Drawbridge Operation Regulation;
Passaic River, Newark, NJ
Coast Guard, DHS.
Notice of temporary deviation
from drawbridge regulation;
modification.
AGENCY:
ACTION:
The Coast Guard has modified
a temporary deviation from the
operating schedule that governs the
Routes 1 & 9 (Lincoln Highway) Bridge
across the Passaic River, mile 1.8, at
Newark, New Jersey. This modified
deviation extends the period the bridge
may remain in the closed-to-navigation
position and is necessary to facilitate
structural steel repairs at the lift span.
DATES: This modified deviation is
effective without actual notice from
February 15, 2018 through 11:59 p.m.
March 30, 2018. For purposes of
enforcement, actual notice will be used
from 12:01 a.m. February 3, 2018, until
February 15, 2018.
ADDRESSES: The docket for this
modified deviation, USCG–2017–1031,
is available at https://
www.regulations.gov. Type the docket
number in the ‘‘SEARCH’’ box and click
‘‘SEARCH’’. Click on Open Docket
Folder on the line associated with this
deviation.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this modified
temporary deviation, call or email Judy
K. Leung-Yee, Bridge Management
Specialist, First District Bridge Branch,
U.S. Coast Guard; telephone 212–514–
4336, email Judy.K.Leung-Yee@uscg.mil.
SUPPLEMENTARY INFORMATION: On
November 21, 2017, the Coast Guard
published a temporary deviation
entitled ‘‘Drawbridge Operation
Regulation; Passaic River, Newark, NJ’’
in the Federal Register (82 FR 55322).
That deviation allowed the bridge to be
in closed-to-navigation position from
November 21, 2017 to January 5, 2018.
On December 28, 2017, the Coast Guard
published a modified temporary
deviation entitled ‘‘Drawbridge
sradovich on DSK3GMQ082PROD with RULES
SUMMARY:
VerDate Sep<11>2014
16:56 Feb 14, 2018
Jkt 244001
Operation Regulation; Passaic River,
Newark, NJ’’ in the Federal Register (82
FR 61452). That modified temporary
deviation extended the period the
bridge may remain in the closed
position from January 6, 2018 to
February 2, 2018.
The owner of the bridge, the New
Jersey Department of Transportation,
requests a second modification to
extend the bridge closure from 12:01
a.m. February 3, 2018 to 11:59 p.m.
March 30, 2018. The extension is
necessary to facilitate structural steel
repairs at the lift span that have been
delayed by inclement weather.
The Routes 1 & 9 Bridge across the
Passaic River, mile 1.8, at Newark, New
Jersey is a vertical lift bridge with a
vertical clearance of 40 feet at mean
high water and 45 feet at mean low
water in the closed position. The
existing drawbridge operating
regulations are listed at 33 CFR
117.739(b).
The waterway users are seasonal
recreational vessels and commercial
vessels of various sizes. Coordination
with waterway users indicated no
objection to extending the closure of the
draw. Vessels that can pass under the
bridge without an opening may do so at
all times. The bridge will not be able to
open for emergencies. There is no
alternate route for vessels to pass.
The Coast Guard will inform the users
of the waterways through our Local and
Broadcast Notices to Mariners of the
change in operating schedule for the
bridge so vessel operators may arrange
their transits to minimize any impact
caused by the temporary deviation.
In accordance with 33 CFR 117.35(e),
the drawbridge must return to its regular
operating schedule immediately at the
end of the effective period of this
temporary deviation. This deviation
from the operating regulations is
authorized under 33 CFR 117.35.
Dated: February 1, 2018.
Christopher J. Bisignano,
Supervisory Bridge Management Specialist,
First Coast Guard District.
[FR Doc. 2018–03172 Filed 2–14–18; 8:45 am]
BILLING CODE 9110–04–P
FEDERAL COMMUNICATIONS
COMMISSION
47 CFR Part 54
[WC Docket No. 10–90; FCC 16–33, 16–64,
16–143, 16–115 and 17–2]
Connect America Fund
Federal Communications
Commission.
AGENCY:
PO 00000
Frm 00006
Fmt 4700
Sfmt 4700
Final rule; announcement of
effective date.
ACTION:
In this document, the Federal
Communications Commission
(Commission) announces that the Office
of Management and Budget (OMB) has
approved, for a period of three years, an
information collection associated with
the Commission’s Connect America
Fund, The Commission submitted
revised information collection
requirements for review and approval
by OMB, as required by the Paperwork
Reduction Act (PRA) of 1995, December
12, 2017, which were approved by the
OMB on February 1, 2018. This
document is consistent with FCC
Orders, which stated that the
Commission would publish a document
in the Federal Register announcing the
effective date of the revised information
collection requirements.
DATES: The amendments regarding
§§ 54.316(a)(1) and (a)(5) and (6), (b)(6),
54.320(d), and the addition of § 54.321
published at 81 FR 69696, October 7,
2016, are effective February 15, 2018.
