Columbia Gas Transmission, LLC; Notice of Request Under Blanket Authorization, 6551-6552 [2018-02961]
Download as PDF
Federal Register / Vol. 83, No. 31 / Wednesday, February 14, 2018 / Notices
385.2001 through 385.2005. Agencies
may obtain copies of the application
directly from the applicant. A copy of
any protest or motion to intervene must
be served upon each representative of
the applicant specified in the particular
application.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
o. A license applicant must file no
later than 60 days following the date of
issuance of this notice: (1) A copy of the
water quality certification; (2) a copy of
the request for certification, including
proof of the date on which the certifying
6551
agency received the request; or (3)
evidence of waiver of water quality
certification.
p. Procedural Schedule:
The application will be processed
according to the following revised
Hydro Licensing Schedule. Revisions to
the schedule may be made as
appropriate.
Milestone
Target date
Filing of comments, recommendations, terms and conditions, and prescriptions ...........................................................................
Reply comments due ........................................................................................................................................................................
Commission issues EA .....................................................................................................................................................................
Comments on EA due ......................................................................................................................................................................
April 2018.
May 2018.
October 2018.
November 2018.
Dated: February 8, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–03007 Filed 2–13–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER18–814–000]
daltland on DSKBBV9HB2PROD with NOTICES
Carlsbad Energy Center LLC;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
This is a supplemental notice in the
above-referenced proceeding Carlsbad
Energy Center LLC’s application for
market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is February 28,
2018.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
VerDate Sep<11>2014
22:07 Feb 13, 2018
Jkt 244001
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: February 8, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–03023 Filed 2–13–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP18–70–000]
Columbia Gas Transmission, LLC;
Notice of Request Under Blanket
Authorization
Take notice that on January 29, 2018,
Columbia Gas Transmission, LLC
(Columbia), 700 Louisiana Street,
PO 00000
Frm 00045
Fmt 4703
Sfmt 4703
Houston, Texas 77002–2700, filed in
Docket No. CP18–70–000 a prior notice
request pursuant to sections 157.205
and 157.213(b) of the Federal Energy
Regulatory Commission’s (Commission)
regulations under the Natural Gas Act
(NGA) and Columbia’s blanket
authorizations issued in Docket No.
CP83–76–000. Columbia seeks
authorization to construct and operate
two new horizontal wells, all as more
fully set forth in the application which
is on file with the Commission and open
to public inspection. The filing may also
be viewed on the web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TTY, (202)
502–8659.
Columbia proposes to construct and
operate in Ashland County, Ohio, two
new horizontal storage wells, designated
Well 12601 and Well 12602, and related
pipelines and appurtenances at
Columbia’s Pavonia Storage Field,
located in Ashland and Richland
Counties, Ohio. Columbia states that the
new wells are focused on improving the
field’s late season deliverability. There
will be no change in the certificated
physical parameters of the field,
including existing boundary, total
inventory, reservoir pressure, reservoir
and buffer boundaries, or the
certificated storage capacity, as a result
of the proposed project. The total cost
is approximately $6,000,000.
Any questions regarding this
Application should be directed to Linda
Farquhar, Manager, Project
Determinations & Regulatory
Administration, Columbia Gas
Transmission, LLC, 700 Louisiana
Street, Suite 700, Houston, Texas
77002–2700, by phone (832) 320–5685,
E:\FR\FM\14FEN1.SGM
14FEN1
daltland on DSKBBV9HB2PROD with NOTICES
6552
Federal Register / Vol. 83, No. 31 / Wednesday, February 14, 2018 / Notices
by fax (832) 320–6685, or by email at
linda_farquhar@transcanada.com.
