Penn Oak Services, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization, 9736-9737 [2018-04597]
Download as PDF
daltland on DSKBBV9HB2PROD with NOTICES
9736
Federal Register / Vol. 83, No. 45 / Wednesday, March 7, 2018 / Notices
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket number P–13239–002.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. This application has been accepted
for filing and is now ready for
environmental analysis.
l. The proposed project would be a
closed-loop pumped storage system,
with an initial fill from the existing
Otter Creek reservoir, and would
include the following new facilities: (1)
An approximately 175-foot-high upper
main dam with a crest length of
approximately 1,650 feet and one saddle
dam; (2) an upper reservoir with a
storage capacity of approximately 6,780
acre-feet and a surface area of
approximately 110 acres; (3) an
approximately 100-foot-high lower dam
with a crest length of approximately
1,750 feet and two saddle dams; (4) a
lower reservoir with storage capacity of
approximately 6,760 acre-feet and a
surface area of approximately 130 acres;
(5) a 2,390-foot-long and 27-footdiameter headrace tunnel; (6) a 2,200foot-long and 27-foot-diameter vertical
shaft; (7) a 1,000-foot-long and 27-footdiameter steel-lined penstock tunnel; (8)
a 7,126-foot-long and 35-foot-diameter
tailrace tunnel; (9) a powerhouse
containing four variable speed,
reversible pump-turbine units with a
minimum rating of 250 megawatt (MW);
(10) an approximately 585-foot by 340foot substation; (11) a 16-inch-diameter
and 68,000-foot-long fill pipeline and
system; (12) approximately one mile of
345-kV transmission line; and (13)
appurtenant facilities. The project
would occupy 458.7 acres of federal
land and would have an estimated
annual generation of 2,630 gigawatt
hours.
m. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s website at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support. A copy is also available
for inspection and reproduction at the
address in item h, above.
VerDate Sep<11>2014
17:30 Mar 06, 2018
Jkt 244001
Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. Any qualified applicant desiring to
file a competing application must
submit to the Commission, on or before
the specified intervention deadline date,
a competing development application,
or a notice of intent to file such an
application. Submission of a timely
notice of intent allows an interested
person to file the competing
development application no later than
120 days after the specified intervention
deadline date. Applications for
preliminary permits will not be
accepted in response to this notice.
A notice of intent must specify the
exact name, business address, and
telephone number of the prospective
applicant, and must include an
unequivocal statement of intent to
submit a development application. A
notice of intent must be served on the
applicant(s) named in this public notice.
Anyone may submit comments, a
protest, or a motion to intervene in
accordance with the requirements of
Rules of Practice and Procedure, 18 CFR
385.210, .211, and .214. In determining
the appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
All filings must: (1) Bear in all capital
letters the title ‘‘PROTEST’’, ‘‘MOTION
TO INTERVENE’’, ‘‘NOTICE OF
INTENT TO FILE COMPETING
APPLICATION,’’ ‘‘COMPETING
APPLICATION,’’ ‘‘COMMENTS,’’
‘‘REPLY COMMENTS,’’
‘‘RECOMMENDATIONS,’’ ‘‘TERMS
AND CONDITIONS,’’ or
‘‘PRESCRIPTIONS;’’ (2) set forth in the
heading the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, recommendations, terms and
conditions or prescriptions must set
forth their evidentiary basis and
otherwise comply with the requirements
of 18 CFR 4.34(b). Agencies may obtain
copies of the application directly from
the applicant. A copy of any protest or
PO 00000
Frm 00013
Fmt 4703
Sfmt 4703
motion to intervene must be served
upon each representative of the
applicant specified in the particular
application. A copy of all other filings
in reference to this application must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
4.34(b) and 385.2010.
o. A license applicant must file no
later than 60 days following the date of
issuance of this notice: (1) A copy of the
water quality certification; (2) a copy of
the request for certification, including
proof of the date on which the certifying
agency received the request; or (3)
evidence of waiver of water quality
certification.
p. Procedural schedule: The
application will be processed according
to the following schedule. Revisions to
the schedule will be made as
appropriate.
