City of Radford; Notice of Ready for Environmental Analysis and Soliciting Comments, Recommendations, Terms and Conditions, and Prescriptions, 7177-7178 [2018-03384]

Download as PDF Federal Register / Vol. 83, No. 34 / Tuesday, February 20, 2018 / Notices Applicants: Gulf South Pipeline Company, LP. Description: § 4(d) Rate Filing: Amendments to Neg Rate Agmts (QEP 36601–70, 37657–237) to be effective 2/ 6/2018. Filed Date: 2/8/18. Accession Number: 20180208–5045. Comments Due: 5 p.m. ET 2/20/18. Docket Numbers: RP18–436–000. Applicants: Gulf South Pipeline Company, LP. Description: § 4(d) Rate Filing: Amendment to Neg Rate Agmt (Chevron 41610–11) to be effective 2/8/2018. Filed Date: 2/8/18. Accession Number: 20180208–5046. Comments Due: 5 p.m. ET 2/20/18. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: February 12, 2018. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2018–03382 Filed 2–16–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 1235–017] sradovich on DSK3GMQ082PROD with NOTICES City of Radford; Notice of Ready for Environmental Analysis and Soliciting Comments, Recommendations, Terms and Conditions, and Prescriptions Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: Subsequent Minor License. b. Project No.: 1235–017. c. Date filed: May 30, 2017. d. Applicant: City of Radford. e. Name of Project: Municipal Hydroelectric Project. VerDate Sep<11>2014 17:55 Feb 16, 2018 Jkt 244001 f. Location: On the Little River near the City of Radford in Montgomery and Pulaski Counties, Virginia. The project does not affect federal lands. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)–825(r). h. Applicant Contact: Tim Logwood, Director of Electric Utilities for the City of Radford, 701 17th Street, Radford, VA 24141; Telephone (540) 731–3641. i. FERC Contact: Allyson Conner, (202) 502–6082 or allyson.conner@ ferc.gov. j. Deadline for filing comments, recommendations, terms and conditions, and prescriptions: 60 days from the issuance date of this notice; reply comments are due 105 days from the issuance date of this notice. The Commission strongly encourages electronic filing. Please file comments, recommendations, terms and conditions, and prescriptions using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The first page of any filing should include docket number P–1235–017. The Commission’s Rules of Practice require all intervenors filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. This application has been accepted, and is ready for environmental analysis at this time. l. The existing Municipal Hydroelectric Project consists of: (1) A 293-foot-long, 58-foot-high reinforced concrete slab and buttress dam that includes: (a) A south non-overflow section; (b) an overflow bulkhead section; (c) an eight-bay spillway section each with a steel tainter gate; (d) a powerhouse intake section; and (e) a north non-overflow section; (2) a 77-acre impoundment with a gross storage capacity of 562 acre-feet at a normal pool elevation of 1,772 feet National PO 00000 Frm 00042 Fmt 4703 Sfmt 4703 7177 Geodetic Vertical Datum of 1929 (NGVD29) and a net storage capacity of 220 acre-feet between elevations 1,768 and 1,772 feet; (3) a 20-foot, 3-inch-wide intake section with angled steel trash racks (3-inch by 5/16th-inch trash rack bars spaced 2.5 inches on center) and a steel roller type head gate; (4) a 27-footlong steel-lined penstock in concrete that transitions from a 13.5-foot-wide, 11-foot-high entrance to an 8-footdiameter conveyance to the turbine scroll case; (5) a 30-foot-long, 28-footwide, and 62-foot-high powerhouse containing a single 1,185-kilowatt turbine-generator unit; (6) a 2.7-milelong transmission line connected to the grid; and (7) appurtenant facilities. The City of Radford proposes to revise its exhibit G to include transmission facilities composed of only three, 560foot-long, 4.16-kV overhead conductors that transmit power to a switched disconnect/interconnection with the local distribution grid. The City of Radford states that the formerly licensed transmission line now serves to distribute power to other sources along its length and is no longer part of the project. The City of Radford operates the project in both run-of-river and peaking modes. For the period 1984 through 2013, the project’s average annual generation was about 4,550 megawatthours. m. A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s website at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support. A copy is also available for inspection and reproduction at the address in item h above. All filings must (1) bear in all capital letters the title ‘‘COMMENTS,’’ ‘‘REPLY COMMENTS,’’ ‘‘RECOMMENDATIONS,’’ ‘‘TERMS AND CONDITIONS,’’ or ‘‘PRESCRIPTIONS;’’ (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person submitting the filing; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, recommendations, terms and conditions or