Combined Notice of Filings, 8257-8258 [2018-03790]

Download as PDF Federal Register / Vol. 83, No. 38 / Monday, February 26, 2018 / Notices Becoming an Intervenor Federal Energy Regulatory Commission Additional Information daltland on DSKBBV9HB2PROD with NOTICES Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern Time on March 12, 2018. DEPARTMENT OF ENERGY Once BCAI files its application with the Commission, you may want to become an intervenor which is an official party to the Commission’s proceeding. Intervenors play a more formal role in the process and are able to file briefs, appear at hearings, and be heard by the courts if they choose to appeal the Commission’s final ruling. An intervenor formally participates in the proceeding by filing a request to intervene. Motions to intervene are more fully described at https:// www.ferc.gov/resources/guides/how-to/ intervene.asp. Instructions for becoming an intervenor are in the Document-less Intervention Guide under the e-filing link on the Commission’s website. Please note that the Commission will not accept requests for intervenor status at this time. You must wait until the Commission receives a formal application for the project. Additional information about the project is available from the Commission’s Office of External Affairs, at (866) 208–FERC, or on the FERC website (www.ferc.gov) using the eLibrary link. Click on the eLibrary link, click on ‘‘General Search’’ and enter the docket number, excluding the last three digits in the Docket Number field (i.e., PF18–2). Be sure you have selected an appropriate date range. For assistance, please contact FERC Online Support at FercOnlineSupport@ferc.gov or toll free at (866) 208–3676, or for TTY, contact (202) 502–8659. The eLibrary link also provides access to the texts of formal documents issued by the Commission, such as orders, notices, and rulemakings. In addition, the Commission offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. Go to www.ferc.gov/docsfiling/esubscription.asp. Finally, public sessions or site visits will be posted on the Commission’s calendar located at www.ferc.gov/ EventCalendar/EventsList.aspx along with other related information. Dated: February 20, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–03822 Filed 2–23–18; 8:45 am] BILLING CODE 6717–01–P VerDate Sep<11>2014 17:58 Feb 23, 2018 Jkt 244001 8257 [Docket No. EL18–61–000] Public Citizen, Inc. v. PJM Interconnection LLC; Notice of Complaint Dated: February 20, 2018. Kimberly D. Bose, Secretary. Take notice that on February 20, 2018, pursuant to section 206 of the Federal Power Act, 16 U.S.C. 824e and 825d and Rule 206 of the Federal Energy Regulatory Commission’s (FERC or Commission) Rules of Practice and Procedure, 18 CFR 385.206, Public Citizen, Inc. (Complainant) filed a formal complaint against PJM Interconnection LLC (PJM or Respondent) alleging that PJM failed to disclose millions of dollars in electoral campaign contributions and lobbying expenditures to its stakeholders or to FERC, in violation of Commission precedent and potential violation of just and reasonable rates, all as more fully explained in the complaint. The Complainant certifies that a copy of the complaint has been served on the Respondent. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. The Respondent’s answer and all interventions, or protests must be filed on or before the comment date. The Respondent’s answer, motions to intervene, and protests must be served on the Complainants. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the eLibrary link and is available for electronic review in the Commission’s Public Reference Room in Washington, DC There is an eSubscription link on the website that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC [FR Doc. 2018–03820 Filed 2–23–18; 8:45 am] PO 00000 Frm 00019 Fmt 4703 Sfmt 4703 BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Filings Instituting Proceedings Docket Numbers: CP18–83–000. Applicants: Gulf Crossing Pipeline Company LLC. Description: Gulf Crossing Pipeline Company LLC and Enable Oklahoma Intrastate Transmission, LLC— Abbreviated Joint Application for Authorization to Abandon a Lease of Capacity. Filed Date: 2/09/18. Accession Number: 20180209–5226. Comments Due: 5 p.m. ET 2/21/18. Docket Numbers: RP18–437–000. Applicants: Guardian Pipeline, L.L.C. Description: § 4(d) Rate Filing: Revisions to OSS/LBS Statement of Rates to be effective 4/1/2018. Filed Date: 2/12/18. Accession Number: 20180212–5061. Comments Due: 5 p.m. ET 2/26/18. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. E:\FR\FM\26FEN1.SGM 26FEN1 8258 Federal Register / Vol. 83, No. 38 / Monday, February 26, 2018 / Notices Dated: February 13, 2018. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2018–03790 Filed 2–23–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. DI18–2–000] daltland on DSKBBV9HB2PROD with NOTICES Merchant Hydro Developers LLC; Notice of Declaration of Intention and Soliciting Comments, Protests, and Motions To Intervene Take notice that the following application has been filed with the Commission and is available for public inspection: a. Application Type: Declaration of Intention. b. Docket No: DI18–2–000. c. Date Filed: February 6, 2018. d. Applicant: Merchant Hydro Developers LLC. e. Name of Project: Old Forge Bore Hole Reclamation Pump Storage Project. f. Location: The proposed Old Forge Bore Hole Reclamation Pump Storage Project would be located near the Borough of Duryea, in Luzerne and Lackawanna counties, Pennsylvania. g. Filed Pursuant to: Section 23(b)(1) of