Combined Notice of Filings #1, 7708-7709 [2018-03645]
Download as PDF
7708
Federal Register / Vol. 83, No. 36 / Thursday, February 22, 2018 / Notices
described in item l below. Cooperating
agencies should note the Commission’s
policy that agencies that cooperate in
the preparation of the environmental
document cannot also intervene. See, 94
FERC ¶ 61,076 (2001).
k. Pursuant to section 4.32(b)(7) of 18
CFR of the Commission’s regulations, if
any resource agency, Indian Tribe, or
person believes that an additional
scientific study should be conducted in
order to form an adequate factual basis
for a complete analysis of the
application on its merit, the resource
agency, Indian Tribe, or person must file
a request for a study with the
Commission not later than 60 days from
the date of filing of the application, and
serve a copy of the request on the
applicant.
l. Deadline for filing additional study
requests and requests for cooperating
agency status: April 3, 2018.
The Commission strongly encourages
electronic filing. Please file additional
study requests and requests for
cooperating agency status using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). In lieu of
electronic filing, please send a paper
copy to: Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426. The first
page of any filing should include docket
number P–2804–033.
m. The application is not ready for
environmental analysis at this time.
n. The project consists of the
following existing facilities:
daltland on DSKBBV9HB2PROD with NOTICES
Swan Lake Dam
(1) A 14-foot-high, 250-foot-long rock
masonry gravity dam impounding Swan
Lake with a surface area of
approximately 1,364 acres at an
elevation of 201 feet above sea level; (2)
a concrete inlet structure; (3) three
manually operated butterfly gates that
regulate flow through the inlet structure;
(4) two culverts the convey flow under
Route 141; and (5) appurtenant
facilities.
Mason’s Dam
(1) A 15-foot-high, 86-foot-long rock
masonry dam impounding a reservoir
with a storage capacity of approximately
1,621 acre-feet at an elevation of 188
feet above sea level; (2) a concrete inlet
structure; (3) a manually operated gate
regulating flow from the inlet structure
to the penstock; (4) a 350-foot-long steel
penstock; (5) a 266-square-foot concrete
powerhouse containing two Kaplan
turbines and generating units with a
VerDate Sep<11>2014
20:10 Feb 21, 2018
Jkt 244001
licensed capacity of 75 kW; (6) a 300foot-long, 12-kilovolt (kV) transmission
line and (7) appurtenant facilities.
Kelley Dam
(1) A 15-foot-high, 135-foot-long
masonry gravity dam impounding a
reservoir with a storage capacity of
approximately 200 acre-feet at an
elevation of approximately 159 feet
above sea level; and (2) three manually
operated gates.
Mill Dam
(1) A 6-foot-tall, 70-foot-wide masonry
dam impounding a reservoir with a
storage capacity of approximately 7
acre-feet at an elevation of
approximately 128 feet above sea level;
(2) a concrete inlet structure; (3) a trash
sluice with wooden stop logs; (4) a 3foot-diameter, 110-foot-long plastic
penstock; (5) a powerhouse containing a
Francis-type turbine and generator unit
with a licensed capacity of 94 kW; and
(6) an approximately 100-foot-long, 12kV transmission line.
CMP Dam
(1) A 21-foot-high, 231-foot-long
buttress dam impounding a reservoir
with a storage capacity of approximately
72 acre-feet at an elevation of
approximately 109 feet above sea level;
(2) a 5-foot-diameter, 1,200-foot-long
steel penstock; (3) a 300-square-foot
concrete and timber powerhouse with a
Kaplan-type turbine and generator unit
with a licensed capacity of 200 kW; and
(4) an approximately 500-foot-long, 12kV transmission line.
o. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s website at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support. A copy is also available
for inspection and reproduction at the
address in item h above.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
p. Procedural schedule: The
application will be processed according
to the following preliminary schedule.
Revisions to the schedule will be made
as appropriate.
Issue Deficiency Letter—March 2018
Issue Notice of Acceptance—July 2018
Issue Scoping Document for
comments—August 2018
PO 00000
Frm 00055
Fmt 4703
Sfmt 4703
Comments on Scoping Document—
October 2018
Issue notice of ready for environmental
analysis—November 2018
Commission issues EA—April 2019
Comments on EA—May 2019
Dated: February 14, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–03556 Filed 2–21–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER18–1–002.
