Parker Knoll Hydro, LLC.; Notice of Application Accepted for Filing, Soliciting Motions To Intervene and Protests, Ready for Environmental Analysis, and Soliciting Comments, Terms and Conditions, Recommendations, and Prescriptions, 9735-9736 [2018-04604]

Download as PDF Federal Register / Vol. 83, No. 45 / Wednesday, March 7, 2018 / Notices Any interested person desiring to be heard in Docket No. EL18–59–000 must file a notice of intervention or motion to intervene, as appropriate, with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, in accordance with Rule 214 of the Commission’s Rules of Practice and Procedure, 18 CFR 385.214 (2017), within 21 days of the date of issuance of the order. Dated: February 28, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–04589 Filed 3–6–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 4718–038] daltland on DSKBBV9HB2PROD with NOTICES Cocheco Falls Associates; Notice of Intent To File License Application, Filing of Pre-Application Document, and Approving Use of the Traditional Licensing Process a. Type of Filing: Notice of Intent to File License Application and Request to Use the Traditional Licensing Process. b. Project No.: 4718–038. c. Date Filed: January 2, 2018. d. Submitted By: Cocheco Falls Associates. e. Name of Project: Cocheco Falls Dam Project. f. Location: On the Cocheco River in Dover, Strafford County, New Hampshire. No federal lands are occupied by the project works or located within the project boundary. g. Filed Pursuant to: 18 CFR 5.3 and 5.5 of the Commission’s regulations. h. Potential Applicant Contact: John Webster, Cocheco Falls Associates, P.O. Box 178, 10 Butler Street, South Berwick, Maine 03908; (207) 384–5334; email at Hydromagnt@gwi.net. i. FERC Contact: Amy Chang at (202) 502–8250; or email at amy.chang@ ferc.gov. j. Cocheco Falls Associates filed its request to use the Traditional Licensing Process on January 2, 2018, and provided public notice of the request on January 12, 2018. In a letter dated March 1, 2018, the Director of the Division of Hydropower Licensing approved Cocheco Falls Associates’ request to use the Traditional Licensing Process. k. With this notice, we are initiating informal consultation with the U.S. Fish and Wildlife Service and NOAA Fisheries under section 7 of the Endangered Species Act and the joint VerDate Sep<11>2014 17:30 Mar 06, 2018 Jkt 244001 agency regulations thereunder at 50 CFR part 402; and NOAA Fisheries under section 305(b) of the Magnuson-Stevens Fishery Conservation and Management Act and implementing regulations at 50 CFR 600.920. We are also initiating consultation with the New Hampshire State Historic Preservation Officer, as required by section 106 of the National Historic Preservation Act, and the implementing regulations of the Advisory Council on Historic Preservation at 36 CFR 800.2. l. With this notice, we are designating Cocheco Falls Associates as the Commission’s non-federal representative for carrying out informal consultation pursuant to section 7 of the Endangered Species Act; and consultation pursuant to section 106 of the National Historic Preservation Act. m. Cocheco Falls Associates filed a Pre-Application Document (PAD; including a proposed process plan and schedule) with the Commission, pursuant to 18 CFR 5.6 of the Commission’s regulations. n. A copy of the PAD is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s website (https:// www.ferc.gov), using the ‘‘eLibrary’’ link. Enter the docket number, excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). A copy is also available for inspection and reproduction at the address in paragraph h. o. The licensee states its unequivocal intent to submit an application for a subsequent license for Project No. 4718. Pursuant to 18 CFR 16.20, each application for a subsequent license and any competing license applications must be filed with the Commission at least 24 months prior to the expiration of the existing license. All applications for license for this project must be filed by December 31, 2020. p. Register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filing and issuances related to this or other pending projects. For assistance, contact FERC Online Support. Dated: March 1, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–04602 Filed 3–6–18; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00012 Fmt 4703 Sfmt 4703 9735 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13239–002] Parker Knoll Hydro, LLC.; Notice of Application Accepted for Filing, Soliciting Motions To Intervene and Protests, Ready for Environmental Analysis, and Soliciting Comments, Terms and Conditions, Recommendations, and Prescriptions Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: Major Unconstructed Project. b. Project No.: 13239–002. c. Date filed: November 30, 2011. d. Applicant: Parker Knoll Hydro, LLC. e. Name of Project: Parker Knoll Pumped Storage Hydroelectric Project. f. Location: The proposed project would be located at Parker Mountain, near the Town of Richfield, Piute County, Utah. The project would occupy 458.7 acres of federal lands administered by the U.S. Bureau of Land Management. g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791 (a)–825(r). h. Applicant Contact: Daniel Dygert, Attorney, Parker Knoll Hydro, LLC, 399 North Main Street, Suite 250, Logan, Utah; (435) 512–4977, dan@dygertlaw.com. i. FERC