Commission issues draft EIS—December
2018.
Comments on draft EIS—January 2019.
Commission issues final EIS—June
2019.
Dated: March 1, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–04604 Filed 3–6–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER18–929–000]
Penn Oak Services, LLC; Supplemental
Notice That Initial Market-Based Rate
Filing Includes Request for Blanket
Section 204 Authorization
This is a supplemental notice in the
above-referenced proceeding of Penn
Oak Services, LLC‘s application for
market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
E:\FR\FM\07MRN1.SGM
07MRN1
Federal Register / Vol. 83, No. 45 / Wednesday, March 7, 2018 / Notices
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is March 21,
2018.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: March 1, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–04597 Filed 3–6–18; 8:45 am]
BILLING CODE 6717–01–P
FEDERAL COMMUNICATIONS
COMMISSION
[OMB 3060–1204]
Information Collection Being
Submitted for Review and Approval to
the Office of Management and Budget
Federal Communications
Commission.
ACTION: Notice and request for
comments.
daltland on DSKBBV9HB2PROD with NOTICES
AGENCY:
As part of its continuing effort
to reduce paperwork burdens, and as
required by the Paperwork Reduction
Act (PRA) of 1995, the Federal
Communications Commission (FCC or
the Commission) invites the general
public and other Federal agencies to
take this opportunity to comment on the
SUMMARY:
VerDate Sep<11>2014
17:30 Mar 06, 2018
Jkt 244001
following information collection.
Comments are requested concerning:
whether the proposed collection of
information is necessary for the proper
performance of the functions of the
Commission, including whether the
information shall have practical utility;
the accuracy of the Commission’s
burden estimate; ways to enhance the
quality, utility, and clarity of the
information collected; ways to minimize
the burden of the collection of
information on the respondents,
including the use of automated
collection techniques or other forms of
information technology; and ways to
further reduce the information
collection burden on small business
concerns with fewer than 25 employees.
The Commission may not conduct or
sponsor a collection of information
unless it displays a currently valid
Office of Management and Budget
(OMB) control number. No person shall
be subject to any penalty for failing to
comply with a collection of information
subject to the PRA that does not display
a valid OMB control number.
DATES: Written comments should be
submitted on or before April 6, 2018. If
you anticipate that you will be
submitting comments, but find it
difficult to do so within the period of
time allowed by this notice, you should
advise the contacts listed below as soon
as possible.
ADDRESSES: Direct all PRA comments to
Nicholas A. Fraser, OMB, via email
Nicholas_A._Fraser@omb.eop.gov; and
to Nicole Ongele, FCC, via email PRA@
fcc.gov and to Nicole.Ongele@fcc.gov.
Include in the comments the OMB
control number as shown in the
SUPPLEMENTARY INFORMATION below.
FOR FURTHER INFORMATION CONTACT: For
additional information or copies of the
information collection, contact Nicole
Ongele at (202) 418–2991. To view a
copy of this information collection
request (ICR) submitted to OMB: (1) Go
to the web page ,
(2) look for the section of the web page
called ‘‘Currently Under Review,’’ (3)
click on the downward-pointing arrow
in the ‘‘Select Agency’’ box below the
‘‘Currently Under Review’’ heading, (4)
select ‘‘Federal Communications
Commission’’ from the list of agencies
presented in the ‘‘Select Agency’’ box,
(5) click the ‘‘Submit’’ button to the
right of the ‘‘Select Agency’’ box, (6)
when the list of FCC ICRs currently
under review appears, look for the OMB
control number of this ICR and then
click on the ICR Reference Number. A
copy of the FCC submission to OMB
will be displayed.
PO 00000
Frm 00014
Fmt 4703
Sfmt 4703
9737
As part of
its continuing effort to reduce
paperwork burdens, and as required by
the Paperwork Reduction Act (PRA) of
1995 (44 U.S.C. 3501–3520), the Federal
Communications Commission (FCC or
the Commission) invites the general
public and other Federal agencies to
take this opportunity to comment on the
following information collection.