prescriptions must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). Agencies may obtain copies of the application directly from the applicant. Each filing must be accompanied by E:\FR\FM\20FEN1.SGM 20FEN1 7178 Federal Register / Vol. 83, No. 34 / Tuesday, February 20, 2018 / Notices proof of service on all persons listed on the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. n. A license applicant must file no later than 60 days following the date of issuance of this notice: (1) A copy of the water quality certification; (2) a copy of the request for certification, including proof of the date on which the certifying agency received the request; or (3) evidence of waiver of water quality certification. o. Procedural schedule: The application will be processed according to the following schedule. Revisions to the schedule will be made as appropriate. Milestone Deadline for Filing Comments, Recommendations and Agency Terms and Conditions/Prescriptions. Deadline for Filing Reply Comments. Commission issues EA ......... Comments on EA Due .......... Target date April 2018. May 2018. October 2018. November 2018. Dated: February 13, 2018. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2018–03384 Filed 2–16–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER18–836–000] Dated: February 13, 2018. Nathaniel J. Davis, Sr., Deputy Secretary. sradovich on DSK3GMQ082PROD with NOTICES Energia Sierra Juarez U.S. 2, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization [FR Doc. 2018–03383 Filed 2–16–18; 8:45 am] BILLING CODE 6717–01–P This is a supplemental notice in the above-referenced proceeding Energia Sierra Juarez U.S. 2, LLC’s application for market-based rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 VerDate Sep<11>2014 17:55 Feb 16, 2018 Jkt 244001 First Street NE, Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability, is March 5, 2018. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 5 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The filings in the above-referenced proceeding are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for electronic review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the website that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. EQUAL EMPLOYMENT OPPORTUNITY COMMISSION Agency Information Collection Activities: Extension Without Change of an Existing Collection; Comments Request Equal Employment Opportunity Commission. ACTION: Notice. AGENCY: PO 00000 Frm 00043 Fmt 4703 Sfmt 4703 In accordance with the Paperwork Reduction Act of 1995, the Commission announces that it intends to submit to the Office of Management and Budget (OMB) a request for a threeyear extension without change of the existing recordkeeping requirements under its regulations. The Commission is seeking public comments on the proposed extension. SUMMARY: Written comments on this notice must be submitted on or before April 23, 2018. DATES: Comments should be sent to Bernadette Wilson, Executive Officer, Executive Secretariat, Equal Employment Opportunity Commission, 131 M Street NE, Washington, DC 20507. As a convenience to commenters, the Executive Secretariat will accept comments totaling six or fewer pages by facsimile (‘‘FAX’’) machine. This limitation is necessary to assure access to the equipment. The telephone number of the fax receiver is (202) 663–4114. (This is not a toll-free number.) Receipt of FAX transmittals will not be acknowledged, except that the sender may request confirmation of receipt by calling the Executive Secretariat staff at (202) 663–4070 (voice) or (202) 663–4074 (TTD). (These are not toll-free telephone numbers.) Instead of sending written comments to EEOC, you may submit comments and attachments electronically at https:// www.regulations.gov, which is the Federal eRulemaking Portal. Follow the instructions online for submitting comments. All comments received through this portal will be posted without change, including any personal information you provide, except as noted below. The EEOC reserves the right to refrain from posting comments, including those that contain obscene, indecent, or profane language; that contain threats or defamatory statements; that contain hate speech directed at race, color, sex, national origin, age, religion, disability, or genetic information; or that promote or endorse services or products. All comments received, including any personal information provided, also will be available for public inspection during normal business hours by appointment only at the EEOC Headquarters Library, 131 M Street NE, Washington, DC 20507. Upon request, individuals who require assistance viewing comments will be provided appropriate aids such as readers or print magnifiers. To schedule an appointment, contact EEOC Library staff at (202) 663–4630 (voice) or (202) 663–4641 (TTY). (These are not toll-free numbers.) ADDRESSES: E:\FR\FM\20FEN1.SGM 20FEN1

