Cocheco Falls Associates; Notice of Intent To File License Application, Filing of Pre-Application Document, and Approving Use of the Traditional Licensing Process, 9735 [2018-04602]
Download as PDF
Federal Register / Vol. 83, No. 45 / Wednesday, March 7, 2018 / Notices
Any interested person desiring to be
heard in Docket No. EL18–59–000 must
file a notice of intervention or motion to
intervene, as appropriate, with the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426, in accordance with Rule 214 of
the Commission’s Rules of Practice and
Procedure, 18 CFR 385.214 (2017),
within 21 days of the date of issuance
of the order.
Dated: February 28, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–04589 Filed 3–6–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 4718–038]
daltland on DSKBBV9HB2PROD with NOTICES
Cocheco Falls Associates; Notice of
Intent To File License Application,
Filing of Pre-Application Document,
and Approving Use of the Traditional
Licensing Process
a. Type of Filing: Notice of Intent to
File License Application and Request to
Use the Traditional Licensing Process.
b. Project No.: 4718–038.
c. Date Filed: January 2, 2018.
d. Submitted By: Cocheco Falls
Associates.
e. Name of Project: Cocheco Falls
Dam Project.
f. Location: On the Cocheco River in
Dover, Strafford County, New
Hampshire. No federal lands are
occupied by the project works or located
within the project boundary.
g. Filed Pursuant to: 18 CFR 5.3 and
5.5 of the Commission’s regulations.
h. Potential Applicant Contact: John
Webster, Cocheco Falls Associates, P.O.
Box 178, 10 Butler Street, South
Berwick, Maine 03908; (207) 384–5334;
email at Hydromagnt@gwi.net.
i. FERC Contact: Amy Chang at (202)
502–8250; or email at amy.chang@
ferc.gov.
j. Cocheco Falls Associates filed its
request to use the Traditional Licensing
Process on January 2, 2018, and
provided public notice of the request on
January 12, 2018. In a letter dated March
1, 2018, the Director of the Division of
Hydropower Licensing approved
Cocheco Falls Associates’ request to use
the Traditional Licensing Process.
k. With this notice, we are initiating
informal consultation with the U.S. Fish
and Wildlife Service and NOAA
Fisheries under section 7 of the
Endangered Species Act and the joint
VerDate Sep<11>2014
17:30 Mar 06, 2018
Jkt 244001
agency regulations thereunder at 50 CFR
part 402; and NOAA Fisheries under
section 305(b) of the Magnuson-Stevens
Fishery Conservation and Management
Act and implementing regulations at 50
CFR 600.920. We are also initiating
consultation with the New Hampshire
State Historic Preservation Officer, as
required by section 106 of the National
Historic Preservation Act, and the
implementing regulations of the
Advisory Council on Historic
Preservation at 36 CFR 800.2.
l. With this notice, we are designating
Cocheco Falls Associates as the
Commission’s non-federal
representative for carrying out informal
consultation pursuant to section 7 of the
Endangered Species Act; and
consultation pursuant to section 106 of
the National Historic Preservation Act.
m. Cocheco Falls Associates filed a
Pre-Application Document (PAD;
including a proposed process plan and
schedule) with the Commission,
pursuant to 18 CFR 5.6 of the
Commission’s regulations.
n. A copy of the PAD is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s website (https://
www.ferc.gov), using the ‘‘eLibrary’’
link. Enter the docket number,
excluding the last three digits in the
docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). A copy is also available for
inspection and reproduction at the
address in paragraph h.
o. The licensee states its unequivocal
intent to submit an application for a
subsequent license for Project No. 4718.
Pursuant to 18 CFR 16.20, each
application for a subsequent license and
any competing license applications
must be filed with the Commission at
least 24 months prior to the expiration
of the existing license. All applications
for license for this project must be filed
by December 31, 2020.
p. Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filing and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Dated: March 1, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–04602 Filed 3–6–18; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00012
Fmt 4703
Sfmt 4703
9735
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13239–002]
Parker Knoll Hydro, LLC.; Notice of
Application Accepted for Filing,
Soliciting Motions To Intervene and
Protests, Ready for Environmental
Analysis, and Soliciting Comments,
Terms and Conditions,
Recommendations, and Prescriptions
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Major
Unconstructed Project.
b. Project No.: 13239–002.
c. Date filed: November 30, 2011.
d. Applicant: Parker Knoll Hydro,
LLC.
