Combined Notice of Filings #1, 10473-10474 [2018-04737]

Download as PDF Federal Register / Vol. 83, No. 47 / Friday, March 9, 2018 / Notices Additional Information Additional information about the project is available from the Commission’s Office of External Affairs, at (866) 208–FERC, or on the FERC website (www.ferc.gov) using the eLibrary link. Click on the eLibrary link, click on General Search and enter the docket number, excluding the last three digits in the Docket Number field (i.e., PF17–8). Be sure you have selected an appropriate date range. For assistance, please contact FERC Online Support at FercOnlineSupport@ferc.gov or toll free at (866) 208–3676, or for TTY, contact (202) 502–8659. The eLibrary link also provides access to the texts of formal documents issued by the Commission, such as orders, notices, and rulemakings. In addition, the Commission offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. Go to www.ferc.gov/docsfiling/esubscription.asp. Finally, public sessions or site visits will be posted on the Commission’s calendar located at www.ferc.gov/ EventCalendar/EventsList.aspx along with other related information. Dated: February 22, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–04709 Filed 3–8–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Commission Staff Attendance amozie on DSK30RV082PROD with NOTICES The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission’s staff may attend the following meeting related to the transmission planning activities of the New York Independent System Operator, Inc. (NYISO): NYISO Electric System Planning Working Group and Transmission Planning Advisory Subcommittee Meeting March 8, 2018, 1:00 p.m.–3:00 p.m. (EST) The above-referenced meeting will be via web conference and teleconference. VerDate Sep<11>2014 16:47 Mar 08, 2018 Jkt 244001 The above-referenced meeting is open to stakeholders. Further information may be found at: https://www.nyiso.com/public/ committees/documents.jsp?com=bic_ espwg&directory=2018-03-08 The discussions at the meetings described above may address matters at issue in the following proceedings: New York Independent System Operator, Inc., Docket No. ER13–102. New York Independent System Operator, Inc., Docket No. ER15– 2059. New York Independent System Operator, Inc., Docket No. ER17– 2327. For more information, contact James Eason, Office of Energy Market Regulation, Federal Energy Regulatory Commission at (202) 502–8622 or James.Eason@ferc.gov. Dated: March 5, 2018. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2018–04740 Filed 3–8–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER11–4625–006; ER10–2861–005; ER10–2862–006; ER10–2866–005; ER10–2867–005; ER11–3634–006; ER13–1504–006; ER13–2169–005. Applicants: Colton Power L.P., Fountain Valley Power, L.L.C., Goal Line L.P., Harbor Cogeneration Company, LLC, KES Kingsburg, L.P., SWG Arapahoe, LLC, SWG Colorado, LLC, Valencia Power, LLC. Description: Notice of Non-Material Change in Status of Colton Power L.P., et. al. Filed Date: 3/1/18. Accession Number: 20180301–5289. Comments Due: 5 p.m. ET 3/22/18. Docket Numbers: ER14–2327–002; ER14–2328–002; ER14–2329–002; ER14–2330–002. Applicants: Entergy Services, Inc., Entergy Nuclear Generation Company, Entergy Nuclear Indian Point 2, LLC, Entergy Nuclear Indian Point 3, LLC, Entergy Nuclear Power Marketing, LLC. Description: Supplement to June 29, 2017 Triennial Market Power Update for the Northeast Region of the Entergy Northeast MBR Utilities. PO 00000 Frm 00051 Fmt 4703 Sfmt 4703 10473 Filed Date: 3/1/18. Accession Number: 20180301–5290. Comments Due: 5 p.m. ET 3/22/18. Docket Numbers: ER18–947–000. Applicants: Nevada Power Company. Description: § 205(d) Rate Filing: NPC RS 161/APS RS 152 Amendment 1 to Agr. to be effective 5/1/2018. Filed Date: 3/1/18. Accession Number: 20180301–5280. Comments Due: 5 p.m. ET 3/22/18. Docket Numbers: ER18–948–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Original ISA, SA No. 4940, Queue No. AA2–178 to be effective 2/2/2018. Filed Date: 3/5/18. Accession Number: 20180305–5000. Comments Due: 5 p.m. ET 3/26/18. Docket Numbers: ER18–949–000. Applicants: Allegheny Energy Supply Company, LLC. Description: Compliance filing: compliance 2018 to be effective 12/5/2017. Filed Date: 3/5/18. Accession Number: 20180305–5002. Comments Due: 5 p.m. ET 3/26/18. Docket Numbers: ER18–950–000. Applicants: FirstEnergy Solutions Corp. Description: Compliance filing: compliance 2018 to be effective 12/5/2017. Filed Date: 3/5/18. Accession Number: 20180305–5003. Comments