Contact: John Mudre, (202) 502–8902, john.mudre@ferc.gov. j. Deadline for filing motions to intervene and protests, comments, terms and conditions, recommendations, and prescriptions: 60 days from the issuance date of this notice; reply comments are due 105 days from the issuance date of this notice. The Commission strongly encourages electronic filing. Please file motions to intervene and protests, comments, terms and conditions, recommendations, and prescriptions using the Commission’s eFiling system at https://www.ferc.gov/ docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 E:\FR\FM\07MRN1.SGM 07MRN1 daltland on DSKBBV9HB2PROD with NOTICES 9736 Federal Register / Vol. 83, No. 45 / Wednesday, March 7, 2018 / Notices First Street NE, Washington, DC 20426. The first page of any filing should include docket number P–13239–002. The Commission’s Rules of Practice require all intervenors filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. This application has been accepted for filing and is now ready for environmental analysis. l. The proposed project would be a closed-loop pumped storage system, with an initial fill from the existing Otter Creek reservoir, and would include the following new facilities: (1) An approximately 175-foot-high upper main dam with a crest length of approximately 1,650 feet and one saddle dam; (2) an upper reservoir with a storage capacity of approximately 6,780 acre-feet and a surface area of approximately 110 acres; (3) an approximately 100-foot-high lower dam with a crest length of approximately 1,750 feet and two saddle dams; (4) a lower reservoir with storage capacity of approximately 6,760 acre-feet and a surface area of approximately 130 acres; (5) a 2,390-foot-long and 27-footdiameter headrace tunnel; (6) a 2,200foot-long and 27-foot-diameter vertical shaft; (7) a 1,000-foot-long and 27-footdiameter steel-lined penstock tunnel; (8) a 7,126-foot-long and 35-foot-diameter tailrace tunnel; (9) a powerhouse containing four variable speed, reversible pump-turbine units with a minimum rating of 250 megawatt (MW); (10) an approximately 585-foot by 340foot substation; (11) a 16-inch-diameter and 68,000-foot-long fill pipeline and system; (12) approximately one mile of 345-kV transmission line; and (13) appurtenant facilities. The project would occupy 458.7 acres of federal land and would have an estimated annual generation of 2,630 gigawatt hours. m. A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s website at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support. A copy is also available for inspection and reproduction at the address in item h, above. VerDate Sep<11>2014 17:30 Mar 06, 2018 Jkt 244001 Register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. n. Any qualified applicant desiring to file a competing application must submit to the Commission, on or before the specified intervention deadline date, a competing development application, or a notice of intent to file such an application. Submission of a timely notice of intent allows an interested person to file the competing development application no later than 120 days after the specified intervention deadline date. Applications for preliminary permits will not be accepted in response to this notice. A notice of intent must specify the exact name, business address, and telephone number of the prospective applicant, and must include an unequivocal statement of intent to submit a development application. A notice of intent must be served on the applicant(s) named in this public notice. Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, and .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. All filings must: (1) Bear in all capital letters the title ‘‘PROTEST’’, ‘‘MOTION TO INTERVENE’’, ‘‘NOTICE OF INTENT TO FILE COMPETING APPLICATION,’’ ‘‘COMPETING APPLICATION,’’ ‘‘COMMENTS,’’ ‘‘REPLY COMMENTS,’’ ‘‘RECOMMENDATIONS,’’ ‘‘TERMS AND CONDITIONS,’’ or ‘‘PRESCRIPTIONS;’’ (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, recommendations, terms and conditions or prescriptions must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). Agencies may obtain copies of the application directly from the applicant. A copy of any protest or PO 00000 Frm 00013 Fmt 4703 Sfmt 4703 motion to intervene must be served upon each representative of the applicant specified in the particular application. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. o. A license applicant must file no later than 60 days following the date of issuance of this notice: (1) A copy of the water quality certification; (2) a copy of the request for certification, including proof of the date on which the certifying agency received the request; or (3) evidence of waiver of water quality certification. p. Procedural schedule: The application will be processed according to the following schedule. Revisions to the schedule will be made as appropriate. Commission issues draft EIS—December 2018. Comments on draft EIS—January 2019. Commission issues final EIS—June 2019. Dated: March 1, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–04604 Filed 3–6–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER18–929–000] Penn Oak Services, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding of Penn Oak Services, LLC‘s application for market-based rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard E:\FR\FM\07MRN1.SGM 07MRN1

