Medallion Delaware Express, LLC, Medallion Pipeline Company, LLC; Notice of Petition for Declaratory Order, 9508-9509 [2018-04458]
Download as PDF
sradovich on DSK3GMQ082PROD with NOTICES
9508
Federal Register / Vol. 83, No. 44 / Tuesday, March 6, 2018 / Notices
should focus on the potential
environmental effects, reasonable
alternatives, and measures to avoid or
lessen environmental impacts. The more
specific your comments, the more useful
they will be. To ensure that the
Commission has the opportunity to
consider your comments prior to
making its decision on this project, it is
important that we receive your
comments in Washington, DC on or
before March 27, 2018.
For your convenience, there are three
methods you can use to file your
comments with the Commission. In all
instances please reference the project
docket number (CP17–476–000) with
your submission. The Commission
encourages electronic filing of
comments and has expert staff available
to assist you at 202–502–8258 or
FercOnlineSupport@ferc.gov.
(1) You can file your comments
electronically using the eComment
feature located on the Commission’s
website (www.ferc.gov) under the link to
Documents and Filings. This is an easy
method for submitting brief, text-only
comments on a project;
(2) You can also file your comments
electronically using the eFiling feature
on the Commission’s website
(www.ferc.gov) under the link to
Documents and Filings. With eFiling,
you can provide comments in a variety
of formats by attaching them as a file
with your submission. New eFiling
users must first create an account by
clicking on ‘‘eRegister.’’ You must select
the type of filing you are making. If you
are filing a comment on a particular
project, please select ‘‘Comment on a
Filing’’; or
(3) You can file a paper copy of your
comments by mailing them to the
following address: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
1A, Washington, DC 20426.
Any person seeking to become a party
to the proceeding must file a motion to
intervene pursuant to Rule 214 of the
Commission’s Rules of Practice and
Procedures (18 CFR 385.214).1 Only
intervenors have the right to seek
rehearing of the Commission’s decision.
The Commission grants affected
landowners and others with
environmental concerns intervenor
status upon showing good cause by
stating that they have a clear and direct
interest in this proceeding which no
other party can adequately represent.
Simply filing environmental comments
will not give you intervenor status, but
1 See the previous discussion on the methods for
filing comments.
VerDate Sep<11>2014
21:39 Mar 05, 2018
Jkt 244001
you do not need intervenor status to
have your comments considered.
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC
website (www.ferc.gov) using the
eLibrary link. Click on the eLibrary link,
click on ‘‘General Search,’’ and enter the
docket number excluding the last three
digits in the Docket Number field (i.e.,
CP17–476). Be sure you have selected
an appropriate date range. For
assistance, please contact FERC Online
Support at FercOnlineSupport@ferc.gov
or toll free at (866) 208–3676, or for
TTY, contact (202) 502–8659. The
eLibrary link also provides access to the
texts of formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to www.ferc.gov/docsfiling/esubscription.asp.
Dated: February 27, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–04456 Filed 3–5–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and 385.214.
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Petitioner.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern time
on March 19, 2018.
Dated: February 27, 2018.
Kimberly D. Bose,
Secretary.
[Docket No. OR18–14–000]
[FR Doc. 2018–04459 Filed 3–5–18; 8:45 am]
Targa NGL Pipeline Company LLC;
Notice of Request for Temporary
Waiver
Take notice that on February 21, 2018,
pursuant to Rule 204 of the Federal
Energy Regulatory Commission’s
(‘‘Commission’’) Rules of Practice and
Procedure, 18 CFR 385.204, Targa NGL
Pipeline Company LLC (Targa or
Petitioner) filed a petition for temporary
waiver of the tariff filing and reporting
requirements of sections 6 and 20 of the
Interstate Commerce Act and parts 341
and 357 of the Commission’s regulations
with respect to service on certain
natural gas liquids pipeline facilities
owned and operated by Targa within the
state of Texas, as well as between points
in Texas and Louisiana, as more fully
explained in the petition.
