City of Radford; Notice of Ready for Environmental Analysis and Soliciting Comments, Recommendations, Terms and Conditions, and Prescriptions, 7177-7178 [2018-03384]
Download as PDF
Federal Register / Vol. 83, No. 34 / Tuesday, February 20, 2018 / Notices
Applicants: Gulf South Pipeline
Company, LP.
Description: § 4(d) Rate Filing:
Amendments to Neg Rate Agmts (QEP
36601–70, 37657–237) to be effective 2/
6/2018.
Filed Date: 2/8/18.
Accession Number: 20180208–5045.
Comments Due: 5 p.m. ET 2/20/18.
Docket Numbers: RP18–436–000.
Applicants: Gulf South Pipeline
Company, LP.
Description: § 4(d) Rate Filing:
Amendment to Neg Rate Agmt (Chevron
41610–11) to be effective 2/8/2018.
Filed Date: 2/8/18.
Accession Number: 20180208–5046.
Comments Due: 5 p.m. ET 2/20/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: February 12, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–03382 Filed 2–16–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 1235–017]
sradovich on DSK3GMQ082PROD with NOTICES
City of Radford; Notice of Ready for
Environmental Analysis and Soliciting
Comments, Recommendations, Terms
and Conditions, and Prescriptions
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Subsequent
Minor License.
b. Project No.: 1235–017.
c. Date filed: May 30, 2017.
d. Applicant: City of Radford.
e. Name of Project: Municipal
Hydroelectric Project.
VerDate Sep<11>2014
17:55 Feb 16, 2018
Jkt 244001
f. Location: On the Little River near
the City of Radford in Montgomery and
Pulaski Counties, Virginia. The project
does not affect federal lands.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Tim Logwood,
Director of Electric Utilities for the City
of Radford, 701 17th Street, Radford, VA
24141; Telephone (540) 731–3641.
i. FERC Contact: Allyson Conner,
(202) 502–6082 or allyson.conner@
ferc.gov.
j. Deadline for filing comments,
recommendations, terms and
conditions, and prescriptions: 60 days
from the issuance date of this notice;
reply comments are due 105 days from
the issuance date of this notice.
The Commission strongly encourages
electronic filing. Please file comments,
recommendations, terms and
conditions, and prescriptions using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket number P–1235–017.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. This application has been accepted,
and is ready for environmental analysis
at this time.
l. The existing Municipal
Hydroelectric Project consists of: (1) A
293-foot-long, 58-foot-high reinforced
concrete slab and buttress dam that
includes: (a) A south non-overflow
section; (b) an overflow bulkhead
section; (c) an eight-bay spillway section
each with a steel tainter gate; (d) a
powerhouse intake section; and (e) a
north non-overflow section; (2) a 77-acre
impoundment with a gross storage
capacity of 562 acre-feet at a normal
pool elevation of 1,772 feet National
PO 00000
Frm 00042
Fmt 4703
Sfmt 4703
7177
Geodetic Vertical Datum of 1929
(NGVD29) and a net storage capacity of
220 acre-feet between elevations 1,768
and 1,772 feet; (3) a 20-foot, 3-inch-wide
intake section with angled steel trash
racks (3-inch by 5/16th-inch trash rack
bars spaced 2.5 inches on center) and a
steel roller type head gate; (4) a 27-footlong steel-lined penstock in concrete
that transitions from a 13.5-foot-wide,
11-foot-high entrance to an 8-footdiameter conveyance to the turbine
scroll case; (5) a 30-foot-long, 28-footwide, and 62-foot-high powerhouse
containing a single 1,185-kilowatt
turbine-generator unit; (6) a 2.7-milelong transmission line connected to the
grid; and (7) appurtenant facilities.
The City of Radford proposes to revise
its exhibit G to include transmission
facilities composed of only three, 560foot-long, 4.16-kV overhead conductors
that transmit power to a switched
disconnect/interconnection with the
local distribution grid. The City of
Radford states that the formerly licensed
transmission line now serves to
distribute power to other sources along
its length and is no longer part of the
project.
The City of Radford operates the
project in both run-of-river and peaking
modes. For the period 1984 through
2013, the project’s average annual
generation was about 4,550 megawatthours.
m. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s website at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support. A copy is also available
for inspection and reproduction at the
address in item h above.
All filings must (1) bear in all capital
letters the title ‘‘COMMENTS,’’ ‘‘REPLY
COMMENTS,’’
‘‘RECOMMENDATIONS,’’ ‘‘TERMS
AND CONDITIONS,’’ or
‘‘PRESCRIPTIONS;’’ (2) set forth in the
heading the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person submitting the
filing; and (4) otherwise comply with
the requirements of 18 CFR 385.2001
through 385.2005. All comments,
recommendations, terms and conditions
or prescriptions must set forth their
evidentiary basis and otherwise comply
with the requirements of 18 CFR 4.34(b).