Applicants: California Independent
System Operator Corporation
Description: Compliance filing: 2018–
02–14 Petition for Limited Tariff Waiver
to Delay Implementation RSI 1b & 2 to
be effective N/A.
Filed Date: 2/14/18.
Accession Number: 20180214–5133.
Comments Due: 5 p.m. ET 2/21/18.
Docket Numbers: ER18–499–001.
Applicants: Southwestern Electric
Power Company.
Description: Tariff Amendment:
SWEPCO–HOPE PSA RS#125 A&R
Windcatcher—Deferral to be effective
1/1/2018.
Filed Date: 2/15/18.
Accession Number: 20180215–5000.
Comments Due: 5 p.m. ET 3/8/18.
Docket Numbers: ER18–500–001.
Applicants: Southwestern Electric
Power Company.
Description: Tariff Amendment:
SWEPCO-Bentonville PSA RS#126 A&R
Windcatcher Deferral Filing to be
effective 1/1/2018.
Filed Date: 2/14/18.
Accession Number: 20180214–5166.
Comments Due: 5 p.m. ET 3/7/18.
Docket Numbers: ER18–858–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Amendment to ISA, Service Agreement
No. 4189; Queue No. Z2–012 to be
effective 6/10/2015.
Filed Date: 2/15/18.
Accession Number: 20180215–5041.
Comments Due: 5 p.m. ET 3/8/18.
Docket Numbers: ER18–859–000.
Applicants: Pacific Gas and Electric
Company.
Description: Request for a One-Time
Tariff Waiver Pacific Gas and Electric
Company.
E:\FR\FM\22FEN1.SGM
22FEN1
Federal Register / Vol. 83, No. 36 / Thursday, February 22, 2018 / Notices
Filed Date: 2/14/18.
Accession Number: 20180214–5176.
Comments Due: 5 p.m. ET 3/7/18.
Docket Numbers: ER18–860–000.
Applicants: East River Electric Power
Cooperative, Inc.
Description: Request for Limited
Waiver of Tariff Provisions of East River
Electric Power Cooperative, Inc.
Filed Date: 2/14/18.
Accession Number: 20180214–5181.
Comments Due: 5 p.m. ET 3/7/18.
Take notice that the Commission
received the following qualifying
facility filings:
Docket Numbers: QF17–935–000:
QF18–936–000.
Applicants: Zeeland Farm Services,
Inc.
Description: Refund report of Zeeland
Farm Services, Inc.
Filed Date: 2/14/18.
Accession Number: 20180214–5170.
Comments Due: 5 p.m. ET 3/7/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: February 15, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–03645 Filed 2–21–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
daltland on DSKBBV9HB2PROD with NOTICES
[Docket No. PR18–30–000]
The City of Alexandria, Louisiana v.
EnLink LIG, LLC; Notice of Complaint
Take notice that on February 13, 2018,
pursuant to Rules 206 and 212 of the
Federal Energy Regulatory
Commission’s (FERC or Commission)
Rules of Practice and Procedure, 18 CFR
385.206, and .212 (2017), and the
VerDate Sep<11>2014
20:10 Feb 21, 2018
Jkt 244001
Commission’s regulations governing
transportation service provided under
section 311 of the Natural Gas Policy
Act of 1978, 18 CFR part 284, the City
of Alexandria, Louisiana (Complainant)
filed a formal complaint against EnLink
LIG, LLC (EnLink or Respondent)
requesting relief from EnLink’s alleged
violations of its FERC filed Statement of
Operating Conditions, all as more fully
explained in the complaint.
Complainant certifies that copies of
complaint were served on the contact of
EnLink as listed on the Commission’s
list of Corporate Officials, the Office of
the General Counsel for the Louisiana
Public Service Commission, and the
Louisiana Department of Natural
Resources.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. The Respondent’s answer
and all interventions, or protests must
be filed on or before the comment date.
The Respondent’s answer, motions to
intervene, and protests must be served
on the Complainant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE, Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on February 20, 2018.
Dated: February 14, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–03557 Filed 2–21–18; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00056
Fmt 4703
Sfmt 4703
7709
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP18–81–000]
Northern Natural Gas Company; Notice
of Request Under Blanket
Authorization
Take notice that on February 5, 2018,
Northern Natural Gas Company
(Northern), 111 South 103rd Street,
Omaha, Nebraska 68124–1000, filed in
Docket No. CP18–81–000 a prior notice
request pursuant to sections 157.205,
157.208 and 157.216 of the
Commission’s regulations under the
Natural Gas Act (NGA), and Northern’s
blanket certificate issued in Docket No.