Due: 5 p.m. ET 3/26/18. Docket Numbers: ER18–951–000. Applicants: Jersey Central Power & Light Company. Description: Compliance filing: compliance 2018 to be effective 12/5/2017. Filed Date: 3/5/18. Accession Number: 20180305–5004. Comments Due: 5 p.m. ET 3/26/18. Docket Numbers: ER18–952–000. Applicants: Monongahela Power Company. Description: Compliance filing: compliance 2018 to be effective 12/5/2017. Filed Date: 3/5/18. Accession Number: 20180305–5005. Comments Due: 5 p.m. ET 3/26/18. Docket Numbers: ER18–953–000. Applicants: Pennsylvania Electric Company. Description: Compliance filing: compliance 2018 to be effective 12/5/2017. Filed Date: 3/5/18. Accession Number: 20180305–5006. Comments Due: 5 p.m. ET 3/26/18. Docket Numbers: ER18–954–000. Applicants: Appalachian Power Company. E:\FR\FM\09MRN1.SGM 09MRN1 10474 Federal Register / Vol. 83, No. 47 / Friday, March 9, 2018 / Notices Description: § 205(d) Rate Filing: OATT—Revise Tax Rate & Attachment K, AEPTX Rate Update to be effective 12/31/9998. Filed Date: 3/5/18. Accession Number: 20180305–5007. Comments Due: 5 p.m. ET 3/26/18. Docket Numbers: ER18–955–000. Applicants: NorthWestern Corporation. Description: § 205(d) Rate Filing: SA 642 6th Rev—NITSA with General Mills Operations LLC to be effective 5/1/2018. Filed Date: 3/5/18. Accession Number: 20180305–5008. Comments Due: 5 p.m. ET 3/26/18. Docket Numbers: ER18–956–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Amendment to ISA SA No. 4525; Queue No. Z2–089/AA2–099 (Consent to Assign) to be effective 8/8/2016. Filed Date: 3/5/18. Accession Number: 20180305–5017. Comments Due: 5 p.m. ET 3/26/18. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: March 5, 2018. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2018–04737 Filed 3–8–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission amozie on DSK30RV082PROD with NOTICES [Docket No. CP18–89–000] Empire Pipeline, Inc.; Notice of Application Take notice that on February 16, 2018, Empire Pipeline, Inc. (Empire), 6363 Main Street, Williamsville, New York 14221, filed an application in Docket VerDate Sep<11>2014 16:47 Mar 08, 2018 Jkt 244001 No. CP18–89–000 an application pursuant to sections 7(b) and 7(c) of the Natural Gas Act (NGA) for its Empire North Project. Specifically, Empire proposes to: (i) Construct a new 21,068 horsepower (hp) compressor station in Tioga County, Pennsylvania; (ii) construct a new 32,000 hp compressor station in Ontario County, New York; (iii) modify its New Victor Regulator Station in Ontario County, New York; (iv) modify its Jackson Meter and Regulator Station in Tioga County, Pennsylvania; (v) abandon by removal certain related facilities; and (vi) uprate the maximum allowable operating pressure of the Empire Connector Pipeline. Empire states that the project will provide 205,000 dekatherms per day of firm transportation service. Empire estimates the cost of the project to be approximately $142,390,912, all as more fully set forth in the application which is on file with the Commission and open to public inspection. The filing is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s website at https:// www.ferc.gov using the eLibrary link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. Any questions concerning this application may be directed to Margaret M. Duggan, Attorney, Empire Pipeline, Inc., 6363 Main Street, Williamsville, New York 14221, or by telephone at (716) 857–7066. Pursuant to section 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: Complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s EA. There are two ways to become involved in the Commission’s review of PO 00000 Frm 00052 Fmt 4703 Sfmt 4703 this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the comment date stated below file with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission’s Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit seven copies of filings made in the proceeding with the Commission and must mail a copy to the applicant and to every other party. Only parties to the proceeding can ask for court review of Commission orders in the proceeding. However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission’s rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commentors will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commentors will not be required to serve copies of filed documents on all other parties. However, the non-party commentors will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the eFiling link at https://www.ferc.gov. E:\FR\FM\09MRN1.SGM 09MRN1

