Combined Notice of Filings, 7176-7177 [2018-03382]

Download as PDF sradovich on DSK3GMQ082PROD with NOTICES 7176 Federal Register / Vol. 83, No. 34 / Tuesday, February 20, 2018 / Notices Description: Request for extension of Tariff Waiver of Midcontinent Independent System Operator, Inc. Filed Date: 2/9/18. Accession Number: 20180209–5122. Comments Due: 5 p.m. ET 3/2/18. Docket Numbers: ER18–835–000. Applicants: Midcontinent Independent System Operator, Inc. Description: § 205(d) Rate Filing: 2018–02–09 Revisions to Attachment X NRIS Election Deadline to be effective 3/1/2018. Filed Date: 2/9/18. Accession Number: 20180209–5145. Comments Due: 5 p.m. ET 3/2/18. Docket Numbers: ER18–836–000. Applicants: Energia Sierra Juarez U.S. 2, LLC. Description: Baseline eTariff Filing: Energia Sierra Juarez U.S. 2, LLC Application for Market-Based Rates to be effective 4/10/2018. Filed Date: 2/9/18. Accession Number: 20180209–5153. Comments Due: 5 p.m. ET 3/2/18. Docket Numbers: ER18–838–000. Applicants: California Independent System Operator Corporation. Description: Compliance filing: 2018– 02–09 Petition Limited Tariff Waiver— Availability Assessment Hours to be effective N/A. Filed Date: 2/9/18. Accession Number: 20180209–5155. Comments Due: 5 p.m. ET 3/2/18. Docket Numbers: ER18–839–000. Applicants: Arizona Public Service Company. Description: § 205(d) Rate Filing: Rate Schedule No. 290—Sun Valley Morgan Interconnection Agreement to be effective 4/11/2018. Filed Date: 2/9/18. Accession Number: 20180209–5157. Comments Due: 5 p.m. ET 3/2/18. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. VerDate Sep<11>2014 17:55 Feb 16, 2018 Jkt 244001 Dated: February 9, 2018. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2018–03378 Filed 2–16–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER10–2950–011. Applicants: Spruance Genco, LLC. Description: Supplement to August 29, 2017 Notice of Non-Material Change in Status by Spruance Genco, LLC. Filed Date: 2/9/18. Accession Number: 20180209–5238. Comments Due: 5 p.m. ET 3/2/18. Docket Numbers: ER13–823–005; ER13–33–004. Applicants: Castleton Commodities Merchant Trading, L.P., Collegiate Clean Energy, LLC. Description: Notice of Non-Material Change in Status of Castleton Commodities Merchant Trading, L.P., et al. Filed Date: 2/9/18. Accession Number: 20180209–5216. Comments Due: 5 p.m. ET 3/2/18. Docket Numbers: ER15–2255–002. Applicants: Armenia Mountain Wind, LLC. Description: Notice of Non-Material Change in Status of Armenia Mountain Wind, LLC. Filed Date: 2/9/18. Accession Number: 20180209–5239. Comments Due: 5 p.m. ET 3/2/18. Docket Numbers: ER15–2679–007. Applicants: Latigo Wind Park, LLC. Description: Compliance filing: Latigo Wind Park, LLC Change in Status to be effective 2/13/2018. Filed Date: 2/12/18. Accession Number: 20180212–5093. Comments Due: 5 p.m. ET 3/5/18. Docket Numbers: ER16–2541–004. Applicants: Pioneer Wind Park I, LLC. Description: Compliance filing: Pioneer Wind Park I, LLC Change in Status to be effective 2/13/2018. Filed Date: 2/12/18. Accession Number: 20180212–5094. Comments Due: 5 p.m. ET 3/5/18. Docket Numbers: ER18–841–000. Applicants: ISO New England Inc. Description: ISO New England Inc. submits Fourth Quarter 2017 Capital Budget Report. Filed Date: 2/9/18. PO 00000 Frm 00041 Fmt 4703 Sfmt 4703 Accession Number: 20180209–5214. Comments Due: 5 p.m. ET 3/2/18. Docket Numbers: ER18–842–000. Applicants: Alabama Power Company. Description: § 205(d) Rate Filing: Macon Parkway Solar Project LGIA Filing to be effective 1/29/2018. Filed Date: 2/12/18. Accession Number: 20180212–5208. Comments Due: 5 p.m. ET 3/5/18. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: February 12, 2018. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2018–03379 Filed 2–16–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Filings Instituting Proceedings Docket Numbers: RP12–490–000. Applicants: Northwest Pipeline GP. Description: Report Filing: Refund Report—Kemmerer Mine Relocation. Filed Date: 2/8/18. Accession Number: 20180208–5125. Comments Due: 5 p.m. ET 2/20/18. Docket Numbers: RP18–434–000. Applicants: Vector Pipeline L.P. Description: § 4(d) Rate Filing: Negotiated Rate Filing—WEP, WG & WPS to be effective 3/12/2018. Filed Date: 2/8/18. Accession Number: 20180208–5044. Comments Due: 5 p.m. ET 2/20/18. Docket Numbers: RP18–435–000. E:\FR\FM\20FEN1.SGM 20FEN1 Federal Register / Vol. 83, No. 34 / Tuesday, February 20, 2018 / Notices Applicants: Gulf South Pipeline Company, LP. Description: § 4(d) Rate Filing: Amendments to Neg Rate Agmts (QEP 36601–70, 37657–237) to be effective 2/ 6/2018. Filed Date: 2/8/18. Accession Number: 20180208–5045. Comments Due: 5 p.m. ET 2/20/18. Docket Numbers: RP18–436–000. Applicants: Gulf South Pipeline Company, LP. Description: § 4(d) Rate Filing: Amendment to Neg Rate Agmt (Chevron 41610–11) to be effective 2/8/2018. Filed Date: 2/8/18. Accession Number: 20180208–5046. Comments Due: 5 p.m. ET 2/20/18. