Drawbridge Operation Regulation; Passaic River, Newark, NJ, 6796 [2018-03172]

Download as PDF 6796 Federal Register / Vol. 83, No. 32 / Thursday, February 15, 2018 / Rules and Regulations Dated: February 1, 2018. Christopher J. Bisignano, Supervisory Bridge Management Specialist, First Coast Guard District. [FR Doc. 2018–03177 Filed 2–14–18; 8:45 am] BILLING CODE 9110–04–P DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 117 [Docket No. USCG–2017–1031] Drawbridge Operation Regulation; Passaic River, Newark, NJ Coast Guard, DHS. Notice of temporary deviation from drawbridge regulation; modification. AGENCY: ACTION: The Coast Guard has modified a temporary deviation from the operating schedule that governs the Routes 1 & 9 (Lincoln Highway) Bridge across the Passaic River, mile 1.8, at Newark, New Jersey. This modified deviation extends the period the bridge may remain in the closed-to-navigation position and is necessary to facilitate structural steel repairs at the lift span. DATES: This modified deviation is effective without actual notice from February 15, 2018 through 11:59 p.m. March 30, 2018. For purposes of enforcement, actual notice will be used from 12:01 a.m. February 3, 2018, until February 15, 2018. ADDRESSES: The docket for this modified deviation, USCG–2017–1031, is available at https:// www.regulations.gov. Type the docket number in the ‘‘SEARCH’’ box and click ‘‘SEARCH’’. Click on Open Docket Folder on the line associated with this deviation. FOR FURTHER INFORMATION CONTACT: If you have questions on this modified temporary deviation, call or email Judy K. Leung-Yee, Bridge Management Specialist, First District Bridge Branch, U.S. Coast Guard; telephone 212–514– 4336, email Judy.K.Leung-Yee@uscg.mil. SUPPLEMENTARY INFORMATION: On November 21, 2017, the Coast Guard published a temporary deviation entitled ‘‘Drawbridge Operation Regulation; Passaic River, Newark, NJ’’ in the Federal Register (82 FR 55322). That deviation allowed the bridge to be in closed-to-navigation position from November 21, 2017 to January 5, 2018. On December 28, 2017, the Coast Guard published a modified temporary deviation entitled ‘‘Drawbridge sradovich on DSK3GMQ082PROD with RULES SUMMARY: VerDate Sep<11>2014 16:56 Feb 14, 2018 Jkt 244001 Operation Regulation; Passaic River, Newark, NJ’’ in the Federal Register (82 FR 61452). That modified temporary deviation extended the period the bridge may remain in the closed position from January 6, 2018 to February 2, 2018. The owner of the bridge, the New Jersey Department of Transportation, requests a second modification to extend the bridge closure from 12:01 a.m. February 3, 2018 to 11:59 p.m. March 30, 2018. The extension is necessary to facilitate structural steel repairs at the lift span that have been delayed by inclement weather. The Routes 1 & 9 Bridge across the Passaic River, mile 1.8, at Newark, New Jersey is a vertical lift bridge with a vertical clearance of 40 feet at mean high water and 45 feet at mean low water in the closed position. The existing drawbridge operating regulations are listed at 33 CFR 117.739(b). The waterway users are seasonal recreational vessels and commercial vessels of various sizes. Coordination with waterway users indicated no objection to extending the closure of the draw. Vessels that can pass under the bridge without an opening may do so at all times. The bridge will not be able to open for emergencies. There is no alternate route for vessels to pass. The Coast Guard will inform the users of the waterways through our Local and Broadcast Notices to Mariners of the change in operating schedule for the bridge so vessel operators may arrange their transits to minimize any impact caused by the temporary deviation. In accordance with 33 CFR 117.35(e), the drawbridge must return to its regular operating schedule immediately at the end of the effective period of this temporary deviation. This deviation from the operating regulations is authorized under 33 CFR 117.35. Dated: February 1, 2018. Christopher J. Bisignano, Supervisory Bridge Management Specialist, First Coast Guard District. [FR Doc. 2018–03172 Filed 2–14–18; 8:45 am] BILLING CODE 9110–04–P FEDERAL COMMUNICATIONS COMMISSION 47 CFR Part 54 [WC Docket No. 10–90; FCC 16–33, 16–64, 16–143, 16–115 and 17–2] Connect America Fund Federal Communications Commission. AGENCY: PO 00000 Frm 00006 Fmt 4700 Sfmt 4700 Final rule; announcement of effective date. ACTION: In this document, the Federal Communications Commission (Commission) announces that the Office of Management and Budget (OMB) has approved, for a period of three years, an information collection associated with the Commission’s Connect America Fund, The Commission submitted revised information collection requirements for review and approval by OMB, as required by the Paperwork Reduction Act (PRA) of 1995, December 12, 2017, which were approved by the OMB on February 1, 2018. This document is consistent with FCC Orders, which stated that the Commission would publish a document in the Federal Register announcing the effective date of the revised information collection requirements. DATES: The amendments regarding §§ 54.316(a)(1) and (a)(5) and (6), (b)(6), 54.320(d), and the addition of § 54.321 published at 81 FR 69696, October 7, 2016, are effective February 15, 2018. OMB has approved the reporting requirements for recipients of Phase II support awarded in partnership with New York’s New NY Broadband Program as adopted in FCC 17–2, paragraphs 69–70 as of February 1, 2018. FOR FURTHER INFORMATION CONTACT: Alexander Minard, Wireline Competition Bureau at (202) 418–7400 or TTY (202) 418–0484. For additional information concerning the Paperwork Reduction Act information collection requirements contact Nicole Ongele at (202) 418–2991 or nicole.ongele@ fcc.gov. SUPPLEMENTARY INFORMATION: This document announces that, on February 1, 2018, OMB approved, for a period of three years, the information collection requirements contained in the Commission’s Orders, FCC 16–33, published at 81 FR 24282, April 25, 2016, FCC 16–64, published at 81 FR 44414, July 7, 2016, FCC 16–143, published at 81 FR 83706, November 22, 2016, FCC 16–115, published at 81 FR 69696, October 7, 2016 and the reporting requirements in FCC 17–2. The OMB Control Number is 3060– 1228. The Commission publishes this notice as an announcement of the effective date of the rules 54.316(a)(1), 54.316(a)(5) and (6), 54.316(b)(6), 54.320(d), 54.321 published at 81 FR 24282, April 25, 2016, 81 FR 44414, July 7, 2016 (Phase II Auction Order), and 81 FR 83706, November 22, 2016, 81 FR 69696, October 7, 2016, and the reporting requirements for recipients of SUMMARY: E:\FR\FM\15FER1.SGM 15FER1