CP82–401–000, to construct its
Marquette Branch Line Expansion
Project (Project). The Project consists of:
(i) Construction of the new East
Wakefield compressor station consisting
of two 1,590-horsepower natural gasfired turbine compressor units in
Gogebic County, Michigan; (ii)
construction of a new regulator station
near West Ishpeming in Marquette
County, Michigan; (iii) uprating the
maximum allowable operating pressure
(MAOP) of a 12.2-mile segment of
Northern’s existing 12- and 16-inchdiameter Marquette branch line in
Marquette County, Michigan; and (iv)
abandonment of short segments of
pipeline to accommodate station tie-ins
in Gogebic and Marquette Counties,
Michigan. The Project will allow
Northern to deliver 24,610 dekatherms
per day of incremental service to Upper
Michigan Energy Resources
Corporation. Northern estimates the cost
of the Project to be approximately
$22,124,718, all as more fully set forth
in the application which is on file with
the Commission and open to public
inspection. The filing may also be
viewed on the web at https://
www.ferc.gov using the eLibrary link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov or toll free at (866) 208–3676, or
TTY, contact (202) 502–8659.
Any questions concerning this
application may be directed to Michael
T. Loeffler, Senior Director, Certificates
and External Affairs, Northern Natural
Gas Company, PO Box 3330, Omaha,
Nebraska 68103–0330, by telephone at
(402) 398–7103, by facsimile at (402)
398–7190, or by email at mike.loeffler@
nngco.com.
Any person or the Commission’s staff
may, within 60 days after issuance of
E:\FR\FM\22FEN1.SGM
22FEN1
Agencies
[Federal Register Volume 83, Number 36 (Thursday, February 22, 2018)]
[Notices]
[Pages 7708-7709]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-03645]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER18-1-002.
Applicants: California Independent System Operator Corporation
Description: Compliance filing: 2018-02-14 Petition for Limited
Tariff Waiver to Delay Implementation RSI 1b & 2 to be effective N/A.
Filed Date: 2/14/18.
Accession Number: 20180214-5133.
Comments Due: 5 p.m. ET 2/21/18.
Docket Numbers: ER18-499-001.
Applicants: Southwestern Electric Power Company.
Description: Tariff Amendment: SWEPCO-HOPE PSA RS#125 A&R
Windcatcher--Deferral to be effective 1/1/2018.
Filed Date: 2/15/18.
Accession Number: 20180215-5000.
Comments Due: 5 p.m. ET 3/8/18.
Docket Numbers: ER18-500-001.
Applicants: Southwestern Electric Power Company.
Description: Tariff Amendment: SWEPCO-Bentonville PSA RS#126 A&R
Windcatcher Deferral Filing to be effective 1/1/2018.
Filed Date: 2/14/18.
Accession Number: 20180214-5166.
Comments Due: 5 p.m. ET 3/7/18.
Docket Numbers: ER18-858-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Amendment to ISA, Service
Agreement No. 4189; Queue No. Z2-012 to be effective 6/10/2015.
Filed Date: 2/15/18.
Accession Number: 20180215-5041.
Comments Due: 5 p.m. ET 3/8/18.
Docket Numbers: ER18-859-000.
Applicants: Pacific Gas and Electric Company.
Description: Request for a One-Time Tariff Waiver Pacific Gas and
Electric Company.
[[Page 7709]]
Filed Date: 2/14/18.
Accession Number: 20180214-5176.
Comments Due: 5 p.m. ET 3/7/18.
Docket Numbers: ER18-860-000.
Applicants: East River Electric Power Cooperative, Inc.
Description: Request for Limited Waiver of Tariff Provisions of
East River Electric Power Cooperative, Inc.
Filed Date: 2/14/18.
Accession Number: 20180214-5181.
Comments Due: 5 p.m. ET 3/7/18.
Take notice that the Commission received the following qualifying
facility filings:
Docket Numbers: QF17-935-000: QF18-936-000.
Applicants: Zeeland Farm Services, Inc.
Description: Refund report of Zeeland Farm Services, Inc.
Filed Date: 2/14/18.
Accession Number: 20180214-5170.
Comments Due: 5 p.m. ET 3/7/18.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: February 15, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-03645 Filed 2-21-18; 8:45 am]
BILLING CODE 6717-01-P