Agencies

[Federal Register Volume 83, Number 45 (Wednesday, March 7, 2018)]
[Notices]
[Pages 9735-9736]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-04604]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 13239-002]


Parker Knoll Hydro, LLC.; Notice of Application Accepted for 
Filing, Soliciting Motions To Intervene and Protests, Ready for 
Environmental Analysis, and Soliciting Comments, Terms and Conditions, 
Recommendations, and Prescriptions

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: Major Unconstructed Project.
    b. Project No.: 13239-002.
    c. Date filed: November 30, 2011.
    d. Applicant: Parker Knoll Hydro, LLC.
    e. Name of Project: Parker Knoll Pumped Storage Hydroelectric 
Project.
    f. Location: The proposed project would be located at Parker 
Mountain, near the Town of Richfield, Piute County, Utah. The project 
would occupy 458.7 acres of federal lands administered by the U.S. 
Bureau of Land Management.
    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791 (a)-825(r).
    h. Applicant Contact: Daniel Dygert, Attorney, Parker Knoll Hydro, 
LLC, 399 North Main Street, Suite 250, Logan, Utah; (435) 512-4977, 
law.com">[email protected]law.com.
    i. FERC Contact: John Mudre, (202) 502-8902, [email protected].
    j. Deadline for filing motions to intervene and protests, comments, 
terms and conditions, recommendations, and prescriptions: 60 days from 
the issuance date of this notice; reply comments are due 105 days from 
the issuance date of this notice.
    The Commission strongly encourages electronic filing. Please file 
motions to intervene and protests, comments, terms and conditions, 
recommendations, and prescriptions using the Commission's eFiling 
system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can 
submit brief comments up to 6,000 characters, without prior 
registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information 
at the end of your comments. For assistance, please contact FERC Online 
Support at [email protected], (866) 208-3676 (toll free), or 
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper 
copy to: Secretary, Federal Energy Regulatory Commission, 888

[[Page 9736]]

