Combined Notice of Filings, 9505-9506 [2018-04490]
Download as PDF
Federal Register / Vol. 83, No. 44 / Tuesday, March 6, 2018 / Notices
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, motions to intervene, or
protests must set forth their evidentiary
basis and otherwise comply with the
requirements of 18 CFR 4.34(b). All
comments, motions to intervene, or
protests should relate to project works
which are the subject of the license
amendment. Agencies may obtain
copies of the application directly from
the applicant. A copy of any protest or
motion to intervene must be served
upon each representative of the
applicant specified in the particular
application. If an intervener files
comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency. A copy of all
other filings in reference to this
application must be accompanied by
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and 18
CFR 385.2010.
Dated: February 27, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–04460 Filed 3–5–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL18–26–000; Docket No.
AD18–8–000]
sradovich on DSK3GMQ082PROD with NOTICES
EDF Renewable Energy, Inc. v. Reform
of Affected System Coordination in the
Generator Interconnection Process, v.
Midcontinent Independent System
Operator, Inc., Southwest Power Pool,
Inc., and PJM Interconnection, L.L.C.;
Supplemental Notice of Technical
Conference
As announced in the Notice of
Technical Conference issued in this
proceeding on February 2, 2018, the
Federal Energy Regulatory Commission
(Commission) will convene a staff-led
technical conference in the abovereferenced proceeding on Tuesday and
Wednesday, April 3–4, 2018 from 9:30
a.m. to 4:30 p.m. (ET). The conference
will be held in the Commission Meeting
Room at Commission headquarters, 888
First Street NE, Washington, DC 20426.
Commissioners may attend and
participate. The purpose of this
conference is to discuss issues related to
VerDate Sep<11>2014
21:39 Mar 05, 2018
Jkt 244001
the coordination of affected systems that
have been raised in the complaint filed
by EDF Renewable Energy, Inc. against
Midcontinent Independent System
Operator, Inc., Southwest Power Pool,
Inc., and PJM Interconnection, L.L.C. in
Docket No. EL18–26–000 and in the
Commission’s Notice of Proposed
Rulemaking (Generator Interconnection
NOPR) on the interconnection process
in Docket No. RM17–8–000. The first
day of the conference will focus on
questions specific to issues raised in the
complaint filed in Docket No. EL18–26–
000, while the second day of the
conference will focus on the broader
affected systems issues raised in the
Generator Interconnection NOPR in
Docket No. RM17–8–000.
Attached to this Supplemental Notice
is a preliminary agenda for the technical
conference. Additional information
regarding the final conference program
and speakers will be provided in a
subsequent supplemental notice of
technical conference.
Those interested in speaking at the
technical conference should notify the
Commission by March 2, 2018 by
completing the online form at the
following web page: https://
www.ferc.gov/whats-new/registration/
04-03-18-speaker-form.asp. At this web
page, please describe the topic(s) you
wish to address and provide
biographical information. Due to time
constraints, we may not be able to
accommodate all those interested in
speaking. We will notify selected
speakers as soon as possible.
The conference will be open for the
public to attend. Information on the
technical conference will also be posted
on the Calendar of Events on the
Commission’s website, https://
www.ferc.gov, prior to the event.
Advance registration is not required but
is encouraged. Attendees may register at
the following web page: https://
www.ferc.gov/whats-new/registration/
04-03-18-form.asp.
This event will be webcast and
transcribed. Anyone with internet
access can navigate to the ‘‘FERC
Calendar’’ at www.ferc.gov and locate
the technical conference in the Calendar
of Events. Opening the technical
conference in the Calendar of Events
will reveal a link to its webcast. The
Capitol Connection provides technical
support for the webcast and offers the
option of listening to the meeting via
phone-bridge for a fee. If you have any
questions, visit
www.capitolconnection.org or call 703–
993–3100. The webcast will be available
on the Calendar of Events at
www.ferc.gov for three months after the
conference. Transcripts of the
PO 00000
Frm 00032
Fmt 4703
Sfmt 4703
9505
conference will be immediately
available for a fee from Ace-Federal
Reporters, Inc. (202–347–3700).
