Combined Notice of Filings, 7176-7177 [2018-03382]
Download as PDF
sradovich on DSK3GMQ082PROD with NOTICES
7176
Federal Register / Vol. 83, No. 34 / Tuesday, February 20, 2018 / Notices
Description: Request for extension of
Tariff Waiver of Midcontinent
Independent System Operator, Inc.
Filed Date: 2/9/18.
Accession Number: 20180209–5122.
Comments Due: 5 p.m. ET 3/2/18.
Docket Numbers: ER18–835–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2018–02–09 Revisions to Attachment X
NRIS Election Deadline to be effective
3/1/2018.
Filed Date: 2/9/18.
Accession Number: 20180209–5145.
Comments Due: 5 p.m. ET 3/2/18.
Docket Numbers: ER18–836–000.
Applicants: Energia Sierra Juarez U.S.
2, LLC.
Description: Baseline eTariff Filing:
Energia Sierra Juarez U.S. 2, LLC
Application for Market-Based Rates to
be effective 4/10/2018.
Filed Date: 2/9/18.
Accession Number: 20180209–5153.
Comments Due: 5 p.m. ET 3/2/18.
Docket Numbers: ER18–838–000.
Applicants: California Independent
System Operator Corporation.
Description: Compliance filing: 2018–
02–09 Petition Limited Tariff Waiver—
Availability Assessment Hours to be
effective N/A.
Filed Date: 2/9/18.
Accession Number: 20180209–5155.
Comments Due: 5 p.m. ET 3/2/18.
Docket Numbers: ER18–839–000.
Applicants: Arizona Public Service
Company.
Description: § 205(d) Rate Filing: Rate
Schedule No. 290—Sun Valley Morgan
Interconnection Agreement to be
effective 4/11/2018.
Filed Date: 2/9/18.
Accession Number: 20180209–5157.
Comments Due: 5 p.m. ET 3/2/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
VerDate Sep<11>2014
17:55 Feb 16, 2018
Jkt 244001
Dated: February 9, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–03378 Filed 2–16–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–2950–011.
Applicants: Spruance Genco, LLC.
Description: Supplement to August
29, 2017 Notice of Non-Material Change
in Status by Spruance Genco, LLC.
Filed Date: 2/9/18.
Accession Number: 20180209–5238.
Comments Due: 5 p.m. ET 3/2/18.
Docket Numbers: ER13–823–005;
ER13–33–004.
Applicants: Castleton Commodities
Merchant Trading, L.P., Collegiate Clean
Energy, LLC.
Description: Notice of Non-Material
Change in Status of Castleton
Commodities Merchant Trading, L.P., et
al.
Filed Date: 2/9/18.
Accession Number: 20180209–5216.
Comments Due: 5 p.m. ET 3/2/18.
Docket Numbers: ER15–2255–002.
Applicants: Armenia Mountain Wind,
LLC.
Description: Notice of Non-Material
Change in Status of Armenia Mountain
Wind, LLC.
Filed Date: 2/9/18.
Accession Number: 20180209–5239.
Comments Due: 5 p.m. ET 3/2/18.
Docket Numbers: ER15–2679–007.
Applicants: Latigo Wind Park, LLC.
Description: Compliance filing: Latigo
Wind Park, LLC Change in Status to be
effective 2/13/2018.
Filed Date: 2/12/18.
Accession Number: 20180212–5093.
Comments Due: 5 p.m. ET 3/5/18.
Docket Numbers: ER16–2541–004.
Applicants: Pioneer Wind Park I, LLC.
Description: Compliance filing:
Pioneer Wind Park I, LLC Change in
Status to be effective 2/13/2018.
Filed Date: 2/12/18.
Accession Number: 20180212–5094.
Comments Due: 5 p.m. ET 3/5/18.
Docket Numbers: ER18–841–000.
Applicants: ISO New England Inc.
Description: ISO New England Inc.
submits Fourth Quarter 2017 Capital
Budget Report.