First Street NE, Washington, DC 20426. The first page of any filing 
should include docket number P-13239-002.
    The Commission's Rules of Practice require all intervenors filing 
documents with the Commission to serve a copy of that document on each 
person on the official service list for the project. Further, if an 
intervenor files comments or documents with the Commission relating to 
the merits of an issue that may affect the responsibilities of a 
particular resource agency, they must also serve a copy of the document 
on that resource agency.
    k. This application has been accepted for filing and is now ready 
for environmental analysis.
    l. The proposed project would be a closed-loop pumped storage 
system, with an initial fill from the existing Otter Creek reservoir, 
and would include the following new facilities: (1) An approximately 
175-foot-high upper main dam with a crest length of approximately 1,650 
feet and one saddle dam; (2) an upper reservoir with a storage capacity 
of approximately 6,780 acre-feet and a surface area of approximately 
110 acres; (3) an approximately 100-foot-high lower dam with a crest 
length of approximately 1,750 feet and two saddle dams; (4) a lower 
reservoir with storage capacity of approximately 6,760 acre-feet and a 
surface area of approximately 130 acres; (5) a 2,390-foot-long and 27-
foot-diameter headrace tunnel; (6) a 2,200-foot-long and 27-foot-
diameter vertical shaft; (7) a 1,000-foot-long and 27-foot-diameter 
steel-lined penstock tunnel; (8) a 7,126-foot-long and 35-foot-diameter 
tailrace tunnel; (9) a powerhouse containing four variable speed, 
reversible pump-turbine units with a minimum rating of 250 megawatt 
(MW); (10) an approximately 585-foot by 340-foot substation; (11) a 16-
inch-diameter and 68,000-foot-long fill pipeline and system; (12) 
approximately one mile of 345-kV transmission line; and (13) 
appurtenant facilities. The project would occupy 458.7 acres of federal 
land and would have an estimated annual generation of 2,630 gigawatt 
hours.
    m. A copy of the application is available for review at the 
Commission in the Public Reference Room or may be viewed on the 
Commission's website at https://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. For assistance, contact 
FERC Online Support. A copy is also available for inspection and 
reproduction at the address in item h, above.
    Register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    n. Any qualified applicant desiring to file a competing application 
must submit to the Commission, on or before the specified intervention 
deadline date, a competing development application, or a notice of 
intent to file such an application. Submission of a timely notice of 
intent allows an interested person to file the competing development 
application no later than 120 days after the specified intervention 
deadline date. Applications for preliminary permits will not be 
accepted in response to this notice.
    A notice of intent must specify the exact name, business address, 
and telephone number of the prospective applicant, and must include an 
unequivocal statement of intent to submit a development application. A 
notice of intent must be served on the applicant(s) named in this 
public notice.
    Anyone may submit comments, a protest, or a motion to intervene in 
accordance with the requirements of Rules of Practice and Procedure, 18 
CFR 385.210, .211, and .214. In determining the appropriate action to 
take, the Commission will consider all protests or other comments 
filed, but only those who file a motion to intervene in accordance with 
the Commission's Rules may become a party to the proceeding. Any 
comments, protests, or motions to intervene must be received on or 
before the specified comment date for the particular application.
    All filings must: (1) Bear in all capital letters the title 
``PROTEST'', ``MOTION TO INTERVENE'', ``NOTICE OF INTENT TO FILE 
COMPETING APPLICATION,'' ``COMPETING APPLICATION,'' ``COMMENTS,'' 
``REPLY COMMENTS,'' ``RECOMMENDATIONS,'' ``TERMS AND CONDITIONS,'' or 
``PRESCRIPTIONS;'' (2) set forth in the heading the name of the 
applicant and the project number of the application to which the filing 
responds; (3) furnish the name, address, and telephone number of the 
person protesting or intervening; and (4) otherwise comply with the 
requirements of 18 CFR 385.2001 through 385.2005. All comments, 
recommendations, terms and conditions or prescriptions must set forth 
their evidentiary basis and otherwise comply with the requirements of 
18 CFR 4.34(b). Agencies may obtain copies of the application directly 
from the applicant. A copy of any protest or motion to intervene must 
be served upon each representative of the applicant specified in the 
particular application. A copy of all other filings in reference to 
this application must be accompanied by proof of service on all persons 
listed in the service list prepared by the Commission in this 
proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
    o. A license applicant must file no later than 60 days following 
the date of issuance of this notice: (1) A copy of the water quality 
certification; (2) a copy of the request for certification, including 
proof of the date on which the certifying agency received the request; 
or (3) evidence of waiver of water quality certification.
    p. Procedural schedule: The application will be processed according 
to the following schedule. Revisions to the schedule will be made as 
appropriate.

Commission issues draft EIS--December 2018.
Comments on draft EIS--January 2019.
Commission issues final EIS--June 2019.

    Dated: March 1, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-04604 Filed 3-6-18; 8:45 am]
 BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.