Any person desiring to intervene or to
protest this filing must file in
PO 00000
Frm 00035
Fmt 4703
Sfmt 4703
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. OR18–13–000]
Medallion Delaware Express, LLC,
Medallion Pipeline Company, LLC;
Notice of Petition for Declaratory Order
Take notice that on February 20, 2018,
pursuant to Rule 207(a)(2) of the Federal
Energy Regulatory Commission’s
(Commission) Rules of Practice and
Procedure, 18 CFR 385.207(a)(2) (2017),
Medallion Delaware Express, LLC and
Medallion Pipeline Company, LLC, filed
a petition for a declaratory order seeking
approval of the overall tariff rate
structure and terms of service, open
E:\FR\FM\06MRN1.SGM
06MRN1
Federal Register / Vol. 83, No. 44 / Tuesday, March 6, 2018 / Notices
season procedures, and proposed joint
tariff service, for a new, integrated joint
crude-oil transportation project
commencing from origin points on
Delaware Express, a new pipeline
system in west Texas, to destination
points on an expanded Medallion crude
oil pipeline system (the Joint Project),
all as more fully explained in the
petition.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Petitioner.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern time
on March 20, 2018.
sradovich on DSK3GMQ082PROD with NOTICES
Dated: February 27, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–04458 Filed 3–5–18; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
21:39 Mar 05, 2018
Jkt 244001
9509
Energy LLC, Shoreham Solar Commons
LLC, Judith Gap Energy LLC, Invenergy
Federal Energy Regulatory
Cannon Falls LLC, Grand Ridge Energy
Commission
IV LLC, Bishop Hill Energy III LLC,
Vantage Wind Energy LLC, Willow
Combined Notice of Filings #1
Creek Energy, LLC, Wolverine Creek
Energy LLC.
Take notice that the Commission
Description: Notice of Change in Facts
received the following electric corporate
under Market-Based Rate Authority of
filings:
Buckeye Wind Energy LLC, et al.
Docket Numbers: EC18–63–000.
Filed Date: 2/27/18.
Applicants: Bayou Cove Peaking
Accession Number: 20180227–5143.
Power LLC, Big Cajun I Peaking Power
Comments Due: 5 p.m. ET 3/20/18.
LLC, CottonWood Energy Company LP,
Docket Numbers: ER17–2323–001.
Louisiana Generating LLC, NRG
Applicants: Midcontinent
Sterlington Power LLC, NRG
Independent System Operator, Inc.,
Cottonwood Tenant LLC, NRG Power
Marketing LLC, Cleco Energy LLC, Cleco Ameren Illinois Company.
Description: Tariff Amendment:
Corporate Holdings LLC, Cleco Group
2018–02–28 Deficiency Response re
LLC, Cleco Partners L.P.
revisions to Ameren Att O Rate
Description: Joint Application for
Template to be effective 6/1/2018.
Order Authorizing Disposition of
Filed Date: 2/28/18.
Jurisdictional Facilities Under Section
Accession Number: 20180228–5069.
203 of the Federal Power Act of the
Comments Due: 5 p.m. ET 3/21/18.
Cleco Applicants and NRG Applicants.
Filed Date: 2/27/18.
Docket Numbers: ER18–541–001.
Accession Number: 20180227–5186.
Applicants: Rausch Creek Generation,
Comments Due: 5 p.m. ET 3/20/18.
LLC.
Take notice that the Commission
Description: Tariff Amendment:
received the following electric rate
Reactive Tariff to be effective 2/28/2018.
filings:
Filed Date: 2/27/18.
Docket Numbers: ER15–1873–008;
Accession Number: 20180227–5142.
ER10–2124–018; ER10–2125–019;
Comments Due: 5 p.m. ET 3/20/18.
ER10–2127–017; ER10–2128–018;
Docket Numbers: ER18–920–000.
ER10–2129–013 ER10–2130–018; ER10–
Applicants: Marco DM Holdings,
2131–020; ER10–2132–018 ER10–2133– L.L.C.
019; ER10–2134–012; ER10–2135–013
Description: Baseline eTariff Filing:
ER10–2136–013; ER10–2137–020;
Market-Based Rate Application to be
ER10–2138–020 ER10–2139–020; ER10– effective 4/30/2018.
2140–020; ER10–2141–020 ER10–2764–
Filed Date: 2/28/18.