Commission conferences are
accessible under section 508 of the
Rehabilitation Act of 1973. For
accessibility accommodations, please
send an email to accessibility@ferc.gov
or call toll free 1–866–208–3372 (voice)
or 202–502–8659 (TTY), or send a fax to
202–208–2106 with the required
accommodations.
For more information about this
technical conference, please contact:
Sarah McKinley (Logistical
Information), Office of External
Affairs, (202) 502–8004,
Sarah.Mckinley@ferc.gov.
Myra Sinnott (Technical Information),
Office of Energy Policy and
Innovation, (202) 502–6033,
Myra.Sinnott@ferc.gov.
Kathleen Ratcliff (Technical
Information), Office of Energy Market
Regulation, (202) 502–8018,
Kathleen.Ratcliff@ferc.gov.
Lina Naik (Legal Information), Office of
the General Counsel, (202) 502–8882
Lina.Naik@ferc.gov.
Dated: February 27, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–04462 Filed 3–5–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Number: PR18–32–000.
Applicants: Bay Gas Storage
Company, Ltd.
Description: Tariff filing per
284.123(b),(e)/: Annual Adjustment to
Company Use Percentage to be effective
3/1/2018.
Filed Date: 2/23/18.
Accession Number: 201802235048.
Comments/Protests Due: 5 p.m. ET 3/
16/18.
Docket Number: PR18–34–000.
Applicants: Duke Energy Ohio, Inc.
Description: Tariff filing per
284.123(b),(e)/: Informational Filing in
Support of Existing State Rate Election
to be effective 3/1/2018.
Filed Date: 2/26/18.
Accession Number: 201802265137.
Comments/Protests Due: 5 p.m. ET 3/
19/18.
E:\FR\FM\06MRN1.SGM
06MRN1
sradovich on DSK3GMQ082PROD with NOTICES
9506
Federal Register / Vol. 83, No. 44 / Tuesday, March 6, 2018 / Notices
Docket Numbers: RP18–472–000.
Applicants: Dominion Energy
Carolina Gas Transmission.
Description: § 4(d) Rate Filing:
DECG—February 27, 2018 Negotiated
Rate Agreements to be effective 3/1/
2018.
Filed Date: 2/27/18.
Accession Number: 20180227–5027.
Comments Due: 5 p.m. ET 3/12/18.
Docket Numbers: RP18–473–000.
Applicants: Southern Star Central Gas
Pipeline, Inc.
Description: Compliance filing Tariff
Waiver—ROFR Posting.
Filed Date: 2/27/18.
Accession Number: 20180227–5032.
Comments Due: 5 p.m. ET 3/12/18.
Docket Numbers: RP18–474–000.
Applicants: Golden Pass Pipeline
LLC.
Description: Compliance filing Golden
Pass Pipeline 2018 Annual Retainage
Report to be effective 4/1/2018.
Filed Date: 2/27/18.
Accession Number: 20180227–5141.
Comments Due: 5 p.m. ET 3/12/18.
Docket Numbers: RP18–475–000.
Applicants: Golden Pass Pipeline
LLC.
Description: Compliance filing Golden
Pass Pipeline Annual Operational
Purchases and Sales Report.
Filed Date: 2/27/18.
Accession Number: 20180227–5159.
Comments Due: 5 p.m. ET 3/12/18.
Docket Numbers: RP18–476–000.
Applicants: High Island Offshore
System, L.L.C.
Description: 2018 Annual Fuel Filing.
Filed Date: 2/27/18.
Accession Number: 20180227–5188.
