Drawbridge Operation Regulation; Passaic River, Harrison, NJ, 8937 [2018-04249]
Download as PDF
Federal Register / Vol. 83, No. 42 / Friday, March 2, 2018 / Rules and Regulations
daltland on DSKBBV9HB2PROD with RULES
requested to determine whether a
permanent change to the schedule is
appropriate to better balance the needs
of marine and rail traffic.
Under this temporary deviation, in
effect from 6 a.m. on March 19, 2018 to
6 a.m. on June 17, 2018, the bridge shall
open on signal from 3 a.m. to 11 p.m.
if at least 2 hours notice is given to the
drawtender. At all other times, the draw
shall be maintained in the fully open
position, except for the passage of trains
or for maintenance. To request an
opening, mariners can contact the
drawtender via marine radio VHF–FM
channel 16/9 or by telephone at (707)
890–8650. Vessels able to pass through
the bridge in the closed position may do
so at anytime. The bridge will be
required to open as soon as practicable
for vessels engaged in emergency
response. SMART will log dates and
times of vessels requesting openings.
There are no alternate routes for vessels
transiting upstream of the bridge on the
Petaluma River.
The Coast Guard will also inform the
users of the waterways through our
Local and Broadcast Notices to Mariners
and through direct outreach to local
harbors, marinas, and water-based
business of the temporary change in the
operating schedule for the bridge so that
vessel operators can arrange their
transits to minimize any impact caused
by the temporary deviation.
In accordance with 33 CFR 117.35(e),
the drawbridge must return to its regular
operating schedule immediately at the
end of the effective period of this
temporary deviation. This deviation
from the operating regulations is
authorized under 33 CFR 117.35.
II. Public Participation and Request for
Comments
We view public participation as
essential to effective rulemaking, and
will consider all comments and
materials received during the comment
period. Your comments can help shape
the outcome of this rulemaking. If you
submit a comment, please include the
docket number for this rulemaking,
indicate the specific section of this
document to which each comment
applies, and provide a reason for each
suggestion or recommendation.
We encourage you to submit
comments through the Federal
eRulemaking Portal at https://
www.regulations.gov. If your material
cannot be submitted using https://
www.regulations.gov, contact the person
in the FOR FURTHER INFORMATION
CONTACT section of this document for
alternate instructions.
We accept anonymous comments. All
comments received will be posted
VerDate Sep<11>2014
16:25 Mar 01, 2018
Jkt 244001
without change to https://
www.regulations.gov and will include
any personal information you have
provided. For more about privacy and
the docket, visit https://
www.regulations.gov/privacynotice.
Documents mentioned in this
document as being available in this
docket and all public comments, will be
in our online docket at https://
www.regulations.gov and can be viewed
by following that website’s instructions.
Additionally, if you go to the online
docket and sign up for email alerts, you
will be notified when comments are
posted or a final rule is published.
Dated: February 26, 2018.
Carl T. Hausner,
District Bridge Chief, Eleventh Coast Guard
District.
[FR Doc. 2018–04251 Filed 3–1–18; 8:45 am]
BILLING CODE 9110–04–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2018–0111]
Drawbridge Operation Regulation;
Passaic River, Harrison, NJ
Coast Guard, DHS.
Notice of deviation from
drawbridge regulation.
AGENCY:
ACTION:
The Coast Guard has issued a
temporary deviation from the operating
schedule that governs the Route 280
Bridge across the Passaic River, mile
5.8, at Harrison, New Jersey. The
deviation is necessary to perform work
on the switch gear power source of the
bridge. This deviation allows the bridge
to undergo necessary maintenance for
Route 21 interchange improvements.
This deviation allows the bridge to
remain closed during the maintenance
period.
SUMMARY:
This deviation is effective from
12:01 a.m. on March 1, 2018, until 11:59
p.m. on March 7, 2018.
ADDRESSES: The docket for this
deviation, USCG–2018–0111, is
available at https://www.regulations.gov.
Type the docket number in the
‘‘SEARCH’’ box and click ‘‘SEARCH.’’
Click on Open Docket Folder on the line
associated with this deviation.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this temporary
deviation, call or email Judy K. LeungYee, Bridge Management Specialist,
First District Bridge Branch, U.S. Coast
DATES:
PO 00000
Frm 00011
Fmt 4700
Sfmt 4700
8937
Guard; telephone 212–514–4336, email
Judy.K.Leung-Yee@uscg.mil.
SUPPLEMENTARY INFORMATION: The owner
of the bridge, the New Jersey
Department of Transportation, requested
a temporary deviation in order to
perform work on the switch gear power
source of the bridge.
