Maryland
Electric Cooperative, Inc., PJM
Interconnection, L.L.C.
Description: § 205(d) Rate Filing:
SMECO submits revisions to OATT, Att.
H–9C re: Transmission Revenue
Requirement to be effective 5/1/2018.
Filed Date: 3/5/18.
Accession Number: 20180305–5293.
Comments Due: 5 p.m. ET 3/26/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: March 5, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–04738 Filed 3–8–18; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
16:47 Mar 08, 2018
Jkt 244001
Dated: February 22, 2018.
Kimberly D. Bose,
Secretary.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[FR Doc. 2018–04707 Filed 3–8–18; 8:45 am]
[Docket No. CP18–42–000]
BILLING CODE 6717–01–P
Transcontinental Gas Pipe Line
Company, LLC; Notice of Filing
DEPARTMENT OF ENERGY
Take notice that on January 2, 2018,
pursuant to Rule 212 of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.212), the North
Carolina Utilities Commission (NCUC)
filed a motion for order to show cause
regarding: (1) Whether Transcontinental
Gas Pipe Line Company, LLC (Transco)
has been operating, and is continuing to
operate, its Eminence Salt Dome Storage
Field, located near the Town of
Seminary in Covington County,
Mississippi, in accordance with the
amended certificate issued in Docket
No. CP11–151; 1 and, (2) whether
Transco should be allowed to assess
demand charges for the amount of firm
service from the Eminence Salt Dome
Storage Field under Rate Schedule ESS
and Rate Schedule EESWS that Transco
allegedly has been and is currently
unable to provide given the revised
operating parameters of the Eminence
Salt Dome Storage Field.
The filing may also be viewed on the
web at https://www.ferc.gov using the
eLibrary link. Enter the docket number
excluding the last three digits in the
docket number field to access the
document. For assistance, please contact
FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at (866) 208–3676, or TTY, contact
(202) 502–8659.
Any person wishing to obtain legal
status by becoming a party to this
proceeding should, on or before the
comment date listed below, file with the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426, a motion to intervene in
accordance with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214).
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the eFiling link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and five
copies of the protest or intervention to
the Federal Energy Regulatory
Commission, 888 First Street NE,
Washington, DC 20426.
Comment Date: 5:00 p.m. Eastern
Time on March 15, 2018.
1 Transcontinental Gas Pipe Line Co., LLC, 142
FERC 61,095 (2013), order on reh’g, 147 FERC
61,091 (2014).
PO 00000
Frm 00048
Fmt 4703
Sfmt 4703
Federal Energy Regulatory
Commission
[Docket No. PF17–8–000]
Commonwealth LNG LLC; Notice of
Intent To Prepare an Environmental
Impact Statement for the Planned
Commonwealth LNG Project, Request
for Comments on Environmental
Issues, and Notice of Public Scoping
Session
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental impact statement (EIS)
that will discuss the environmental
impacts of the Commonwealth LNG
Project involving construction and
operation of facilities by
Commonwealth LNG LLC
(Commonwealth LNG) in Cameron
Parish, Louisiana. The Commission will
use this EIS in its decision-making
process to determine whether the
project is in the public interest.
This notice announces the opening of
the scoping process the Commission
will use to gather input from the public
and interested agencies on the project.
You can make a difference by providing
us with your specific comments or
concerns about the project. Your
comments should focus on the potential
environmental effects, reasonable
alternatives, and measures to avoid or
lessen environmental impacts. Your
input will help the Commission staff
determine what issues they need to
evaluate in the EIS. To ensure that your
comments are timely and properly
recorded, please send your comments so
that the Commission receives them in
Washington, DC on or before March 26,
2018.
If you sent comments on this project
to the Commission before the opening of
this docket on July 28, 2017, you will
need to file those comments in Docket
No. PF17–8–000 to ensure they are
considered as part of this proceeding.
This notice is being sent to the
Commission’s current environmental
mailing list for this project. State and
local government representatives should
notify their constituents of this planned
project and encourage them to comment
on their areas of concern.
A fact sheet prepared by the FERC
entitled An Interstate Natural Gas
E:\FR\FM\09MRN1.SGM
09MRN1
Agencies
[Federal Register Volume 83, Number 47 (Friday, March 9, 2018)]
[Notices]
[Pages 10469-10470]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-04738]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #2
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER10-1532-003; ER10-1541-004; ER10-1642-005; ER10-
1763-003; ER10-1766-003; ER10-1767-003; ER13-2349-002; ER13-2350-002;
ER16-221-001; ER17-1757-001.
Applicants: Entergy Arkansas, Inc., Entergy Louisiana, LLC, Entergy
Mississippi, Inc., Entergy New Orleans, LLC, Entergy Texas, Inc.,
Entergy Nuclear Palisades, LLC, Entergy Power, LLC, EWO Marketing, LLC,
EAM Nelson Holding, LLC, RS Cogen, LLC, Entergy Services, Inc.
Description: Supplement to December 28, 2017 Triennial Market Power
Update for the Central Region of the Entergy MBR Utilities.
Filed Date: 3/1/18.
Accession Number: 20180301-5319.
Comments Due: 5 p.m. ET 3/22/18.
Docket Numbers: ER17-481-000.
Applicants: CPV Maryland, LLC.
Description: Report Filing: Refund Report to be effective N/A.
Filed Date: 3/5/18.
Accession Number: 20180305-5323.
Comments Due: 5 p.m. ET 3/26/18.
Docket Numbers: ER18-958-000.
Applicants: Duke Energy Florida, LLC.
Description: Sec. 205(d) Rate Filing: DEF-DEF E&P Agreement--
Hamilton Solar to be effective 3/6/2018.
Filed Date: 3/5/18.
Accession Number: 20180305-5284.
Comments Due: 5 p.m. ET 3/26/18.
Docket Numbers: ER18-959-000.
Applicants: Bayonne Plant Holding, L.L.C.
Description: Tariff Cancellation: Notice of Cancellation of Rate
Schedule and Request for Waiver to be effective 6/1/2018.
[[Page 10470]]
Filed Date: 3/5/18.
Accession Number: 20180305-5286.
Comments Due: 5 p.m. ET 3/26/18.
Docket Numbers: ER18-961-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Original Service Agreement
No. 4955--NITSA among PJM and AEP EP to be effective 6/1/2014.
Filed Date: 3/5/18.
Accession Number: 20180305-5288.
Comments Due: 5 p.m. ET 3/26/18.
Docket Numbers: ER18-962-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Original Service Agreement
No. 4956--NITSA among PJM and AEPSC to be effective 1/1/2017.
Filed Date: 3/5/18.
Accession Number: 20180305-5290.
Comments Due: 5 p.m. ET 3/26/18.
Docket Numbers: ER18-963-000.
Applicants: Southern Maryland Electric Cooperative, Inc., PJM
Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: SMECO submits revisions to
OATT, Att. H-9C re: Transmission Revenue Requirement to be effective 5/
1/2018.
Filed Date: 3/5/18.
Accession Number: 20180305-5293.
Comments Due: 5 p.m. ET 3/26/18.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: March 5, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-04738 Filed 3-8-18; 8:45 am]
BILLING CODE 6717-01-P