Filed Date: 2/9/18.
PO 00000
Frm 00041
Fmt 4703
Sfmt 4703
Accession Number: 20180209–5214.
Comments Due: 5 p.m. ET 3/2/18.
Docket Numbers: ER18–842–000.
Applicants: Alabama Power
Company.
Description: § 205(d) Rate Filing:
Macon Parkway Solar Project LGIA
Filing to be effective 1/29/2018.
Filed Date: 2/12/18.
Accession Number: 20180212–5208.
Comments Due: 5 p.m. ET 3/5/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: February 12, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–03379 Filed 2–16–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP12–490–000.
Applicants: Northwest Pipeline GP.
Description: Report Filing: Refund
Report—Kemmerer Mine Relocation.
Filed Date: 2/8/18.
Accession Number: 20180208–5125.
Comments Due: 5 p.m. ET 2/20/18.
Docket Numbers: RP18–434–000.
Applicants: Vector Pipeline L.P.
Description: § 4(d) Rate Filing:
Negotiated Rate Filing—WEP, WG &
WPS to be effective 3/12/2018.
Filed Date: 2/8/18.
Accession Number: 20180208–5044.
Comments Due: 5 p.m. ET 2/20/18.
Docket Numbers: RP18–435–000.
E:\FR\FM\20FEN1.SGM
20FEN1
Federal Register / Vol. 83, No. 34 / Tuesday, February 20, 2018 / Notices
Applicants: Gulf South Pipeline
Company, LP.
Description: § 4(d) Rate Filing:
Amendments to Neg Rate Agmts (QEP
36601–70, 37657–237) to be effective 2/
6/2018.
Filed Date: 2/8/18.
Accession Number: 20180208–5045.
Comments Due: 5 p.m. ET 2/20/18.
Docket Numbers: RP18–436–000.
Applicants: Gulf South Pipeline
Company, LP.
Description: § 4(d) Rate Filing:
Amendment to Neg Rate Agmt (Chevron
41610–11) to be effective 2/8/2018.
Filed Date: 2/8/18.
Accession Number: 20180208–5046.
Comments Due: 5 p.m. ET 2/20/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: February 12, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–03382 Filed 2–16–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 1235–017]
sradovich on DSK3GMQ082PROD with NOTICES
City of Radford; Notice of Ready for
Environmental Analysis and Soliciting
Comments, Recommendations, Terms
and Conditions, and Prescriptions
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Subsequent
Minor License.
b. Project No.: 1235–017.
c. Date filed: May 30, 2017.
d. Applicant: City of Radford.
e. Name of Project: Municipal
Hydroelectric Project.
VerDate Sep<11>2014
17:55 Feb 16, 2018
Jkt 244001
f. Location: On the Little River near
the City of Radford in Montgomery and
Pulaski Counties, Virginia. The project
does not affect federal lands.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Tim Logwood,
Director of Electric Utilities for the City
of Radford, 701 17th Street, Radford, VA
24141; Telephone (540) 731–3641.
i. FERC Contact: Allyson Conner,
(202) 502–6082 or allyson.conner@
ferc.gov.
j. Deadline for filing comments,
recommendations, terms and
conditions, and prescriptions: 60 days
from the issuance date of this notice;
reply comments are due 105 days from
the issuance date of this notice.
The Commission strongly encourages
electronic filing. Please file comments,
recommendations, terms and
conditions, and prescriptions using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket number P–1235–017.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. This application has been accepted,
and is ready for environmental analysis
at this time.
