PJM Interconnection, L.L.C., Ohio Valley Electric Corporation; Notice Establishing Answer Period to Motion To Defer Effective Date, 9504 [2018-04457]

Download as PDF 9504 Federal Register / Vol. 83, No. 44 / Tuesday, March 6, 2018 / Notices application. The users create a profile upon their initial access to the system, and they can modify the profile electronically as needed. The primary respondents of DTS are DoD civilians and military personnel. The secondary respondents (less than 1%) are members of the public, specifically dependents of DoD personnel and, in very rare cases, travel guests of DoD such as Academy students or foreign nationals. Dated: March 1, 2018. Aaron Siegel, Alternate OSD Federal Register, Liaison Officer, Department of Defense. [FR Doc. 2018–04542 Filed 3–5–18; 8:45 am] BILLING CODE 5001–06–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. ER18–459–000, ER18–460– 000] PJM Interconnection, L.L.C., Ohio Valley Electric Corporation; Notice Establishing Answer Period to Motion To Defer Effective Date On February 26, 2018, PJM Interconnection, L.L.C. and Ohio Valley Electric Corporation (collectively, the Parties) filed a motion to defer the present March 1, 2018 effective date for the modifications to the Revised Tariff Sheets (Motion), accepted by the Commission on February 13, 2018, in this proceeding.1 Also included in the filing was a request to shorten the answer period for the Motion to one day. By this notice, the Parties’ request to shorten the date for filing answers to the Motion to one day is denied. Answers to the Motion shall be filed on or before March 5, 2018. Dated: February 27, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–04457 Filed 3–5–18; 8:45 am] sradovich on DSK3GMQ082PROD with NOTICES BILLING CODE 6717–01–P 1 PJM Interconnection, L.L.C. and Ohio Valley Electric Corp., 162 FERC ¶ 61,098 (2018). VerDate Sep<11>2014 21:39 Mar 05, 2018 Jkt 244001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2216–084] New York Power Authority; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Type of Application: Request for recreation plan amendment. b. Project No.: 2216–084. c. Dates Filed: July 12 and November 22, 2017. d. Applicant: New York Power Authority. e. Name of Project: Niagara Power Project. f. Location: The project is located on the Niagara River in Niagara County, New York. The project does not occupy federal lands. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a–825r. h. Applicant Contact: Mr. Stephen M. Schoenwiesner, Licensing Manager, New York Power Authority, 123 Main Street, White Plains, NY 10601, (914) 681–6200. i. FERC Contact: Ms. Mary Karwoski, (678) 245–3027, mary.karwoski@ ferc.gov. j. Deadline for filing comments, motions to intervene, and protests is 30 days from the issuance date of this notice by the Commission (March 28, 2018). All documents may be filed electronically via the internet. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s website at https://www.ferc.gov/docsfiling/efiling.asp. If unable to be filed electronically, documents may be paperfiled. To paper-file, an original and seven copies should be mailed to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. Please include the project number (P– 2216–084) on any comments, motions, or recommendations filed. k. Description of Request: New York Power Authority (licensee) requests Commission approval for an amendment to its current recreation PO 00000 Frm 00031 Fmt 4703 Sfmt 4703 plan to remove a two mile section, of which 1.4 miles is inside the project boundary, of the four-lane Niagara Scenic Parkway (formerly known as the Robert Moses Parkway) between Main Street and Findlay Drive; restore the landscape reclaimed along the Niagara Gorge rim; construct a pedestrian/ bicycle trial network along the Niagara Gorge rim; and reconfigure the Upper Whirlpool Overlook recreation site to enhance its scenic and recreational value and integrate the existing recreation site into the network of trails. l. Locations of the Application: A copy of the application is available for inspection and reproduction at the Commission’s Public Reference Room, located at 888 First Street NE, Room 2A, Washington, DC 20426, or by calling (202) 502–8371. This filing may also be viewed on the Commission’s website at https://www.ferc.gov/docs-filing/ efiling.asp. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1–866–208–3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item (h) above. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Responsive Documents: All filings must (1) bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTEST’’, or ‘‘MOTION TO INTERVENE’’ as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or E:\FR\FM\06MRN1.SGM 06MRN1

Agencies

[Federal Register Volume 83, Number 44 (Tuesday, March 6, 2018)]
[Notices]
[Page 9504]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-04457]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket Nos. ER18-459-000, ER18-460-000]


PJM Interconnection, L.L.C., Ohio Valley Electric Corporation; 
Notice Establishing Answer Period to Motion To Defer Effective Date

    On February 26, 2018, PJM Interconnection, L.L.C. and Ohio Valley 
Electric Corporation (collectively, the Parties) filed a motion to 
defer the present March 1, 2018 effective date for the modifications to 
the Revised Tariff Sheets (Motion), accepted by the Commission on 
February 13, 2018, in this proceeding.\1\ Also included in the filing 
was a request to shorten the answer period for the Motion to one day.
---------------------------------------------------------------------------

    \1\ PJM Interconnection, L.L.C. and Ohio Valley Electric Corp., 
162 FERC ] 61,098 (2018).
---------------------------------------------------------------------------

    By this notice, the Parties' request to shorten the date for filing 
answers to the Motion to one day is denied. Answers to the Motion shall 
be filed on or before March 5, 2018.

    Dated: February 27, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-04457 Filed 3-5-18; 8:45 am]
 BILLING CODE 6717-01-P