Agencies

[Federal Register Volume 83, Number 34 (Tuesday, February 20, 2018)]
[Notices]
[Pages 7177-7178]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-03384]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 1235-017]


City of Radford; Notice of Ready for Environmental Analysis and 
Soliciting Comments, Recommendations, Terms and Conditions, and 
Prescriptions

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: Subsequent Minor License.
    b. Project No.: 1235-017.
    c. Date filed: May 30, 2017.
    d. Applicant: City of Radford.
    e. Name of Project: Municipal Hydroelectric Project.
    f. Location: On the Little River near the City of Radford in 
Montgomery and Pulaski Counties, Virginia. The project does not affect 
federal lands.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Tim Logwood, Director of Electric Utilities 
for the City of Radford, 701 17th Street, Radford, VA 24141; Telephone 
(540) 731-3641.
    i. FERC Contact: Allyson Conner, (202) 502-6082 or 
[email protected].
    j. Deadline for filing comments, recommendations, terms and 
conditions, and prescriptions: 60 days from the issuance date of this 
notice; reply comments are due 105 days from the issuance date of this 
notice.
    The Commission strongly encourages electronic filing. Please file 
comments, recommendations, terms and conditions, and prescriptions 
using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 
characters, without prior registration, using the eComment system at 
https://www.ferc.gov/docs-filing/ecomment.asp. You must include your 
name and contact information at the end of your comments. For 
assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE, 
Washington, DC 20426. The first page of any filing should include 
docket number P-1235-017.
    The Commission's Rules of Practice require all intervenors filing 
documents with the Commission to serve a copy of that document on each 
person on the official service list for the project. Further, if an 
intervenor files comments or documents with the Commission relating to 
the merits of an issue that may affect the responsibilities of a 
particular resource agency, they must also serve a copy of the document 
on that resource agency.
    k. This application has been accepted, and is ready for 
environmental analysis at this time.
    l. The existing Municipal Hydroelectric Project consists of: (1) A 
293-foot-long, 58-foot-high reinforced concrete slab and buttress dam 
that includes: (a) A south non-overflow section; (b) an overflow 
bulkhead section; (c) an eight-bay spillway section each with a steel 
tainter gate; (d) a powerhouse intake section; and (e) a north non-
overflow section; (2) a 77-acre impoundment with a gross storage 
capacity of 562 acre-feet at a normal pool elevation of 1,772 feet 
National Geodetic Vertical Datum of 1929 (NGVD29) and a net storage 
capacity of 220 acre-feet between elevations 1,768 and 1,772 feet; (3) 
a 20-foot, 3-inch-wide intake section with angled steel trash racks (3-
inch by 5/16th-inch trash rack bars spaced 2.5 inches on center) and a 
steel roller type head gate; (4) a 27-foot-long steel-lined penstock in 
concrete that transitions from a 13.5-foot-wide, 11-foot-high entrance 
to an 8-foot-diameter conveyance to the turbine scroll case; (5) a 30-
foot-long, 28-foot-wide, and 62-foot-high powerhouse containing a 
single 1,185-kilowatt turbine-generator unit; (6) a 2.7-mile-long 
transmission line connected to the grid; and (7) appurtenant 
facilities.
    The City of Radford proposes to revise its exhibit G to include 
transmission facilities composed of only three, 560-foot-long, 4.16-kV 
overhead conductors that transmit power to a switched disconnect/
interconnection with the local distribution grid. The City of Radford 
states that the formerly licensed transmission line now serves to 
distribute power to other sources along its length and is no longer 
part of the project.
    The City of Radford operates the project in both run-of-river and 
peaking modes. For the period 1984 through 2013, the project's average 
annual generation was about 4,550 megawatt-hours.
    m. A copy of the application is available for review at the 
Commission in the Public Reference Room or may be viewed on the 
Commission's website at https://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. For assistance, contact 
FERC Online Support. A copy is also available for inspection and 
reproduction at the address in item h above.
    All filings must (1) bear in all capital letters the title 
``COMMENTS,'' ``REPLY COMMENTS,'' ``RECOMMENDATIONS,'' ``TERMS AND 
CONDITIONS,'' or ``PRESCRIPTIONS;'' (2) set forth in the heading the 
name of the applicant and the project number of the application to 
which the filing responds; (3) furnish the name, address, and telephone 
number of the person submitting the filing; and (4) otherwise comply 
with the requirements of 18 CFR 385.2001 through 385.2005. All 
comments, recommendations, terms and conditions or prescriptions must 
set forth their evidentiary basis and otherwise comply with the 
requirements of 18 CFR 4.34(b). Agencies may obtain copies of the 
application directly from the applicant. Each filing must be 
accompanied by

[[Page 7178]]

proof of service on all persons listed on the service list prepared by 
the Commission in this proceeding, in accordance with 18 CFR 4.34(b) 
and 385.2010.
    You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    n. A license applicant must file no later than 60 days following 
the date of issuance of this notice: (1) A copy of the water quality 
certification; (2) a copy of the request for certification, including 
proof of the date on which the certifying agency received the request; 
or (3) evidence of waiver of water quality certification.
    o. Procedural schedule: The application will be processed according 
to the following schedule. Revisions to the schedule will be made as 
appropriate.

------------------------------------------------------------------------
                 Milestone                           Target date
------------------------------------------------------------------------
Deadline for Filing Comments,               April 2018.
 Recommendations and Agency Terms and
 Conditions/Prescriptions.
Deadline for Filing Reply Comments........  May 2018.
Commission issues EA......................  October 2018.
Comments on EA Due........................  November 2018.
------------------------------------------------------------------------


    Dated: February 13, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-03384 Filed 2-16-18; 8:45 am]
 BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.