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: February 12, 2018. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2018–03382 Filed 2–16–18; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 1235–017] sradovich on DSK3GMQ082PROD with NOTICES City of Radford; Notice of Ready for Environmental Analysis and Soliciting Comments, Recommendations, Terms and Conditions, and Prescriptions Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: Subsequent Minor License. b. Project No.: 1235–017. c. Date filed: May 30, 2017. d. Applicant: City of Radford. e. Name of Project: Municipal Hydroelectric Project. VerDate Sep<11>2014 17:55 Feb 16, 2018 Jkt 244001 f. Location: On the Little River near the City of Radford in Montgomery and Pulaski Counties, Virginia. The project does not affect federal lands. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)–825(r). h. Applicant Contact: Tim Logwood, Director of Electric Utilities for the City of Radford, 701 17th Street, Radford, VA 24141; Telephone (540) 731–3641. i. FERC Contact: Allyson Conner, (202) 502–6082 or allyson.conner@ ferc.gov. j. Deadline for filing comments, recommendations, terms and conditions, and prescriptions: 60 days from the issuance date of this notice; reply comments are due 105 days from the issuance date of this notice. The Commission strongly encourages electronic filing. Please file comments, recommendations, terms and conditions, and prescriptions using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The first page of any filing should include docket number P–1235–017. The Commission’s Rules of Practice require all intervenors filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. This application has been accepted, and is ready for environmental analysis at this time. l. The existing Municipal Hydroelectric Project consists of: (1) A 293-foot-long, 58-foot-high reinforced concrete slab and buttress dam that includes: (a) A south non-overflow section; (b) an overflow bulkhead section; (c) an eight-bay spillway section each with a steel tainter gate; (d) a powerhouse intake section; and (e) a north non-overflow section; (2) a 77-acre impoundment with a gross storage capacity of 562 acre-feet at a normal pool elevation of 1,772 feet National PO 00000 Frm 00042 Fmt 4703 Sfmt 4703 7177 Geodetic Vertical Datum of 1929 (NGVD29) and a net storage capacity of 220 acre-feet between elevations 1,768 and 1,772 feet; (3) a 20-foot, 3-inch-wide intake section with angled steel trash racks (3-inch by 5/16th-inch trash rack bars spaced 2.5 inches on center) and a steel roller type head gate; (4) a 27-footlong steel-lined penstock in concrete that transitions from a 13.5-foot-wide, 11-foot-high entrance to an 8-footdiameter conveyance to the turbine scroll case; (5) a 30-foot-long, 28-footwide, and 62-foot-high powerhouse containing a single 1,185-kilowatt turbine-generator unit; (6) a 2.7-milelong transmission line connected to the grid; and (7) appurtenant facilities. The City of Radford proposes to revise its exhibit G to include transmission facilities composed of only three, 560foot-long, 4.16-kV overhead conductors that transmit power to a switched disconnect/interconnection with the local distribution grid. The City of Radford states that the formerly licensed transmission line now serves to distribute power to other sources along its length and is no longer part of the project. The City of Radford operates the project in both run-of-river and peaking modes. For the period 1984 through 2013, the project’s average annual generation was about 4,550 megawatthours. m. A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s website at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support. A copy is also available for inspection and reproduction at the address in item h above. All filings must (1) bear in all capital letters the title ‘‘COMMENTS,’’ ‘‘REPLY COMMENTS,’’ ‘‘RECOMMENDATIONS,’’ ‘‘TERMS AND CONDITIONS,’’ or ‘‘PRESCRIPTIONS;’’ (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person submitting the filing; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, recommendations, terms and conditions or prescriptions must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). Agencies may obtain copies of the application directly from the applicant. Each filing must be accompanied by E:\FR\FM\20FEN1.SGM 20FEN1

