Drawbridge Operation Regulation; Passaic River, Harrison, NJ, 8937 [2018-04249]

Download as PDF Federal Register / Vol. 83, No. 42 / Friday, March 2, 2018 / Rules and Regulations daltland on DSKBBV9HB2PROD with RULES requested to determine whether a permanent change to the schedule is appropriate to better balance the needs of marine and rail traffic. Under this temporary deviation, in effect from 6 a.m. on March 19, 2018 to 6 a.m. on June 17, 2018, the bridge shall open on signal from 3 a.m. to 11 p.m. if at least 2 hours notice is given to the drawtender. At all other times, the draw shall be maintained in the fully open position, except for the passage of trains or for maintenance. To request an opening, mariners can contact the drawtender via marine radio VHF–FM channel 16/9 or by telephone at (707) 890–8650. Vessels able to pass through the bridge in the closed position may do so at anytime. The bridge will be required to open as soon as practicable for vessels engaged in emergency response. SMART will log dates and times of vessels requesting openings. There are no alternate routes for vessels transiting upstream of the bridge on the Petaluma River. The Coast Guard will also inform the users of the waterways through our Local and Broadcast Notices to Mariners and through direct outreach to local harbors, marinas, and water-based business of the temporary change in the operating schedule for the bridge so that vessel operators can arrange their transits to minimize any impact caused by the temporary deviation. In accordance with 33 CFR 117.35(e), the drawbridge must return to its regular operating schedule immediately at the end of the effective period of this temporary deviation. This deviation from the operating regulations is authorized under 33 CFR 117.35. II. Public Participation and Request for Comments We view public participation as essential to effective rulemaking, and will consider all comments and materials received during the comment period. Your comments can help shape the outcome of this rulemaking. If you submit a comment, please include the docket number for this rulemaking, indicate the specific section of this document to which each comment applies, and provide a reason for each suggestion or recommendation. We encourage you to submit comments through the Federal eRulemaking Portal at https:// www.regulations.gov. If your material cannot be submitted using https:// www.regulations.gov, contact the person in the FOR FURTHER INFORMATION CONTACT section of this document for alternate instructions. We accept anonymous comments. All comments received will be posted VerDate Sep<11>2014 16:25 Mar 01, 2018 Jkt 244001 without change to https:// www.regulations.gov and will include any personal information you have provided. For more about privacy and the docket, visit https:// www.regulations.gov/privacynotice. Documents mentioned in this document as being available in this docket and all public comments, will be in our online docket at https:// www.regulations.gov and can be viewed by following that website’s instructions. Additionally, if you go to the online docket and sign up for email alerts, you will be notified when comments are posted or a final rule is published. Dated: February 26, 2018. Carl T. Hausner, District Bridge Chief, Eleventh Coast Guard District. [FR Doc. 2018–04251 Filed 3–1–18; 8:45 am] BILLING CODE 9110–04–P DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 117 [Docket No. USCG–2018–0111] Drawbridge Operation Regulation; Passaic River, Harrison, NJ Coast Guard, DHS. Notice of deviation from drawbridge regulation. AGENCY: ACTION: The Coast Guard has issued a temporary deviation from the operating schedule that governs the Route 280 Bridge across the Passaic River, mile 5.8, at Harrison, New Jersey. The deviation is necessary to perform work on the switch gear power source of the bridge. This deviation allows the bridge to undergo necessary maintenance for Route 21 interchange improvements. This deviation allows the bridge to remain closed during the maintenance period. SUMMARY: This deviation is effective from 12:01 a.m. on March 1, 2018, until 11:59 p.m. on March 7, 2018. ADDRESSES: The docket for this deviation, USCG–2018–0111, is available at https://www.regulations.gov. Type the docket number in the ‘‘SEARCH’’ box and click ‘‘SEARCH.’’ Click on Open Docket Folder on the line associated with this deviation. FOR FURTHER INFORMATION CONTACT: If you have questions on this temporary deviation, call or email Judy K. LeungYee, Bridge Management Specialist, First District Bridge Branch, U.S. Coast DATES: PO 00000 Frm 00011 Fmt 4700 Sfmt 4700 8937 Guard; telephone 212–514–4336, email Judy.K.Leung-Yee@uscg.mil. SUPPLEMENTARY INFORMATION: The owner of the bridge, the New Jersey Department of Transportation, requested a temporary deviation in order to perform work on the switch gear power source of the bridge. The Route 280 Bridge across the Passaic River, mile 5.8, at Harrison, New Jersey is a vertical lift bridge with a vertical clearance of 35 feet at mean high water and 40 feet at mean low water in the closed position. The existing drawbridge operating regulations are listed at 33 CFR 117.739(h). This temporary deviation will allow the Route 280 Bridge to remain in the closed position from 12:01 a.m. on March 1, 2018, to 11:59 p.m. on March 7, 2018. The deviation will have negligible effect on navigation. The waterway is transited by recreational and commercial vessels. Coordination with waterway users has indicated no objection to the proposed closure of the draw. Vessels that can pass under the bridge without an opening may do so at all times. The bridge will not be able to open for emergencies. There is no alternate route for vessels to pass. The Coast Guard will also inform the users of the waterways through our Local and Broadcast Notices to Mariners of the change in operating schedule for the bridge so that vessel operators can arrange their transits to minimize any impact caused by the temporary deviation. In accordance with 33 CFR 117.35(e), the drawbridge must return to its regular operating schedule immediately at the end of the effective period of this temporary deviation. This deviation from the operating regulations is authorized under 33 CFR 117.35. Dated: February 27, 2018. Christopher J. Bisignano, Supervisory Bridge Management Specialist, First Coast Guard District. [FR Doc. 2018–04249 Filed 3–1–18; 8:45 am] BILLING CODE 9110–04–P DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 117 [Docket No. USCG–2018–0031] Drawbridge Operation Regulation; Curtis Creek, Baltimore, MD AGENCY: E:\FR\FM\02MRR1.SGM Coast Guard, DHS. 02MRR1