Agencies may obtain copies of the
application directly from the applicant.
Each filing must be accompanied by
E:\FR\FM\20FEN1.SGM
20FEN1
7178
Federal Register / Vol. 83, No. 34 / Tuesday, February 20, 2018 / Notices
proof of service on all persons listed on
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. A license applicant must file no
later than 60 days following the date of
issuance of this notice: (1) A copy of the
water quality certification; (2) a copy of
the request for certification, including
proof of the date on which the certifying
agency received the request; or (3)
evidence of waiver of water quality
certification.
o. Procedural schedule: The
application will be processed according
to the following schedule. Revisions to
the schedule will be made as
appropriate.
Milestone
Deadline for Filing Comments, Recommendations
and Agency Terms and
Conditions/Prescriptions.
Deadline for Filing Reply
Comments.
Commission issues EA .........
Comments on EA Due ..........
Target date
April 2018.
May 2018.
October 2018.
November
2018.
Dated: February 13, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–03384 Filed 2–16–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER18–836–000]
Dated: February 13, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
sradovich on DSK3GMQ082PROD with NOTICES
Energia Sierra Juarez U.S. 2, LLC;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
[FR Doc. 2018–03383 Filed 2–16–18; 8:45 am]
BILLING CODE 6717–01–P
This is a supplemental notice in the
above-referenced proceeding Energia
Sierra Juarez U.S. 2, LLC’s application
for market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
VerDate Sep<11>2014
17:55 Feb 16, 2018
Jkt 244001
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is March 5,
2018.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
EQUAL EMPLOYMENT OPPORTUNITY
COMMISSION
Agency Information Collection
Activities: Extension Without Change
of an Existing Collection; Comments
Request
Equal Employment
Opportunity Commission.
ACTION: Notice.
AGENCY:
PO 00000
Frm 00043
Fmt 4703
Sfmt 4703
In accordance with the
Paperwork Reduction Act of 1995, the
Commission announces that it intends
to submit to the Office of Management
and Budget (OMB) a request for a threeyear extension without change of the
existing recordkeeping requirements
under its regulations. The Commission
is seeking public comments on the
proposed extension.
SUMMARY:
Written comments on this notice
must be submitted on or before April 23,
2018.
DATES:
Comments should be sent to
Bernadette Wilson, Executive Officer,
Executive Secretariat, Equal
Employment Opportunity Commission,
131 M Street NE, Washington, DC
20507. As a convenience to
commenters, the Executive Secretariat
will accept comments totaling six or
fewer pages by facsimile (‘‘FAX’’)
machine. This limitation is necessary to
assure access to the equipment. The
telephone number of the fax receiver is
(202) 663–4114. (This is not a toll-free
number.) Receipt of FAX transmittals
will not be acknowledged, except that
the sender may request confirmation of
receipt by calling the Executive
Secretariat staff at (202) 663–4070
(voice) or (202) 663–4074 (TTD). (These
are not toll-free telephone numbers.)
Instead of sending written comments to
EEOC, you may submit comments and
attachments electronically at https://
www.regulations.gov, which is the
Federal eRulemaking Portal. Follow the
instructions online for submitting
comments. All comments received
through this portal will be posted
without change, including any personal
information you provide, except as
noted below. The EEOC reserves the
right to refrain from posting comments,
including those that contain obscene,
indecent, or profane language; that
contain threats or defamatory
statements; that contain hate speech
directed at race, color, sex, national
origin, age, religion, disability, or
genetic information; or that promote or
endorse services or products. All
comments received, including any
personal information provided, also will
be available for public inspection during
normal business hours by appointment
only at the EEOC Headquarters Library,
131 M Street NE, Washington, DC
20507. Upon request, individuals who
require assistance viewing comments
will be provided appropriate aids such
as readers or print magnifiers. To
schedule an appointment, contact EEOC
Library staff at (202) 663–4630 (voice) or
(202) 663–4641 (TTY). (These are not
toll-free numbers.)
ADDRESSES:
E:\FR\FM\20FEN1.SGM
20FEN1
Agencies
[Federal Register Volume 83, Number 34 (Tuesday, February 20, 2018)]
[Notices]
[Pages 7177-7178]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-03384]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 1235-017]
City of Radford; Notice of Ready for Environmental Analysis and
Soliciting Comments, Recommendations, Terms and Conditions, and
Prescriptions
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Subsequent Minor License.
b. Project No.: 1235-017.
c. Date filed: May 30, 2017.
d. Applicant: City of Radford.
e. Name of Project: Municipal Hydroelectric Project.
f. Location: On the Little River near the City of Radford in
Montgomery and Pulaski Counties, Virginia. The project does not affect
federal lands.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Tim Logwood, Director of Electric Utilities
for the City of Radford, 701 17th Street, Radford, VA 24141; Telephone
(540) 731-3641.
i. FERC Contact: Allyson Conner, (202) 502-6082 or
[email protected].
j. Deadline for filing comments, recommendations, terms and
conditions, and prescriptions: 60 days from the issuance date of this
notice; reply comments are due 105 days from the issuance date of this
notice.