Agencies

[Federal Register Volume 83, Number 32 (Thursday, February 15, 2018)]
[Rules and Regulations]
[Page 6796]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-03172]


-----------------------------------------------------------------------

DEPARTMENT OF HOMELAND SECURITY

Coast Guard

33 CFR Part 117

[Docket No. USCG-2017-1031]


Drawbridge Operation Regulation; Passaic River, Newark, NJ

AGENCY: Coast Guard, DHS.

ACTION: Notice of temporary deviation from drawbridge regulation; 
modification.

-----------------------------------------------------------------------

SUMMARY: The Coast Guard has modified a temporary deviation from the 
operating schedule that governs the Routes 1 & 9 (Lincoln Highway) 
Bridge across the Passaic River, mile 1.8, at Newark, New Jersey. This 
modified deviation extends the period the bridge may remain in the 
closed-to-navigation position and is necessary to facilitate structural 
steel repairs at the lift span.

DATES: This modified deviation is effective without actual notice from 
February 15, 2018 through 11:59 p.m. March 30, 2018. For purposes of 
enforcement, actual notice will be used from 12:01 a.m. February 3, 
2018, until February 15, 2018.

ADDRESSES: The docket for this modified deviation, USCG-2017-1031, is 
available at https://www.regulations.gov. Type the docket number in the 
``SEARCH'' box and click ``SEARCH''. Click on Open Docket Folder on the 
line associated with this deviation.

FOR FURTHER INFORMATION CONTACT: If you have questions on this modified 
temporary deviation, call or email Judy K. Leung-Yee, Bridge Management 
Specialist, First District Bridge Branch, U.S. Coast Guard; telephone 
212-514-4336, email [email protected].

SUPPLEMENTARY INFORMATION: On November 21, 2017, the Coast Guard 
published a temporary deviation entitled ``Drawbridge Operation 
Regulation; Passaic River, Newark, NJ'' in the Federal Register (82 FR 
55322). That deviation allowed the bridge to be in closed-to-navigation 
position from November 21, 2017 to January 5, 2018. On December 28, 
2017, the Coast Guard published a modified temporary deviation entitled 
``Drawbridge Operation Regulation; Passaic River, Newark, NJ'' in the 
Federal Register (82 FR 61452). That modified temporary deviation 
extended the period the bridge may remain in the closed position from 
January 6, 2018 to February 2, 2018.
    The owner of the bridge, the New Jersey Department of 
Transportation, requests a second modification to extend the bridge 
closure from 12:01 a.m. February 3, 2018 to 11:59 p.m. March 30, 2018. 
The extension is necessary to facilitate structural steel repairs at 
the lift span that have been delayed by inclement weather.
    The Routes 1 & 9 Bridge across the Passaic River, mile 1.8, at 
Newark, New Jersey is a vertical lift bridge with a vertical clearance 
of 40 feet at mean high water and 45 feet at mean low water in the 
closed position. The existing drawbridge operating regulations are 
listed at 33 CFR 117.739(b).
    The waterway users are seasonal recreational vessels and commercial 
vessels of various sizes. Coordination with waterway users indicated no 
objection to extending the closure of the draw. Vessels that can pass 
under the bridge without an opening may do so at all times. The bridge 
will not be able to open for emergencies. There is no alternate route 
for vessels to pass.
    The Coast Guard will inform the users of the waterways through our 
Local and Broadcast Notices to Mariners of the change in operating 
schedule for the bridge so vessel operators may arrange their transits 
to minimize any impact caused by the temporary deviation.
    In accordance with 33 CFR 117.35(e), the drawbridge must return to 
its regular operating schedule immediately at the end of the effective 
period of this temporary deviation. This deviation from the operating 
regulations is authorized under 33 CFR 117.35.

    Dated: February 1, 2018.
Christopher J. Bisignano,
Supervisory Bridge Management Specialist, First Coast Guard District.
[FR Doc. 2018-03172 Filed 2-14-18; 8:45 am]
BILLING CODE 9110-04-P