Cocheco Falls Associates; Notice of Intent To File License Application, Filing of Pre-Application Document, and Approving Use of the Traditional Licensing Process, 9735 [2018-04602]

Download as PDF Federal Register / Vol. 83, No. 45 / Wednesday, March 7, 2018 / Notices Any interested person desiring to be heard in Docket No. EL18–59–000 must file a notice of intervention or motion to intervene, as appropriate, with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, in accordance with Rule 214 of the Commission’s Rules of Practice and Procedure, 18 CFR 385.214 (2017), within 21 days of the date of issuance of the order. Dated: February 28, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–04589 Filed 3–6–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 4718–038] daltland on DSKBBV9HB2PROD with NOTICES Cocheco Falls Associates; Notice of Intent To File License Application, Filing of Pre-Application Document, and Approving Use of the Traditional Licensing Process a. Type of Filing: Notice of Intent to File License Application and Request to Use the Traditional Licensing Process. b. Project No.: 4718–038. c. Date Filed: January 2, 2018. d. Submitted By: Cocheco Falls Associates. e. Name of Project: Cocheco Falls Dam Project. f. Location: On the Cocheco River in Dover, Strafford County, New Hampshire. No federal lands are occupied by the project works or located within the project boundary. g. Filed Pursuant to: 18 CFR 5.3 and 5.5 of the Commission’s regulations. h. Potential Applicant Contact: John Webster, Cocheco Falls Associates, P.O. Box 178, 10 Butler Street, South Berwick, Maine 03908; (207) 384–5334; email at Hydromagnt@gwi.net. i. FERC Contact: Amy Chang at (202) 502–8250; or email at amy.chang@ ferc.gov. j. Cocheco Falls Associates filed its request to use the Traditional Licensing Process on January 2, 2018, and provided public notice of the request on January 12, 2018. In a letter dated March 1, 2018, the Director of the Division of Hydropower Licensing approved Cocheco Falls Associates’ request to use the Traditional Licensing Process. k. With this notice, we are initiating informal consultation with the U.S. Fish and Wildlife Service and NOAA Fisheries under section 7 of the Endangered Species Act and the joint VerDate Sep<11>2014 17:30 Mar 06, 2018 Jkt 244001 agency regulations thereunder at 50 CFR part 402; and NOAA Fisheries under section 305(b) of the Magnuson-Stevens Fishery Conservation and Management Act and implementing regulations at 50 CFR 600.920. We are also initiating consultation with the New Hampshire State Historic Preservation Officer, as required by section 106 of the National Historic Preservation Act, and the implementing regulations of the Advisory Council on Historic Preservation at 36 CFR 800.2. l. With this notice, we are designating Cocheco Falls Associates as the Commission’s non-federal representative for carrying out informal consultation pursuant to section 7 of the Endangered Species Act; and consultation pursuant to section 106 of the National Historic Preservation Act. m. Cocheco Falls Associates filed a Pre-Application Document (PAD; including a proposed process plan and schedule) with the Commission, pursuant to 18 CFR 5.6 of the Commission’s regulations. n. A copy of the PAD is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s website (https:// www.ferc.gov), using the ‘‘eLibrary’’ link. Enter the docket number, excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). A copy is also available for inspection and reproduction at the address in paragraph h. o. The licensee states its unequivocal intent to submit an application for a subsequent license for Project No. 4718. Pursuant to 18 CFR 16.20, each application for a subsequent license and any competing license applications must be filed with the Commission at least 24 months prior to the expiration of the existing license. All applications for license for this project must be filed by December 31, 2020. p. Register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filing and issuances related to this or other pending projects. For assistance, contact FERC Online Support. Dated: March 1, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–04602 Filed 3–6–18; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00012 Fmt 4703 Sfmt 4703 9735 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13239–002] Parker Knoll Hydro, LLC.; Notice of Application Accepted for Filing, Soliciting Motions To Intervene and Protests, Ready for Environmental Analysis, and Soliciting Comments, Terms and Conditions, Recommendations, and Prescriptions Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: Major Unconstructed Project. b. Project No.: 13239–002. c. Date filed: November 30, 2011. d. Applicant: Parker Knoll Hydro, LLC. e. Name of Project: Parker Knoll Pumped Storage Hydroelectric Project. f. Location: The proposed project would be located at Parker Mountain, near the Town of Richfield, Piute County, Utah. The project would occupy 458.7 acres of federal lands administered by the U.S. Bureau of Land Management. g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791 (a)–825(r). h. Applicant Contact: Daniel Dygert, Attorney, Parker Knoll Hydro, LLC, 399 North Main Street, Suite 250, Logan, Utah; (435) 512–4977, dan@dygertlaw.com. i. FERC Contact: John Mudre, (202) 502–8902, john.mudre@ferc.gov. j. Deadline for filing motions to intervene and protests, comments, terms and conditions, recommendations, and prescriptions: 60 days from the issuance date of this notice; reply comments are due 105 days from the issuance date of this notice. The Commission strongly encourages electronic filing. Please file motions to intervene and protests, comments, terms and conditions, recommendations, and prescriptions using the Commission’s eFiling system at https://www.ferc.gov/ docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 E:\FR\FM\07MRN1.SGM 07MRN1

