Policy and Procedural Guidance for Processing Requests To Alter U.S. Army Corps of Engineers Civil Works Projects Pursuant to Section 408, 8251 [2018-03851]
Download as PDF
Federal Register / Vol. 83, No. 38 / Monday, February 26, 2018 / Notices
Missions/Civil-Works/Section408/) and
at https://www.regulations.gov reference
docket number COE–2018–0003.
Responses per Respondent: 1.1,
approximately.
Annual Responses: 94.
Average Burden per Response: 14.2
hours, approximately.
Annual Response Burden Hours:
1,334.
The public comment period that
began on February 5, 2018 (83 FR 5075)
is extended until April 6, 2018.
DATES:
Summary of Information Collection
The clause at DFARS 252.243–7002,
Requests for Equitable Adjustment, is
prescribed at DFARS 243.205–71 for use
in solicitations and contracts, including
solicitations and contracts using FAR
part 12 procedures for the acquisition of
commercial items that are estimated to
exceed the simplified acquisition
threshold. The clause requires
contractors to certify that requests for
equitable adjustment that exceed the
simplified acquisition threshold are
made in good faith and that the
supporting data are accurate and
complete. The clause also requires
contractors to fully disclose all facts
relevant to the requests for adjustment.
Jennifer L. Hawes,
Regulatory Control Officer, Defense
Acquisition Regulations System.
[FR Doc. 2018–03856 Filed 2–23–18; 8:45 am]
BILLING CODE 5001–06–P
DEPARTMENT OF DEFENSE
Department of the Army, Corps of
Engineers
U.S. Army Corps of Engineers,
DoD.
ACTION:
Extension of comment period.
On February 5, 2018, the U.S.
Army Corps of Engineers (USACE)
published a notice announcing the
availability of a draft Engineer Circular
(EC), which is an agency policy
document, for a 30-day comment
period. This draft EC provides the
proposed policies and procedures
related to how USACE will process
certain requests by others to alter a
USACE civil works project pursuant to
Section 14 of the Rivers and Harbors Act
of 1899, as amended (more commonly
referred to as Section 408). This notice
announces the extension of the
comment period by an additional 30
days. The extension of the comment
period is a result of requests by entities
to allow more time to submit their
comments. The draft EC is available for
review on the USACE Section 408
website (https://www.usace.army.mil/
daltland on DSKBBV9HB2PROD with NOTICES
SUMMARY:
VerDate Sep<11>2014
17:58 Feb 23, 2018
Jkt 244001
Ms.
Tammy Conforti at 202–761–4649,
email HQ-Section408@usace.army.mil,
or visit https://www.usace.army.mil/
Missions/Civil-Works/Section408/.
FOR FURTHER INFORMATION CONTACT:
Policy and Procedural Guidance for
Processing Requests To Alter U.S.
Army Corps of Engineers Civil Works
Projects Pursuant to Section 408
AGENCY:
You may submit comments
identified by docket number COE–
2018–0003 by any of the following
methods:
Federal eRulemaking Portal: https://
www.regulations.gov. Follow the
instructions for submitting comments.
Email: HQ-Section408@
usace.army.mil and include the docket
number COE–2018–0003 or ‘‘EC 1165–
2–220 Comments’’ in the subject line of
the message.
Mail: Headquarters, U.S. Army Corps
of Engineers, ATTN: CECW–CE/3E62,
441 G Street NW, Washington, DC
20314–1000.
Hand Delivery/Courier: Due to
security requirements, we cannot
receive comments by hand delivery or
courier.
Instructions: Instructions for
submitting comments are provided in
the document published on February 5,
2018 (83 FR 5075). Consideration will
be given to all comments received by
April 6, 2018.
ADDRESSES:
In the
February 5, 2018 issue of the Federal
Register (83 FR 5075), the U.S. Army
Corps of Engineers (USACE) published
a notice announcing the availability of
a draft Engineer Circular (EC), which is
an agency policy document, for a 30-day
comment period. This draft EC provides
the proposed policies and procedures
related to how USACE will process
certain requests by others to alter a
USACE civil works project pursuant to
Section 14 of the Rivers and Harbors Act
of 1899, as amended (more commonly
referred to as Section 408). Several
entities have requested an extension of
the comment period. USACE finds that
an extension of the comment period is
warranted. Therefore, the comment
period for the draft EC extended until
April 6, 2018.
SUPPLEMENTARY INFORMATION:
Dated: February 20, 2018.
James C. Dalton,
Director of Civil Works.
[FR Doc. 2018–03851 Filed 2–23–18; 8:45 am]
BILLING CODE 3720–58–P
PO 00000
Frm 00013
Fmt 4703
Sfmt 4703
8251
DEPARTMENT OF DEFENSE
Department of the Army, Corps of
Engineers
Availability of Draft Integrated
Feasibility Report and Environmental
Impact Statement for the Gulf
Intracoastal Waterway: Brazos River
Floodgates and Colorado River Locks
Systems Feasibility Study, Brazos and
Matagorda Counties, TX
Department of the Army, U.S.
Army Corps of Engineers, DoD.
ACTION: Notice of availability.
