PJM Interconnection, L.L.C., Ohio Valley Electric Corporation; Notice Establishing Answer Period to Motion To Defer Effective Date, 9504 [2018-04457]
Download as PDF
9504
Federal Register / Vol. 83, No. 44 / Tuesday, March 6, 2018 / Notices
application. The users create a profile
upon their initial access to the system,
and they can modify the profile
electronically as needed. The primary
respondents of DTS are DoD civilians
and military personnel. The secondary
respondents (less than 1%) are members
of the public, specifically dependents of
DoD personnel and, in very rare cases,
travel guests of DoD such as Academy
students or foreign nationals.
Dated: March 1, 2018.
Aaron Siegel,
Alternate OSD Federal Register, Liaison
Officer, Department of Defense.
[FR Doc. 2018–04542 Filed 3–5–18; 8:45 am]
BILLING CODE 5001–06–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. ER18–459–000, ER18–460–
000]
PJM Interconnection, L.L.C., Ohio
Valley Electric Corporation; Notice
Establishing Answer Period to Motion
To Defer Effective Date
On February 26, 2018, PJM
Interconnection, L.L.C. and Ohio Valley
Electric Corporation (collectively, the
Parties) filed a motion to defer the
present March 1, 2018 effective date for
the modifications to the Revised Tariff
Sheets (Motion), accepted by the
Commission on February 13, 2018, in
this proceeding.1 Also included in the
filing was a request to shorten the
answer period for the Motion to one
day.
By this notice, the Parties’ request to
shorten the date for filing answers to the
Motion to one day is denied. Answers
to the Motion shall be filed on or before
March 5, 2018.
Dated: February 27, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–04457 Filed 3–5–18; 8:45 am]
sradovich on DSK3GMQ082PROD with NOTICES
BILLING CODE 6717–01–P
1 PJM Interconnection, L.L.C. and Ohio Valley
Electric Corp., 162 FERC ¶ 61,098 (2018).
VerDate Sep<11>2014
21:39 Mar 05, 2018
Jkt 244001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2216–084]
New York Power Authority; Notice of
Application Accepted for Filing,
Soliciting Comments, Motions To
Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Request for
recreation plan amendment.
b. Project No.: 2216–084.
c. Dates Filed: July 12 and November
22, 2017.
d. Applicant: New York Power
Authority.
e. Name of Project: Niagara Power
Project.
f. Location: The project is located on
the Niagara River in Niagara County,
New York. The project does not occupy
federal lands.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Mr. Stephen M.
Schoenwiesner, Licensing Manager,
New York Power Authority, 123 Main
Street, White Plains, NY 10601, (914)
681–6200.
i. FERC Contact: Ms. Mary Karwoski,
(678) 245–3027, mary.karwoski@
ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests is 30
days from the issuance date of this
notice by the Commission (March 28,
2018).
All documents may be filed
electronically via the internet. See, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s
website at https://www.ferc.gov/docsfiling/efiling.asp. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and
seven copies should be mailed to:
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE,
Washington, DC 20426. Commenters
can submit brief comments up to 6,000
characters, without prior registration,
using the eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments.
Please include the project number (P–
2216–084) on any comments, motions,
or recommendations filed.
k. Description of Request: New York
Power Authority (licensee) requests
Commission approval for an
amendment to its current recreation
PO 00000
Frm 00031
Fmt 4703
Sfmt 4703
plan to remove a two mile section, of
which 1.4 miles is inside the project
boundary, of the four-lane Niagara
Scenic Parkway (formerly known as the
Robert Moses Parkway) between Main
Street and Findlay Drive; restore the
landscape reclaimed along the Niagara
Gorge rim; construct a pedestrian/
bicycle trial network along the Niagara
Gorge rim; and reconfigure the Upper
Whirlpool Overlook recreation site to
enhance its scenic and recreational
value and integrate the existing
recreation site into the network of trails.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street NE, Room 2A,
Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s website at
https://www.ferc.gov/docs-filing/
efiling.asp. Enter the docket number
excluding the last three digits in the
docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents: All filings must (1) bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘PROTEST’’, or
‘‘MOTION TO INTERVENE’’ as
applicable; (2) set forth in the heading
the name of the applicant and the
project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
E:\FR\FM\06MRN1.SGM
06MRN1
Agencies
[Federal Register Volume 83, Number 44 (Tuesday, March 6, 2018)]
[Notices]
[Page 9504]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-04457]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket Nos. ER18-459-000, ER18-460-000]
PJM Interconnection, L.L.C., Ohio Valley Electric Corporation;
Notice Establishing Answer Period to Motion To Defer Effective Date
On February 26, 2018, PJM Interconnection, L.L.C. and Ohio Valley
Electric Corporation (collectively, the Parties) filed a motion to
defer the present March 1, 2018 effective date for the modifications to
the Revised Tariff Sheets (Motion), accepted by the Commission on
February 13, 2018, in this proceeding.\1\ Also included in the filing
was a request to shorten the answer period for the Motion to one day.
---------------------------------------------------------------------------
\1\ PJM Interconnection, L.L.C. and Ohio Valley Electric Corp.,
162 FERC ] 61,098 (2018).
---------------------------------------------------------------------------
By this notice, the Parties' request to shorten the date for filing
answers to the Motion to one day is denied. Answers to the Motion shall
be filed on or before March 5, 2018.
Dated: February 27, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-04457 Filed 3-5-18; 8:45 am]
BILLING CODE 6717-01-P