Agencies

[Federal Register Volume 83, Number 45 (Wednesday, March 7, 2018)]
[Notices]
[Page 9735]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-04602]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 4718-038]


Cocheco Falls Associates; Notice of Intent To File License 
Application, Filing of Pre-Application Document, and Approving Use of 
the Traditional Licensing Process

    a. Type of Filing: Notice of Intent to File License Application and 
Request to Use the Traditional Licensing Process.
    b. Project No.: 4718-038.
    c. Date Filed: January 2, 2018.
    d. Submitted By: Cocheco Falls Associates.
    e. Name of Project: Cocheco Falls Dam Project.
    f. Location: On the Cocheco River in Dover, Strafford County, New 
Hampshire. No federal lands are occupied by the project works or 
located within the project boundary.
    g. Filed Pursuant to: 18 CFR 5.3 and 5.5 of the Commission's 
regulations.
    h. Potential Applicant Contact: John Webster, Cocheco Falls 
Associates, P.O. Box 178, 10 Butler Street, South Berwick, Maine 03908; 
(207) 384-5334; email at [email protected].
    i. FERC Contact: Amy Chang at (202) 502-8250; or email at 
[email protected].
    j. Cocheco Falls Associates filed its request to use the 
Traditional Licensing Process on January 2, 2018, and provided public 
notice of the request on January 12, 2018. In a letter dated March 1, 
2018, the Director of the Division of Hydropower Licensing approved 
Cocheco Falls Associates' request to use the Traditional Licensing 
Process.
    k. With this notice, we are initiating informal consultation with 
the U.S. Fish and Wildlife Service and NOAA Fisheries under section 7 
of the Endangered Species Act and the joint agency regulations 
thereunder at 50 CFR part 402; and NOAA Fisheries under section 305(b) 
of the Magnuson-Stevens Fishery Conservation and Management Act and 
implementing regulations at 50 CFR 600.920. We are also initiating 
consultation with the New Hampshire State Historic Preservation 
Officer, as required by section 106 of the National Historic 
Preservation Act, and the implementing regulations of the Advisory 
Council on Historic Preservation at 36 CFR 800.2.
    l. With this notice, we are designating Cocheco Falls Associates as 
the Commission's non-federal representative for carrying out informal 
consultation pursuant to section 7 of the Endangered Species Act; and 
consultation pursuant to section 106 of the National Historic 
Preservation Act.
    m. Cocheco Falls Associates filed a Pre-Application Document (PAD; 
including a proposed process plan and schedule) with the Commission, 
pursuant to 18 CFR 5.6 of the Commission's regulations.
    n. A copy of the PAD is available for review at the Commission in 
the Public Reference Room or may be viewed on the Commission's website 
(https://www.ferc.gov), using the ``eLibrary'' link. Enter the docket 
number, excluding the last three digits in the docket number field to 
access the document. For assistance, contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). A copy is also available for inspection and reproduction at 
the address in paragraph h.
    o. The licensee states its unequivocal intent to submit an 
application for a subsequent license for Project No. 4718. Pursuant to 
18 CFR 16.20, each application for a subsequent license and any 
competing license applications must be filed with the Commission at 
least 24 months prior to the expiration of the existing license. All 
applications for license for this project must be filed by December 31, 
2020.
    p. Register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filing and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.

    Dated: March 1, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-04602 Filed 3-6-18; 8:45 am]
 BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.