Agencies

[Federal Register Volume 83, Number 47 (Friday, March 9, 2018)]
[Notices]
[Pages 10473-10474]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-04737]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #1

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER11-4625-006; ER10-2861-005; ER10-2862-006; ER10-
2866-005; ER10-2867-005; ER11-3634-006; ER13-1504-006; ER13-2169-005.
    Applicants: Colton Power L.P., Fountain Valley Power, L.L.C., Goal 
Line L.P., Harbor Cogeneration Company, LLC, KES Kingsburg, L.P., SWG 
Arapahoe, LLC, SWG Colorado, LLC, Valencia Power, LLC.
    Description: Notice of Non-Material Change in Status of Colton 
Power L.P., et. al.
    Filed Date: 3/1/18.
    Accession Number: 20180301-5289.
    Comments Due: 5 p.m. ET 3/22/18.

    Docket Numbers: ER14-2327-002; ER14-2328-002; ER14-2329-002; ER14-
2330-002.
    Applicants: Entergy Services, Inc., Entergy Nuclear Generation 
Company, Entergy Nuclear Indian Point 2, LLC, Entergy Nuclear Indian 
Point 3, LLC, Entergy Nuclear Power Marketing, LLC.
    Description: Supplement to June 29, 2017 Triennial Market Power 
Update for the Northeast Region of the Entergy Northeast MBR Utilities.
    Filed Date: 3/1/18.
    Accession Number: 20180301-5290.
    Comments Due: 5 p.m. ET 3/22/18.

    Docket Numbers: ER18-947-000.
    Applicants: Nevada Power Company.
    Description: Sec.  205(d) Rate Filing: NPC RS 161/APS RS 152 
Amendment 1 to Agr. to be effective 5/1/2018.
    Filed Date: 3/1/18.
    Accession Number: 20180301-5280.
    Comments Due: 5 p.m. ET 3/22/18.

    Docket Numbers: ER18-948-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Original ISA, SA No. 4940, 
Queue No. AA2-178 to be effective 2/2/2018.
    Filed Date: 3/5/18.
    Accession Number: 20180305-5000.
    Comments Due: 5 p.m. ET 3/26/18.

    Docket Numbers: ER18-949-000.
    Applicants: Allegheny Energy Supply Company, LLC.
    Description: Compliance filing: compliance 2018 to be effective 12/
5/2017.
    Filed Date: 3/5/18.
    Accession Number: 20180305-5002.
    Comments Due: 5 p.m. ET 3/26/18.

    Docket Numbers: ER18-950-000.
    Applicants: FirstEnergy Solutions Corp.
    Description: Compliance filing: compliance 2018 to be effective 12/
5/2017.
    Filed Date: 3/5/18.
    Accession Number: 20180305-5003.
    Comments Due: 5 p.m. ET 3/26/18.

    Docket Numbers: ER18-951-000.
    Applicants: Jersey Central Power & Light Company.
    Description: Compliance filing: compliance 2018 to be effective 12/
5/2017.
    Filed Date: 3/5/18.
    Accession Number: 20180305-5004.
    Comments Due: 5 p.m. ET 3/26/18.

    Docket Numbers: ER18-952-000.
    Applicants: Monongahela Power Company.
    Description: Compliance filing: compliance 2018 to be effective 12/
5/2017.
    Filed Date: 3/5/18.
    Accession Number: 20180305-5005.
    Comments Due: 5 p.m. ET 3/26/18.

    Docket Numbers: ER18-953-000.
    Applicants: Pennsylvania Electric Company.
    Description: Compliance filing: compliance 2018 to be effective 12/
5/2017.
    Filed Date: 3/5/18.
    Accession Number: 20180305-5006.
    Comments Due: 5 p.m. ET 3/26/18.

    Docket Numbers: ER18-954-000.
    Applicants: Appalachian Power Company.

[[Page 10474]]

    Description: Sec.  205(d) Rate Filing: OATT--Revise Tax Rate & 
Attachment K, AEPTX Rate Update to be effective 12/31/9998.
    Filed Date: 3/5/18.
    Accession Number: 20180305-5007.
    Comments Due: 5 p.m. ET 3/26/18.

    Docket Numbers: ER18-955-000.
    Applicants: NorthWestern Corporation.
    Description: Sec.  205(d) Rate Filing: SA 642 6th Rev--NITSA with 
General Mills Operations LLC to be effective 5/1/2018.
    Filed Date: 3/5/18.
    Accession Number: 20180305-5008.
    Comments Due: 5 p.m. ET 3/26/18.

    Docket Numbers: ER18-956-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Amendment to ISA SA No. 
4525; Queue No. Z2-089/AA2-099 (Consent to Assign) to be effective 8/8/
2016.
    Filed Date: 3/5/18.
    Accession Number: 20180305-5017.
    Comments Due: 5 p.m. ET 3/26/18.

    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: March 5, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-04737 Filed 3-8-18; 8:45 am]
 BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.