The Route 280 Bridge across the
Passaic River, mile 5.8, at Harrison, New
Jersey is a vertical lift bridge with a
vertical clearance of 35 feet at mean
high water and 40 feet at mean low
water in the closed position. The
existing drawbridge operating
regulations are listed at 33 CFR
117.739(h).
This temporary deviation will allow
the Route 280 Bridge to remain in the
closed position from 12:01 a.m. on
March 1, 2018, to 11:59 p.m. on March
7, 2018. The deviation will have
negligible effect on navigation. The
waterway is transited by recreational
and commercial vessels. Coordination
with waterway users has indicated no
objection to the proposed closure of the
draw. Vessels that can pass under the
bridge without an opening may do so at
all times. The bridge will not be able to
open for emergencies. There is no
alternate route for vessels to pass.
The Coast Guard will also inform the
users of the waterways through our
Local and Broadcast Notices to Mariners
of the change in operating schedule for
the bridge so that vessel operators can
arrange their transits to minimize any
impact caused by the temporary
deviation.
In accordance with 33 CFR 117.35(e),
the drawbridge must return to its regular
operating schedule immediately at the
end of the effective period of this
temporary deviation. This deviation
from the operating regulations is
authorized under 33 CFR 117.35.
Dated: February 27, 2018.
Christopher J. Bisignano,
Supervisory Bridge Management Specialist,
First Coast Guard District.
[FR Doc. 2018–04249 Filed 3–1–18; 8:45 am]
BILLING CODE 9110–04–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2018–0031]
Drawbridge Operation Regulation;
Curtis Creek, Baltimore, MD
AGENCY:
E:\FR\FM\02MRR1.SGM
Coast Guard, DHS.
02MRR1
Agencies
[Federal Register Volume 83, Number 42 (Friday, March 2, 2018)]
[Rules and Regulations]
[Page 8937]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-04249]
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG-2018-0111]
Drawbridge Operation Regulation; Passaic River, Harrison, NJ
AGENCY: Coast Guard, DHS.
ACTION: Notice of deviation from drawbridge regulation.
-----------------------------------------------------------------------
SUMMARY: The Coast Guard has issued a temporary deviation from the
operating schedule that governs the Route 280 Bridge across the Passaic
River, mile 5.8, at Harrison, New Jersey. The deviation is necessary to
perform work on the switch gear power source of the bridge. This
deviation allows the bridge to undergo necessary maintenance for Route
21 interchange improvements. This deviation allows the bridge to remain
closed during the maintenance period.
DATES: This deviation is effective from 12:01 a.m. on March 1, 2018,
until 11:59 p.m. on March 7, 2018.
ADDRESSES: The docket for this deviation, USCG-2018-0111, is available
at https://www.regulations.gov. Type the docket number in the ``SEARCH''
box and click ``SEARCH.'' Click on Open Docket Folder on the line
associated with this deviation.
FOR FURTHER INFORMATION CONTACT: If you have questions on this
temporary deviation, call or email Judy K. Leung-Yee, Bridge Management
Specialist, First District Bridge Branch, U.S. Coast Guard; telephone
212-514-4336, email [email protected].
SUPPLEMENTARY INFORMATION: The owner of the bridge, the New Jersey
Department of Transportation, requested a temporary deviation in order
to perform work on the switch gear power source of the bridge.
The Route 280 Bridge across the Passaic River, mile 5.8, at
Harrison, New Jersey is a vertical lift bridge with a vertical
clearance of 35 feet at mean high water and 40 feet at mean low water
in the closed position. The existing drawbridge operating regulations
are listed at 33 CFR 117.739(h).
This temporary deviation will allow the Route 280 Bridge to remain
in the closed position from 12:01 a.m. on March 1, 2018, to 11:59 p.m.
on March 7, 2018. The deviation will have negligible effect on
navigation. The waterway is transited by recreational and commercial
vessels. Coordination with waterway users has indicated no objection to
the proposed closure of the draw. Vessels that can pass under the
bridge without an opening may do so at all times. The bridge will not
be able to open for emergencies. There is no alternate route for
vessels to pass.
The Coast Guard will also inform the users of the waterways through
our Local and Broadcast Notices to Mariners of the change in operating
schedule for the bridge so that vessel operators can arrange their
transits to minimize any impact caused by the temporary deviation.
In accordance with 33 CFR 117.35(e), the drawbridge must return to
its regular operating schedule immediately at the end of the effective
period of this temporary deviation. This deviation from the operating
regulations is authorized under 33 CFR 117.35.
Dated: February 27, 2018.
Christopher J. Bisignano,
Supervisory Bridge Management Specialist, First Coast Guard District.
[FR Doc. 2018-04249 Filed 3-1-18; 8:45 am]