OMB has approved the reporting
requirements for recipients of Phase II
support awarded in partnership with
New York’s New NY Broadband
Program as adopted in FCC 17–2,
paragraphs 69–70 as of February 1,
2018.
FOR FURTHER INFORMATION CONTACT:
Alexander Minard, Wireline
Competition Bureau at (202) 418–7400
or TTY (202) 418–0484. For additional
information concerning the Paperwork
Reduction Act information collection
requirements contact Nicole Ongele at
(202) 418–2991 or nicole.ongele@
fcc.gov.
SUPPLEMENTARY INFORMATION: This
document announces that, on February
1, 2018, OMB approved, for a period of
three years, the information collection
requirements contained in the
Commission’s Orders, FCC 16–33,
published at 81 FR 24282, April 25,
2016, FCC 16–64, published at 81 FR
44414, July 7, 2016, FCC 16–143,
published at 81 FR 83706, November 22,
2016, FCC 16–115, published at 81 FR
69696, October 7, 2016 and the
reporting requirements in FCC 17–2.
The OMB Control Number is 3060–
1228. The Commission publishes this
notice as an announcement of the
effective date of the rules 54.316(a)(1),
54.316(a)(5) and (6), 54.316(b)(6),
54.320(d), 54.321 published at 81 FR
24282, April 25, 2016, 81 FR 44414, July
7, 2016 (Phase II Auction Order), and 81
FR 83706, November 22, 2016, 81 FR
69696, October 7, 2016, and the
reporting requirements for recipients of
SUMMARY:
E:\FR\FM\15FER1.SGM
15FER1
Agencies
[Federal Register Volume 83, Number 32 (Thursday, February 15, 2018)]
[Rules and Regulations]
[Page 6796]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-03172]
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG-2017-1031]
Drawbridge Operation Regulation; Passaic River, Newark, NJ
AGENCY: Coast Guard, DHS.
ACTION: Notice of temporary deviation from drawbridge regulation;
modification.
-----------------------------------------------------------------------
SUMMARY: The Coast Guard has modified a temporary deviation from the
operating schedule that governs the Routes 1 & 9 (Lincoln Highway)
Bridge across the Passaic River, mile 1.8, at Newark, New Jersey. This
modified deviation extends the period the bridge may remain in the
closed-to-navigation position and is necessary to facilitate structural
steel repairs at the lift span.
DATES: This modified deviation is effective without actual notice from
February 15, 2018 through 11:59 p.m. March 30, 2018. For purposes of
enforcement, actual notice will be used from 12:01 a.m. February 3,
2018, until February 15, 2018.
ADDRESSES: The docket for this modified deviation, USCG-2017-1031, is
available at https://www.regulations.gov. Type the docket number in the
``SEARCH'' box and click ``SEARCH''. Click on Open Docket Folder on the
line associated with this deviation.
FOR FURTHER INFORMATION CONTACT: If you have questions on this modified
temporary deviation, call or email Judy K. Leung-Yee, Bridge Management
Specialist, First District Bridge Branch, U.S. Coast Guard; telephone
212-514-4336, email [email protected].
SUPPLEMENTARY INFORMATION: On November 21, 2017, the Coast Guard
published a temporary deviation entitled ``Drawbridge Operation
Regulation; Passaic River, Newark, NJ'' in the Federal Register (82 FR
55322). That deviation allowed the bridge to be in closed-to-navigation
position from November 21, 2017 to January 5, 2018. On December 28,
2017, the Coast Guard published a modified temporary deviation entitled
``Drawbridge Operation Regulation; Passaic River, Newark, NJ'' in the
Federal Register (82 FR 61452). That modified temporary deviation
extended the period the bridge may remain in the closed position from
January 6, 2018 to February 2, 2018.
The owner of the bridge, the New Jersey Department of
Transportation, requests a second modification to extend the bridge
closure from 12:01 a.m. February 3, 2018 to 11:59 p.m. March 30, 2018.
The extension is necessary to facilitate structural steel repairs at
the lift span that have been delayed by inclement weather.
The Routes 1 & 9 Bridge across the Passaic River, mile 1.8, at
Newark, New Jersey is a vertical lift bridge with a vertical clearance
of 40 feet at mean high water and 45 feet at mean low water in the
closed position. The existing drawbridge operating regulations are
listed at 33 CFR 117.739(b).
The waterway users are seasonal recreational vessels and commercial
vessels of various sizes. Coordination with waterway users indicated no
objection to extending the closure of the draw. Vessels that can pass
under the bridge without an opening may do so at all times. The bridge
will not be able to open for emergencies. There is no alternate route
for vessels to pass.
The Coast Guard will inform the users of the waterways through our
Local and Broadcast Notices to Mariners of the change in operating
schedule for the bridge so vessel operators may arrange their transits
to minimize any impact caused by the temporary deviation.
In accordance with 33 CFR 117.35(e), the drawbridge must return to
its regular operating schedule immediately at the end of the effective
period of this temporary deviation. This deviation from the operating
regulations is authorized under 33 CFR 117.35.