Any person or the Commission’s Staff
may, within 60 days after the issuance
of the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and, pursuant to section
157.205 of the Commission’s
Regulations under the NGA (18 CFR
157.205) a protest to the request. If no
protest is filed within the time allowed
therefore, the proposed activity shall be
deemed to be authorized effective the
day after the time allowed for protest. If
a protest is filed and not withdrawn
within 30 days after the time allowed
for filing a protest, the instant request
shall be treated as an application for
authorization pursuant to section 7 of
the NGA.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding, or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenters will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commenters will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commenters
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
VerDate Sep<11>2014
22:07 Feb 13, 2018
Jkt 244001
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests,
and interventions via the internet in lieu
of paper. See 18 CFR 385.2001(a)(1)(iii)
and the instructions on the
Commission’s website (www.ferc.gov)
under the e-Filing link. Persons unable
to file electronically should submit an
original and 5 copies of the protest or
intervention to the Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426.
Dated: February 7, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–02961 Filed 2–13–18; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RM07–10–000]
Transparency Provisions of Section 23
of the Natural Gas Act; Notice of
Change to Filing Instructions
Take notice that the filing instructions
for the FERC Form No. 552: Annual
Report of Natural Gas Transactions 1
have been updated to clarify what
transactions must be reported in Line 2
of Page 6 of FERC Form No. 552,
consistent with the revised NAESB
WGQ standards 2 incorporated by
reference in Order No. 809.3
Specifically, the filing instructions now
clarify that next-day natural gas
transactions must be reported in Line 2
of Page 6 of FERC Form No. 552 using
the Timely Nomination Cycle deadline
for scheduling natural gas transportation
of 1:00 p.m. Central Clock Time (CCT)
rather than 11:30 a.m. CCT. There are no
other changes to the FERC Form No. 552
filing instructions.
The updated filing instructions are
available at: https://www.ferc.gov/docsfiling/forms/form-552/form-552.pdf. For
more information, please contact John
Collins at (202) 502–8981, or email
Form552@ferc.gov.
Dated: February 7, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–02966 Filed 2–13–18; 8:45 am]
BILLING CODE 6717–01–P
1 See
18 CFR 260.401 (2017).
18 CFR 284.12(a) and (b) (2017).
3 Coordination of the Scheduling Processes of
Interstate Natural Gas Pipelines and Public
Utilities, Order No. 809, FERC Stats. & Regs. 31,368
(2015).
2 See
PO 00000
Frm 00046
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC18–54–000.
Applicants: Twin Eagle Resource
Management, LLC,TERM Holdings, LLC.
Description: Application under FPA
Section 203 of Twin Eagle Resource
Management, LLC, et al.
Filed Date: 2/7/18.
Accession Number: 20180207–5153.
Comments Due: 5 p.m. ET 2/28/18.
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG18–45–000.
Applicants: ColGreen North Shore,
LLC.
Description: Self-Certification of EWG
Status of ColGreen North Shore, LLC.
Filed Date: 2/7/18.
Accession Number: 20180207–5126.
Comments Due: 5 p.m. ET 2/28/18.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER17–1567–002.
Applicants: PJM Interconnection,
L.L.C.
Description: Compliance filing:
Amended Compliance Filing RE:
November 9, 2017 Order in Docket No.
ER17–1567–001 to be effective 12/31/
9998.
Filed Date: 2/8/18.
Accession Number: 20180208–5047.
Comments Due: 5 p.m. ET 3/1/18.
Docket Numbers: ER18–815–001.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Amendment: Errata
to Attachment Q re: Regulation
Resource Credit filing-Docket No. ER18–
815 to be effective 4/9/2018.
Filed Date: 2/7/18.
Accession Number: 20180207–5128.
Comments Due: 5 p.m. ET 2/28/18.
Docket Numbers: ER18–828–000.
Applicants: Pacific Gas and Electric
Company.
Description: § 205(d) Rate Filing: E&P
Agreement for Avenal Solar Holdings
LLC to be effective 2/9/2018.
Filed Date: 2/8/18.
Accession Number: 20180208–5110.
Comments Due: 5 p.m. ET 3/1/18.
Take notice that the Commission
received the following PURPA
210(m)(3) filings:
Docket Numbers: QM18–9–000.
Applicants: Indiana Municipal Power
Agency.