e. Name of Project: Parker Knoll
Pumped Storage Hydroelectric Project.
f. Location: The proposed project
would be located at Parker Mountain,
near the Town of Richfield, Piute
County, Utah. The project would
occupy 458.7 acres of federal lands
administered by the U.S. Bureau of
Land Management.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791 (a)–825(r).
h. Applicant Contact: Daniel Dygert,
Attorney, Parker Knoll Hydro, LLC, 399
North Main Street, Suite 250, Logan,
Utah; (435) 512–4977, dan@dygertlaw.com.
i. FERC Contact: John Mudre, (202)
502–8902, john.mudre@ferc.gov.
j. Deadline for filing motions to
intervene and protests, comments, terms
and conditions, recommendations, and
prescriptions: 60 days from the issuance
date of this notice; reply comments are
due 105 days from the issuance date of
this notice.
The Commission strongly encourages
electronic filing. Please file motions to
intervene and protests, comments, terms
and conditions, recommendations, and
prescriptions using the Commission’s
eFiling system at https://www.ferc.gov/
docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000
characters, without prior registration,
using the eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
E:\FR\FM\07MRN1.SGM
07MRN1
Agencies
[Federal Register Volume 83, Number 45 (Wednesday, March 7, 2018)]
[Notices]
[Page 9735]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-04602]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 4718-038]
Cocheco Falls Associates; Notice of Intent To File License
Application, Filing of Pre-Application Document, and Approving Use of
the Traditional Licensing Process
a. Type of Filing: Notice of Intent to File License Application and
Request to Use the Traditional Licensing Process.
b. Project No.: 4718-038.
c. Date Filed: January 2, 2018.
d. Submitted By: Cocheco Falls Associates.
e. Name of Project: Cocheco Falls Dam Project.
f. Location: On the Cocheco River in Dover, Strafford County, New
Hampshire. No federal lands are occupied by the project works or
located within the project boundary.
g. Filed Pursuant to: 18 CFR 5.3 and 5.5 of the Commission's
regulations.
h. Potential Applicant Contact: John Webster, Cocheco Falls
Associates, P.O. Box 178, 10 Butler Street, South Berwick, Maine 03908;
(207) 384-5334; email at [email protected].
i. FERC Contact: Amy Chang at (202) 502-8250; or email at
[email protected].
j. Cocheco Falls Associates filed its request to use the
Traditional Licensing Process on January 2, 2018, and provided public
notice of the request on January 12, 2018. In a letter dated March 1,
2018, the Director of the Division of Hydropower Licensing approved
Cocheco Falls Associates' request to use the Traditional Licensing
Process.
k. With this notice, we are initiating informal consultation with
the U.S. Fish and Wildlife Service and NOAA Fisheries under section 7
of the Endangered Species Act and the joint agency regulations
thereunder at 50 CFR part 402; and NOAA Fisheries under section 305(b)
of the Magnuson-Stevens Fishery Conservation and Management Act and
implementing regulations at 50 CFR 600.920. We are also initiating
consultation with the New Hampshire State Historic Preservation
Officer, as required by section 106 of the National Historic
Preservation Act, and the implementing regulations of the Advisory
Council on Historic Preservation at 36 CFR 800.2.
l. With this notice, we are designating Cocheco Falls Associates as
the Commission's non-federal representative for carrying out informal
consultation pursuant to section 7 of the Endangered Species Act; and
consultation pursuant to section 106 of the National Historic
Preservation Act.
m. Cocheco Falls Associates filed a Pre-Application Document (PAD;
including a proposed process plan and schedule) with the Commission,
pursuant to 18 CFR 5.6 of the Commission's regulations.
n. A copy of the PAD is available for review at the Commission in
the Public Reference Room or may be viewed on the Commission's website
(https://www.ferc.gov), using the ``eLibrary'' link. Enter the docket
number, excluding the last three digits in the docket number field to
access the document. For assistance, contact FERC Online Support at
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). A copy is also available for inspection and reproduction at
the address in paragraph h.
o. The licensee states its unequivocal intent to submit an
application for a subsequent license for Project No. 4718. Pursuant to
18 CFR 16.20, each application for a subsequent license and any
competing license applications must be filed with the Commission at
least 24 months prior to the expiration of the existing license. All
applications for license for this project must be filed by December 31,
2020.
p. Register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filing and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
Dated: March 1, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-04602 Filed 3-6-18; 8:45 am]
BILLING CODE 6717-01-P