018; ER11–3872–020; ER11–4044–019
Accession Number: 20180228–5019.
ER11–4046–018; ER12–164–017; ER14–
Comments Due: 5 p.m. ET 3/21/18.
2187–014 ER14–2798–012; ER14–2799–
Docket Numbers: ER18–921–000.
012; ER15–103–008 ER15–1041–008;
Applicants: PJM Interconnection,
ER15–1873–008; ER15–2205–008 ER16–
L.L.C.
1720–005; ER17–2336–003; ER17–2337–
Description: § 205(d) Rate Filing:
003 ER18–140–003; ER18–471–002;
Original WMPA SA No. 4948; Queue
ER18–472–002.
No. AD1–053 to be effective 2/15/2018.
Applicants: Buckeye Wind Energy
Filed Date: 2/28/18.
LLC, Prairie Breeze Wind Energy II LLC,
Accession Number: 20180228–5030.
Prairie Breeze Wind Energy III LLC,
Comments Due: 5 p.m. ET 3/21/18.
States Edge Wind I LLC, States Edge
Docket Numbers: ER18–923–000.
Wind I Holdings LLC, Invenergy Energy
Applicants: New England Power Pool
Management LLC, Beech Ridge Energy
Participants Committee.
LLC, Beech Ridge Energy II LLC, Beech
Description: § 205(d) Rate Filing: Mar
Ridge Energy Storage LLC, Forward
2018 Membership Filing to be effective
Energy LLC, Gratiot County Wind LLC,
2/1/2018.
Gratiot County Wind II LLC, Grand
Filed Date: 2/28/18.
Ridge Energy LLC, Grand Ridge Energy
Accession Number: 20180228–5086.
II LLC, Grand Ridge Energy III LLC,
Comments Due: 5 p.m. ET 3/21/18.
Grand Ridge Energy V LLC, Grand Ridge
Docket Numbers: ER18–924–000.
Energy Storage LLC, Grays Harbor
Applicants: Arizona Public Service
Energy LLC, Hardee Power Partners
Company.
Limited, Invenergy Nelson LLC,
Description: § 205(d) Rate Filing: Rate
Invenergy TN LLC, Lackawanna Energy
Center LLC, Sheldon Energy LLC,
Schedule No. 224—ATS Participation
Shoreham Solar Commons Holdings
Agreement to be effective 5/1/2018.
LLC, Spindle Hill Energy LLC, Stony
Filed Date: 2/28/18.
Creek Energy LLC, Spring Canyon
Accession Number: 20180228–5089.
DEPARTMENT OF ENERGY
PO 00000
Frm 00036
Fmt 4703
Sfmt 4703
E:\FR\FM\06MRN1.SGM
06MRN1
Agencies
[Federal Register Volume 83, Number 44 (Tuesday, March 6, 2018)]
[Notices]
[Pages 9508-9509]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-04458]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. OR18-13-000]
Medallion Delaware Express, LLC, Medallion Pipeline Company, LLC;
Notice of Petition for Declaratory Order
Take notice that on February 20, 2018, pursuant to Rule 207(a)(2)
of the Federal Energy Regulatory Commission's (Commission) Rules of
Practice and Procedure, 18 CFR 385.207(a)(2) (2017), Medallion Delaware
Express, LLC and Medallion Pipeline Company, LLC, filed a petition for
a declaratory order seeking approval of the overall tariff rate
structure and terms of service, open
[[Page 9509]]
season procedures, and proposed joint tariff service, for a new,
integrated joint crude-oil transportation project commencing from
origin points on Delaware Express, a new pipeline system in west Texas,
to destination points on an expanded Medallion crude oil pipeline
system (the Joint Project), all as more fully explained in the
petition.
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed on or before the comment date.
Anyone filing a motion to intervene or protest must serve a copy of
that document on the Petitioner.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://www.ferc.gov. Persons unable to file electronically should submit an
original and 5 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street NE, Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the website that enables subscribers to receive email
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please email
[email protected], or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Comment Date: 5:00 p.m. Eastern time on March 20, 2018.
Dated: February 27, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-04458 Filed 3-5-18; 8:45 am]
BILLING CODE 6717-01-P