AGENCY:
Pursuant to the National
Environmental Policy Act (NEPA), the
U.S. Army Corps of Engineers,
Galveston District (USACE) announces
the release of the Draft Integrated
Feasibility Report and Environmental
Impact Statement (DIFR–EIS) for the
Recommended Plan of the Gulf
Intracoastal Waterway (GIWW): Brazos
River Floodgates (BRFG) and Colorado
River Locks (CRL) Systems Feasibility
Study, Brazos and Matagorda Counties,
TX. The DIFR–EIS documents the
existing condition of environmental
resources in and around areas
considered for development, and
potential impacts on those resources as
a result of implementing the
alternatives.
SUMMARY:
The Galveston District will hold
a public meeting for the DIFR–EIS on
March 13, 2018 from 6:00–8:00 p.m.
USACE will accept written public
comments on the DIFR–EIS from
February 26, 2018 to April 11, 2018.
Comments on the DIFR–EIS must be
postmarked by April 11, 2018.
ADDRESSES: The public meeting will be
held at the West Columbia Civic Center,
516 E. Brazos Ave. (State Highway 35),
West Columbia, TX 77486. Comments
may be submitted at the public meeting
or mailed to the District Engineer, P.O.
Box 1229, Galveston, TX 77553.
Comments may also be sent to the
District Engineer via email at BRFG_
CRL_FeasibilityStudy@usace.army.mil.
FOR FURTHER INFORMATION CONTACT:
Galveston District Public Affairs Office
at 409–766–3004 or swgpao@
usace.army.mil.
DATES:
Authority:
The lead agency for this proposed action
is USACE. This study has been prepared
in response to the provision of funds in
the Energy and Water Development
Appropriations Act of 1998, under the
authority of Section 216 of the 1970
Flood Control Act. The non-federal
sponsor is the Texas Department of
Transportation (TxDOT).
SUPPLEMENTARY INFORMATION:
E:\FR\FM\26FEN1.SGM
26FEN1
Agencies
[Federal Register Volume 83, Number 38 (Monday, February 26, 2018)]
[Notices]
[Page 8251]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-03851]
-----------------------------------------------------------------------
DEPARTMENT OF DEFENSE
Department of the Army, Corps of Engineers
Policy and Procedural Guidance for Processing Requests To Alter
U.S. Army Corps of Engineers Civil Works Projects Pursuant to Section
408
AGENCY: U.S. Army Corps of Engineers, DoD.
ACTION: Extension of comment period.
-----------------------------------------------------------------------
SUMMARY: On February 5, 2018, the U.S. Army Corps of Engineers (USACE)
published a notice announcing the availability of a draft Engineer
Circular (EC), which is an agency policy document, for a 30-day comment
period. This draft EC provides the proposed policies and procedures
related to how USACE will process certain requests by others to alter a
USACE civil works project pursuant to Section 14 of the Rivers and
Harbors Act of 1899, as amended (more commonly referred to as Section
408). This notice announces the extension of the comment period by an
additional 30 days. The extension of the comment period is a result of
requests by entities to allow more time to submit their comments. The
draft EC is available for review on the USACE Section 408 website
(https://www.usace.army.mil/Missions/Civil-Works/Section408/) and at
https://www.regulations.gov reference docket number COE-2018-0003.
DATES: The public comment period that began on February 5, 2018 (83 FR
5075) is extended until April 6, 2018.
ADDRESSES: You may submit comments identified by docket number COE-
2018-0003 by any of the following methods:
Federal eRulemaking Portal: https://www.regulations.gov. Follow the
instructions for submitting comments.
Email: [email protected] and include the docket number
COE-2018-0003 or ``EC 1165-2-220 Comments'' in the subject line of the
message.
Mail: Headquarters, U.S. Army Corps of Engineers, ATTN: CECW-CE/
3E62, 441 G Street NW, Washington, DC 20314-1000.
Hand Delivery/Courier: Due to security requirements, we cannot
receive comments by hand delivery or courier.
Instructions: Instructions for submitting comments are provided in
the document published on February 5, 2018 (83 FR 5075). Consideration
will be given to all comments received by April 6, 2018.
FOR FURTHER INFORMATION CONTACT: Ms. Tammy Conforti at 202-761-4649,
email [email protected], or visit https://www.usace.army.mil/Missions/Civil-Works/Section408/.
SUPPLEMENTARY INFORMATION: In the February 5, 2018 issue of the Federal
Register (83 FR 5075), the U.S. Army Corps of Engineers (USACE)
published a notice announcing the availability of a draft Engineer
Circular (EC), which is an agency policy document, for a 30-day comment
period. This draft EC provides the proposed policies and procedures
related to how USACE will process certain requests by others to alter a
USACE civil works project pursuant to Section 14 of the Rivers and
Harbors Act of 1899, as amended (more commonly referred to as Section
408). Several entities have requested an extension of the comment
period. USACE finds that an extension of the comment period is
warranted. Therefore, the comment period for the draft EC extended
until April 6, 2018.
Dated: February 20, 2018.
James C. Dalton,
Director of Civil Works.
[FR Doc. 2018-03851 Filed 2-23-18; 8:45 am]