Environmental Impact Statements; Notice of Availability, 8988 [2018-04301]
Download as PDF
daltland on DSKBBV9HB2PROD with NOTICES
8988
Federal Register / Vol. 83, No. 42 / Friday, March 2, 2018 / Notices
docket for this ICR. The docket can be
viewed online at www.regulations.gov
or in person at the EPA Docket Center,
WJC West, Room 3334, 1301
Constitution Ave. NW, Washington, DC.
The telephone number for the Docket
Center is 202–566–1744. For additional
information about EPA’s public docket,
visit https://www.epa.gov/dockets.
Pursuant to section 3506(c)(2)(A) of
the PRA, EPA is soliciting comments
and information to enable it to: (i)
Evaluate whether the proposed
collection of information is necessary
for the proper performance of the
functions of the Agency, including
whether the information will have
practical utility; (ii) evaluate the
accuracy of the Agency’s estimate of the
burden of the proposed collection of
information, including the validity of
the methodology and assumptions used;
(iii) enhance the quality, utility, and
clarity of the information to be
collected; and (iv) minimize the burden
of the collection of information on those
who are to respond, including through
the use of appropriate automated
electronic, mechanical, or other
technological collection techniques or
other forms of information technology,
e.g., permitting electronic submission of
responses. EPA will consider the
comments received and amend the ICR
as appropriate. The final ICR package
will then be submitted to OMB for
review and approval. At that time, EPA
will issue another Federal Register
notice to announce the submission of
the ICR to OMB and the opportunity to
submit additional comments to OMB.
Abstract: EPA contractors will be
required to disclose business
relationships and corporate affiliations
to determine whether EPA’s interests
are jeopardized by such relationships.
Because EPA has the dual responsibility
of cleanup and enforcement and
because its contractors are often
involved in both activities, it is
imperative that contractors are free from
conflicts of interest so as not to
prejudice response and enforcement
actions. Contractors will be required to
maintain a database of business
relationships and report information to
EPA on either an annual basis or when
each work order is issued.
Form numbers: ICR numbers: EPA
ICR No. 1550.11, OMB Control No.
2030–0023.
Respondents/affected entities: Entities
potentially affected by this action are
businesses or organizations performing
contracts for the EPA.
Respondent’s obligation to respond:
Mandatory to continue performance on
the respective contract, in accordance
with respective contract clause terms.
VerDate Sep<11>2014
18:10 Mar 01, 2018
Jkt 244001
Estimated number of respondents: 45
(total).
Frequency of response: 1,245.67 hours
per response.
Total estimated burden: 14,652 hours
(per year). Burden is defined at 5 CFR
1320.03(b).
Total estimated cost: Estimated total
annual costs are $3,214,288.05. This
includes an estimated contractor burden
cost of $2,798,168.85 and an estimated
agency burden cost of $416,119.20.
These amounts were calculated using
the hours above and the labor rates from
the 2017 Bureau of Labor National Mean
Statistics and the General Schedule.
Changes in estimates: There is no
change in the number of hours in the
total estimated respondent burden
compared to the ICR currently approved
by OMB.
Dated: February 21, 2018.
Kimberly Y. Patrick,
Director, Office of Acquisition Management.
[FR Doc. 2018–04310 Filed 3–1–18; 8:45 am]
EIS No. 20180029, Final, USACE, NC,
Bogue Banks Master Beach
Nourishment Plan, Review Period
Ends: 04/02/2018, Contact: Mickey
Sugg 910–251–4811.
EIS No. 20180030, Draft, FHWA, WA,
Industrial Way/Oregon Way
Intersection Project, Comment Period
Ends: 04/16/2018, Contact: Liana Liu
360–753–9553.
Amended Notices
EIS No. 20170249, Draft, OSM, MT,
Western Energy Company’s Rosebud
Mine Area F, Revision to Federal
Register Notice published 01/05/
2018, extending comment period from
02/20/2018 to 03/05/2018, Contact:
Logan Sholar 303–293–5036.
Dated: February 27, 2018.
Kelly Knight,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. 2018–04301 Filed 3–1–18; 8:45 am]
BILLING CODE 6560–50–P
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
FARM CREDIT SYSTEM INSURANCE
CORPORATION
[ER–FRL–9037–9]
Regular Meeting: Farm Credit System
Insurance Corporation Board
Environmental Impact Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–7156 or https://www2.epa.gov/nepa.
Weekly receipt of Environmental Impact
Statements
Filed 02/19/2018 Through 02/23/2018
Pursuant to 40 CFR 1506.9.