Agencies

[Federal Register Volume 83, Number 34 (Tuesday, February 20, 2018)]
[Notices]
[Pages 7176-7177]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-03382]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings

    Take notice that the Commission has received the following Natural 
Gas Pipeline Rate and Refund Report filings:

Filings Instituting Proceedings

    Docket Numbers: RP12-490-000.
    Applicants: Northwest Pipeline GP.
    Description: Report Filing: Refund Report--Kemmerer Mine 
Relocation.
    Filed Date: 2/8/18.
    Accession Number: 20180208-5125.
    Comments Due: 5 p.m. ET 2/20/18.

    Docket Numbers: RP18-434-000.
    Applicants: Vector Pipeline L.P.
    Description: Sec.  4(d) Rate Filing: Negotiated Rate Filing--WEP, 
WG & WPS to be effective 3/12/2018.
    Filed Date: 2/8/18.
    Accession Number: 20180208-5044.
    Comments Due: 5 p.m. ET 2/20/18.

    Docket Numbers: RP18-435-000.

[[Page 7177]]

    Applicants: Gulf South Pipeline Company, LP.
    Description: Sec.  4(d) Rate Filing: Amendments to Neg Rate Agmts 
(QEP 36601-70, 37657-237) to be effective 2/6/2018.
    Filed Date: 2/8/18.
    Accession Number: 20180208-5045.
    Comments Due: 5 p.m. ET 2/20/18.

    Docket Numbers: RP18-436-000.
    Applicants: Gulf South Pipeline Company, LP.
    Description: Sec.  4(d) Rate Filing: Amendment to Neg Rate Agmt 
(Chevron 41610-11) to be effective 2/8/2018.
    Filed Date: 2/8/18.
    Accession Number: 20180208-5046.
    Comments Due: 5 p.m. ET 2/20/18.

    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: February 12, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-03382 Filed 2-16-18; 8:45 am]
 BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.