Comments Due: 5 p.m. ET 3/12/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified date(s). Protests
may be considered, but intervention is
necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
VerDate Sep<11>2014
21:39 Mar 05, 2018
Jkt 244001
Dated: February 28, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–04490 Filed 3–5–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER18–920–000]
Marco DM Holdings, L.L.C.;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
This is a supplemental notice in the
above-referenced proceeding of Marco
DM Holdings, L.L.C.’s application for
market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is March 20,
2018.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov., or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: February 28, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–04491 Filed 3–5–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2698–100]
Duke Energy Carolinas, LLC; Notice of
Application Accepted for Filing,
Soliciting Comments, Motions To
Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Request for a
temporary variance from elevation
requirements.
b. Project No.: 2698–100.
c. Date Filed: February 22, 2018.
d. Applicant: Duke Energy Carolinas,
LLC.
e. Name of Project: East Fork
Hydroelectric Project.
f. Location: The project is located on
the East Fork of the Tuckasegee River in
Jackson County, North Carolina.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Mr. Jeff
Lineberger, Duke Energy Carolinas, LLC,
526 S Church Street, Mail Stop EC 12Y,
Charlotte, NC 28202, (704) 382–5942.
i. FERC Contact: Zeena Aljibury, (202)
502–6065, zeena.aljibury@ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests:
March 27, 2018.
The Commission strongly encourages
electronic filing. Please file motions to
intervene, protests, comments, or
recommendations using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
E:\FR\FM\06MRN1.SGM
06MRN1
Agencies
[Federal Register Volume 83, Number 44 (Tuesday, March 6, 2018)]
[Notices]
[Pages 9505-9506]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-04490]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings
Take notice that the Commission has received the following Natural
Gas Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Number: PR18-32-000.
Applicants: Bay Gas Storage Company, Ltd.
Description: Tariff filing per 284.123(b),(e)/: Annual Adjustment
to Company Use Percentage to be effective 3/1/2018.
Filed Date: 2/23/18.
Accession Number: 201802235048.
Comments/Protests Due: 5 p.m. ET 3/16/18.
Docket Number: PR18-34-000.
Applicants: Duke Energy Ohio, Inc.
Description: Tariff filing per 284.123(b),(e)/: Informational
Filing in Support of Existing State Rate Election to be effective 3/1/
2018.
Filed Date: 2/26/18.
Accession Number: 201802265137.
Comments/Protests Due: 5 p.m. ET 3/19/18.
[[Page 9506]]
Docket Numbers: RP18-472-000.
Applicants: Dominion Energy Carolina Gas Transmission.
Description: Sec. 4(d) Rate Filing: DECG--February 27, 2018
Negotiated Rate Agreements to be effective 3/1/2018.
Filed Date: 2/27/18.
Accession Number: 20180227-5027.
Comments Due: 5 p.m. ET 3/12/18.
Docket Numbers: RP18-473-000.
Applicants: Southern Star Central Gas Pipeline, Inc.
Description: Compliance filing Tariff Waiver--ROFR Posting.
Filed Date: 2/27/18.
Accession Number: 20180227-5032.
Comments Due: 5 p.m. ET 3/12/18.
Docket Numbers: RP18-474-000.
Applicants: Golden Pass Pipeline LLC.
Description: Compliance filing Golden Pass Pipeline 2018 Annual
Retainage Report to be effective 4/1/2018.
Filed Date: 2/27/18.
Accession Number: 20180227-5141.
Comments Due: 5 p.m. ET 3/12/18.
Docket Numbers: RP18-475-000.
Applicants: Golden Pass Pipeline LLC.
Description: Compliance filing Golden Pass Pipeline Annual
Operational Purchases and Sales Report.
Filed Date: 2/27/18.
Accession Number: 20180227-5159.
Comments Due: 5 p.m. ET 3/12/18.
Docket Numbers: RP18-476-000.
Applicants: High Island Offshore System, L.L.C.
Description: 2018 Annual Fuel Filing.
Filed Date: 2/27/18.
Accession Number: 20180227-5188.
Comments Due: 5 p.m. ET 3/12/18.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified date(s). Protests may be considered,
but intervention is necessary to become a party to the proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: February 28, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-04490 Filed 3-5-18; 8:45 am]
BILLING CODE 6717-01-P