l. The existing Municipal
Hydroelectric Project consists of: (1) A
293-foot-long, 58-foot-high reinforced
concrete slab and buttress dam that
includes: (a) A south non-overflow
section; (b) an overflow bulkhead
section; (c) an eight-bay spillway section
each with a steel tainter gate; (d) a
powerhouse intake section; and (e) a
north non-overflow section; (2) a 77-acre
impoundment with a gross storage
capacity of 562 acre-feet at a normal
pool elevation of 1,772 feet National
PO 00000
Frm 00042
Fmt 4703
Sfmt 4703
7177
Geodetic Vertical Datum of 1929
(NGVD29) and a net storage capacity of
220 acre-feet between elevations 1,768
and 1,772 feet; (3) a 20-foot, 3-inch-wide
intake section with angled steel trash
racks (3-inch by 5/16th-inch trash rack
bars spaced 2.5 inches on center) and a
steel roller type head gate; (4) a 27-footlong steel-lined penstock in concrete
that transitions from a 13.5-foot-wide,
11-foot-high entrance to an 8-footdiameter conveyance to the turbine
scroll case; (5) a 30-foot-long, 28-footwide, and 62-foot-high powerhouse
containing a single 1,185-kilowatt
turbine-generator unit; (6) a 2.7-milelong transmission line connected to the
grid; and (7) appurtenant facilities.
The City of Radford proposes to revise
its exhibit G to include transmission
facilities composed of only three, 560foot-long, 4.16-kV overhead conductors
that transmit power to a switched
disconnect/interconnection with the
local distribution grid. The City of
Radford states that the formerly licensed
transmission line now serves to
distribute power to other sources along
its length and is no longer part of the
project.
The City of Radford operates the
project in both run-of-river and peaking
modes. For the period 1984 through
2013, the project’s average annual
generation was about 4,550 megawatthours.
m. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s website at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support. A copy is also available
for inspection and reproduction at the
address in item h above.
All filings must (1) bear in all capital
letters the title ‘‘COMMENTS,’’ ‘‘REPLY
COMMENTS,’’
‘‘RECOMMENDATIONS,’’ ‘‘TERMS
AND CONDITIONS,’’ or
‘‘PRESCRIPTIONS;’’ (2) set forth in the
heading the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person submitting the
filing; and (4) otherwise comply with
the requirements of 18 CFR 385.2001
through 385.2005. All comments,
recommendations, terms and conditions
or prescriptions must set forth their
evidentiary basis and otherwise comply
with the requirements of 18 CFR 4.34(b).
Agencies may obtain copies of the
application directly from the applicant.
Each filing must be accompanied by
E:\FR\FM\20FEN1.SGM
20FEN1
Agencies
[Federal Register Volume 83, Number 34 (Tuesday, February 20, 2018)]
[Notices]
[Pages 7176-7177]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-03382]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings
Take notice that the Commission has received the following Natural
Gas Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP12-490-000.
Applicants: Northwest Pipeline GP.
Description: Report Filing: Refund Report--Kemmerer Mine
Relocation.
Filed Date: 2/8/18.
Accession Number: 20180208-5125.
Comments Due: 5 p.m. ET 2/20/18.
Docket Numbers: RP18-434-000.
Applicants: Vector Pipeline L.P.
Description: Sec. 4(d) Rate Filing: Negotiated Rate Filing--WEP,
WG & WPS to be effective 3/12/2018.
Filed Date: 2/8/18.
Accession Number: 20180208-5044.
Comments Due: 5 p.m. ET 2/20/18.
Docket Numbers: RP18-435-000.
[[Page 7177]]
Applicants: Gulf South Pipeline Company, LP.
Description: Sec. 4(d) Rate Filing: Amendments to Neg Rate Agmts
(QEP 36601-70, 37657-237) to be effective 2/6/2018.
Filed Date: 2/8/18.
Accession Number: 20180208-5045.
Comments Due: 5 p.m. ET 2/20/18.
Docket Numbers: RP18-436-000.
Applicants: Gulf South Pipeline Company, LP.
Description: Sec. 4(d) Rate Filing: Amendment to Neg Rate Agmt
(Chevron 41610-11) to be effective 2/8/2018.
Filed Date: 2/8/18.
Accession Number: 20180208-5046.
Comments Due: 5 p.m. ET 2/20/18.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: February 12, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-03382 Filed 2-16-18; 8:45 am]
BILLING CODE 6717-01-P