E:\FR\FM\14FEN1.SGM
14FEN1
Agencies
[Federal Register Volume 83, Number 31 (Wednesday, February 14, 2018)]
[Notices]
[Pages 6551-6552]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2018-02961]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP18-70-000]
Columbia Gas Transmission, LLC; Notice of Request Under Blanket
Authorization
Take notice that on January 29, 2018, Columbia Gas Transmission,
LLC (Columbia), 700 Louisiana Street, Houston, Texas 77002-2700, filed
in Docket No. CP18-70-000 a prior notice request pursuant to sections
157.205 and 157.213(b) of the Federal Energy Regulatory Commission's
(Commission) regulations under the Natural Gas Act (NGA) and Columbia's
blanket authorizations issued in Docket No. CP83-76-000. Columbia seeks
authorization to construct and operate two new horizontal wells, all as
more fully set forth in the application which is on file with the
Commission and open to public inspection. The filing may also be viewed
on the web at https://www.ferc.gov using the ``eLibrary'' link. Enter
the docket number excluding the last three digits in the docket number
field to access the document. For assistance, contact FERC at
[email protected] or call toll-free, (866) 208-3676 or TTY,
(202) 502-8659.
Columbia proposes to construct and operate in Ashland County, Ohio,
two new horizontal storage wells, designated Well 12601 and Well 12602,
and related pipelines and appurtenances at Columbia's Pavonia Storage
Field, located in Ashland and Richland Counties, Ohio. Columbia states
that the new wells are focused on improving the field's late season
deliverability. There will be no change in the certificated physical
parameters of the field, including existing boundary, total inventory,
reservoir pressure, reservoir and buffer boundaries, or the
certificated storage capacity, as a result of the proposed project. The
total cost is approximately $6,000,000.
Any questions regarding this Application should be directed to
Linda Farquhar, Manager, Project Determinations & Regulatory
Administration, Columbia Gas Transmission, LLC, 700 Louisiana Street,
Suite 700, Houston, Texas 77002-2700, by phone (832) 320-5685,
[[Page 6552]]
by fax (832) 320-6685, or by email at [email protected].
Any person or the Commission's Staff may, within 60 days after the
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to
intervene or notice of intervention and, pursuant to section 157.205 of
the Commission's Regulations under the NGA (18 CFR 157.205) a protest
to the request. If no protest is filed within the time allowed
therefore, the proposed activity shall be deemed to be authorized
effective the day after the time allowed for protest. If a protest is
filed and not withdrawn within 30 days after the time allowed for
filing a protest, the instant request shall be treated as an
application for authorization pursuant to section 7 of the NGA.
Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9,
within 90 days of this Notice the Commission staff will either:
Complete its environmental assessment (EA) and place it into the
Commission's public record (eLibrary) for this proceeding, or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the final environmental impact statement (FEIS) or EA for this
proposal. The filing of the EA in the Commission's public record for
this proceeding or the issuance of a Notice of Schedule for
Environmental Review will serve to notify federal and state agencies of
the timing for the completion of all necessary reviews, and the
subsequent need to complete all federal authorizations within 90 days
of the date of issuance of the Commission staff's FEIS or EA.
Persons who wish to comment only on the environmental review of
this project should submit an original and two copies of their comments
to the Secretary of the Commission. Environmental commenters will be
placed on the Commission's environmental mailing list, will receive
copies of the environmental documents, and will be notified of meetings
associated with the Commission's environmental review process.
Environmental commenters will not be required to serve copies of filed
documents on all other parties. However, the non-party commenters will
not receive copies of all documents filed by other parties or issued by
the Commission (except for the mailing of environmental documents
issued by the Commission) and will not have the right to seek court
review of the Commission's final order.
The Commission strongly encourages electronic filings of comments,
protests, and interventions via the internet in lieu of paper. See 18
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's
website (www.ferc.gov) under the e-Filing link. Persons unable to file
electronically should submit an original and 5 copies of the protest or
intervention to the Federal Energy Regulatory Commission, 888 First
Street NE, Washington, DC 20426.
Dated: February 7, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018-02961 Filed 2-13-18; 8:45 am]