Agencies

[Federal Register Volume 83, Number 42 (Friday, March 2, 2018)]
[Rules and Regulations]
[Page 8937]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-04249]


-----------------------------------------------------------------------

DEPARTMENT OF HOMELAND SECURITY

Coast Guard

33 CFR Part 117

[Docket No. USCG-2018-0111]


Drawbridge Operation Regulation; Passaic River, Harrison, NJ

AGENCY: Coast Guard, DHS.

ACTION: Notice of deviation from drawbridge regulation.

-----------------------------------------------------------------------

SUMMARY: The Coast Guard has issued a temporary deviation from the 
operating schedule that governs the Route 280 Bridge across the Passaic 
River, mile 5.8, at Harrison, New Jersey. The deviation is necessary to 
perform work on the switch gear power source of the bridge. This 
deviation allows the bridge to undergo necessary maintenance for Route 
21 interchange improvements. This deviation allows the bridge to remain 
closed during the maintenance period.

DATES: This deviation is effective from 12:01 a.m. on March 1, 2018, 
until 11:59 p.m. on March 7, 2018.

ADDRESSES: The docket for this deviation, USCG-2018-0111, is available 
at https://www.regulations.gov. Type the docket number in the ``SEARCH'' 
box and click ``SEARCH.'' Click on Open Docket Folder on the line 
associated with this deviation.

FOR FURTHER INFORMATION CONTACT: If you have questions on this 
temporary deviation, call or email Judy K. Leung-Yee, Bridge Management 
Specialist, First District Bridge Branch, U.S. Coast Guard; telephone 
212-514-4336, email [email protected].

SUPPLEMENTARY INFORMATION: The owner of the bridge, the New Jersey 
Department of Transportation, requested a temporary deviation in order 
to perform work on the switch gear power source of the bridge.
    The Route 280 Bridge across the Passaic River, mile 5.8, at 
Harrison, New Jersey is a vertical lift bridge with a vertical 
clearance of 35 feet at mean high water and 40 feet at mean low water 
in the closed position. The existing drawbridge operating regulations 
are listed at 33 CFR 117.739(h).
    This temporary deviation will allow the Route 280 Bridge to remain 
in the closed position from 12:01 a.m. on March 1, 2018, to 11:59 p.m. 
on March 7, 2018. The deviation will have negligible effect on 
navigation. The waterway is transited by recreational and commercial 
vessels. Coordination with waterway users has indicated no objection to 
the proposed closure of the draw. Vessels that can pass under the 
bridge without an opening may do so at all times. The bridge will not 
be able to open for emergencies. There is no alternate route for 
vessels to pass.
    The Coast Guard will also inform the users of the waterways through 
our Local and Broadcast Notices to Mariners of the change in operating 
schedule for the bridge so that vessel operators can arrange their 
transits to minimize any impact caused by the temporary deviation.
    In accordance with 33 CFR 117.35(e), the drawbridge must return to 
its regular operating schedule immediately at the end of the effective 
period of this temporary deviation. This deviation from the operating 
regulations is authorized under 33 CFR 117.35.

    Dated: February 27, 2018.
Christopher J. Bisignano,
Supervisory Bridge Management Specialist, First Coast Guard District.
[FR Doc. 2018-04249 Filed 3-1-18; 8:45 am]
BILLING CODE 9110-04-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.