The Commission strongly encourages electronic filing. Please file
comments, recommendations, terms and conditions, and prescriptions
using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000
characters, without prior registration, using the eComment system at
https://www.ferc.gov/docs-filing/ecomment.asp. You must include your
name and contact information at the end of your comments. For
assistance, please contact FERC Online Support at
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE,
Washington, DC 20426. The first page of any filing should include
docket number P-1235-017.
The Commission's Rules of Practice require all intervenors filing
documents with the Commission to serve a copy of that document on each
person on the official service list for the project. Further, if an
intervenor files comments or documents with the Commission relating to
the merits of an issue that may affect the responsibilities of a
particular resource agency, they must also serve a copy of the document
on that resource agency.
k. This application has been accepted, and is ready for
environmental analysis at this time.
l. The existing Municipal Hydroelectric Project consists of: (1) A
293-foot-long, 58-foot-high reinforced concrete slab and buttress dam
that includes: (a) A south non-overflow section; (b) an overflow
bulkhead section; (c) an eight-bay spillway section each with a steel
tainter gate; (d) a powerhouse intake section; and (e) a north non-
overflow section; (2) a 77-acre impoundment with a gross storage
capacity of 562 acre-feet at a normal pool elevation of 1,772 feet
National Geodetic Vertical Datum of 1929 (NGVD29) and a net storage
capacity of 220 acre-feet between elevations 1,768 and 1,772 feet; (3)
a 20-foot, 3-inch-wide intake section with angled steel trash racks (3-
inch by 5/16th-inch trash rack bars spaced 2.5 inches on center) and a
steel roller type head gate; (4) a 27-foot-long steel-lined penstock in
concrete that transitions from a 13.5-foot-wide, 11-foot-high entrance
to an 8-foot-diameter conveyance to the turbine scroll case; (5) a 30-
foot-long, 28-foot-wide, and 62-foot-high powerhouse containing a
single 1,185-kilowatt turbine-generator unit; (6) a 2.7-mile-long
transmission line connected to the grid; and (7) appurtenant
facilities.
The City of Radford proposes to revise its exhibit G to include
transmission facilities composed of only three, 560-foot-long, 4.16-kV
overhead conductors that transmit power to a switched disconnect/
interconnection with the local distribution grid. The City of Radford
states that the formerly licensed transmission line now serves to
distribute power to other sources along its length and is no longer
part of the project.
The City of Radford operates the project in both run-of-river and
peaking modes. For the period 1984 through 2013, the project's average
annual generation was about 4,550 megawatt-hours.
m. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's website at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC Online Support. A copy is also available for inspection and
reproduction at the address in item h above.
All filings must (1) bear in all capital letters the title
``COMMENTS,'' ``REPLY COMMENTS,'' ``RECOMMENDATIONS,'' ``TERMS AND
CONDITIONS,'' or ``PRESCRIPTIONS;'' (2) set forth in the heading the
name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person submitting the filing; and (4) otherwise comply
with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, recommendations, terms and conditions or prescriptions must
set forth their evidentiary basis and otherwise comply with the
requirements of 18 CFR 4.34(b). Agencies may obtain copies of the
application directly from the applicant. Each filing must be
accompanied by
[[Page 7178]]
proof of service on all persons listed on the service list prepared by
the Commission in this proceeding, in accordance with 18 CFR 4.34(b)
and 385.2010.
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
n. A license applicant must file no later than 60 days following
the date of issuance of this notice: (1) A copy of the water quality
certification; (2) a copy of the request for certification, including
proof of the date on which the certifying agency received the request;
or (3) evidence of waiver of water quality certification.
o. Procedural schedule: The application will be processed according
to the following schedule. Revisions to the schedule will be made as
appropriate.
------------------------------------------------------------------------
Milestone Target date
------------------------------------------------------------------------
Deadline for Filing Comments, April 2018.
Recommendations and Agency Terms and
Conditions/Prescriptions.
Deadline for Filing Reply Comments........ May 2018.
Commission issues EA...................... October 2018.
Comments on EA Due........................ November 2018.
------------------------------------------------------------------------
Dated: February 13, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-03384 Filed 2-16-18; 8:45 am]
BILLING CODE 6717-01-P