the Federal Power Act, 16 U.S.C. 817(b) (2012). h. Applicant and Agent Contact: Merchant Hydro Developers LLC, c/o Adam R. Rousselle, Sr., 5710 Oak Crest Drive, Doylestown, PA 45150, telephone: (267) 254–6107; email: arousselle@merchanthydro.com; i. FERC Contact: Any questions on this notice should be addressed to Jennifer Polardino, (202) 502–6437, or email: Jennifer.Polardino@ferc.gov. j. Deadline for filing comments, protests, and motions to intervene is: 30 days from the issuance date of this notice by the Commission. The Commission strongly encourages electronic filing. Please file comments, protests, and motions to intervene using the Commission’s eFiling system at https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please VerDate Sep<11>2014 17:58 Feb 23, 2018 Jkt 244001 send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The first page of any filing should include docket number DI18–2–000. k. Description of Project: The proposed closed-loop Old Forge Bore Hole Reclamation Pump Storage Project would consist of: (1) A new upper reservoir with a surface area of 300 acres and a storage capacity of 4,500 acre-feet at a surface elevation of approximately 1,356 feet above mean sea level (msl) created through construction of a new roller-compacted concrete or rock-fill dam; (2) a new lower reservoir with a surface area of 300 acres and a storage capacity of 5,014 acre-feet at a surface elevation of 550 feet msl; (3) four new 5,640-foot-long, 16-foot-diameter penstocks connecting the upper and lower reservoirs; (4) a new 250-footlong, 150-foot-wide, 50-foot-high powerhouse containing two or three turbine-generator units with a total rated capacity of 450 megawatts; (5) a new transmission line connecting the powerhouse to the 230/69-kilovolt Stanton substation owned by PPL Electric Utilities; and (6) appurtenant facilities. Merchant Hydro Developers LLC states that it will use only groundwater from an underground abandoned mine to initially charge and seasonally refill the upper reservoirs. The applicant proposes to transport groundwater to its upper reservoirs using underground pumping equipment and intakes. The applicant also states the project effectuates an interconnection line without crossing the Susquehanna River or any other body of water. When a Declaration of Intention is filed with the Federal Energy Regulatory Commission, the Federal Power Act requires the Commission to investigate and determine if the project would affect the interests of interstate or foreign commerce. The Commission also determines whether or not the project: (1) Would be located on a navigable waterway; (2) would occupy public lands or reservations of the United States; (3) would utilize surplus water or water power from a government dam; or (4) would be located on a nonnavigable stream over which Congress has Commerce Clause jurisdiction and would be constructed or enlarged after 1935. l. Locations of the Application: This filing may be viewed on the Commission’s website at https:// www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at https:// PO 00000 Frm 00020 Fmt 4703 Sfmt 9990 www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1–866–208–3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item (h) above and in the Commission’s Public Reference Room located at 888 First Street NE, Room 2A, Washington, DC 20426, or by calling (202) 502–8371. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, and .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Responsive Documents: All filings must bear in all capital letters the title COMMENTS, PROTESTS, and MOTIONS TO INTERVENE, as applicable, and the Docket Number of the particular application to which the filing refers. A copy of any Motion to Intervene must also be served upon each representative of the Applicant specified in the particular application. p. Agency Comments: Federal, state, and local agencies are invited to file comments on the described application. A copy of the application may be obtained by agencies directly from the Applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency’s comments must also be sent to the Applicant’s representatives. Dated: February 20, 2018. Kimberly D. Bose, Secretary. [FR Doc. 2018–03819 Filed 2–23–18; 8:45 am] BILLING CODE 6717–01–P E:\FR\FM\26FEN1.SGM 26FEN1

Agencies

[Federal Register Volume 83, Number 38 (Monday, February 26, 2018)]
[Notices]
[Pages 8257-8258]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-03790]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings

    Take notice that the Commission has received the following Natural 
Gas Pipeline Rate and Refund Report filings:

Filings Instituting Proceedings

    Docket Numbers: CP18-83-000.
    Applicants: Gulf Crossing Pipeline Company LLC.
    Description: Gulf Crossing Pipeline Company LLC and Enable Oklahoma 
Intrastate Transmission, LLC--Abbreviated Joint Application for 
Authorization to Abandon a Lease of Capacity.
    Filed Date: 2/09/18.
    Accession Number: 20180209-5226.
    Comments Due: 5 p.m. ET 2/21/18.

    Docket Numbers: RP18-437-000.
    Applicants: Guardian Pipeline, L.L.C.
    Description: Sec.  4(d) Rate Filing: Revisions to OSS/LBS Statement 
of Rates to be effective 4/1/2018.
    Filed Date: 2/12/18.
    Accession Number: 20180212-5061.
    Comments Due: 5 p.m. ET 2/26/18.

    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.


[[Page 8258]]


    Dated: February 13, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-03790 Filed 2-23-18; 8:45 am]
 BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.