Comments are requested concerning:
Whether the proposed collection of
information is necessary for the proper
performance of the functions of the
Commission, including whether the
information shall have practical utility;
the accuracy of the Commission’s
burden estimate; ways to enhance the
quality, utility, and clarity of the
information collected; ways to minimize
the burden of the collection of
information on the respondents,
including the use of automated
collection techniques or other forms of
information technology; and ways to
further reduce the information
collection burden on small business
concerns with fewer than 25 employees.
OMB Control Number: 3060–1204.
Title: Deployment of Text-to-911.
Form Number: Not applicable.
Type of Review: Extension of a
currently approved collection.
Respondents: Businesses or other-forprofit and state, local and tribal
governments.
Number of Respondents and
Responses: 2,649 Respondents; 51,730
Responses.
Estimated Time per Response: 1–8
hours.
Frequency of Response: One-time;
annual reporting requirements and
third-party disclosure requirement.
Obligation to Respond: Required to
obtain or retain benefits. Statutory
authority for these collections is
contained in 47 U.S.C. 151, 152, 154(i),
154(j), 154(o), 251(e), 303(b), 303(g),
303(r), 316, and 403.
Total Annual Burden: 69,883 hours.
Total Annual Cost: No Cost.
Privacy Act Impact Assessment: No
Impact(s).
Nature and Extent of Confidentiality:
There is no need for confidentiality.
Needs and Uses: In a Second Report
and Order released on August 13, 2014,
FCC 14–118, published at 79 FR 55367,
September 16, 2014, the Commission
adopted final rules—containing
information collection requirements—to
enable the Commission to implement
text-to-911 service. The text-to-911 rules
provide enhanced access to emergency
services for people with disabilities and
fulfilling a crucial role as an alternative
means of emergency communication for
the general public in situations where
SUPPLEMENTARY INFORMATION:
E:\FR\FM\07MRN1.SGM
07MRN1
Agencies
[Federal Register Volume 83, Number 45 (Wednesday, March 7, 2018)]
[Notices]
[Pages 9736-9737]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-04597]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. ER18-929-000]
Penn Oak Services, LLC; Supplemental Notice That Initial Market-
Based Rate Filing Includes Request for Blanket Section 204
Authorization
This is a supplemental notice in the above-referenced proceeding of
Penn Oak Services, LLC`s application for market-based rate authority,
with an accompanying rate tariff, noting that such application includes
a request for blanket authorization, under 18 CFR part 34, of future
issuances of securities and assumptions of liability.
Any person desiring to intervene or to protest should file with the
Federal Energy Regulatory Commission, 888 First Street NE, Washington,
DC 20426, in accordance with Rules 211 and 214 of the Commission's
Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone
filing a motion to intervene or protest must serve a copy of that
document on the Applicant.
Notice is hereby given that the deadline for filing protests with
regard
[[Page 9737]]
to the applicant's request for blanket authorization, under 18 CFR part
34, of future issuances of securities and assumptions of liability, is
March 21, 2018.
The Commission encourages electronic submission of protests and
interventions in lieu of paper, using the FERC Online links at https://www.ferc.gov. To facilitate electronic service, persons with internet
access who will eFile a document and/or be listed as a contact for an
intervenor must create and validate an eRegistration account using the
eRegistration link. Select the eFiling link to log on and submit the
intervention or protests.
Persons unable to file electronically should submit an original and
5 copies of the intervention or protest to the Federal Energy
Regulatory Commission, 888 First Street NE, Washington, DC 20426.
The filings in the above-referenced proceeding are accessible in
the Commission's eLibrary system by clicking on the appropriate link in
the above list. They are also available for electronic review in the
Commission's Public Reference Room in Washington, DC. There is an
eSubscription link on the website that enables subscribers to receive
email notification when a document is added to a subscribed docket(s).
For assistance with any FERC Online service, please email
[email protected]. or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Dated: March 1, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-04597 Filed 3-6-18; 8:45 am]
BILLING CODE 6717-01-P