Notice
Section 309(a) of the Clean Air Act
requires that EPA make public its
comments on EISs issued by other
Federal agencies. EPA’s comment letters
on EISs are available at: https://
cdxnodengn.epa.gov/cdx-nepa-public/
action/eia/search.
EIS No. 20180025, Final Supplement,
FTA, CA, VTA’s BART Silicon Valley
Phase II Extension Project. Review
Period Ends: 04/02/2018, Contact:
Mary Nguyen 213–202–3960.
EIS No. 20180026, Final, USFS, ID, Big
Creek Geothermal Leasing Project,
Review Period Ends: 04/16/2018,
Contact: Julie Hopkins 208–756–5279.
EIS No. 20180027, Draft, FDA,GSA, MD,
2018 Federal Research Center Master
Plan, Comment Period Ends: 04/16/
2018, Contact: Paul Gyamfi 202–440–
3405.
EIS No. 20180028, Final, Caltrans, CA,
State Route 269 Bridge Project,
Review Period Ends: 09/03/2018,
Contact: Jeff Sorensen 559–445–5329.
PO 00000
Frm 00026
Fmt 4703
Sfmt 4703
Farm Credit System Insurance
Corporation.
ACTION: Notice, regular meeting.
AGENCY:
Notice is hereby given of the
regular meeting of the Farm Credit
System Insurance Corporation Board
(Board).
SUMMARY:
The meeting of the Board will be
held at the offices of the Farm Credit
Administration in McLean, Virginia, on
March 8, 2018, from 2:00 p.m. until
such time as the Board concludes its
business.
DATES:
Dale
L. Aultman, Secretary to the Farm
Credit System Insurance Corporation
Board, (703) 883–4009, TTY (703) 883–
4056, aultmand@fca.gov.
ADDRESSES: Farm Credit System
Insurance Corporation, 1501 Farm
Credit Drive, McLean, Virginia 22102.
Submit attendance requests via email to
VisitorRequest@FCA.gov. See
SUPPLEMENTARY INFORMATION for further
information about attendance requests.
SUPPLEMENTARY INFORMATION: Parts of
this meeting of the Board will be open
to the public (limited space available),
and parts will be closed to the public.
Please send an email to VisitorRequest@
FCA.gov at least 24 hours before the
meeting. In your email include: Name,
postal address, entity you are
FOR FURTHER INFORMATION CONTACT:
E:\FR\FM\02MRN1.SGM
02MRN1
Agencies
[Federal Register Volume 83, Number 42 (Friday, March 2, 2018)]
[Notices]
[Page 8988]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-04301]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-9037-9]
Environmental Impact Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7156 or https://www2.epa.gov/nepa.
Weekly receipt of Environmental Impact Statements
Filed 02/19/2018 Through 02/23/2018
Pursuant to 40 CFR 1506.9.
Notice
Section 309(a) of the Clean Air Act requires that EPA make public
its comments on EISs issued by other Federal agencies. EPA's comment
letters on EISs are available at: https://cdxnodengn.epa.gov/cdx-nepa-public/action/eia/search.
EIS No. 20180025, Final Supplement, FTA, CA, VTA's BART Silicon Valley
Phase II Extension Project. Review Period Ends: 04/02/2018, Contact:
Mary Nguyen 213-202-3960.
EIS No. 20180026, Final, USFS, ID, Big Creek Geothermal Leasing
Project, Review Period Ends: 04/16/2018, Contact: Julie Hopkins 208-
756-5279.
EIS No. 20180027, Draft, FDA,GSA, MD, 2018 Federal Research Center
Master Plan, Comment Period Ends: 04/16/2018, Contact: Paul Gyamfi 202-
440-3405.
EIS No. 20180028, Final, Caltrans, CA, State Route 269 Bridge Project,
Review Period Ends: 09/03/2018, Contact: Jeff Sorensen 559-445-5329.
EIS No. 20180029, Final, USACE, NC, Bogue Banks Master Beach
Nourishment Plan, Review Period Ends: 04/02/2018, Contact: Mickey Sugg
910-251-4811.
EIS No. 20180030, Draft, FHWA, WA, Industrial Way/Oregon Way
Intersection Project, Comment Period Ends: 04/16/2018, Contact: Liana
Liu 360-753-9553.
Amended Notices
EIS No. 20170249, Draft, OSM, MT, Western Energy Company's Rosebud Mine
Area F, Revision to Federal Register Notice published 01/05/2018,
extending comment period from 02/20/2018 to 03/05/2018, Contact: Logan
Sholar 303-293-5036.
Dated: February 27, 2018.
Kelly Knight,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 2018-04301 Filed 3-1-18; 8:45 am]
BILLING CODE 6560-50-P